SlideShare a Scribd company logo
1 of 17
JOINT OPTIMISATION OF X BAR
CONTROL CHART &
PREVENTIVE MAINTENANCE
(YISHA XIANG*)
- SANTOSH PIDGE
Control chart
 A control chart is graphically representation
of the collected information.
 It detects the variation in processing.
 Types of control cahrt,
1) x -chart
2) R -chart
3) 6- chart
Statistical process control
 A. Shewhart developed the control chart In
1924 and concept of A state statistical Control.
 Extend the quality of the product by using
statistics.
 Statistics process control help to determine
the amount of variation.
 To make sure process in a state of control.
Variation in Quality:
 Some sort of variation the two atoms is bound to
be there. In fact is an integral part of any
manufacturing process.
 This difference in characteristics known as
variation.
 This variation may be due to substandard quality
of raw material, carelessness on the part of
operator, fault in machinery systems etc.
Types Of Variations
A. Variation due to “chance causes”
B. Variation due “assinable causes”
Variation due to chance causes/
common causes
 This Variation is NOT due to defect in machine, raw
material or any other factors .
 Behave in random manner.
 Negligible but investable.
 The process is said to be under the state of statistical
control.
Variation due to assignable causes :
 Difference in quality of raw material
 Difference in machines
 Difference in operator
 Difference of time
Specification and control limits :
 No items in the world can be a true copy of another
item.
 It is not expressed in absolute values but in terms of a
range .
 For Eg.
The diameter of a pen is expected by its
manufacture not as 7mm but as 7mm±0.05
Thus, the diameter of pen produced by the
manufacture can vary from 6.95mm to 7.05mm.
Setting Control Chart :
How Control Limits are useful..
X- Bar Control Chart
Preventive Maintenance:
 The primary goal of maintenance is to avoid or mitigate the
consequences of failure of equipment.
 This may be by preventing the failure before it actually
occurs which Planned Maintenance and Condition Based
Maintenance help to achieve
 Maintenance activities include partial or complete overhauls
at specified periods, oil changes, lubrication, minor
adjustments, and so on. In addition, workers can record
equipment deterioration so they know to replace or repair
worn parts before they cause system failure.
For eg . servicing of our vehicle
Corrective Maintenance :
 Corrective maintenance is a maintenance task
performed to identify, isolate, and rectify a fault so
that the failed equipment, machine, or system can
be restored to an operational condition within the
tolerances or limits established for in-service
operations.
for eg. Replacement of component after failure
Conclusion:
 ●This paper presents an integrated model for the joint optimization of
statistical process control (sampling intervals, sample size and control
limit) and preventive maintenance
 Information from quality control charts is utilized to facilitate
maintenance decisions.
 ●It is assumed that preventive maintenance is imperfect, meaning
that preventive maintenance improves the process from its current
state to any non-worse state with given probabilities.
 ●A cost model is formulated for the simultaneous optimization of
statistical process control and maintenance activities with the
objective of minimizing the total expected operational cost rate
References
 ●Alardhi, M., Labib, A.W., 2008. Preventive maintenance
scheduling of multicogeneration plants using integer
programming. Journal of the Operational Research Society 59,
503–509.
 ●Ben-Daya, M., 1999. Integrated production maintenance and
quality model for imperfect processes. IIE Transactions 31 (6),
491–501.
Joint optimisation  of x bar control chart &

More Related Content

What's hot

Reducing Maintenance Costs In A Tough Economic Climate
Reducing Maintenance Costs In A Tough Economic ClimateReducing Maintenance Costs In A Tough Economic Climate
Reducing Maintenance Costs In A Tough Economic Climate
OMCS International
 
Plant maintenance system
Plant maintenance systemPlant maintenance system
Plant maintenance system
jincy joy
 

What's hot (19)

Reducing Maintenance Costs In A Tough Economic Climate
Reducing Maintenance Costs In A Tough Economic ClimateReducing Maintenance Costs In A Tough Economic Climate
Reducing Maintenance Costs In A Tough Economic Climate
 
Reliability Centered Maintenance
Reliability Centered MaintenanceReliability Centered Maintenance
Reliability Centered Maintenance
 
