Underground Cable Installation
Equipment & Procedures
When the decision is made to "Go Underground" on a new distribution system,
there are many different areas to consider prior to construction. In the following
paper, we would like to suggest some of these areas for your consideration in
regards to equipment and procedures for underground cable installation.
The three most common methods of cable placement are Direct Buried, Cable
in Conduit, and a Total Conduit System. Most Utilities are currently using one
or more of these methods with various degrees of success.
The first system or method commonly undertaken is the Direct Buried method.
As this system matures, a few questions come to the surface. How much care
was taken in preparation of the trench? How was the cable placed in the
trench? How does different cables react to different soils and ground
conditions? How complicated is it to replace damaged or faulted cable? When
a fault or damage caused by digging occurs, it is very time consuming to open
the trench and make repairs. All these factors and many more affect the
reliability and life of the conductor.
3
Due to these and other conditions, the Cable in Conduit method is considered
in some areas. The cable is placed in a conduit during the manufacturing
process, and this conduit protects the conductor as it lies in the trench, giving it
longer life. However, most of the same questions occur when using the C.I.C.
method as occurs when using the Direct Buried method.
The particular method we would like to discuss in this paper is the Total
Conduit System.
1. System Preparation:
A. A good system must be installed properly with attention given to
preparation of the trenches, placement of the conduit, and care
used when backfilling the trenches.
B. Consideration should be given to selecting the size of inside
diameter to ensure adequate fill ratios and schedules such as
DB-120, SCH-40, or SCH-80 as required in specific areas.
C. The pulling cable has a great impact on the selection of the
schedule of the conduit. Initially, everyone assumed if synthetic
rope is good enough for overhead, it must be good enough for
underground as well. However, we learned synthetic rope
4
generates heat, causes friction, and burns through the PVC. The
most common response was to increase the wall thickness of the
conduit or even go to steel 90's in order to stop this problem. Since
the rope was causing the problem, most pullers today use steel
pulling ropes. Steel ropes dissipate the heat over the length of the
cable and slides around the 90's, instead of burning through them.
D. The maximum length between vaults depends on system designs,
customer requirements, and pulling equipment available. The
average pull normally runs between 500 and 1,000 ft., however,
some systems require cable pulls over 2,000 ft.
E. How many 90-degree sweeps can one pull have before damage is
done to the conductor? The rule of thumb in the industry is a
maximum of 270 degrees. However, some designs or requirements
demand more, but keep in mind every 90-degree sweep adds
pulling tension to the pull. The cable manufacture normally
recommends a maximum pulling tension for a specific size and
type of conductor.
F. Remember a good conduit system is sized, installed, and tested
(mandreled) properly prior to installing the conductor.
5
2. Pulling Equipment
A. Drum type winches - A common practice is using the same drum
puller for overhead and underground, or a bed winch, to pull in the
URD conductor. A drum type puller or winch has no way to
monitor actual line tension. Also, the maximum pulling capacity is
obtained when the drum is empty. As the drum fills up with cable,
the speed increases and the pulling tension decreases. At the end
of the pull when the drum is full, the winch is at its minimum
capacity; and that is when the pull is at its maximum tension.
B. Bullwheel type pullers - A puller with bullwheels maintains the
same speed and tension when the drum is empty as when the
