C. Scope
To review the existing study reports, standards and specifications.
Detailed engineering survey of alignment.
Preparation of topographical map.
Study for cross-drainage works and propose suitable drainage
structure.
Preparation of working drawings.
Preparation of quantity and cost estimate.
Preparation of survey and design report
D. Project location
The proposed road is located in the Lalitpur District,
Bagmati Zone, Central Region. The road starts from
Badikhel and ends at Badegaun.
The road runs along Karmanasha River corridor.
The latitude and the longitude of the starting point are
27057’07’’ and 85035’27’’ respectively.
F. Hydrology And Meteorology
Small temporary streams running only during monsoon crosses
the alignment with small discharge.
The project area experiences marked seasonal and specific
climate variation with moderately hot summer and relatively cool
winters. Average temperature is 25oC in summer and 10oC in
winter.
Almost 80% of the rainfall occurs during monsoon which starts
at the middle of the June and continues until the end of August.
METHODOLOGY
DESK STUDY
SOCIAL IMPACT ASSESMENT
FIELD WORK
EQUIPMENT USED FOR SURVEYING
OFFICE WORK
DESK STUDY
The geographical and the topographical maps
were studied and the relevant information
regarding the alignment selection, cross drainage
structures, gradient of the road were discussed.
The strategy for the field study was made
accordingly.
The study team member discussed the related
matters of the project.
SOCIAL IMPACT ASSESMENT
The study identified the following key social issues
for investigation:
Loss of private property and other assets (land,
houses and trees) and compensation modalities for
these losses.
Population displacement.
 EQUIPMENT USED FOR
SURVEYING
Total station
GPS device
Staff
Compass
Measuring tape
Hammer
Communicating Device
Road Classification
As per the NRS 2045, the road project falls on the
category of District Roads.
 A Design speed of 30 km/hr is taken for the
design of geometric parameters of the road.
Design Speed
The Design values are taken as recommended by NRS
2045 as far as practicable
The shoulder width is taken as 1 m considering the
site condition and the utility of the road
Minimum Gradient recommended by NRS (1% for
better drainage) cannot be incorporated considering
the site condition
Horizontal Alignment
 The most suitable horizontal alignment was selected
considering the following factors:
 Short (S)
 Easy (E)
 Safe (S)
 Economical (E)
 Minimum radius for the horizontal curve as
recommended by NRS is 12 m. The minimum radius of
12m is provided at the intersection of existing road
and proposed road.
The extrawidening and transition curves are not
provided owing to low design speed and simplicity in
construction
A maximum of 5 % super elevation is provided at each
horizontal curve.
Superelevation is provided by rotation of pavement
about the center line.
Transition length for super elevation is provided as 5 m
Summit curves are designed considering stopping sight
distance.
Valley curves are designed on the basis of night
visibility
The radius of vertical curve is adopted as large as
possible so that all the factors are satisfied
The least vertical radius taken in design is 1000 m
Cross Section Design
Cross section is designed providing camber of 4% on
carriageway and 5 % on shoulder
For embankment the side slope of 1.5H: 1V and for cut
the side slope of 1H: 1V is adopted
Total pavement thickness of 28 cm is adopted as per
CBR method of design
Gravel is used as the sub-base course
Otta Seal is used as the surface course
Drainage
Longitudinal drain is provided on the cut slope side of the
road
The side slope is 1:1 and longitudinal slope is parallel to the
alignment
Earthen drain is provided from chainage 0+000 to the
chainage of 1+251.35
Stoned masonry drain of thickness 20 cm is provided from the
chainage of 1+309.82 to chainage 2+027.24
Pipe culverts of 60 cm in diameter and total length of
7.5m are provided at 12 sections of the road
They are provided at the lowest point of the vertical
alignment
A minimum depth of 60 cm is provided between the
surface of the pavement and the crown of the pipe
Plan and Profile
• Ch. 0+000-0+200
• Ch. 0+200-0+480
• Ch. 0+480-0+760
• Ch. 0+760-1+040
• Ch. 1+040-1+360
• Ch. 1+360-1+700
• Ch. 1+700-2+027.24
Cross Section
• Ch. 0+000-0+271.50
• Ch. 0+280-0+500
• Ch. 0+511.92-0+680
• Ch. 0+683.87-0+760
• Ch. 0+780-0+920
• Ch. 0+936.71-1+125.89
• Ch. 1+130.75-1+213.66
• Ch.1+220-1+319.59
• Ch.1+320-1+380
• Ch.1+397.04-1+465.09
• Ch.1+480-1+545.77
• Ch.1+560-1+800
• Ch.1+800.91-1+980
• Ch.1+984.58-2+027.24
Typical Pavement
Cross Drainage Structure
ESTIMATE
Quantity Estimate
Calculation of Earthwork
Necessary Calculations
Rate Analysis
BoQ /Cost Estimate
QUANTITY ESTIMATE
•Earthwork Calculations:
Calculated at each cross-section
Separate calculation according to soil type
Total cut volume = 10283.57 m3
Total fill volume = 16052.44 m3
Balance (fill) = 5768.869 m3
Earthwork for drain = 768.129 m3
All the detailed calculation is shown in the tabular form
in the following slides:
Contd………
•Necessary calculations:
i. For side drain:
Calculations were made taking the following design
considerations:
 Section = trapezoidal
 Depth: 0.3m
 Base width: 0.3m
 Side slope: 1:1
 Unlined earthen canal(Ch. 0+000 to 1251.35)
 Lined canal: (ch.1+309.82 to Ch. 2+027.24)
ii. Sub-grade calculations:
RATE ANALYSIS
•Rate analysis was performed under the following
criteria:
The quantity of the materials, required labor force and
plants, machinery, tools and equipments were taken
from the work norms provided by the DoR.
The rate for the materials, labors, plants and
machinery, tools and equipments was taken from the
district rates provided by the Lalitpur DDC.
COST ESTIMATE
• The BoQ was prepared on the basis of the quantity of
work calculated and rate analysis done previously:
• The cost estimate is as below:

More Related Content

Similar to Design Aproach.pptx

Highway Design - Techniques for proper Planning and Execution .
Highway Design - Techniques for proper Planning and Execution . Highway Design - Techniques for proper Planning and Execution .
Highway Design - Techniques for proper Planning and Execution . gunjatetm
 
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.pptHill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.pptswaongniyogi
 
Vertical alignment of highways
Vertical alignment of highwaysVertical alignment of highways
Vertical alignment of highwayssrinivas2036
 
Case Study on Geometry of Four Lane Highway
Case Study on Geometry of Four Lane HighwayCase Study on Geometry of Four Lane Highway
Case Study on Geometry of Four Lane HighwayIRJET Journal
 
7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERINGVATSAL PATEL
 
Road construction in Civil engineering
Road construction in Civil engineeringRoad construction in Civil engineering
Road construction in Civil engineeringKailash Chander
 
Road-design-standards-for-LGED.pptx
Road-design-standards-for-LGED.pptxRoad-design-standards-for-LGED.pptx
Road-design-standards-for-LGED.pptxRagibShuvo1
 
Construction of a High Level Bridge
Construction of a High Level BridgeConstruction of a High Level Bridge
Construction of a High Level BridgeIJSRD
 
1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf
1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf
1. ii Highway Alignment,, Engineering Survey and feasibility study.pdfEr. Bam Bhandari
 
Sight Distance for horizontal curves
Sight Distance for horizontal curvesSight Distance for horizontal curves
Sight Distance for horizontal curvesLatif Hyder Wadho
 
Minor project bridge report( aka survey camp)
Minor project bridge report( aka survey camp)Minor project bridge report( aka survey camp)
Minor project bridge report( aka survey camp)lltdayar
 

Similar to Design Aproach.pptx (20)

Hill roads
Hill roadsHill roads
Hill roads
 
Highway Design - Techniques for proper Planning and Execution .
Highway Design - Techniques for proper Planning and Execution . Highway Design - Techniques for proper Planning and Execution .
Highway Design - Techniques for proper Planning and Execution .
 