Cutting Process Control
Cutting Process ControlCutting Process Control
Cutting Process Control
 
Machine maintenance
Machine maintenanceMachine maintenance
Machine maintenance
 
Basic Maintenance
Basic MaintenanceBasic Maintenance
Basic Maintenance
 
Statistical process control technique with example - xbar chart and R chart
Statistical process control technique with example - xbar chart and R chartStatistical process control technique with example - xbar chart and R chart
Statistical process control technique with example - xbar chart and R chart
 
Plant maintenance system
Plant maintenance systemPlant maintenance system
Plant maintenance system
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Failure Mode & Effect Analysis
Failure Mode & Effect AnalysisFailure Mode & Effect Analysis
Failure Mode & Effect Analysis
 
Final notes on s1 qc
Final notes on s1 qcFinal notes on s1 qc
Final notes on s1 qc
 
Statistical quality control introduction
Statistical quality control introductionStatistical quality control introduction
Statistical quality control introduction
 
10 Keys to CMMS Implementation Success
10 Keys to CMMS Implementation Success10 Keys to CMMS Implementation Success
10 Keys to CMMS Implementation Success
 
Guide to CNC Machine Maintenance and Calibration
Guide to CNC Machine Maintenance and CalibrationGuide to CNC Machine Maintenance and Calibration
Guide to CNC Machine Maintenance and Calibration
 
Plant Maintenance
Plant MaintenancePlant Maintenance
Plant Maintenance
 
Gupta2009
Gupta2009Gupta2009
Gupta2009
 
Statistical quality control 1,2
Statistical quality control 1,2Statistical quality control 1,2
Statistical quality control 1,2
 
Maintenance module 1 ppt number 1
Maintenance module 1 ppt number 1Maintenance module 1 ppt number 1
Maintenance module 1 ppt number 1
 
Statistical quality control
Statistical quality controlStatistical quality control
Statistical quality control
 
Unit 1 cim
Unit 1 cimUnit 1 cim
Unit 1 cim
 

Similar to Joint optimisation of x bar control chart &

STATISTICAL QUALITY CONTROL2.pdf
STATISTICAL QUALITY CONTROL2.pdfSTATISTICAL QUALITY CONTROL2.pdf
STATISTICAL QUALITY CONTROL2.pdf
SNEHA AGRAWAL GUPTA
 
Spc lecture presentation (bonnie corrror)
Spc lecture presentation (bonnie corrror)Spc lecture presentation (bonnie corrror)
Spc lecture presentation (bonnie corrror)
Jitesh Gaurav
 
Control Charts28 Modified
Control Charts28 ModifiedControl Charts28 Modified
Control Charts28 Modified
valiamoley
 

Similar to Joint optimisation of x bar control chart & (20)

Design of an accuracy control system in ship building industry
Design of an accuracy control system in ship building  industryDesign of an accuracy control system in ship building  industry
Design of an accuracy control system in ship building industry
 
Statistical Process Control Part 1
Statistical Process Control Part 1Statistical Process Control Part 1
Statistical Process Control Part 1
 
Statistical quality control .pdf
Statistical quality control .pdfStatistical quality control .pdf
Statistical quality control .pdf
 
Statistical Process Control,Control Chart and Process Capability
Statistical Process Control,Control Chart and Process CapabilityStatistical Process Control,Control Chart and Process Capability
Statistical Process Control,Control Chart and Process Capability
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
 
Spc
SpcSpc
Spc
 
statistical process control
 statistical process control statistical process control
statistical process control
 
A Practical Guide to Selecting the Right Control Chart eBook
A Practical Guide to Selecting the Right Control Chart eBookA Practical Guide to Selecting the Right Control Chart eBook
A Practical Guide to Selecting the Right Control Chart eBook
 
De33635641
De33635641De33635641
De33635641
 
De33635641
De33635641De33635641
De33635641
 
STATISTICAL QUALITY CONTROL2.pdf
STATISTICAL QUALITY CONTROL2.pdfSTATISTICAL QUALITY CONTROL2.pdf
STATISTICAL QUALITY CONTROL2.pdf
 