drum is full. The actual drum on this type puller is merely a storage
drum with no effect on the speed or tension.
C. Underground pullers - A puller designed specifically for
underground normally has a dynamometer and footage counter to
allow the operator to monitor and maintain desired pulling tensions
and speeds for safe and efficient cable installation.
6
3. Reel Trailers
A. Reel trailers are built in various designs and configurations and
normally carry from one to four reels. Care should be taken in the
selection of a safe and functional reel trailer with capacities equal
to the size and weights of the conductor reels.
B. A Manual Reel Trailer is most commonly used for underground
construction. This trailer allows the puller to remove the conductor
at it's own speed with a manual overspin brake to prevent
overspinning.
C. A Hydraulic Reel Trailer allows the operator to adjust the speed
and tension of the conductor hydraulically as it flows from the reel
stands. However, care should be taken to ensure enough slack is
available to prevent the reel trailer from pulling against the puller,
which causes unnecessary tension on the conductor.
D. Regardless of the design, manual or hydraulic, the trailer should be
equipped with a ball bearing on the reel shaft to prevent the
additional pulling tension and friction required just to turn the reel.
7
4. Rigging, Blocks, and Accessories
A. Properly installed rigging ensures safe and efficient cable
installation with a minimum amount of damage to the conductor. If
the rigging slips during a pull, causing the pull to stop, the
conductor settles to the bottom of the conduit. When the pull
resumes, the pulling tension required to move the conductor is
much greater than the tension required before the pull stopped.
B. The diameter of the blocks used should be selected to ensure
proper bending radius and installation without damage to the
conductor. The cable manufacture will provide its
recommendations for specific cables and applications.
C. Conduit Rollers are available to assist the conductor from the
conduit to the puller or reel trailer. This roller is designed to fit the
inside of the conduit and provide protection for the conductor as it
slides past the end of the conduit.
D. Lip Rollers are used to assist the conductor over the lip of the vault
or manhole without unnecessary damage.
E. Jamb Skids and Quadrant Blocks are normally used on larger
conductor installations. The jamb skid is designed to rest on the
floor of the vault and is secured to the manhole.
8
F. Feed Tubes assist the conductors from the reel trailers into the
vault and conduit. The round tube helps form the conductors into a
triangle shape to allow proper entry into the conduit. Without this
tool, normally someone has to assist the conductors into the
conduit.
5. Lubricant
A. It is very important to maintain a proper amount of lube on the
conductor as it is pulled into the conduit. Inadequate lubricant can
cause damage and unnecessary tension to the conductor during
installation. How much lube is "proper" or "adequate"? Pulling
conditions vary with conduit, conductor, length of pull, and layout
designs. Attached is a general chart that can be used to determine
the quantity of lubricant. However, the quantity needs to be
adjusted according to the pulling conditions.
9
All of the above areas of consideration are very important steps to ensure safe,
reliable, and long lasting cable installation.
1. A tested and proven Conduit System.
2. Select a Cable Puller to meet your specific needs.
3. The Reel Trailer should be designed to safely transport the conductor.
4. Make sure your rigging is safe and secure.
5. Use adequate amounts of lubricant.
Please feel free to contact me if you have any questions, or if I may be of any
assistance. Thank you for your time and consideration.
10
LUBRICANT IN GALLONS (G)
CONDUIT I.D.
IN INCHES (D)
PULL LENGTH
IN FEET (L) 2” 3” 4”
100 .30 .45 .60
500 1.50 2.25 3.00
1,000 3.00 4.50 6.00
G = L x D x .0015

More Related Content

What's hot

Under ground cables presention
Under ground cables presentionUnder ground cables presention
Under ground cables presentionRazu Khan
 
Electromagnetic Interference & Electromagnetic Compatibility
Electromagnetic Interference  & Electromagnetic CompatibilityElectromagnetic Interference  & Electromagnetic Compatibility
Electromagnetic Interference & Electromagnetic CompatibilitySabeel Irshad
 
Electrical earthing
Electrical earthingElectrical earthing
Electrical earthingDenuka
 
Types of cables
Types of cables Types of cables
Types of cables Nisarg Amin
 
Cable fault location methods (Megger)
Cable fault location methods (Megger)Cable fault location methods (Megger)
Cable fault location methods (Megger)AHMED MOHAMED HEGAB
 
signals and GSM-R in railway ppt
signals and GSM-R in railway pptsignals and GSM-R in railway ppt
signals and GSM-R in railway pptLokesh Gogia
 
Traction distribution
Traction distribution Traction distribution
Traction distribution Amit Kumar
 
Indian Railways Workshop Electrical PPT
Indian Railways Workshop Electrical PPTIndian Railways Workshop Electrical PPT
Indian Railways Workshop Electrical PPTNikunj Parashar
 
Distribution boards and Protection devices ppt
Distribution boards and Protection devices  pptDistribution boards and Protection devices  ppt
Distribution boards and Protection devices pptZuhairQadri
 
fire detection and alarm system
fire detection and alarm systemfire detection and alarm system
fire detection and alarm systemsingh1515
 
Fault detection in Distribution Transformer
Fault detection in Distribution TransformerFault detection in Distribution Transformer
Fault detection in Distribution TransformerVairam _VM
 
Electrical protective devices ec
Electrical protective devices ecElectrical protective devices ec
Electrical protective devices ectrg12345
 
UNIT - 04 POWER INSTALLATIONS
UNIT - 04 POWER INSTALLATIONSUNIT - 04 POWER INSTALLATIONS
UNIT - 04 POWER INSTALLATIONSPremanandDesai
 
Transmission Line Towers and details
Transmission Line Towers and detailsTransmission Line Towers and details
Transmission Line Towers and detailsMahesh Sontyal
 
UNIT - 03 LIGHTING INSTALLATION
UNIT - 03 LIGHTING INSTALLATIONUNIT - 03 LIGHTING INSTALLATION
UNIT - 03 LIGHTING INSTALLATIONPremanandDesai
 
1.Electrical Accidents PPT - Vskp RAJESH CEA.pdf
1.Electrical Accidents PPT - Vskp RAJESH CEA.pdf1.Electrical Accidents PPT - Vskp RAJESH CEA.pdf
1.Electrical Accidents PPT - Vskp RAJESH CEA.pdfssuser4bcf3b
 
Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenancekarikalan123
 

What's hot (20)

Under ground cables presention
Under ground cables presentionUnder ground cables presention
Under ground cables presention
 
Electromagnetic Interference & Electromagnetic Compatibility
Electromagnetic Interference  & Electromagnetic CompatibilityElectromagnetic Interference  & Electromagnetic Compatibility
Electromagnetic Interference & Electromagnetic Compatibility
 
Electrical earthing
Electrical earthingElectrical earthing
Electrical earthing
 
Types of cables
Types of cables Types of cables
Types of cables
 
1.substation layouts
1.substation  layouts1.substation  layouts
1.substation layouts
 
Cable fault location methods (Megger)
Cable fault location methods (Megger)Cable fault location methods (Megger)
Cable fault location methods (Megger)
 
signals and GSM-R in railway ppt
signals and GSM-R in railway pptsignals and GSM-R in railway ppt
signals and GSM-R in railway ppt
 
Traction distribution
Traction distribution Traction distribution
Traction distribution
 
Indian Railways Workshop Electrical PPT
Indian Railways Workshop Electrical PPTIndian Railways Workshop Electrical PPT
Indian Railways Workshop Electrical PPT
 
Distribution boards and Protection devices ppt
Distribution boards and Protection devices  pptDistribution boards and Protection devices  ppt
Distribution boards and Protection devices ppt
 
fire detection and alarm system
fire detection and alarm systemfire detection and alarm system
fire detection and alarm system
 
Fault detection in Distribution Transformer
Fault detection in Distribution TransformerFault detection in Distribution Transformer
Fault detection in Distribution Transformer
 
EMI EMC RE CE
EMI EMC RE  CE  EMI EMC RE  CE
EMI EMC RE CE
 
Electrical protective devices ec
Electrical protective devices ecElectrical protective devices ec
Electrical protective devices ec
 