Hill_Roads
Hill_RoadsHill_Roads
Hill_Roads
 
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.pptHill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
 
Vertical alignment of highways
Vertical alignment of highwaysVertical alignment of highways
Vertical alignment of highways
 
Case Study on Geometry of Four Lane Highway
Case Study on Geometry of Four Lane HighwayCase Study on Geometry of Four Lane Highway
Case Study on Geometry of Four Lane Highway
 
Highway Project
Highway ProjectHighway Project
Highway Project
 
Highway presentation
Highway presentationHighway presentation
Highway presentation
 
7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING
 
Road construction in Civil engineering
Road construction in Civil engineeringRoad construction in Civil engineering
Road construction in Civil engineering
 
Road-design-standards-for-LGED.pptx
Road-design-standards-for-LGED.pptxRoad-design-standards-for-LGED.pptx
Road-design-standards-for-LGED.pptx
 
Design of expressways
Design of expresswaysDesign of expressways
Design of expressways
 
pdf24_merged (5).pdf
pdf24_merged (5).pdfpdf24_merged (5).pdf
pdf24_merged (5).pdf
 
Ch2.ppt
Ch2.pptCh2.ppt
Ch2.ppt
 
Construction of a High Level Bridge
Construction of a High Level BridgeConstruction of a High Level Bridge
Construction of a High Level Bridge
 
1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf
1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf
1. ii Highway Alignment,, Engineering Survey and feasibility study.pdf
 
Transportation engineering highway part
Transportation engineering highway partTransportation engineering highway part
Transportation engineering highway part
 
Sight Distance for horizontal curves
Sight Distance for horizontal curvesSight Distance for horizontal curves
Sight Distance for horizontal curves
 
designing simple drainage system.pptx
designing simple drainage system.pptxdesigning simple drainage system.pptx
designing simple drainage system.pptx
 
Minor project bridge report( aka survey camp)
Minor project bridge report( aka survey camp)Minor project bridge report( aka survey camp)
Minor project bridge report( aka survey camp)
 

Recently uploaded

NO1 Pakistan Best vashikaran specialist in UK USA UAE London Dubai Canada Ame...
NO1 Pakistan Best vashikaran specialist in UK USA UAE London Dubai Canada Ame...NO1 Pakistan Best vashikaran specialist in UK USA UAE London Dubai Canada Ame...
NO1 Pakistan Best vashikaran specialist in UK USA UAE London Dubai Canada Ame...Amil Baba Dawood bangali
 
Vibration of Continuous Systems.pjjjjjjjjptx
Vibration of Continuous Systems.pjjjjjjjjptxVibration of Continuous Systems.pjjjjjjjjptx
Vibration of Continuous Systems.pjjjjjjjjptxjoshuaclack73
 
如何办理(OP毕业证书)奥塔哥理工学院毕业证成绩单本科硕士学位证留信学历认证
如何办理(OP毕业证书)奥塔哥理工学院毕业证成绩单本科硕士学位证留信学历认证如何办理(OP毕业证书)奥塔哥理工学院毕业证成绩单本科硕士学位证留信学历认证
如何办理(OP毕业证书)奥塔哥理工学院毕业证成绩单本科硕士学位证留信学历认证mestb
 
如何办理(UVic毕业证书)维多利亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UVic毕业证书)维多利亚大学毕业证成绩单本科硕士学位证留信学历认证如何办理(UVic毕业证书)维多利亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UVic毕业证书)维多利亚大学毕业证成绩单本科硕士学位证留信学历认证mestb
 
如何办理(AUT毕业证书)奥克兰理工大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(AUT毕业证书)奥克兰理工大学毕业证成绩单本科硕士学位证留信学历认证如何办理(AUT毕业证书)奥克兰理工大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(AUT毕业证书)奥克兰理工大学毕业证成绩单本科硕士学位证留信学历认证mestb
 
[[Jeddah]] IN RIYADH +2773-7758557]] Abortion pills in Jeddah Cytotec in Riya...
[[Jeddah]] IN RIYADH +2773-7758557]] Abortion pills in Jeddah Cytotec in Riya...[[Jeddah]] IN RIYADH +2773-7758557]] Abortion pills in Jeddah Cytotec in Riya...
[[Jeddah]] IN RIYADH +2773-7758557]] Abortion pills in Jeddah Cytotec in Riya...daisycvs
 
