10.030 CABLEWAY GUIDANCE NOTE 2:
DRAFT SPECIFICATION
Approval Date: this is a guidance note only Version: 1
Purpose
The cable way is to be used for discharge measurements by current meters, in rivers.
Conditions and requirements
• The cable way shall be of such a design that it operates reliably and safely under
the prevailing environmental conditions.
• The cable way shall be bank operated.
• The cable way shall be easy to operate and maintain.
• The cable way shall be supplied with accessories as needed for effective
deployment.
• All critical materials on the cable way exterior shall be non-corrosive.
• The cable way shall have an expected technical lifetime of not less than 10 years.
• Operating and maintenance manuals, related to the type and model of the cable
way, shall be part of the delivery.
• A hand driven winch system to traverse the trolley (instrument carrier) and to lower
and hoist the current meter shall be provided at one of the towers on the
riverbanks.
• While winding, the cable shall be wound gradually guided from the one drum end to
the other and vice versa, to lay the windings tidily next to each other.
• The winch system shall have a distance and a depth counter, both re-settable.
• The suspension cable, shall have an incorporated insulated electrical conductor, to
connect the current meter to a pulse counter via a slip-ring set at the winch system.
• The suspension cable shall match the cup/propeller type current meters.
• If a propeller type flow meter is used then the suspension cable shall be torque
free.
• Instrument suspension cable shall disengage itself, in case drag load on it exceeds
2,500 Newton, due to either current on it or on attached debris etc.
• Construction and support are not part of this specification.
• It is recommended that the supplier be made responsible for all facets of the work,
i.e. design, supply, installation and commissioning and training.
• Optionally, and in addition to the hand driven system, a motor driven winch system
could be included. The motor could be an electrical motor or a diesel engine.
• If an electrical winch is specified, then a compatible power generator should be
included in the delivery.
• The winch motor shall be reliable both in starting and in control.
• The motor driven winch system shall have a manual override.
• The current meter shall be equipped with a bottom sensor below the current meter
body.
• Upon reaching and touching the bottom, the bottom sensor shall close a switch.
The switch closure shall generate an electrical signal over the measuring cable to
notify the observer, e.g. by an audible alarm and/or a signal light.
• The speed of the winch shall be reliably controllable for accurate positioning of the
interments.
Equipment Guidance Note: CABLEWAY Version 1 10.030-1/2
• After positioning and blocking the cables for measurements, none of the cables
may slip except when overloaded. In the latter case of an overload the built in
safety measures may be activated.
Specifications
The purchaser may execute his judicious discretion in the choice of configuration and
options.
river width •up to 100 m size 1
•up to 200 m size 2
river depth max. 20 m
flow velocity max. 5 m/s
mass of current meter up to 125 kg, including sinker weight
Winch motor
electrical 220 VAC ±25%, 47 to 53 Hz
temperature range 0 to 50 °C
housing splash waterproof
OR
diesel sufficient power
Remarks
The design for the cable way depends on the site specific conditions. The engineer in
charge shall finalise details for tower height, minimum admissible clearance between
peak water level and cable, bank where the winch shall be located, civil works etc, in
collaboration with the supplier.
Equipment Guidance Note: CABLEWAY Version 1 10.030-1/2

More Related Content

What's hot

Industrial training report
Industrial training report Industrial training report
Industrial training report Pritam Samanta
 
Transformer Maintenance and Testing
Transformer Maintenance and TestingTransformer Maintenance and Testing
Transformer Maintenance and TestingGPTraining
 
Internship Report at a 132/33 KV transmission station
Internship Report at a 132/33 KV transmission stationInternship Report at a 132/33 KV transmission station
Internship Report at a 132/33 KV transmission stationOluwaseun Amodu
 
Related RE work (LT, 11kV & 33kV)
Related RE work (LT, 11kV & 33kV)Related RE work (LT, 11kV & 33kV)
Related RE work (LT, 11kV & 33kV)SAJAL KUMAR BAG
 
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREUNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREPremanandDesai
 
Sub stations-air insulated substations
Sub stations-air insulated substationsSub stations-air insulated substations
Sub stations-air insulated substationsbhanu lucky
 
Installation Operation & Maintenance of 33kV & 11kV Switchgear
Installation   Operation & Maintenance of 33kV & 11kV SwitchgearInstallation   Operation & Maintenance of 33kV & 11kV Switchgear
Installation Operation & Maintenance of 33kV & 11kV SwitchgearSheikh Nazmul Islam
 