UNIT - 04 POWER INSTALLATIONS
UNIT - 04 POWER INSTALLATIONSUNIT - 04 POWER INSTALLATIONS
UNIT - 04 POWER INSTALLATIONS
 
Earthing system
Earthing system   Earthing system
Earthing system
 
Transmission Line Towers and details
Transmission Line Towers and detailsTransmission Line Towers and details
Transmission Line Towers and details
 
UNIT - 03 LIGHTING INSTALLATION
UNIT - 03 LIGHTING INSTALLATIONUNIT - 03 LIGHTING INSTALLATION
UNIT - 03 LIGHTING INSTALLATION
 
1.Electrical Accidents PPT - Vskp RAJESH CEA.pdf
1.Electrical Accidents PPT - Vskp RAJESH CEA.pdf1.Electrical Accidents PPT - Vskp RAJESH CEA.pdf
1.Electrical Accidents PPT - Vskp RAJESH CEA.pdf
 
Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenance
 

Similar to Underground cabling installation

Approach cable installation
Approach cable installationApproach cable installation
Approach cable installationMayank Porwal
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15John Grover
 
OFCPulling
OFCPullingOFCPulling
OFCPullingBala V
 
OFC Puling
OFC PulingOFC Puling
OFC PulingBala V
 
01 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 963213697601 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 9632136976Southern Railway
 
194 adss cable-installationguide
194 adss cable-installationguide194 adss cable-installationguide
194 adss cable-installationguidebui thequan
 
Keep running costs down operating en-masse chain conveyors
Keep running costs down operating en-masse chain conveyorsKeep running costs down operating en-masse chain conveyors
Keep running costs down operating en-masse chain conveyorsMilling and Grain magazine
 
A Complete Guide on Directional Boring
A Complete Guide on Directional BoringA Complete Guide on Directional Boring
A Complete Guide on Directional BoringWe-Bore-It
 
commutation failure
commutation failurecommutation failure
commutation failureShiva Kumar
 
Jaipur metro rail corporation summer training report
Jaipur metro rail corporation summer training reportJaipur metro rail corporation summer training report
Jaipur metro rail corporation summer training reportRajendra Jhurawat
 
Cableway guidance note 2 draft specification
Cableway guidance note 2   draft specificationCableway guidance note 2   draft specification
Cableway guidance note 2 draft specificationhydrologyproject0
 
Cableway guidance note 1 design
Cableway guidance note 1   designCableway guidance note 1   design
Cableway guidance note 1 designhydrologyproject0
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am newAhmed Radwan
 
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...John Grover
 
PMT80 Foundation Design & Installation & Commissioning & Safety.pdf
PMT80 Foundation Design & Installation & Commissioning & Safety.pdfPMT80 Foundation Design & Installation & Commissioning & Safety.pdf
PMT80 Foundation Design & Installation & Commissioning & Safety.pdfssuseref23d3
 
casing and cementing _ ADCO drilling manual
casing and cementing _ ADCO drilling manualcasing and cementing _ ADCO drilling manual
casing and cementing _ ADCO drilling manualEnriqueFigueroa42
 
Foundations for SPAR Platforms1.pptx
Foundations for SPAR Platforms1.pptxFoundations for SPAR Platforms1.pptx
Foundations for SPAR Platforms1.pptxMailapalliJayaRaju
 

Similar to Underground cabling installation (20)

Approach cable installation
Approach cable installationApproach cable installation
Approach cable installation
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15
 
OFCPulling
OFCPullingOFCPulling
OFCPulling
 
OFC Puling
OFC PulingOFC Puling
OFC Puling
 
01 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 963213697601 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 9632136976
 
194 adss cable-installationguide
194 adss cable-installationguide194 adss cable-installationguide
194 adss cable-installationguide
 
Keep running costs down operating en-masse chain conveyors
Keep running costs down operating en-masse chain conveyorsKeep running costs down operating en-masse chain conveyors
Keep running costs down operating en-masse chain conveyors
 
Trenchless Technologies
Trenchless TechnologiesTrenchless Technologies
Trenchless Technologies
 
Pipe Jacking
Pipe JackingPipe Jacking
Pipe Jacking
 
A Complete Guide on Directional Boring
A Complete Guide on Directional BoringA Complete Guide on Directional Boring
A Complete Guide on Directional Boring
 
commutation failure
commutation failurecommutation failure
commutation failure
 
Jaipur metro rail corporation summer training report
Jaipur metro rail corporation summer training reportJaipur metro rail corporation summer training report
Jaipur metro rail corporation summer training report
 
2012 offshore wind cables
2012 offshore wind cables2012 offshore wind cables
2012 offshore wind cables
 
Cableway guidance note 2 draft specification
Cableway guidance note 2   draft specificationCableway guidance note 2   draft specification
Cableway guidance note 2 draft specification
 
Cableway guidance note 1 design
Cableway guidance note 1   designCableway guidance note 1   design
Cableway guidance note 1 design
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am new
 
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
 
PMT80 Foundation Design & Installation & Commissioning & Safety.pdf
PMT80 Foundation Design & Installation & Commissioning & Safety.pdfPMT80 Foundation Design & Installation & Commissioning & Safety.pdf
PMT80 Foundation Design & Installation & Commissioning & Safety.pdf
 
casing and cementing _ ADCO drilling manual
casing and cementing _ ADCO drilling manualcasing and cementing _ ADCO drilling manual
casing and cementing _ ADCO drilling manual
 
Foundations for SPAR Platforms1.pptx
Foundations for SPAR Platforms1.pptxFoundations for SPAR Platforms1.pptx
Foundations for SPAR Platforms1.pptx
 

More from Amit Kumar

Electrical maintenance work profile & need of it
Electrical maintenance work profile & need of itElectrical maintenance work profile & need of it
Electrical maintenance work profile & need of itAmit Kumar
 
HVAC Lecture Notes
HVAC Lecture NotesHVAC Lecture Notes
HVAC Lecture NotesAmit Kumar
 
Hvac Lecture Notes
Hvac Lecture NotesHvac Lecture Notes
Hvac Lecture NotesAmit Kumar
 
Material movement in a manufacturing plant
Material movement in a manufacturing plantMaterial movement in a manufacturing plant
Material movement in a manufacturing plantAmit Kumar
 
Mep elec abbrivations
Mep elec  abbrivationsMep elec  abbrivations
Mep elec abbrivationsAmit Kumar
 
Love you till i find someone better
Love you till i find someone betterLove you till i find someone better
Love you till i find someone betterAmit Kumar
 
Scada presentation
Scada presentationScada presentation
Scada presentationAmit Kumar
 
Substation journal
Substation  journalSubstation  journal
Substation journalAmit Kumar
 
Technical instructions to work
Technical instructions to workTechnical instructions to work
Technical instructions to workAmit Kumar
 
Technical specification EEE
Technical specification EEETechnical specification EEE
Technical specification EEEAmit Kumar
 
Three d company-AAI Presentation
Three d company-AAI PresentationThree d company-AAI Presentation
Three d company-AAI PresentationAmit Kumar
 

More from Amit Kumar (20)

Electrical maintenance work profile & need of it
Electrical maintenance work profile & need of itElectrical maintenance work profile & need of it
Electrical maintenance work profile & need of it
 
Motor
MotorMotor
Motor
 
HVAC Lecture Notes
HVAC Lecture NotesHVAC Lecture Notes
HVAC Lecture Notes
 
Hvac Lecture Notes
Hvac Lecture NotesHvac Lecture Notes
Hvac Lecture Notes
 
Material movement in a manufacturing plant
Material movement in a manufacturing plantMaterial movement in a manufacturing plant
Material movement in a manufacturing plant
 
Mep elec abbrivations
Mep elec  abbrivationsMep elec  abbrivations
Mep elec abbrivations
 
