SlideShare a Scribd company logo
1 of 30
Download to read offline
OPERATIONALISING CRITICAL
CONTROLS THROUGH IN-FIELD
INTERACTIONS
CRITICAL CONTROL
LEADERSHIP &
VERIFICATIONS:
Copyright © Sentis Pty Ltd 2023. This document remains the intellectual property of Sentis Pty Ltd and is protected by copyright and
registered trademarks. No material from this document is to be reproduced or used in any format without express written permission.
Your Presenter
Mark Cooper, Principal Consultant
ACKNOWLEDGEMENT OF COUNTRY
Sentis acknowledges the traditional custodians
throughout Australia and recognises their connections to
land, waters and community.
We acknowledge the Traditional Owners of the land on
which we meet today and pay our respects to elders past
and present. We extend that respect to Aboriginal and
Torres Strait Islander peoples here today. We do this
because we value Aboriginal and Torres Strait Islander
history, culture and knowledge.
To change the lives
of individuals and
organisations for the
better, every day.
THE ABR MODEL
Critical risks and injury risks
are both important, but each
demand a different approach.
AUTHOR
CRITICAL RISK MANAGEMENT
(CRM)
Because we care lives
the lives of our people
and the ripple effect that
SIF event have when
they do occur.
WHAT IS CRM?
WHY?
WHY?
A systematic and
integrated approach to
ensure critical controls are
known, in-place and
effective to
eliminate SIF from our
company.
Download free resources at
sentis.com.au/resources
Most critical risks
and controls are
already known
UNDERPINNING PRINCIPLES OF CRM
Most SIF events
are associated
with known
controls not
being fully
implemented
Some controls
are crucial to
preventing SIF
events and are
the “critical
controls” that
must be in place
Less can be
more
Adapted from ICMM CCM Best Practice Guide, 2014
1. We haven’t formally assessed our critical risks yet
2. We have risk registers and/or life-saving rules
3. We have used a methodological CRM approach to
identify our critical controls
4. We have a CC verification process to test and improve
critical control effectiveness in the field.
WHAT CRM MATURITY DOES YOUR BUSINESS
HAVE?
POLL
SAFETY CULTURE MODEL
THE SAFETY
CULTURE
MODEL &
CRITICAL RISK
High risk work controls
are not always effective
or fully enabled.
SOME ‘BRUTAL FACTS’
*28% involved workers
and/or supervisors adjusting
practices for local
circumstances
Local operational risk
tolerance is often driven
by misaligned
corporate systems.
*32% of control failures
resulted from routine work
practices that drifted over
time
*From studies performed by Incident Analytics
DID WE SET OUR PEOPLE UP FOR SUCCESS?
ENABLED: Did they have the procedures, knowledge, skills, equipment and work
environment to effectively implement the critical controls?
DIFFICULT: Can the task be controlled but takes extra effort or increased resources? Are
the local conditions and operating context prompting a ‘work around’?
NON-ENABLED: Is it reasonable to expect the person to be able to control the risk in the
context of local or organisational factors?
of control failures
involved intentional
‘workarounds’ by the
worker
of critical controls were in
some way difficult to
implement for the worker
A review of 168 serious incidents* across multiple industry sectors in 2020/2021 revealed
49% of control failures involved intentional ‘workarounds’ by workers.
CONSIDER THIS…
49%
61%
*From studies performed by Incident Analytics
High Risk
Context
External to the Operation
• Corporate-Operations
disconnect
• Misaligned systems
• Competing objectives
External to the Operator
• Deliberate work-arounds
