MAHESH CHOKKAKULA
D.No.43-34-5/2, Railway New Colony, Visakhapatnam District, Andhra Pradesh-530016
Contact: +91-9959898514, Email: mahesh1027@yahoo.co.in.
INSTRUMENTATION ENGINEER
Seeking a challenging and rewarding opportunity with an organization of repute which recognizes & utilizes my true potential
while nurturing my analytical and technical skills
PROFILE
• A highly motivated Control and Instrument Engineer with more than 8+ years of engineering services experience in a wide
array of Oil and Gas projects on shore
• Project Execution and commissioning experiences which includes ,Reviewing Instrumentation related engineering
documents, punch walk downs, supervision & Inspection of Instrument installations, loop checks, calibration, execution of
DCS,ESD,F&G systems
• Has excellent team spirit and capable of interacting effectively with other discipline engineers and with other departments
and also Great ability to perform multi-task and meet deadlines. Possesses great inter-personal skills and comfortable
working effectively both independently and in a team environment.
• Demonstrated history of successful independently handling the Project Inspection, Quality Audit and controlling the
Projects as per schedule.
• Implementation and review of single loop drawings, cable schedules, instrumentation hookup drawings, C&E diagrams &G
layouts, termination diagrams, control room layout, interconnection diagram with electrical equipment and construction
and commissioning work packages in line with client Standards
Instruments & controls systems Handled:
• ABB DCS, ESD, GE F&G, Cameron LP, MP, Dresser Rand HP, Siemens Turbine, PSA Nitrogen, Callidus Flare, Federal signal
corporation PAGA.
• Various Instruments like Emerson, Fisher, Masoneilan , Flow Serve, Etc
• Various compressors, pumps, Pig launchers & receivers.
EDUCATIONAL CREDENTIALS:
B. Tech (Electronics & Instrumentation Engineering) 2006
Gokul Institute of Technology and sciences, J.N.T.U.
Skills:
• Able to work independently on Various Instrumentation related activities, Engineering, Calibration, Installation, Loop
checking, Modification, Troubleshooting.
• Able to assist Engineering/Field Engineering team.
• Able to prepare Instrument Index, Instrument data sheet valve sizing, conventional and FF wiring using SPI
• Experience in Oil & Gas Industry ON Shore India.
• Good interpersonal skills and ability to lead a team and work as team member.
• Familiar with safety systems/Permit to work system.
•
Soft Skills: SPI , MS Office, Navisworks
PROFESSIONAL EXPERIENCE
MEGHA ENGINEERING AND INFRASTRUCTURES LTD
Sr. Engineer ◊ since June 2010 to Till Dated
Project: Assam Renewal Project Gr-A, OIL AND NATURAL GAS CORPORATIOIN.LTD, ASSAM
RESPONSIBILITIES:
 In-charge for all Instrumentation day to day Activities in the Site.
 We successfully completed Two Group Gathering Station and one Gas compression plant in all aspects
 Undertaking day to day Instrument operational support as we are taking over and providing detailed input on the
instrumentation related activities.
 Providing Instrumentation support for all maintenance and operations.
 Ensure that all activities are carried in a safe and efficient manner to comply with statutory and company standards.
 Planning and executing Instrument Installation, testing and commissioning activities.
 Preparing daily, weekly and monthly progress reports and submitting to clients in order to meet the requirements.
 Arranging the testing facilities and Calibration activities on all Instrumentation process equipment and guide them to
finish in the activities in time as per the procedure and standards.
 Checking Cause & Effect and control Narrative checks of all the systems.
 Understanding, implementing and Red-mark up drawing where ever required of the Various Engineering drawing Like
P&I Diagrams, Instrumentation Index, Cable Schedule, Field Location Layout, Vessel Nozzle Orientation, and other
Construction and Process Related Drawings.
 Inspection and participating in Punch walk downs for getting system clearance.
 Participating in SAT activities of F&G, DCS, ESD,BMS,PDB, marshalling cabinets, system cabinets, mimic panels, Logics
& Graphics.
 Executing Pre-commissioning and Commissioning activities for HVAC systems, DCS, ESD, F&G systems.