Love you till i find someone better
Love you till i find someone betterLove you till i find someone better
Love you till i find someone better
 
Plc tags
Plc tagsPlc tags
Plc tags
 
Plumbing
PlumbingPlumbing
Plumbing
 
Fire
FireFire
Fire
 
Hvac R&Amp
Hvac R&Amp Hvac R&Amp
Hvac R&Amp
 
ABB Relay
ABB RelayABB Relay
ABB Relay
 
Scada
ScadaScada
Scada
 
Scada presentation
Scada presentationScada presentation
Scada presentation
 
CRP testing
CRP testingCRP testing
CRP testing
 
Substation journal
Substation  journalSubstation  journal
Substation journal
 
Technical instructions to work
Technical instructions to workTechnical instructions to work
Technical instructions to work
 
Technical specification EEE
Technical specification EEETechnical specification EEE
Technical specification EEE
 
Firefighting
FirefightingFirefighting
Firefighting
 
Three d company-AAI Presentation
Three d company-AAI PresentationThree d company-AAI Presentation
Three d company-AAI Presentation
 

Recently uploaded

chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 

Recently uploaded (20)

chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 

Underground cabling installation

  • 1. UNDERGROUND CABLE INSTALLATION EQUIPMENT & PROCEDURES PRESENTED AT SOUTHWEST TRAINING EXPO FEBRUARY, 2000 PRESENTED BY JERRY C. CHEEKS REGIONAL SALES MANAGER
  • 2. 2 Underground Cable Installation Equipment & Procedures When the decision is made to "Go Underground" on a new distribution system, there are many different areas to consider prior to construction. In the following paper, we would like to suggest some of these areas for your consideration in regards to equipment and procedures for underground cable installation. The three most common methods of cable placement are Direct Buried, Cable in Conduit, and a Total Conduit System. Most Utilities are currently using one or more of these methods with various degrees of success. The first system or method commonly undertaken is the Direct Buried method. As this system matures, a few questions come to the surface. How much care was taken in preparation of the trench? How was the cable placed in the trench? How does different cables react to different soils and ground conditions? How complicated is it to replace damaged or faulted cable? When a fault or damage caused by digging occurs, it is very time consuming to open the trench and make repairs. All these factors and many more affect the reliability and life of the conductor.
  • 3. 3 Due to these and other conditions, the Cable in Conduit method is considered in some areas. The cable is placed in a conduit during the manufacturing process, and this conduit protects the conductor as it lies in the trench, giving it longer life. However, most of the same questions occur when using the C.I.C. method as occurs when using the Direct Buried method. The particular method we would like to discuss in this paper is the Total Conduit System. 1. System Preparation: A. A good system must be installed properly with attention given to preparation of the trenches, placement of the conduit, and care used when backfilling the trenches. B. Consideration should be given to selecting the size of inside diameter to ensure adequate fill ratios and schedules such as DB-120, SCH-40, or SCH-80 as required in specific areas. C. The pulling cable has a great impact on the selection of the schedule of the conduit. Initially, everyone assumed if synthetic rope is good enough for overhead, it must be good enough for underground as well. However, we learned synthetic rope
  • 4. 4 generates heat, causes friction, and burns through the PVC. The most common response was to increase the wall thickness of the conduit or even go to steel 90's in order to stop this problem. Since the rope was causing the problem, most pullers today use steel pulling ropes. Steel ropes dissipate the heat over the length of the cable and slides around the 90's, instead of burning through them. D. The maximum length between vaults depends on system designs, customer requirements, and pulling equipment available. The average pull normally runs between 500 and 1,000 ft., however, some systems require cable pulls over 2,000 ft. E. How many 90-degree sweeps can one pull have before damage is done to the conductor? The rule of thumb in the industry is a maximum of 270 degrees. However, some designs or requirements demand more, but keep in mind every 90-degree sweep adds pulling tension to the pull. The cable manufacture normally recommends a maximum pulling tension for a specific size and type of conductor. F. Remember a good conduit system is sized, installed, and tested (mandreled) properly prior to installing the conductor.