• Local circumstances
• Compliance drift
• Not set up for success
Internal to the Operator
• Innocent mistakes
• Forgotten steps
• Failure to notice
• Making it up
CONTEXT IS IMPORTANT
CRITICAL CONTROL
VERIFICATIONS
CRITICAL CONTROL VERIFICATIONS
(CCV)
• In-field observation and engagement to:
• Verify critical controls are in place and working
• Recognise and reinforce safe behaviours
• Identify CRM system improvements
• For tasks involving a critical (SIF) risk
• Done at the location and in the moment
• Using a standardised checklist.
• Recorded in system to enable analysis
• Occur as part of normal leader routines
18
FRAMES AROUND 'HOW WORK IS DONE'
CCVS WITH THE BRAIN IN MIND
DIPI
TOKENS &
ATTRIBUTIONS
7 UNITS
SOLUTION
FOCUSED
LANGUAGE
ACTIVE
LISTENING &
QUESTIONS
SOCIAL
BRAIN
CRM SYSTEM DESIGN
DO
2. DO
Implement critical
controls
CHECK
3. CHECK
Verify controls are in
place and working
PLAN
1. PLAN
Identify critical risks,
critical controls and
define minimum
requirements
ACT
4. ACT
Close gaps, learn,
improve
DAY IN THE LIFE OF...
“STOP and seek
help” and fix gaps in
the field if possible
Pre-start
Discuss critical tasks, critical risks and
critical controls. Plan to be in the field
when high risk tasks are carried out.
22
Ready for a safe
shift
Finished a
productive and
safe shift
Implement critical
controls
Use process to plan and set up critical
work (SLAM, JSA, Permits, SWMS,
etc)
Learning
processes
Work planning
Critical control
verification
Targeted in-field conversations to
verify the critical controls are in
place and working
Risk review &
data analytics
Use system
to record
INTERPERSONAL
COMMUNICATION
STRATEGIES
WHAT ‘THREAT’ FRAMES MIGHT EXIST?
1. The Safety (Fun) Police are coming
2. It’s just a KPI exercise
3. They are happening ok, but no real learnings or
feedback
4. It is a positive learning experience with system
improvements that are shared across the organisation
WHAT FRAMES DO YOUR TEAMS HAVE AROUND
LEADERS ENGAGING WITH THE FRONTLINE?
POLL
WHAT IS YOUR CCV PITCH AS A CCV COACH?
Adapted from Simon Sinek’s Golden Circle
Seize every opportunity to understand how the work
has gone well and recognise and reinforce positive
outcomes (e.g., behaviours).
FOCUS ON WHAT IS WORKING WELL
01
Seek to understand why the control was absent or
compromised? Recognise that every “Red” is a learning.
Collaborate on what fixes to implement.
DISCUSS THE GAPS
02
Ask what help may they may need. Ensure front line
feel supported.
OFFER ASSISTANCE
03
HOW WE RESPOND MATTERS
OUTCOMES
Reduction in actual SIF
frequency (particularly
repeat incidents)
Continuous Improvement of
the CRM system
MEASURES OF SUCCESS
PERFORMANCE
CR Leading Indicator
Increased effectiveness of
critical controls (i.e.
enabling)
Increased understanding
of critical risks and critical
controls
ACTIVITY
Quality and coverage of
verifications
Actions to close gaps in
critical risk exposure
Sharing of insights and
learnings
Operationalising Critical Controls through in-field interactions
Would you like a copy of Sentis’
Critical Control Assurance White
Paper and the option to book a
meeting to find out more on
Critical Control Verifications?
DISCOVER MORE
Express your interest
sentis.com.au 1300 653 042
Copyright © Sentis Pty Ltd 2021. This document remains the intellectual property of Sentis Pty Ltd and is protected by copyright and
registered trademarks. No material from this document is to be reproduced or used in any format without express written permission.
Get in touch
MARK COOPER
Principal Consultant
https://www.linkedin.com/in/mark-cooper-09526054
Email: Mark.Cooper@sentis.com.au
Q&A
OVER TO YOU