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证mestb
 
Top^Clinic Soweto ^%[+27838792658_termination in florida_Safe*Abortion Pills ...
Top^Clinic Soweto ^%[+27838792658_termination in florida_Safe*Abortion Pills ...Top^Clinic Soweto ^%[+27838792658_termination in florida_Safe*Abortion Pills ...
Top^Clinic Soweto ^%[+27838792658_termination in florida_Safe*Abortion Pills ...drjose256
 
Cyber-Security-power point presentation.
Cyber-Security-power point presentation.Cyber-Security-power point presentation.
Cyber-Security-power point presentation.ECoyShastriBhawan
 
NO1 Qari Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil In R...
NO1 Qari Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil In R...NO1 Qari Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil In R...
NO1 Qari Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil In R...Amil baba
 
Matrix Methods.pptxhhhhhhhhhhhhhhhhhhhhh
Matrix Methods.pptxhhhhhhhhhhhhhhhhhhhhhMatrix Methods.pptxhhhhhhhhhhhhhhhhhhhhh
Matrix Methods.pptxhhhhhhhhhhhhhhhhhhhhhjoshuaclack73
 
NO1 Best Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Addre...
NO1 Best Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Addre...NO1 Best Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Addre...
NO1 Best Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Addre...Amil baba
 
Buy best abortion pills Doha [+966572737505 | Planned cytotec Qatar
Buy best abortion pills Doha [+966572737505 | Planned cytotec QatarBuy best abortion pills Doha [+966572737505 | Planned cytotec Qatar
Buy best abortion pills Doha [+966572737505 | Planned cytotec Qatarsamsungultra782445
 
Balancing of rotating bodies questions.pptx
Balancing of rotating bodies questions.pptxBalancing of rotating bodies questions.pptx
Balancing of rotating bodies questions.pptxjoshuaclack73
 
如何办理(USYD毕业证书)悉尼大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(USYD毕业证书)悉尼大学毕业证成绩单本科硕士学位证留信学历认证如何办理(USYD毕业证书)悉尼大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(USYD毕业证书)悉尼大学毕业证成绩单本科硕士学位证留信学历认证mestb
 

Recently uploaded (15)

NO1 Pakistan Best vashikaran specialist in UK USA UAE London Dubai Canada Ame...
NO1 Pakistan Best vashikaran specialist in UK USA UAE London Dubai Canada Ame...NO1 Pakistan Best vashikaran specialist in UK USA UAE London Dubai Canada Ame...
NO1 Pakistan Best vashikaran specialist in UK USA UAE London Dubai Canada Ame...
 
Vibration of Continuous Systems.pjjjjjjjjptx
Vibration of Continuous Systems.pjjjjjjjjptxVibration of Continuous Systems.pjjjjjjjjptx
Vibration of Continuous Systems.pjjjjjjjjptx
 
如何办理(OP毕业证书)奥塔哥理工学院毕业证成绩单本科硕士学位证留信学历认证
如何办理(OP毕业证书)奥塔哥理工学院毕业证成绩单本科硕士学位证留信学历认证如何办理(OP毕业证书)奥塔哥理工学院毕业证成绩单本科硕士学位证留信学历认证
如何办理(OP毕业证书)奥塔哥理工学院毕业证成绩单本科硕士学位证留信学历认证
 
如何办理(UVic毕业证书)维多利亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UVic毕业证书)维多利亚大学毕业证成绩单本科硕士学位证留信学历认证如何办理(UVic毕业证书)维多利亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UVic毕业证书)维多利亚大学毕业证成绩单本科硕士学位证留信学历认证
 
如何办理(AUT毕业证书)奥克兰理工大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(AUT毕业证书)奥克兰理工大学毕业证成绩单本科硕士学位证留信学历认证如何办理(AUT毕业证书)奥克兰理工大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(AUT毕业证书)奥克兰理工大学毕业证成绩单本科硕士学位证留信学历认证
 
[[Jeddah]] IN RIYADH +2773-7758557]] Abortion pills in Jeddah Cytotec in Riya...
[[Jeddah]] IN RIYADH +2773-7758557]] Abortion pills in Jeddah Cytotec in Riya...[[Jeddah]] IN RIYADH +2773-7758557]] Abortion pills in Jeddah Cytotec in Riya...
[[Jeddah]] IN RIYADH +2773-7758557]] Abortion pills in Jeddah Cytotec in Riya...
 