Spc lecture presentation (bonnie corrror)
Spc lecture presentation (bonnie corrror)Spc lecture presentation (bonnie corrror)
Spc lecture presentation (bonnie corrror)
 
Spc
Spc  Spc
Spc
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
 
Statistical Process Control in Operation Mnagement
Statistical Process Control in Operation MnagementStatistical Process Control in Operation Mnagement
Statistical Process Control in Operation Mnagement
 
Control chart
Control chartControl chart
Control chart
 
Introduction to control charts
Introduction to control chartsIntroduction to control charts
Introduction to control charts
 
Em33832837
Em33832837Em33832837
Em33832837
 
03&04 SPC NOTES.pptx
03&04 SPC NOTES.pptx03&04 SPC NOTES.pptx
03&04 SPC NOTES.pptx
 
Control Charts28 Modified
Control Charts28 ModifiedControl Charts28 Modified
Control Charts28 Modified
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 

Recently uploaded (20)

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 

Joint optimisation of x bar control chart &

  • 1. JOINT OPTIMISATION OF X BAR CONTROL CHART & PREVENTIVE MAINTENANCE (YISHA XIANG*) - SANTOSH PIDGE
  • 2. Control chart  A control chart is graphically representation of the collected information.  It detects the variation in processing.  Types of control cahrt, 1) x -chart 2) R -chart 3) 6- chart
  • 3. Statistical process control  A. Shewhart developed the control chart In 1924 and concept of A state statistical Control.  Extend the quality of the product by using statistics.  Statistics process control help to determine the amount of variation.  To make sure process in a state of control.
  • 4. Variation in Quality:  Some sort of variation the two atoms is bound to be there. In fact is an integral part of any manufacturing process.  This difference in characteristics known as variation.  This variation may be due to substandard quality of raw material, carelessness on the part of operator, fault in machinery systems etc.
  • 5. Types Of Variations A. Variation due to “chance causes” B. Variation due “assinable causes”
  • 6. Variation due to chance causes/ common causes  This Variation is NOT due to defect in machine, raw material or any other factors .  Behave in random manner.  Negligible but investable.  The process is said to be under the state of statistical control.
  • 7. Variation due to assignable causes :  Difference in quality of raw material  Difference in machines  Difference in operator  Difference of time
  • 8.
  • 9. Specification and control limits :  No items in the world can be a true copy of another item.  It is not expressed in absolute values but in terms of a range .  For Eg. The diameter of a pen is expected by its manufacture not as 7mm but as 7mm±0.05 Thus, the diameter of pen produced by the manufacture can vary from 6.95mm to 7.05mm.
  • 11. How Control Limits are useful..
  • 12. X- Bar Control Chart
  • 13. Preventive Maintenance:  The primary goal of maintenance is to avoid or mitigate the consequences of failure of equipment.  This may be by preventing the failure before it actually occurs which Planned Maintenance and Condition Based Maintenance help to achieve  Maintenance activities include partial or complete overhauls at specified periods, oil changes, lubrication, minor adjustments, and so on. In addition, workers can record equipment deterioration so they know to replace or repair worn parts before they cause system failure. For eg . servicing of our vehicle
  • 14. Corrective Maintenance :  Corrective maintenance is a maintenance task performed to identify, isolate, and rectify a fault so that the failed equipment, machine, or system can be restored to an operational condition within the tolerances or limits established for in-service operations. for eg. Replacement of component after failure
  • 15. Conclusion:  ●This paper presents an integrated model for the joint optimization of statistical process control (sampling intervals, sample size and control limit) and preventive maintenance  Information from quality control charts is utilized to facilitate maintenance decisions.  ●It is assumed that preventive maintenance is imperfect, meaning that preventive maintenance improves the process from its current state to any non-worse state with given probabilities.  ●A cost model is formulated for the simultaneous optimization of statistical process control and maintenance activities with the objective of minimizing the total expected operational cost rate
  • 16. References  ●Alardhi, M., Labib, A.W., 2008. Preventive maintenance scheduling of multicogeneration plants using integer programming. Journal of the Operational Research Society 59, 503–509.  ●Ben-Daya, M., 1999. Integrated production maintenance and quality model for imperfect processes. IIE Transactions 31 (6), 491–501.