More Related Content

Similar to Critical Control Leadership & Verifications: Operationalising Critical Controls Through In-Field Interactions

Vulnerability Management Whitepaper PowerPoint Presentation Slides
Vulnerability Management Whitepaper PowerPoint Presentation SlidesVulnerability Management Whitepaper PowerPoint Presentation Slides
Vulnerability Management Whitepaper PowerPoint Presentation SlidesSlideTeam
 
Process Safety Bulletin Sep 2015
Process Safety Bulletin Sep 2015Process Safety Bulletin Sep 2015
Process Safety Bulletin Sep 2015Aamish J. Khan, CSP
 
The value of risk management
The value of risk managementThe value of risk management
The value of risk managementAdrian Clements
 
The Compliance Avalanche - why Regtech is the only workable solution
The Compliance Avalanche - why Regtech is the only workable solutionThe Compliance Avalanche - why Regtech is the only workable solution
The Compliance Avalanche - why Regtech is the only workable solutionRedland
 
Lewis.bip RIDDOR
Lewis.bip RIDDORLewis.bip RIDDOR
Lewis.bip RIDDORLewis Smith
 
Asset Integrity Management
Asset Integrity Management Asset Integrity Management
Asset Integrity Management Advisian
 
Flaws in M&A Workshop
Flaws in M&A WorkshopFlaws in M&A Workshop
Flaws in M&A WorkshopSheena Tooke
 
3 focus areas for any organisation's IT & Security department
3 focus areas for any organisation's IT & Security department 3 focus areas for any organisation's IT & Security department
3 focus areas for any organisation's IT & Security department Sandeep S Jaryal
 
Operational Risk | Assessing and Mitigating Operational Risk in a Changing En...
Operational Risk | Assessing and Mitigating Operational Risk in a Changing En...Operational Risk | Assessing and Mitigating Operational Risk in a Changing En...
Operational Risk | Assessing and Mitigating Operational Risk in a Changing En...NICSA
 
Phoenix Symposium update 2023.pptx
Phoenix Symposium update 2023.pptxPhoenix Symposium update 2023.pptx
Phoenix Symposium update 2023.pptxSumit697996
 
Critical risk and control frameworks - James Ritchie
Critical risk and control frameworks - James RitchieCritical risk and control frameworks - James Ritchie
Critical risk and control frameworks - James RitchieNSW Environment and Planning
 
ISO Internal Auditors Workshop_Final Version
ISO Internal Auditors Workshop_Final VersionISO Internal Auditors Workshop_Final Version
ISO Internal Auditors Workshop_Final VersionDuncan O. Ogutu; CPA, CFE
 
Competence in the major hazard industries
Competence in the major hazard industriesCompetence in the major hazard industries
Competence in the major hazard industriesAlan Bassett
 
General Employee Risk Management Course
General Employee Risk Management CourseGeneral Employee Risk Management Course
General Employee Risk Management Coursedavidcurriecia
 
Business Continuity, Disaster Recovery Planning & Leadership, 16 - 19 Februar...
Business Continuity, Disaster Recovery Planning & Leadership, 16 - 19 Februar...Business Continuity, Disaster Recovery Planning & Leadership, 16 - 19 Februar...
Business Continuity, Disaster Recovery Planning & Leadership, 16 - 19 Februar...360 BSI
 
High impact facilities organizations for submission
High impact facilities organizations for submissionHigh impact facilities organizations for submission
High impact facilities organizations for submissionRobin Camarote, LLC
 
Business Continuity & Disaster Recovery Planning, 23 - 25 February 2016 Kuala...
Business Continuity & Disaster Recovery Planning, 23 - 25 February 2016 Kuala...Business Continuity & Disaster Recovery Planning, 23 - 25 February 2016 Kuala...
Business Continuity & Disaster Recovery Planning, 23 - 25 February 2016 Kuala...360 BSI
 

Similar to Critical Control Leadership & Verifications: Operationalising Critical Controls Through In-Field Interactions (20)

BCM Challenges and Compliance
BCM Challenges and Compliance BCM Challenges and Compliance
BCM Challenges and Compliance
 
Vulnerability Management Whitepaper PowerPoint Presentation Slides
Vulnerability Management Whitepaper PowerPoint Presentation SlidesVulnerability Management Whitepaper PowerPoint Presentation Slides
Vulnerability Management Whitepaper PowerPoint Presentation Slides
 
Process Safety Bulletin Sep 2015
Process Safety Bulletin Sep 2015Process Safety Bulletin Sep 2015
Process Safety Bulletin Sep 2015
 
Chris Gould - BCM case
Chris Gould - BCM caseChris Gould - BCM case
Chris Gould - BCM case
 
The value of risk management
The value of risk managementThe value of risk management
The value of risk management
 
The Compliance Avalanche - why Regtech is the only workable solution
The Compliance Avalanche - why Regtech is the only workable solutionThe Compliance Avalanche - why Regtech is the only workable solution
The Compliance Avalanche - why Regtech is the only workable solution
 
Lewis.bip RIDDOR
Lewis.bip RIDDORLewis.bip RIDDOR
Lewis.bip RIDDOR
 
Asset Integrity Management
Asset Integrity Management Asset Integrity Management
Asset Integrity Management
 
Flaws in M&A Workshop
Flaws in M&A WorkshopFlaws in M&A Workshop
Flaws in M&A Workshop
 
3 focus areas for any organisation's IT & Security department
3 focus areas for any organisation's IT & Security department 3 focus areas for any organisation's IT & Security department
3 focus areas for any organisation's IT & Security department
 
Operational Risk | Assessing and Mitigating Operational Risk in a Changing En...
Operational Risk | Assessing and Mitigating Operational Risk in a Changing En...Operational Risk | Assessing and Mitigating Operational Risk in a Changing En...
Operational Risk | Assessing and Mitigating Operational Risk in a Changing En...
 
Phoenix Symposium update 2023.pptx
Phoenix Symposium update 2023.pptxPhoenix Symposium update 2023.pptx
Phoenix Symposium update 2023.pptx
 
Enterprise Risk Management
Enterprise Risk ManagementEnterprise Risk Management
Enterprise Risk Management
 
Critical risk and control frameworks - James Ritchie
Critical risk and control frameworks - James RitchieCritical risk and control frameworks - James Ritchie
Critical risk and control frameworks - James Ritchie
 
ISO Internal Auditors Workshop_Final Version
ISO Internal Auditors Workshop_Final VersionISO Internal Auditors Workshop_Final Version
ISO Internal Auditors Workshop_Final Version
 
Competence in the major hazard industries
Competence in the major hazard industriesCompetence in the major hazard industries
Competence in the major hazard industries
 
General Employee Risk Management Course
General Employee Risk Management CourseGeneral Employee Risk Management Course
General Employee Risk Management Course
 
Business Continuity, Disaster Recovery Planning & Leadership, 16 - 19 Februar...
Business Continuity, Disaster Recovery Planning & Leadership, 16 - 19 Februar...Business Continuity, Disaster Recovery Planning & Leadership, 16 - 19 Februar...
Business Continuity, Disaster Recovery Planning & Leadership, 16 - 19 Februar...
 
High impact facilities organizations for submission
High impact facilities organizations for submissionHigh impact facilities organizations for submission
High impact facilities organizations for submission
 
Business Continuity & Disaster Recovery Planning, 23 - 25 February 2016 Kuala...
Business Continuity & Disaster Recovery Planning, 23 - 25 February 2016 Kuala...Business Continuity & Disaster Recovery Planning, 23 - 25 February 2016 Kuala...
Business Continuity & Disaster Recovery Planning, 23 - 25 February 2016 Kuala...
 

More from myosh team

Understanding Injury Risk in Ageing Workers for a Sustainable Workforce
Understanding Injury Risk in Ageing Workers for a Sustainable WorkforceUnderstanding Injury Risk in Ageing Workers for a Sustainable Workforce
Understanding Injury Risk in Ageing Workers for a Sustainable Workforcemyosh team
 
Benchmarking: Explore Unique Ways to Reflect, Learn and Improve
Benchmarking: Explore Unique Ways to Reflect, Learn and ImproveBenchmarking: Explore Unique Ways to Reflect, Learn and Improve
Benchmarking: Explore Unique Ways to Reflect, Learn and Improvemyosh team
 
Safety vs Wellbeing Programs – How to Boost Employee Engagement
Safety vs Wellbeing Programs – How to Boost Employee EngagementSafety vs Wellbeing Programs – How to Boost Employee Engagement
Safety vs Wellbeing Programs – How to Boost Employee Engagementmyosh team
 
Continuum e-Learning
Continuum e-LearningContinuum e-Learning
Continuum e-Learningmyosh team
 
Psychosocial Dx: Identifying Invisible 45003 Factors
Psychosocial Dx: Identifying Invisible 45003 FactorsPsychosocial Dx: Identifying Invisible 45003 Factors
Psychosocial Dx: Identifying Invisible 45003 Factorsmyosh team
 
Psychosocial Risk Series – 1. ISO 45003 vs Model Code of Practice
Psychosocial Risk Series – 1. ISO 45003 vs Model Code of PracticePsychosocial Risk Series – 1. ISO 45003 vs Model Code of Practice
Psychosocial Risk Series – 1. ISO 45003 vs Model Code of Practicemyosh team
 
myosh Critical Control Management Presentation.pdf
myosh Critical Control Management Presentation.pdfmyosh Critical Control Management Presentation.pdf
myosh Critical Control Management Presentation.pdfmyosh team
 
Psychosocial Risk Series : Mental Fitness – Opening up Conversations
Psychosocial Risk Series : Mental Fitness – Opening up ConversationsPsychosocial Risk Series : Mental Fitness – Opening up Conversations
Psychosocial Risk Series : Mental Fitness – Opening up Conversationsmyosh team
 
Psychosocial Risk Series : Change Management
Psychosocial Risk Series : Change ManagementPsychosocial Risk Series : Change Management
Psychosocial Risk Series : Change Managementmyosh team
 
Navigating H&S in Complex Times
Navigating H&S in Complex TimesNavigating H&S in Complex Times
Navigating H&S in Complex Timesmyosh team
 
Psychosocial Risk Series : HR vs Safety – Psychosocial Ownership
Psychosocial Risk Series : HR vs Safety – Psychosocial OwnershipPsychosocial Risk Series : HR vs Safety – Psychosocial Ownership
Psychosocial Risk Series : HR vs Safety – Psychosocial Ownershipmyosh team
 
Psychosocial Risk Series : Change Management
Psychosocial Risk Series : Change ManagementPsychosocial Risk Series : Change Management
Psychosocial Risk Series : Change Managementmyosh team
 
The State of Safety Culture in Mining Webinar - Slides.pdf
The State of Safety Culture in Mining Webinar - Slides.pdfThe State of Safety Culture in Mining Webinar - Slides.pdf
The State of Safety Culture in Mining Webinar - Slides.pdfmyosh team
 
Joint Action Solutions
Joint Action SolutionsJoint Action Solutions
Joint Action Solutionsmyosh team
 
ICMM Critical Control Management Implementation Guide
ICMM Critical Control Management Implementation GuideICMM Critical Control Management Implementation Guide
ICMM Critical Control Management Implementation Guidemyosh team
 
Code of practice - Mine Safety Management System
Code of practice - Mine Safety Management SystemCode of practice - Mine Safety Management System
Code of practice - Mine Safety Management Systemmyosh team
 
Key work health and safety statistics Queensland 2021
Key work health and safety statistics Queensland 2021Key work health and safety statistics Queensland 2021
Key work health and safety statistics Queensland 2021myosh team
 
Underreporting and the Implications for Serious Injury and Fatality Prevention
Underreporting and the Implications for Serious Injury and Fatality PreventionUnderreporting and the Implications for Serious Injury and Fatality Prevention
Underreporting and the Implications for Serious Injury and Fatality Preventionmyosh team
 
Webinar – OKR vs KPI: Measuring Health and Safety Metrics that Matter
Webinar – OKR vs KPI: Measuring Health and Safety Metrics that MatterWebinar – OKR vs KPI: Measuring Health and Safety Metrics that Matter
Webinar – OKR vs KPI: Measuring Health and Safety Metrics that Mattermyosh team
 
Webinar : The Intangibles – Do We Need to Change Our Focus
Webinar : The Intangibles – Do We Need to Change Our FocusWebinar : The Intangibles – Do We Need to Change Our Focus
Webinar : The Intangibles – Do We Need to Change Our Focusmyosh team
 

More from myosh team (20)

Understanding Injury Risk in Ageing Workers for a Sustainable Workforce
Understanding Injury Risk in Ageing Workers for a Sustainable WorkforceUnderstanding Injury Risk in Ageing Workers for a Sustainable Workforce
Understanding Injury Risk in Ageing Workers for a Sustainable Workforce
 
Benchmarking: Explore Unique Ways to Reflect, Learn and Improve
Benchmarking: Explore Unique Ways to Reflect, Learn and ImproveBenchmarking: Explore Unique Ways to Reflect, Learn and Improve
Benchmarking: Explore Unique Ways to Reflect, Learn and Improve
 
Safety vs Wellbeing Programs – How to Boost Employee Engagement
Safety vs Wellbeing Programs – How to Boost Employee EngagementSafety vs Wellbeing Programs – How to Boost Employee Engagement
Safety vs Wellbeing Programs – How to Boost Employee Engagement
 
Continuum e-Learning
Continuum e-LearningContinuum e-Learning
Continuum e-Learning
 
Psychosocial Dx: Identifying Invisible 45003 Factors
Psychosocial Dx: Identifying Invisible 45003 FactorsPsychosocial Dx: Identifying Invisible 45003 Factors
Psychosocial Dx: Identifying Invisible 45003 Factors
 
Psychosocial Risk Series – 1. ISO 45003 vs Model Code of Practice
Psychosocial Risk Series – 1. ISO 45003 vs Model Code of PracticePsychosocial Risk Series – 1. ISO 45003 vs Model Code of Practice
Psychosocial Risk Series – 1. ISO 45003 vs Model Code of Practice
 
myosh Critical Control Management Presentation.pdf
myosh Critical Control Management Presentation.pdfmyosh Critical Control Management Presentation.pdf
myosh Critical Control Management Presentation.pdf
 
Psychosocial Risk Series : Mental Fitness – Opening up Conversations
Psychosocial Risk Series : Mental Fitness – Opening up ConversationsPsychosocial Risk Series : Mental Fitness – Opening up Conversations
Psychosocial Risk Series : Mental Fitness – Opening up Conversations
 
Psychosocial Risk Series : Change Management
Psychosocial Risk Series : Change ManagementPsychosocial Risk Series : Change Management
Psychosocial Risk Series : Change Management
 
Navigating H&S in Complex Times
Navigating H&S in Complex TimesNavigating H&S in Complex Times
Navigating H&S in Complex Times
 
Psychosocial Risk Series : HR vs Safety – Psychosocial Ownership
Psychosocial Risk Series : HR vs Safety – Psychosocial OwnershipPsychosocial Risk Series : HR vs Safety – Psychosocial Ownership
Psychosocial Risk Series : HR vs Safety – Psychosocial Ownership
 
Psychosocial Risk Series : Change Management
Psychosocial Risk Series : Change ManagementPsychosocial Risk Series : Change Management
Psychosocial Risk Series : Change Management
 
The State of Safety Culture in Mining Webinar - Slides.pdf
The State of Safety Culture in Mining Webinar - Slides.pdfThe State of Safety Culture in Mining Webinar - Slides.pdf
The State of Safety Culture in Mining Webinar - Slides.pdf
 
Joint Action Solutions
Joint Action SolutionsJoint Action Solutions
Joint Action Solutions
 
ICMM Critical Control Management Implementation Guide
ICMM Critical Control Management Implementation GuideICMM Critical Control Management Implementation Guide
ICMM Critical Control Management Implementation Guide
 
Code of practice - Mine Safety Management System
Code of practice - Mine Safety Management SystemCode of practice - Mine Safety Management System
Code of practice - Mine Safety Management System
 
Key work health and safety statistics Queensland 2021
Key work health and safety statistics Queensland 2021Key work health and safety statistics Queensland 2021
Key work health and safety statistics Queensland 2021
 
Underreporting and the Implications for Serious Injury and Fatality Prevention
Underreporting and the Implications for Serious Injury and Fatality PreventionUnderreporting and the Implications for Serious Injury and Fatality Prevention
Underreporting and the Implications for Serious Injury and Fatality Prevention
 
Webinar – OKR vs KPI: Measuring Health and Safety Metrics that Matter
Webinar – OKR vs KPI: Measuring Health and Safety Metrics that MatterWebinar – OKR vs KPI: Measuring Health and Safety Metrics that Matter
Webinar – OKR vs KPI: Measuring Health and Safety Metrics that Matter
 
Webinar : The Intangibles – Do We Need to Change Our Focus
Webinar : The Intangibles – Do We Need to Change Our FocusWebinar : The Intangibles – Do We Need to Change Our Focus
Webinar : The Intangibles – Do We Need to Change Our Focus
 

Recently uploaded

Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...stazi3110
 
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...Christina Lin
 
Folding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesFolding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesPhilip Schwarz
 
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideBuilding Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideChristina Lin
 
chapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptchapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptkotipi9215
 
What is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWhat is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWave PLM
 
Asset Management Software - Infographic
Asset Management Software - InfographicAsset Management Software - Infographic
Asset Management Software - InfographicHr365.us smith
 
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024StefanoLambiase
 
Salesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantSalesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantAxelRicardoTrocheRiq
 
Cloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEECloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEEVICTOR MAESTRE RAMIREZ
 
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样umasea
 
Cloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackCloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackVICTOR MAESTRE RAMIREZ
 
React Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaReact Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaHanief Utama
 
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdf
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdfGOING AOT WITH GRAALVM – DEVOXX GREECE.pdf
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdfAlina Yurenko
 
Professional Resume Template for Software Developers
Professional Resume Template for Software DevelopersProfessional Resume Template for Software Developers
Professional Resume Template for Software DevelopersVinodh Ram
 
Advancing Engineering with AI through the Next Generation of Strategic Projec...
Advancing Engineering with AI through the Next Generation of Strategic Projec...Advancing Engineering with AI through the Next Generation of Strategic Projec...
Advancing Engineering with AI through the Next Generation of Strategic Projec...OnePlan Solutions
 
Intelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmIntelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmSujith Sukumaran
 
Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)OPEN KNOWLEDGE GmbH
 
EY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityEY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityNeo4j
 

Recently uploaded (20)

Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
 
Call Girls In Mukherjee Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
Call Girls In Mukherjee Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...Call Girls In Mukherjee Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
Call Girls In Mukherjee Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
 
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
 
Folding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesFolding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a series
 
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideBuilding Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
 
chapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptchapter--4-software-project-planning.ppt
chapter--4-software-project-planning.ppt
 
What is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWhat is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need It
 
Asset Management Software - Infographic
Asset Management Software - InfographicAsset Management Software - Infographic
Asset Management Software - Infographic
 
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
 
Salesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantSalesforce Certified Field Service Consultant
Salesforce Certified Field Service Consultant
 
Cloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEECloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEE
 
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
 
Cloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackCloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStack
 
React Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaReact Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief Utama
 
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdf
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdfGOING AOT WITH GRAALVM – DEVOXX GREECE.pdf
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdf
 
Professional Resume Template for Software Developers
Professional Resume Template for Software DevelopersProfessional Resume Template for Software Developers
Professional Resume Template for Software Developers
 
Advancing Engineering with AI through the Next Generation of Strategic Projec...
Advancing Engineering with AI through the Next Generation of Strategic Projec...Advancing Engineering with AI through the Next Generation of Strategic Projec...
Advancing Engineering with AI through the Next Generation of Strategic Projec...
 
Intelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmIntelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalm
 
Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)
 
EY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityEY_Graph Database Powered Sustainability
EY_Graph Database Powered Sustainability
 

Critical Control Leadership & Verifications: Operationalising Critical Controls Through In-Field Interactions