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
 
Top^Clinic Soweto ^%[+27838792658_termination in florida_Safe*Abortion Pills ...
Top^Clinic Soweto ^%[+27838792658_termination in florida_Safe*Abortion Pills ...Top^Clinic Soweto ^%[+27838792658_termination in florida_Safe*Abortion Pills ...
Top^Clinic Soweto ^%[+27838792658_termination in florida_Safe*Abortion Pills ...
 
Cyber-Security-power point presentation.
Cyber-Security-power point presentation.Cyber-Security-power point presentation.
Cyber-Security-power point presentation.
 
NO1 Qari Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil In R...
NO1 Qari Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil In R...NO1 Qari Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil In R...
NO1 Qari Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil In R...
 
Matrix Methods.pptxhhhhhhhhhhhhhhhhhhhhh
Matrix Methods.pptxhhhhhhhhhhhhhhhhhhhhhMatrix Methods.pptxhhhhhhhhhhhhhhhhhhhhh
Matrix Methods.pptxhhhhhhhhhhhhhhhhhhhhh
 
NO1 Best Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Addre...
NO1 Best Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Addre...NO1 Best Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Addre...
NO1 Best Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Addre...
 
Buy best abortion pills Doha [+966572737505 | Planned cytotec Qatar
Buy best abortion pills Doha [+966572737505 | Planned cytotec QatarBuy best abortion pills Doha [+966572737505 | Planned cytotec Qatar
Buy best abortion pills Doha [+966572737505 | Planned cytotec Qatar
 
Balancing of rotating bodies questions.pptx
Balancing of rotating bodies questions.pptxBalancing of rotating bodies questions.pptx
Balancing of rotating bodies questions.pptx
 
如何办理(USYD毕业证书)悉尼大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(USYD毕业证书)悉尼大学毕业证成绩单本科硕士学位证留信学历认证如何办理(USYD毕业证书)悉尼大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(USYD毕业证书)悉尼大学毕业证成绩单本科硕士学位证留信学历认证
 