  • 5. 5 2. Pulling Equipment A. Drum type winches - A common practice is using the same drum puller for overhead and underground, or a bed winch, to pull in the URD conductor. A drum type puller or winch has no way to monitor actual line tension. Also, the maximum pulling capacity is obtained when the drum is empty. As the drum fills up with cable, the speed increases and the pulling tension decreases. At the end of the pull when the drum is full, the winch is at its minimum capacity; and that is when the pull is at its maximum tension. B. Bullwheel type pullers - A puller with bullwheels maintains the same speed and tension when the drum is empty as when the drum is full. The actual drum on this type puller is merely a storage drum with no effect on the speed or tension. C. Underground pullers - A puller designed specifically for underground normally has a dynamometer and footage counter to allow the operator to monitor and maintain desired pulling tensions and speeds for safe and efficient cable installation.
  • 6. 6 3. Reel Trailers A. Reel trailers are built in various designs and configurations and normally carry from one to four reels. Care should be taken in the selection of a safe and functional reel trailer with capacities equal to the size and weights of the conductor reels. B. A Manual Reel Trailer is most commonly used for underground construction. This trailer allows the puller to remove the conductor at it's own speed with a manual overspin brake to prevent overspinning. C. A Hydraulic Reel Trailer allows the operator to adjust the speed and tension of the conductor hydraulically as it flows from the reel stands. However, care should be taken to ensure enough slack is available to prevent the reel trailer from pulling against the puller, which causes unnecessary tension on the conductor. D. Regardless of the design, manual or hydraulic, the trailer should be equipped with a ball bearing on the reel shaft to prevent the additional pulling tension and friction required just to turn the reel.
  • 7. 7 4. Rigging, Blocks, and Accessories A. Properly installed rigging ensures safe and efficient cable installation with a minimum amount of damage to the conductor. If the rigging slips during a pull, causing the pull to stop, the conductor settles to the bottom of the conduit. When the pull resumes, the pulling tension required to move the conductor is much greater than the tension required before the pull stopped. B. The diameter of the blocks used should be selected to ensure proper bending radius and installation without damage to the conductor. The cable manufacture will provide its recommendations for specific cables and applications. C. Conduit Rollers are available to assist the conductor from the conduit to the puller or reel trailer. This roller is designed to fit the inside of the conduit and provide protection for the conductor as it slides past the end of the conduit. D. Lip Rollers are used to assist the conductor over the lip of the vault or manhole without unnecessary damage. E. Jamb Skids and Quadrant Blocks are normally used on larger conductor installations. The jamb skid is designed to rest on the floor of the vault and is secured to the manhole.
  • 8. 8 F. Feed Tubes assist the conductors from the reel trailers into the vault and conduit. The round tube helps form the conductors into a triangle shape to allow proper entry into the conduit. Without this tool, normally someone has to assist the conductors into the conduit. 5. Lubricant A. It is very important to maintain a proper amount of lube on the conductor as it is pulled into the conduit. Inadequate lubricant can cause damage and unnecessary tension to the conductor during installation. How much lube is "proper" or "adequate"? Pulling conditions vary with conduit, conductor, length of pull, and layout designs. Attached is a general chart that can be used to determine the quantity of lubricant. However, the quantity needs to be adjusted according to the pulling conditions.
  • 9. 9 All of the above areas of consideration are very important steps to ensure safe, reliable, and long lasting cable installation. 1. A tested and proven Conduit System. 2. Select a Cable Puller to meet your specific needs. 3. The Reel Trailer should be designed to safely transport the conductor. 4. Make sure your rigging is safe and secure. 5. Use adequate amounts of lubricant. Please feel free to contact me if you have any questions, or if I may be of any assistance. Thank you for your time and consideration.