  • 1. OPERATIONALISING CRITICAL CONTROLS THROUGH IN-FIELD INTERACTIONS CRITICAL CONTROL LEADERSHIP & VERIFICATIONS: Copyright © Sentis Pty Ltd 2023. This document remains the intellectual property of Sentis Pty Ltd and is protected by copyright and registered trademarks. No material from this document is to be reproduced or used in any format without express written permission.
  • 2. Your Presenter Mark Cooper, Principal Consultant
  • 3. ACKNOWLEDGEMENT OF COUNTRY Sentis acknowledges the traditional custodians throughout Australia and recognises their connections to land, waters and community. We acknowledge the Traditional Owners of the land on which we meet today and pay our respects to elders past and present. We extend that respect to Aboriginal and Torres Strait Islander peoples here today. We do this because we value Aboriginal and Torres Strait Islander history, culture and knowledge.
  • 4. To change the lives of individuals and organisations for the better, every day.
  • 6. Critical risks and injury risks are both important, but each demand a different approach.
  • 8. CRITICAL RISK MANAGEMENT (CRM) Because we care lives the lives of our people and the ripple effect that SIF event have when they do occur. WHAT IS CRM? WHY? WHY? A systematic and integrated approach to ensure critical controls are known, in-place and effective to eliminate SIF from our company. Download free resources at sentis.com.au/resources
  • 9. Most critical risks and controls are already known UNDERPINNING PRINCIPLES OF CRM Most SIF events are associated with known controls not being fully implemented Some controls are crucial to preventing SIF events and are the “critical controls” that must be in place Less can be more Adapted from ICMM CCM Best Practice Guide, 2014
  • 10. 1. We haven’t formally assessed our critical risks yet 2. We have risk registers and/or life-saving rules 3. We have used a methodological CRM approach to identify our critical controls 4. We have a CC verification process to test and improve critical control effectiveness in the field. WHAT CRM MATURITY DOES YOUR BUSINESS HAVE? POLL
  • 13. High risk work controls are not always effective or fully enabled. SOME ‘BRUTAL FACTS’ *28% involved workers and/or supervisors adjusting practices for local circumstances Local operational risk tolerance is often driven by misaligned corporate systems. *32% of control failures resulted from routine work practices that drifted over time *From studies performed by Incident Analytics
  • 14. DID WE SET OUR PEOPLE UP FOR SUCCESS? ENABLED: Did they have the procedures, knowledge, skills, equipment and work environment to effectively implement the critical controls? DIFFICULT: Can the task be controlled but takes extra effort or increased resources? Are the local conditions and operating context prompting a ‘work around’? NON-ENABLED: Is it reasonable to expect the person to be able to control the risk in the context of local or organisational factors?
  • 15. of control failures involved intentional ‘workarounds’ by the worker of critical controls were in some way difficult to implement for the worker A review of 168 serious incidents* across multiple industry sectors in 2020/2021 revealed 49% of control failures involved intentional ‘workarounds’ by workers. CONSIDER THIS… 49% 61% *From studies performed by Incident Analytics
  • 16. High Risk Context External to the Operation • Corporate-Operations disconnect • Misaligned systems • Competing objectives External to the Operator • Deliberate work-arounds • Local circumstances • Compliance drift • Not set up for success Internal to the Operator • Innocent mistakes • Forgotten steps • Failure to notice • Making it up CONTEXT IS IMPORTANT
  • 18. CRITICAL CONTROL VERIFICATIONS (CCV) • In-field observation and engagement to: • Verify critical controls are in place and working • Recognise and reinforce safe behaviours • Identify CRM system improvements • For tasks involving a critical (SIF) risk • Done at the location and in the moment • Using a standardised checklist. • Recorded in system to enable analysis • Occur as part of normal leader routines 18
  • 19. FRAMES AROUND 'HOW WORK IS DONE'
  • 20. CCVS WITH THE BRAIN IN MIND DIPI TOKENS & ATTRIBUTIONS 7 UNITS SOLUTION FOCUSED LANGUAGE ACTIVE LISTENING & QUESTIONS SOCIAL BRAIN
  • 21. CRM SYSTEM DESIGN DO 2. DO Implement critical controls CHECK 3. CHECK Verify controls are in place and working PLAN 1. PLAN Identify critical risks, critical controls and define minimum requirements ACT 4. ACT Close gaps, learn, improve
  • 22. DAY IN THE LIFE OF... “STOP and seek help” and fix gaps in the field if possible Pre-start Discuss critical tasks, critical risks and critical controls. Plan to be in the field when high risk tasks are carried out. 22 Ready for a safe shift Finished a productive and safe shift Implement critical controls Use process to plan and set up critical work (SLAM, JSA, Permits, SWMS, etc) Learning processes Work planning Critical control verification Targeted in-field conversations to verify the critical controls are in place and working Risk review & data analytics Use system to record
  • 24. WHAT ‘THREAT’ FRAMES MIGHT EXIST?
  • 25. 1. The Safety (Fun) Police are coming 2. It’s just a KPI exercise 3. They are happening ok, but no real learnings or feedback 4. It is a positive learning experience with system improvements that are shared across the organisation WHAT FRAMES DO YOUR TEAMS HAVE AROUND LEADERS ENGAGING WITH THE FRONTLINE? POLL
  • 26. WHAT IS YOUR CCV PITCH AS A CCV COACH? Adapted from Simon Sinek’s Golden Circle
  • 27. Seize every opportunity to understand how the work has gone well and recognise and reinforce positive outcomes (e.g., behaviours). FOCUS ON WHAT IS WORKING WELL 01 Seek to understand why the control was absent or compromised? Recognise that every “Red” is a learning. Collaborate on what fixes to implement. DISCUSS THE GAPS 02 Ask what help may they may need. Ensure front line feel supported. OFFER ASSISTANCE 03 HOW WE RESPOND MATTERS
  • 28. OUTCOMES Reduction in actual SIF frequency (particularly repeat incidents) Continuous Improvement of the CRM system MEASURES OF SUCCESS PERFORMANCE CR Leading Indicator Increased effectiveness of critical controls (i.e. enabling) Increased understanding of critical risks and critical controls ACTIVITY Quality and coverage of verifications Actions to close gaps in critical risk exposure Sharing of insights and learnings
  • 29. Operationalising Critical Controls through in-field interactions Would you like a copy of Sentis’ Critical Control Assurance White Paper and the option to book a meeting to find out more on Critical Control Verifications? DISCOVER MORE Express your interest
  • 30. sentis.com.au 1300 653 042 Copyright © Sentis Pty Ltd 2021. This document remains the intellectual property of Sentis Pty Ltd and is protected by copyright and registered trademarks. No material from this document is to be reproduced or used in any format without express written permission. Get in touch MARK COOPER Principal Consultant https://www.linkedin.com/in/mark-cooper-09526054 Email: Mark.Cooper@sentis.com.au Q&A OVER TO YOU