Design Aproach.pptx

  • 1. C. Scope To review the existing study reports, standards and specifications. Detailed engineering survey of alignment. Preparation of topographical map. Study for cross-drainage works and propose suitable drainage structure.
  • 2. Preparation of working drawings. Preparation of quantity and cost estimate. Preparation of survey and design report
  • 3. D. Project location The proposed road is located in the Lalitpur District, Bagmati Zone, Central Region. The road starts from Badikhel and ends at Badegaun. The road runs along Karmanasha River corridor. The latitude and the longitude of the starting point are 27057’07’’ and 85035’27’’ respectively.
  • 4. F. Hydrology And Meteorology Small temporary streams running only during monsoon crosses the alignment with small discharge. The project area experiences marked seasonal and specific climate variation with moderately hot summer and relatively cool winters. Average temperature is 25oC in summer and 10oC in winter. Almost 80% of the rainfall occurs during monsoon which starts at the middle of the June and continues until the end of August.
  • 5. METHODOLOGY DESK STUDY SOCIAL IMPACT ASSESMENT FIELD WORK EQUIPMENT USED FOR SURVEYING OFFICE WORK
  • 6. DESK STUDY The geographical and the topographical maps were studied and the relevant information regarding the alignment selection, cross drainage structures, gradient of the road were discussed. The strategy for the field study was made accordingly. The study team member discussed the related matters of the project.
  • 7. SOCIAL IMPACT ASSESMENT The study identified the following key social issues for investigation: Loss of private property and other assets (land, houses and trees) and compensation modalities for these losses. Population displacement.
  • 8.  EQUIPMENT USED FOR SURVEYING Total station GPS device Staff Compass Measuring tape Hammer Communicating Device
  • 9. Road Classification As per the NRS 2045, the road project falls on the category of District Roads.
  • 10.  A Design speed of 30 km/hr is taken for the design of geometric parameters of the road. Design Speed
  • 11. The Design values are taken as recommended by NRS 2045 as far as practicable The shoulder width is taken as 1 m considering the site condition and the utility of the road Minimum Gradient recommended by NRS (1% for better drainage) cannot be incorporated considering the site condition
  • 12. Horizontal Alignment  The most suitable horizontal alignment was selected considering the following factors:  Short (S)  Easy (E)  Safe (S)  Economical (E)  Minimum radius for the horizontal curve as recommended by NRS is 12 m. The minimum radius of 12m is provided at the intersection of existing road and proposed road.
  • 13. The extrawidening and transition curves are not provided owing to low design speed and simplicity in construction A maximum of 5 % super elevation is provided at each horizontal curve. Superelevation is provided by rotation of pavement about the center line. Transition length for super elevation is provided as 5 m
  • 14. Summit curves are designed considering stopping sight distance. Valley curves are designed on the basis of night visibility The radius of vertical curve is adopted as large as possible so that all the factors are satisfied The least vertical radius taken in design is 1000 m
  • 15. Cross Section Design Cross section is designed providing camber of 4% on carriageway and 5 % on shoulder For embankment the side slope of 1.5H: 1V and for cut the side slope of 1H: 1V is adopted Total pavement thickness of 28 cm is adopted as per CBR method of design
  • 16. Gravel is used as the sub-base course Otta Seal is used as the surface course
  • 17. Drainage Longitudinal drain is provided on the cut slope side of the road The side slope is 1:1 and longitudinal slope is parallel to the alignment Earthen drain is provided from chainage 0+000 to the chainage of 1+251.35 Stoned masonry drain of thickness 20 cm is provided from the chainage of 1+309.82 to chainage 2+027.24
  • 18. Pipe culverts of 60 cm in diameter and total length of 7.5m are provided at 12 sections of the road They are provided at the lowest point of the vertical alignment A minimum depth of 60 cm is provided between the surface of the pavement and the crown of the pipe
  • 19. Plan and Profile • Ch. 0+000-0+200 • Ch. 0+200-0+480 • Ch. 0+480-0+760 • Ch. 0+760-1+040 • Ch. 1+040-1+360 • Ch. 1+360-1+700 • Ch. 1+700-2+027.24
  • 20. Cross Section • Ch. 0+000-0+271.50 • Ch. 0+280-0+500 • Ch. 0+511.92-0+680 • Ch. 0+683.87-0+760 • Ch. 0+780-0+920 • Ch. 0+936.71-1+125.89 • Ch. 1+130.75-1+213.66 • Ch.1+220-1+319.59 • Ch.1+320-1+380 • Ch.1+397.04-1+465.09 • Ch.1+480-1+545.77 • Ch.1+560-1+800 • Ch.1+800.91-1+980 • Ch.1+984.58-2+027.24
  • 22. ESTIMATE Quantity Estimate Calculation of Earthwork Necessary Calculations Rate Analysis BoQ /Cost Estimate
  • 23. QUANTITY ESTIMATE •Earthwork Calculations: Calculated at each cross-section Separate calculation according to soil type Total cut volume = 10283.57 m3 Total fill volume = 16052.44 m3 Balance (fill) = 5768.869 m3 Earthwork for drain = 768.129 m3 All the detailed calculation is shown in the tabular form in the following slides:
  • 24. Contd……… •Necessary calculations: i. For side drain: Calculations were made taking the following design considerations:  Section = trapezoidal  Depth: 0.3m  Base width: 0.3m  Side slope: 1:1  Unlined earthen canal(Ch. 0+000 to 1251.35)  Lined canal: (ch.1+309.82 to Ch. 2+027.24) ii. Sub-grade calculations:
  • 25. RATE ANALYSIS •Rate analysis was performed under the following criteria: The quantity of the materials, required labor force and plants, machinery, tools and equipments were taken from the work norms provided by the DoR. The rate for the materials, labors, plants and machinery, tools and equipments was taken from the district rates provided by the Lalitpur DDC.
  • 26. COST ESTIMATE • The BoQ was prepared on the basis of the quantity of work calculated and rate analysis done previously: • The cost estimate is as below: