International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 07 | July-2016 www.irjet.net p-ISSN: 2395-0072
© 2016, IRJET ISO 9001:2008 Certified Journal Page 722
Design and Construction of 33/11 KV Line & Substation
Mohammad Sharique Nawaz
Guide- Prof. Irfan Khan
M Tech. Scholar, Electrical and Electronics Engineering Department,
AISECT UNIVERSITY Bhopal, MP, India.
ABSTRACT - The thesis deals with the analysis of Construction of Power Lines and Substation Switchyard of 33/11 KV. In
today’s life electricity plays a very vital role. The demand of electricity is being increased day by day. Therefore many new
projects are being introduced not only in town as well as in remote areas also to provide the facilities of electricity by
Constructing new transmission lines and Switchyard.
1. INTRODUCTION
Before construction of any line, survey is done. The Line route should be so selected that the maintenance is easy and the
line does not cause Obstruction to vehicular traffic and should be shortest, as well, consistent with engineering and
economic principles. The transmission lines shall be routed, where ever possible to avoid difficult terrain and natural
obstacles such as steep hills, dense forests, landslides, lakes, rivers, highly developed areas, etc. Transmission lines should
not also cross school-yards. The correct and accurate Survey results in speedy construction and saving of unnecessary
alignment and realignment at the time of carrying out actual construction work. All measurements should be taken with
utmost accuracy and similarly the line charts and the profiles should be prepared with great care and precaution.
Where the lines are constructed over farm-land, structures and anchors shall be so located as to interfere as little
as possible with farming operation. Wherever such structures and anchors become necessary, the same shall be located
along fencing or in any uncultivated areas.
While aligning for poles or for underground cabling, care should be exercised to determine the location of all
underground services such as water mains, sewers, telephone cables, power cables, land drainage tiles, gas, and oil pipe
lines etc. and adequate clearance should be provided to avoid damage.
The Transmission lines shall be routed to avoid buildings and build up areas wherever possible. The clearances of the
various conductors from the ground and buildings should be taken well as per latest INDIAN ELECTRICITY RULES.
Where Switchyard means collection of equipment where high voltage electricity is switched using of various
components. Electrical Switchyard is usually a part of Substation where electricity is transferred from one Voltage to
another for the Transmission and Distribution purpose.
2. CONFIGURATION
2.1 Lines
The transmission lines shall be routed to avoid length of parallelism between power and Communication circuits as far as
possible. Minimum separation distance between power and Communication Circuits should be kept as 61 metres (200 ft.)
for 33 KV line provided length of parallelism does not exceed 1.6 Km. For greater distances minimum “separation distance
will be governed” by given formula as:-
Minimum Spacing = 025 x √ Metres
Where,
E = Voltage between Phases in Volts
L = Length of Parallelism in Km
After the survey and stacking out have been done, the construction of line should be started. The holes for cross-
arm, F- bracket and other fitting should be drilled in the supports before these are transmitted to site. The sequence of
operation in construction of the transmission line is given as:-
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 07 | July-2016 www.irjet.net p-ISSN: 2395-0072
© 2016, IRJET ISO 9001:2008 Certified Journal Page 723
 Pit digging and Pole erection
 Concreting of Poles.
 Staying of Supports.
 Running and tensioning of conductors.
 Clamping up.
 Fitting of Armour rods and Binding of Conductors.
 Fixing of Danger and number Plates and Anti-Climbing device.
After the line is erected, pole to pole inspection is done to ensure the following:-
 Jumpering has been done neatly at all the section Points.
 Danger and number Plates and Anti-Climbing devices has been provided on the supports.
 Stays provided at angle and section points have been tightened and are taking up the load.
 All the cross-arms and poles are painted.
 All the poles are in vertical position.
 No loose conductor, binding wire or earth wire is hanging at any location and short circuiting the line.
 All the trees in the danger zone have been felled.
After inspection, the line is meggered by 1000 volt megger and insulation resistance between phases and,
between phase and earth is noted.
2.2 Switchyard
Switchyard means collection of equipment where high voltage electricity is switched using of various components.
Electrical Switchyard is usually a part of Substation where electricity is transferred from one Voltage to another for the
Transmission and Distribution purpose.-
Fig-1: Switchyard Equipments
TRANSFORMER
L.A
C.T
V.C.B
BUS-ISOLATOR
POST-INSULATOR
BUS-BAR
P.T
LINE-ISOLATOR
L.A
TERMINAL GANTRY
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 07 | July-2016 www.irjet.net p-ISSN: 2395-0072
© 2016, IRJET ISO 9001:2008 Certified Journal Page 724
Switchyard is constructed with assembling of much electrical equipment. The various main structures used in
construction of switchyard are configurations of equipments are:- Transformer, L.A, CT, VCB, Bus Isolator, Post Insulator,
Bus-bar, P.T, Line Isolator and Terminal Gantry. The sequence of Equipments used in switchyard from starting point of
transformer to the end point of terminal gantry is given as:-
3. PRINCIPLE OF EQUIPMENTS
Transformer -