MEASURE INDIA CORPORATION
Service Engineer ◊ since September 2007 to May 2010
RESPONSIBILITIES:
 Trained on Servo hydraulic, electro mechanical, and Hydraulic testing Equipment’s from the suppliers Instron, BISS, ETS
who are pioneers in Material testing Machines.
 Responsible for any type of Complaints from customers like Material testing defence Laboratories, Scientific and
Industrial Research, India etc.
 Responsible in conducting training and presentation of different systems to customer.
 Proposing solutions to the problems faced by the customer while handling the testing equipment.
 Proposing different type of new testing procedures and implementing as per the industrial standard practices.
 Each of our systems supplied is a true representation of our technical excellence in manufacturing and performance.
 Troubleshooting on Universal Testing Machines
 Speed, Temperature and Load Calibrations
 Up gradation of old Machines
 Maintenance of High pressure intensifying compressors & cooling units in chilling process machineries.
IVRCL infrastructures & Projects Ltd
Graduate Engineer Trainee◊ since April 2007 to August 2007
Project: Naval Academy Project, Ezhimala.
Responsibilities:
 ON Job Training and handling the day to day site construction activities and reporting to the line manager and to the
site in-charge
 Responsible for Inspection of wiring, marking, labelling, terminal blocks, panel, and internal instruments as per the
inter connection drawings.
 Laying of HT & LT cables, Testing of cables with megger
 Supervision for laying of Earth Pits
 Erection of 11KV transmission line with material segregation of three different types of towers and stringing.
 Erection of LT & HT panels, NGR, Lighting & Distribution transformers
 Rerouting cable trays connection as per site conditions including all aspects
 Responsible for Marking of Door opening stopper, light, cooling, grounding, modules etc. as per the Internal mark-up
drawings.
 Distributing, Handling and allocating manpower to execute different instrumentation activities in day to day Installation
activities in order to meet the schedule as promised to the client.
 Supervision & Inspection of Electrical installation activities at site.
Personnel Snippets:
Date of Birth: 09th
June 1982
Marital Status: Married
Languages Known: English, Hindi and Telugu
Nationality: Indian
Passport Number & Expire: L9636675 & 12/06/2024. MAHESH CHOKKAKULA

Instrument Eng oil&gas

  • 1.
    MAHESH CHOKKAKULA D.No.43-34-5/2, RailwayNew Colony, Visakhapatnam District, Andhra Pradesh-530016 Contact: +91-9959898514, Email: mahesh1027@yahoo.co.in. INSTRUMENTATION ENGINEER Seeking a challenging and rewarding opportunity with an organization of repute which recognizes & utilizes my true potential while nurturing my analytical and technical skills PROFILE • A highly motivated Control and Instrument Engineer with more than 8+ years of engineering services experience in a wide array of Oil and Gas projects on shore • Project Execution and commissioning experiences which includes ,Reviewing Instrumentation related engineering documents, punch walk downs, supervision & Inspection of Instrument installations, loop checks, calibration, execution of DCS,ESD,F&G systems • Has excellent team spirit and capable of interacting effectively with other discipline engineers and with other departments and also Great ability to perform multi-task and meet deadlines. Possesses great inter-personal skills and comfortable working effectively both independently and in a team environment. • Demonstrated history of successful independently handling the Project Inspection, Quality Audit and controlling the Projects as per schedule. • Implementation and review of single loop drawings, cable schedules, instrumentation hookup drawings, C&E diagrams &G layouts, termination diagrams, control room layout, interconnection diagram with electrical equipment and construction and commissioning work packages in line with client Standards Instruments & controls systems Handled: • ABB DCS, ESD, GE F&G, Cameron LP, MP, Dresser Rand HP, Siemens Turbine, PSA Nitrogen, Callidus Flare, Federal signal corporation PAGA. • Various Instruments like Emerson, Fisher, Masoneilan , Flow Serve, Etc • Various compressors, pumps, Pig launchers & receivers. EDUCATIONAL CREDENTIALS: B. Tech (Electronics & Instrumentation Engineering) 2006 Gokul Institute of Technology and sciences, J.N.T.U. Skills: • Able to work independently on Various Instrumentation related activities, Engineering, Calibration, Installation, Loop checking, Modification, Troubleshooting. • Able to assist Engineering/Field Engineering team. • Able to prepare Instrument Index, Instrument data sheet valve sizing, conventional and FF wiring using SPI • Experience in Oil & Gas Industry ON Shore India. • Good interpersonal skills and ability to lead a team and work as team member. • Familiar with safety systems/Permit to work system. • Soft Skills: SPI , MS Office, Navisworks PROFESSIONAL EXPERIENCE MEGHA ENGINEERING AND INFRASTRUCTURES LTD Sr. Engineer ◊ since June 2010 to Till Dated Project: Assam Renewal Project Gr-A, OIL AND NATURAL GAS CORPORATIOIN.LTD, ASSAM RESPONSIBILITIES:  In-charge for all Instrumentation day to day Activities in the Site.  We successfully completed Two Group Gathering Station and one Gas compression plant in all aspects  Undertaking day to day Instrument operational support as we are taking over and providing detailed input on the instrumentation related activities.  Providing Instrumentation support for all maintenance and operations.