A static electrical machine used for transforming power from one circuit to another circuit without changing
frequency is termed as power transformer. The transformers are generally used to step down or step up the voltage levels
of a system for transmission and generation purpose. These transformers are classified into different types based on their
design, utilization purpose, installation methods, and so on.
Lightning Arrester-
The substation equipments such as conductors, transformers, etc., are always erected outdoor. Whenever light
surges occur then, a high-voltage pass through these electrical components causing damage to them (either temporary or
permanent damage based on the amount of voltage surge). Therefore, to avoid this difficulty, lightening arresters are
placed to pass the entire lightening surges to earth. There are other arresters which are used to ground the switching
surges called as surge arresters.
Current Transformer -
It is used for the measurement of the alternating current by taking samples of the higher currents of the system.
These reduced samples are in accurate proportions with the actual high currents of the system. These are used for
installation and maintenance of the current relays in substations for protection purpose which are normally has low-
current ratings for their operation.
Vacuum Circuit Breaker -
For the protection of substation and its components from the over currents or over load due to short circuit or any
other fault the faulty section is disconnected from the healthy section either manually or automatically. If once the fault is
rectified, then again the original circuit can be rebuilt by manually or automatically. Different types of circuit breakers are
designed based on different criteria and usage. But in general mostly used circuit breakers are Oil circuit breaker, Air
circuit breaker, SF6 circuit breaker, Vacuum Circuit Breaker, and so on.
Bus Isolator -
These have three stacks of post insulators. The central post insulator carries a tubular or flat male contact which
can be rotated horizontally with rotation of central post insulator. This rod type contact is also called moving contact.
The female type contacts are fixed on the top of the other post insulators which fitted at both sides of the central
post insulator. The female contacts are generally in the form of spring loaded figure contacts. The rotational movement of
male contact causes to come itself into female contacts and isolators becomes closed. The rotation of male contact in
opposite direction make to it out from female contacts and isolators becomes open. Rotation of the central post insulator is
done by a driving lever mechanism at the base of the post insulator and it connected to operating handle (in case of hand
operation) or motor (in case of motorized operation) of the isolator through a mechanical tie rod.
Post Insulator -
It is more or less similar to Pin insulator but former is suitable for higher voltage application. Post insulator has
higher numbers of petticoats and has greater height. This type of insulator can be mounted on supporting structure
horizontally as well as vertically. The insulator is made of one piece of porcelain but has fixing clamp arrangement are in
both top and bottom end.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 07 | July-2016 www.irjet.net p-ISSN: 2395-0072
© 2016, IRJET ISO 9001:2008 Certified Journal Page 725
` Post Type insulators are usually used in substations. These insulators are constructed in the form of a cylinder.
The circular surface of the cylinder is corrugated to increase the leakage distance. They are mounted on pedestals. These
insulators exhibit high resistance to puncture.
Bus-Bar -
The conductor carrying current and having multiple numbers of incoming and outgoing line connections can be
called as bus bar, which is commonly used in substations. These are classified into different types like single bus, double
bus and ring bus.
Potential Transformer -
It is quite similar to the current transformer, but it is used for taking samples of high voltages of a system for
providing low-voltage to the relays of protection system and also to the low-rating meters for voltage measurement. From
this low-voltage measurement, the actual system’s high voltage can be calculated without measuring high voltages directly
to avoid the cost of the measurement system.
Line Isolator -
In Power systems an isolator is a switch which is used to completely open a circuit which has been rendered dead
by means of opening a circuit breaker for maintenance of equipment. It can be visually seen that an isolator is open and
hence service man are assured that it is safe to work on the isolated equipment. The equipment to be worked on is further
earthed mostly on either side so that electrical energy that could be in the equipment is completely discharged to earth
further enhancing safety of the service man. An isolator is also used for sectionalising power lines during fault location.
Isolators are always opened in no load condition (after opening of circuit breakers) because it lags the mechanism
of operating in high voltage.
Terminal Gantry -
Gantry tower is a structure commonly found in electrical substation or transmission line. It is a combination of
two or more legs (towers) and an overhead beam. To the overhead beam a lifting device is connected. Gantries can be
constructed to meet the specific requirements of the location. As they can only lift vertically, versatility is limited and they
need to be built over the foundation.
Conductor -
The material or object that obeys the electrical property conductance (mostly made of metals such as aluminium
and copper) and that allows the flow of electric charge is called conductor. Conductors permit free movement of the flow
of electrons through them. These are used for the transmission of power or electrical energy from one place (generating
station) to another place (consumer point where power is consumed by the loads) through substations. Conductors are of
different types and mostly aluminium conductors are preferred in practical power systems.
Relays -
Relays are used for disconnecting the circuits by manual or automatic operation. Relay consists of the coil which is
excited or energized and such that making the contacts of relay closed activates the relay to break or make the circuit
connection. There are different types of relays such as over current relays, definite time over current relays, voltage relays,
auxiliary relays, reclosing relays, solid state relays, directional relays, and inverse time over current relays,
microcontroller relays, etc
Capacitor Bank -
A Capacitor bank is a set of many identical capacitors connected in series or parallel within a enclosure and is
used for the maintaining power factor correction and basic protection of substation. These capacitor banks are acts as a
source of reactive power, and thus, the phase difference between voltage and current can be reduced by the capacitor
banks. They will increase the ripple current capacity of the supply. It avoids undesirable characteristics in the power
system. It is the most economical method for maintaining power factor and of correction of the power lag problems.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 07 | July-2016 www.irjet.net p-ISSN: 2395-0072
© 2016, IRJET ISO 9001:2008 Certified Journal Page 726
4. RESULT
While working and making analysis on this project, I have Observed many Technical Implementation on it. While erecting
pole for the line of 11 KV and 33 KV Line, we use 11m STP Pole for 11 KV and 13m STP Pole for 33 KV.
Watching future scope, here I would like to replace the 11 m STP Pole by 13 m STP Pole because in Present Scenario,
many new lines are being constructed either of 33 KV or 11 KV line. In future also many such lines will be constructed. For
convenient purpose, we will use 13 m Pole for both 11 KV and 33 KV Lines. So that if any new line being constructed in
future then Composite lines can be made on 13 m STP Poles for 11 KV Lines.
By making above changes, the result obtained will be as below:-
 Space can be minimised for the other lines that can be constructed in future.
 Expenses of Poles for new lines will be decreased.
 Labour cost is reduced.
 Work can be carried easier.
 Minimum time is required for completion of work.
In Distribution or L.T side, Load Fluctuation always occurs, generally in Summer Season, load is increased. Due to
this increase in load, heating effects occur and current flowing in the conductors increases above the rated current
carrying capacity of the conductors.
Due to above undesired conditions fault occurs in the line and the Conductor breakdown Occurs.
This Serious problem of fault Occurring and breakdown of Conductors can be removed to a great extent by
replacing RABBIT Conductor by RACCOON or DOG Conductors, because DOG and RABBIT Conductor have high
Current Carrying Capacity of approx. 350 Amp and 300 Amp respectively rather than RABBIT Conductors which have
the current carrying capacity of approx. 240 Amp.
5. CONCLUSION
While making this Project on Design and constructed of 33/11 KV Lines and switch yard, I conclude that in this
overall project and report for electrical engineering I put my great effort to understand and explore more and more about
the Construction of lines and switch yard designing for substation. But Construction of Lines and Substation Switchyard
designing is such a complex which has so many functions, systems and components which need so much time to
understand. But I try my best to utilize this short span of time to bring out the valuable knowledge about the Construction
of 33/11 KV Lines and switch yard designing for substation.
ACKNOWLEDGEMENT
The proposed work has been carried out in the Electrical and Electronics laboratory of the AISECT UNIVERSITY,
Bhopal.
I express my regards and sense of gratitude to my Guide and faculty members for giving inspiration, expert guidance,
moral support and encouragement throughout this work. Their wide experience, sharp and incisive intellect, dynamism,
timely help, and painstaking efforts has unerringly steered the work on smooth and steady course.
I deeply acknowledge the support and advice provided by my Guide, faculty members and classmates.
REFERANCES
While making this thesis report on Design and Construction of 33/11 KV lines and Substation Switchyard I referred
the following books and websites.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 03 Issue: 07 | July-2016 www.irjet.net p-ISSN: 2395-0072
© 2016, IRJET ISO 9001:2008 Certified Journal Page 727
Books –
[1] G.N Mathur and R.S Chadha, “Manual on E.H.V Substation equipments Maintenance”, Vol 2, April 2005.
[2] Syed A. Nasar, “Schaum’s Outline of Electrical Power system” ,Vol 2, May 1990.
[3] Madhvi Gupta, “Installation and Maintenance of electrical Equipments”, Vol 3, April 2014.
[4] Sumathi Rao, “Electrical Substation Engineering”, Vol 2, Dec 2003.
[5] UPPCL Training Institute, “Construction Manual for Design Guide for Substations and Line”.
[6] John D. Mc Donald, “Electric Power Substation Engineering”, Vol 3, June 2012,
[7] Dr. D.P Kothari, “Modern Power System Analysis”, Vol 3, June 2011
Websites -
[1] www.energy.siemens.com
[2] www.electrical-engineering-portal.com
[3] www.electrical-installation.com
[4] www.electrical4u.com
[5] www.en.wikipedia.com
[6] www.scribd.com
[7] www.encyclopedia.com

More Related Content

What's hot

Electrical Grid Substation
Electrical Grid SubstationElectrical Grid Substation
Electrical Grid SubstationAng Sovann
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a SubstationMd. Atiqur Rahman
 
the substation components study
the substation components study the substation components study
the substation components study Krishnaveni Reddy
 
Live line maintenance in power sector
Live line maintenance in power sectorLive line maintenance in power sector
Live line maintenance in power sectorUMESH THAKARE
 
Efficient sub stationdesign
Efficient sub stationdesignEfficient sub stationdesign
Efficient sub stationdesignRasmin Sahoo
 
Live Line Maintenance
Live Line MaintenanceLive Line Maintenance
Live Line MaintenanceGAURAV KUMAR
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPURsahid raja khan
 
Switchgear Installation Precomissioning Inspection.PPT
Switchgear Installation  Precomissioning Inspection.PPTSwitchgear Installation  Precomissioning Inspection.PPT
Switchgear Installation Precomissioning Inspection.PPTAbdullah Al Dushaishi
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1Siswoyo Edo
 
Interlocking on switchgear principles
Interlocking on switchgear principlesInterlocking on switchgear principles
Interlocking on switchgear principlesBryan Johnson
 
Electrical Isolators, It's types, types based on location and tap changer
Electrical Isolators, It's types, types based on location and tap changerElectrical Isolators, It's types, types based on location and tap changer
Electrical Isolators, It's types, types based on location and tap changerUrooj Abid
 
Cableway guidance note 2 draft specification
Cableway guidance note 2   draft specificationCableway guidance note 2   draft specification
Cableway guidance note 2 draft specificationhydrologyproject0
 
switchgear and protection by vala kamlesh
switchgear and protection by vala kamleshswitchgear and protection by vala kamlesh
switchgear and protection by vala kamleshKamlesh Vala
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training ReportParas Pratap
 
Introduction to switchgear
Introduction to switchgearIntroduction to switchgear
Introduction to switchgearAdnan Sayed
 

What's hot (20)

Electrical Grid Substation
Electrical Grid SubstationElectrical Grid Substation
Electrical Grid Substation
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a Substation
 
the substation components study
the substation components study the substation components study
the substation components study
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
ppt on gss
ppt on gssppt on gss
ppt on gss
 
Live line maintenance in power sector
Live line maintenance in power sectorLive line maintenance in power sector
Live line maintenance in power sector
 
Efficient sub stationdesign
Efficient sub stationdesignEfficient sub stationdesign
Efficient sub stationdesign
 
Live Line Maintenance
Live Line MaintenanceLive Line Maintenance
Live Line Maintenance
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR
 
Switchgear Installation Precomissioning Inspection.PPT
Switchgear Installation  Precomissioning Inspection.PPTSwitchgear Installation  Precomissioning Inspection.PPT
Switchgear Installation Precomissioning Inspection.PPT
 
SWITCHGEAR
SWITCHGEARSWITCHGEAR
SWITCHGEAR
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1
 
Harendra
HarendraHarendra
Harendra
 
Interlocking on switchgear principles
Interlocking on switchgear principlesInterlocking on switchgear principles
Interlocking on switchgear principles
 
Electrical Isolators, It's types, types based on location and tap changer
Electrical Isolators, It's types, types based on location and tap changerElectrical Isolators, It's types, types based on location and tap changer
Electrical Isolators, It's types, types based on location and tap changer
 
Cableway guidance note 2 draft specification
Cableway guidance note 2   draft specificationCableway guidance note 2   draft specification
Cableway guidance note 2 draft specification
 
switchgear and protection by vala kamlesh
switchgear and protection by vala kamleshswitchgear and protection by vala kamlesh
switchgear and protection by vala kamlesh
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training Report
 
Introduction to switchgear
Introduction to switchgearIntroduction to switchgear
Introduction to switchgear
 

Similar to Related RE work (LT, 11kV & 33kV)

Entership Presentation (1).pptx
Entership Presentation (1).pptxEntership Presentation (1).pptx
Entership Presentation (1).pptxmebremezgebe
 
EHVAC transmission line maintenance techniques
EHVAC transmission line maintenance techniquesEHVAC transmission line maintenance techniques
EHVAC transmission line maintenance techniquesYashwant Chaudhari
 
Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Mohit Kothari
 
Gssherap 110901224655-phpapp0
Gssherap 110901224655-phpapp0Gssherap 110901224655-phpapp0
Gssherap 110901224655-phpapp0Mohit Kothari
 
Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Mohit Kothari
 
Design of substation
Design of substationDesign of substation
Design of substationSayanSarkar55
 
IRJET- Rogowiski Coil
IRJET- Rogowiski CoilIRJET- Rogowiski Coil
IRJET- Rogowiski CoilIRJET Journal
 
Training at 132 kv substation
Training at 132 kv substation Training at 132 kv substation
Training at 132 kv substation Tejveer Choudhary
 
A Review on Selection of Proper Busbar Arrangement for Typical Substation (Bu...
A Review on Selection of Proper Busbar Arrangement for Typical Substation (Bu...A Review on Selection of Proper Busbar Arrangement for Typical Substation (Bu...
A Review on Selection of Proper Busbar Arrangement for Typical Substation (Bu...IRJET Journal
 
Catalog cs switch disconnectors_dienhathe.vn
Catalog cs switch disconnectors_dienhathe.vnCatalog cs switch disconnectors_dienhathe.vn
Catalog cs switch disconnectors_dienhathe.vnDien Ha The
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at JassureShuvam Pathania
 
IRJET- Power Loss Reduction in Radial Network using Flower Pollination Approach
IRJET- Power Loss Reduction in Radial Network using Flower Pollination ApproachIRJET- Power Loss Reduction in Radial Network using Flower Pollination Approach
IRJET- Power Loss Reduction in Radial Network using Flower Pollination ApproachIRJET Journal
 
Training report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationTraining report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationankesh kumar
 
IRJET- Three Phase Fault Analysis in Three Phase Distribution Line
IRJET- Three Phase Fault Analysis in Three Phase Distribution LineIRJET- Three Phase Fault Analysis in Three Phase Distribution Line
IRJET- Three Phase Fault Analysis in Three Phase Distribution LineIRJET Journal
 
Protection of 3-Phase Induction Motor Fed from 3-Phase Inverter Using Rogowsk...
Protection of 3-Phase Induction Motor Fed from 3-Phase Inverter Using Rogowsk...Protection of 3-Phase Induction Motor Fed from 3-Phase Inverter Using Rogowsk...
Protection of 3-Phase Induction Motor Fed from 3-Phase Inverter Using Rogowsk...IRJET Journal
 
Protection of 3-Phase Induction Motor Fed from 3-Phase Inverter Using Rogowsk...
Protection of 3-Phase Induction Motor Fed from 3-Phase Inverter Using Rogowsk...Protection of 3-Phase Induction Motor Fed from 3-Phase Inverter Using Rogowsk...
Protection of 3-Phase Induction Motor Fed from 3-Phase Inverter Using Rogowsk...IRJET Journal
 
substation internship report
substation internship report substation internship report
substation internship report Arun Thapa
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportAneel-k Suthar
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training ReportParas Pratap
 

Similar to Related RE work (LT, 11kV & 33kV) (20)

Entership Presentation (1).pptx
Entership Presentation (1).pptxEntership Presentation (1).pptx
Entership Presentation (1).pptx
 
EHVAC transmission line maintenance techniques
EHVAC transmission line maintenance techniquesEHVAC transmission line maintenance techniques
EHVAC transmission line maintenance techniques
 
Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02
 
Gssherap 110901224655-phpapp0
Gssherap 110901224655-phpapp0Gssherap 110901224655-phpapp0
Gssherap 110901224655-phpapp0
 
Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02
 
Design of substation
Design of substationDesign of substation
Design of substation
 
IRJET- Rogowiski Coil
IRJET- Rogowiski CoilIRJET- Rogowiski Coil
IRJET- Rogowiski Coil
 
Training at 132 kv substation
Training at 132 kv substation Training at 132 kv substation
Training at 132 kv substation
 
Shashikdoc
ShashikdocShashikdoc
Shashikdoc
 
A Review on Selection of Proper Busbar Arrangement for Typical Substation (Bu...
A Review on Selection of Proper Busbar Arrangement for Typical Substation (Bu...A Review on Selection of Proper Busbar Arrangement for Typical Substation (Bu...
A Review on Selection of Proper Busbar Arrangement for Typical Substation (Bu...
 
Catalog cs switch disconnectors_dienhathe.vn
Catalog cs switch disconnectors_dienhathe.vnCatalog cs switch disconnectors_dienhathe.vn
Catalog cs switch disconnectors_dienhathe.vn
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at Jassure
 
IRJET- Power Loss Reduction in Radial Network using Flower Pollination Approach
IRJET- Power Loss Reduction in Radial Network using Flower Pollination ApproachIRJET- Power Loss Reduction in Radial Network using Flower Pollination Approach
IRJET- Power Loss Reduction in Radial Network using Flower Pollination Approach
 
Training report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationTraining report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substation
 
IRJET- Three Phase Fault Analysis in Three Phase Distribution Line
IRJET- Three Phase Fault Analysis in Three Phase Distribution LineIRJET- Three Phase Fault Analysis in Three Phase Distribution Line
IRJET- Three Phase Fault Analysis in Three Phase Distribution Line
 
Protection of 3-Phase Induction Motor Fed from 3-Phase Inverter Using Rogowsk...
Protection of 3-Phase Induction Motor Fed from 3-Phase Inverter Using Rogowsk...Protection of 3-Phase Induction Motor Fed from 3-Phase Inverter Using Rogowsk...
Protection of 3-Phase Induction Motor Fed from 3-Phase Inverter Using Rogowsk...
 
Protection of 3-Phase Induction Motor Fed from 3-Phase Inverter Using Rogowsk...
Protection of 3-Phase Induction Motor Fed from 3-Phase Inverter Using Rogowsk...Protection of 3-Phase Induction Motor Fed from 3-Phase Inverter Using Rogowsk...
Protection of 3-Phase Induction Motor Fed from 3-Phase Inverter Using Rogowsk...
 
substation internship report
substation internship report substation internship report
substation internship report
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship report
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training Report
 

Recently uploaded

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 

Related RE work (LT, 11kV & 33kV)

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 07 | July-2016 www.irjet.net p-ISSN: 2395-0072 © 2016, IRJET ISO 9001:2008 Certified Journal Page 722 Design and Construction of 33/11 KV Line & Substation Mohammad Sharique Nawaz Guide- Prof. Irfan Khan M Tech. Scholar, Electrical and Electronics Engineering Department, AISECT UNIVERSITY Bhopal, MP, India. ABSTRACT - The thesis deals with the analysis of Construction of Power Lines and Substation Switchyard of 33/11 KV. In today’s life electricity plays a very vital role. The demand of electricity is being increased day by day. Therefore many new projects are being introduced not only in town as well as in remote areas also to provide the facilities of electricity by Constructing new transmission lines and Switchyard. 1. INTRODUCTION Before construction of any line, survey is done. The Line route should be so selected that the maintenance is easy and the line does not cause Obstruction to vehicular traffic and should be shortest, as well, consistent with engineering and economic principles. The transmission lines shall be routed, where ever possible to avoid difficult terrain and natural obstacles such as steep hills, dense forests, landslides, lakes, rivers, highly developed areas, etc. Transmission lines should not also cross school-yards. The correct and accurate Survey results in speedy construction and saving of unnecessary alignment and realignment at the time of carrying out actual construction work. All measurements should be taken with utmost accuracy and similarly the line charts and the profiles should be prepared with great care and precaution. Where the lines are constructed over farm-land, structures and anchors shall be so located as to interfere as little as possible with farming operation. Wherever such structures and anchors become necessary, the same shall be located along fencing or in any uncultivated areas. While aligning for poles or for underground cabling, care should be exercised to determine the location of all underground services such as water mains, sewers, telephone cables, power cables, land drainage tiles, gas, and oil pipe lines etc. and adequate clearance should be provided to avoid damage. The Transmission lines shall be routed to avoid buildings and build up areas wherever possible. The clearances of the various conductors from the ground and buildings should be taken well as per latest INDIAN ELECTRICITY RULES. Where Switchyard means collection of equipment where high voltage electricity is switched using of various components. Electrical Switchyard is usually a part of Substation where electricity is transferred from one Voltage to another for the Transmission and Distribution purpose. 2. CONFIGURATION 2.1 Lines The transmission lines shall be routed to avoid length of parallelism between power and Communication circuits as far as possible. Minimum separation distance between power and Communication Circuits should be kept as 61 metres (200 ft.) for 33 KV line provided length of parallelism does not exceed 1.6 Km. For greater distances minimum “separation distance will be governed” by given formula as:- Minimum Spacing = 025 x √ Metres Where, E = Voltage between Phases in Volts L = Length of Parallelism in Km After the survey and stacking out have been done, the construction of line should be started. The holes for cross- arm, F- bracket and other fitting should be drilled in the supports before these are transmitted to site. The sequence of operation in construction of the transmission line is given as:-
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 07 | July-2016 www.irjet.net p-ISSN: 2395-0072 © 2016, IRJET ISO 9001:2008 Certified Journal Page 723  Pit digging and Pole erection  Concreting of Poles.  Staying of Supports.  Running and tensioning of conductors.  Clamping up.  Fitting of Armour rods and Binding of Conductors.  Fixing of Danger and number Plates and Anti-Climbing device. After the line is erected, pole to pole inspection is done to ensure the following:-  Jumpering has been done neatly at all the section Points.  Danger and number Plates and Anti-Climbing devices has been provided on the supports.  Stays provided at angle and section points have been tightened and are taking up the load.  All the cross-arms and poles are painted.  All the poles are in vertical position.  No loose conductor, binding wire or earth wire is hanging at any location and short circuiting the line.  All the trees in the danger zone have been felled. After inspection, the line is meggered by 1000 volt megger and insulation resistance between phases and, between phase and earth is noted. 2.2 Switchyard Switchyard means collection of equipment where high voltage electricity is switched using of various components. Electrical Switchyard is usually a part of Substation where electricity is transferred from one Voltage to another for the Transmission and Distribution purpose.- Fig-1: Switchyard Equipments TRANSFORMER L.A C.T V.C.B BUS-ISOLATOR POST-INSULATOR BUS-BAR P.T LINE-ISOLATOR L.A TERMINAL GANTRY
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 07 | July-2016 www.irjet.net p-ISSN: 2395-0072 © 2016, IRJET ISO 9001:2008 Certified Journal Page 724 Switchyard is constructed with assembling of much electrical equipment. The various main structures used in construction of switchyard are configurations of equipments are:- Transformer, L.A, CT, VCB, Bus Isolator, Post Insulator, Bus-bar, P.T, Line Isolator and Terminal Gantry. The sequence of Equipments used in switchyard from starting point of transformer to the end point of terminal gantry is given as:- 3. PRINCIPLE OF EQUIPMENTS Transformer - A static electrical machine used for transforming power from one circuit to another circuit without changing frequency is termed as power transformer. The transformers are generally used to step down or step up the voltage levels of a system for transmission and generation purpose. These transformers are classified into different types based on their design, utilization purpose, installation methods, and so on. Lightning Arrester- The substation equipments such as conductors, transformers, etc., are always erected outdoor. Whenever light surges occur then, a high-voltage pass through these electrical components causing damage to them (either temporary or permanent damage based on the amount of voltage surge). Therefore, to avoid this difficulty, lightening arresters are placed to pass the entire lightening surges to earth. There are other arresters which are used to ground the switching surges called as surge arresters. Current Transformer - It is used for the measurement of the alternating current by taking samples of the higher currents of the system. These reduced samples are in accurate proportions with the actual high currents of the system. These are used for installation and maintenance of the current relays in substations for protection purpose which are normally has low- current ratings for their operation. Vacuum Circuit Breaker - For the protection of substation and its components from the over currents or over load due to short circuit or any other fault the faulty section is disconnected from the healthy section either manually or automatically. If once the fault is rectified, then again the original circuit can be rebuilt by manually or automatically. Different types of circuit breakers are designed based on different criteria and usage. But in general mostly used circuit breakers are Oil circuit breaker, Air circuit breaker, SF6 circuit breaker, Vacuum Circuit Breaker, and so on. Bus Isolator - These have three stacks of post insulators. The central post insulator carries a tubular or flat male contact which can be rotated horizontally with rotation of central post insulator. This rod type contact is also called moving contact. The female type contacts are fixed on the top of the other post insulators which fitted at both sides of the central post insulator. The female contacts are generally in the form of spring loaded figure contacts. The rotational movement of male contact causes to come itself into female contacts and isolators becomes closed. The rotation of male contact in opposite direction make to it out from female contacts and isolators becomes open. Rotation of the central post insulator is done by a driving lever mechanism at the base of the post insulator and it connected to operating handle (in case of hand operation) or motor (in case of motorized operation) of the isolator through a mechanical tie rod. Post Insulator - It is more or less similar to Pin insulator but former is suitable for higher voltage application. Post insulator has higher numbers of petticoats and has greater height. This type of insulator can be mounted on supporting structure horizontally as well as vertically. The insulator is made of one piece of porcelain but has fixing clamp arrangement are in both top and bottom end.
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 07 | July-2016 www.irjet.net p-ISSN: 2395-0072 © 2016, IRJET ISO 9001:2008 Certified Journal Page 725 ` Post Type insulators are usually used in substations. These insulators are constructed in the form of a cylinder. The circular surface of the cylinder is corrugated to increase the leakage distance. They are mounted on pedestals. These insulators exhibit high resistance to puncture. Bus-Bar - The conductor carrying current and having multiple numbers of incoming and outgoing line connections can be called as bus bar, which is commonly used in substations. These are classified into different types like single bus, double bus and ring bus. Potential Transformer - It is quite similar to the current transformer, but it is used for taking samples of high voltages of a system for providing low-voltage to the relays of protection system and also to the low-rating meters for voltage measurement. From this low-voltage measurement, the actual system’s high voltage can be calculated without measuring high voltages directly to avoid the cost of the measurement system. Line Isolator - In Power systems an isolator is a switch which is used to completely open a circuit which has been rendered dead by means of opening a circuit breaker for maintenance of equipment. It can be visually seen that an isolator is open and hence service man are assured that it is safe to work on the isolated equipment. The equipment to be worked on is further earthed mostly on either side so that electrical energy that could be in the equipment is completely discharged to earth further enhancing safety of the service man. An isolator is also used for sectionalising power lines during fault location. Isolators are always opened in no load condition (after opening of circuit breakers) because it lags the mechanism of operating in high voltage. Terminal Gantry - Gantry tower is a structure commonly found in electrical substation or transmission line. It is a combination of two or more legs (towers) and an overhead beam. To the overhead beam a lifting device is connected. Gantries can be constructed to meet the specific requirements of the location. As they can only lift vertically, versatility