  • 2.
     Ensure thatall activities are carried in a safe and efficient manner to comply with statutory and company standards.  Planning and executing Instrument Installation, testing and commissioning activities.  Preparing daily, weekly and monthly progress reports and submitting to clients in order to meet the requirements.  Arranging the testing facilities and Calibration activities on all Instrumentation process equipment and guide them to finish in the activities in time as per the procedure and standards.  Checking Cause & Effect and control Narrative checks of all the systems.  Understanding, implementing and Red-mark up drawing where ever required of the Various Engineering drawing Like P&I Diagrams, Instrumentation Index, Cable Schedule, Field Location Layout, Vessel Nozzle Orientation, and other Construction and Process Related Drawings.  Inspection and participating in Punch walk downs for getting system clearance.  Participating in SAT activities of F&G, DCS, ESD,BMS,PDB, marshalling cabinets, system cabinets, mimic panels, Logics & Graphics.  Executing Pre-commissioning and Commissioning activities for HVAC systems, DCS, ESD, F&G systems. MEASURE INDIA CORPORATION Service Engineer ◊ since September 2007 to May 2010 RESPONSIBILITIES:  Trained on Servo hydraulic, electro mechanical, and Hydraulic testing Equipment’s from the suppliers Instron, BISS, ETS who are pioneers in Material testing Machines.  Responsible for any type of Complaints from customers like Material testing defence Laboratories, Scientific and Industrial Research, India etc.  Responsible in conducting training and presentation of different systems to customer.  Proposing solutions to the problems faced by the customer while handling the testing equipment.  Proposing different type of new testing procedures and implementing as per the industrial standard practices.  Each of our systems supplied is a true representation of our technical excellence in manufacturing and performance.  Troubleshooting on Universal Testing Machines  Speed, Temperature and Load Calibrations  Up gradation of old Machines  Maintenance of High pressure intensifying compressors & cooling units in chilling process machineries. IVRCL infrastructures & Projects Ltd Graduate Engineer Trainee◊ since April 2007 to August 2007 Project: Naval Academy Project, Ezhimala. Responsibilities:  ON Job Training and handling the day to day site construction activities and reporting to the line manager and to the site in-charge  Responsible for Inspection of wiring, marking, labelling, terminal blocks, panel, and internal instruments as per the inter connection drawings.  Laying of HT & LT cables, Testing of cables with megger  Supervision for laying of Earth Pits  Erection of 11KV transmission line with material segregation of three different types of towers and stringing.  Erection of LT & HT panels, NGR, Lighting & Distribution transformers  Rerouting cable trays connection as per site conditions including all aspects  Responsible for Marking of Door opening stopper, light, cooling, grounding, modules etc. as per the Internal mark-up drawings.  Distributing, Handling and allocating manpower to execute different instrumentation activities in day to day Installation activities in order to meet the schedule as promised to the client.
  • 3.
     Supervision &Inspection of Electrical installation activities at site. Personnel Snippets: Date of Birth: 09th June 1982 Marital Status: Married Languages Known: English, Hindi and Telugu Nationality: Indian Passport Number & Expire: L9636675 & 12/06/2024. MAHESH CHOKKAKULA