is limited and they need to be built over the foundation. Conductor - The material or object that obeys the electrical property conductance (mostly made of metals such as aluminium and copper) and that allows the flow of electric charge is called conductor. Conductors permit free movement of the flow of electrons through them. These are used for the transmission of power or electrical energy from one place (generating station) to another place (consumer point where power is consumed by the loads) through substations. Conductors are of different types and mostly aluminium conductors are preferred in practical power systems. Relays - Relays are used for disconnecting the circuits by manual or automatic operation. Relay consists of the coil which is excited or energized and such that making the contacts of relay closed activates the relay to break or make the circuit connection. There are different types of relays such as over current relays, definite time over current relays, voltage relays, auxiliary relays, reclosing relays, solid state relays, directional relays, and inverse time over current relays, microcontroller relays, etc Capacitor Bank - A Capacitor bank is a set of many identical capacitors connected in series or parallel within a enclosure and is used for the maintaining power factor correction and basic protection of substation. These capacitor banks are acts as a source of reactive power, and thus, the phase difference between voltage and current can be reduced by the capacitor banks. They will increase the ripple current capacity of the supply. It avoids undesirable characteristics in the power system. It is the most economical method for maintaining power factor and of correction of the power lag problems.
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 07 | July-2016 www.irjet.net p-ISSN: 2395-0072 © 2016, IRJET ISO 9001:2008 Certified Journal Page 726 4. RESULT While working and making analysis on this project, I have Observed many Technical Implementation on it. While erecting pole for the line of 11 KV and 33 KV Line, we use 11m STP Pole for 11 KV and 13m STP Pole for 33 KV. Watching future scope, here I would like to replace the 11 m STP Pole by 13 m STP Pole because in Present Scenario, many new lines are being constructed either of 33 KV or 11 KV line. In future also many such lines will be constructed. For convenient purpose, we will use 13 m Pole for both 11 KV and 33 KV Lines. So that if any new line being constructed in future then Composite lines can be made on 13 m STP Poles for 11 KV Lines. By making above changes, the result obtained will be as below:-  Space can be minimised for the other lines that can be constructed in future.  Expenses of Poles for new lines will be decreased.  Labour cost is reduced.  Work can be carried easier.  Minimum time is required for completion of work. In Distribution or L.T side, Load Fluctuation always occurs, generally in Summer Season, load is increased. Due to this increase in load, heating effects occur and current flowing in the conductors increases above the rated current carrying capacity of the conductors. Due to above undesired conditions fault occurs in the line and the Conductor breakdown Occurs. This Serious problem of fault Occurring and breakdown of Conductors can be removed to a great extent by replacing RABBIT Conductor by RACCOON or DOG Conductors, because DOG and RABBIT Conductor have high Current Carrying Capacity of approx. 350 Amp and 300 Amp respectively rather than RABBIT Conductors which have the current carrying capacity of approx. 240 Amp. 5. CONCLUSION While making this Project on Design and constructed of 33/11 KV Lines and switch yard, I conclude that in this overall project and report for electrical engineering I put my great effort to understand and explore more and more about the Construction of lines and switch yard designing for substation. But Construction of Lines and Substation Switchyard designing is such a complex which has so many functions, systems and components which need so much time to understand. But I try my best to utilize this short span of time to bring out the valuable knowledge about the Construction of 33/11 KV Lines and switch yard designing for substation. ACKNOWLEDGEMENT The proposed work has been carried out in the Electrical and Electronics laboratory of the AISECT UNIVERSITY, Bhopal. I express my regards and sense of gratitude to my Guide and faculty members for giving inspiration, expert guidance, moral support and encouragement throughout this work. Their wide experience, sharp and incisive intellect, dynamism, timely help, and painstaking efforts has unerringly steered the work on smooth and steady course. I deeply acknowledge the support and advice provided by my Guide, faculty members and classmates. REFERANCES While making this thesis report on Design and Construction of 33/11 KV lines and Substation Switchyard I referred the following books and websites.
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 07 | July-2016 www.irjet.net p-ISSN: 2395-0072 © 2016, IRJET ISO 9001:2008 Certified Journal Page 727 Books – [1] G.N Mathur and R.S Chadha, “Manual on E.H.V Substation equipments Maintenance”, Vol 2, April 2005. [2] Syed A. Nasar, “Schaum’s Outline of Electrical Power system” ,Vol 2, May 1990. [3] Madhvi Gupta, “Installation and Maintenance of electrical Equipments”, Vol 3, April 2014. [4] Sumathi Rao, “Electrical Substation Engineering”, Vol 2, Dec 2003. [5] UPPCL Training Institute, “Construction Manual for Design Guide for Substations and Line”. [6] John D. Mc Donald, “Electric Power Substation Engineering”, Vol 3, June 2012, [7] Dr. D.P Kothari, “Modern Power System Analysis”, Vol 3, June 2011 Websites - [1] www.energy.siemens.com [2] www.electrical-engineering-portal.com [3] www.electrical-installation.com [4] www.electrical4u.com [5] www.en.wikipedia.com [6] www.scribd.com [7] www.encyclopedia.com