Kyn28 metal clad switchgear
Kyn28 metal clad switchgearKyn28 metal clad switchgear
Kyn28 metal clad switchgearJoeChueng
 
Electrical substation general_equipments
Electrical substation general_equipmentsElectrical substation general_equipments
Electrical substation general_equipmentsEman Dacanay
 
AUDIO FREQUENCY TRACK CIRCUITS
AUDIO FREQUENCY TRACK CIRCUITSAUDIO FREQUENCY TRACK CIRCUITS
AUDIO FREQUENCY TRACK CIRCUITSsspardesh
 

What's hot (19)

RVR-1(3) automatic step voltage regulator
RVR-1(3) automatic step voltage regulatorRVR-1(3) automatic step voltage regulator
RVR-1(3) automatic step voltage regulator
 
KYN28 12kV Medium voltage metal clad switchgear
KYN28 12kV Medium voltage metal clad switchgearKYN28 12kV Medium voltage metal clad switchgear
KYN28 12kV Medium voltage metal clad switchgear
 
Industrial training report
Industrial training report Industrial training report
Industrial training report
 
Transformer Maintenance and Testing
Transformer Maintenance and TestingTransformer Maintenance and Testing
Transformer Maintenance and Testing
 
Standing type outdoor full sf6 gas insualted ring main unit
Standing type outdoor full sf6 gas insualted ring main unitStanding type outdoor full sf6 gas insualted ring main unit
Standing type outdoor full sf6 gas insualted ring main unit
 
Internship Report at a 132/33 KV transmission station
Internship Report at a 132/33 KV transmission stationInternship Report at a 132/33 KV transmission station
Internship Report at a 132/33 KV transmission station
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
SM66-24RMU Modular Switchgear
SM66-24RMU Modular SwitchgearSM66-24RMU Modular Switchgear
SM66-24RMU Modular Switchgear
 
Related RE work (LT, 11kV & 33kV)
Related RE work (LT, 11kV & 33kV)Related RE work (LT, 11kV & 33kV)
Related RE work (LT, 11kV & 33kV)
 
Transformers
TransformersTransformers
Transformers
 
RBM Type Outdoor metering unit catalog
RBM Type Outdoor metering unit catalogRBM Type Outdoor metering unit catalog
RBM Type Outdoor metering unit catalog
 
36kV high voltage drawout VCB type switchgear
36kV high voltage drawout VCB type switchgear36kV high voltage drawout VCB type switchgear
36kV high voltage drawout VCB type switchgear
 
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREUNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
 
Perfiles
PerfilesPerfiles
Perfiles
 
Sub stations-air insulated substations
Sub stations-air insulated substationsSub stations-air insulated substations
Sub stations-air insulated substations
 
Installation Operation & Maintenance of 33kV & 11kV Switchgear
Installation   Operation & Maintenance of 33kV & 11kV SwitchgearInstallation   Operation & Maintenance of 33kV & 11kV Switchgear
Installation Operation & Maintenance of 33kV & 11kV Switchgear
 
Kyn28 metal clad switchgear
Kyn28 metal clad switchgearKyn28 metal clad switchgear
Kyn28 metal clad switchgear
 
Electrical substation general_equipments
Electrical substation general_equipmentsElectrical substation general_equipments
Electrical substation general_equipments
 
AUDIO FREQUENCY TRACK CIRCUITS
AUDIO FREQUENCY TRACK CIRCUITSAUDIO FREQUENCY TRACK CIRCUITS
AUDIO FREQUENCY TRACK CIRCUITS
 

Similar to Cableway guidance note 2 draft specification

Current meter, electromagnetic
Current meter, electromagneticCurrent meter, electromagnetic
Current meter, electromagnetichydrologyproject0
 
Current meter, propeller type
Current meter, propeller typeCurrent meter, propeller type
Current meter, propeller typehydrologyproject0
 
10 different equipment used in Distribution Substation
10 different equipment used in Distribution Substation10 different equipment used in Distribution Substation
10 different equipment used in Distribution SubstationDevanshVarma1
 
Electrical_substation_general_equipments.ppt
Electrical_substation_general_equipments.pptElectrical_substation_general_equipments.ppt
Electrical_substation_general_equipments.pptBrijeshKumar33410
 
Accessories track electrifiction
Accessories  track electrifictionAccessories  track electrifiction
Accessories track electrifictionvishalgohel12195
 
Substation presentation by ram
Substation presentation by ramSubstation presentation by ram
Substation presentation by ramGRBabu Naidu
 
Current meter, electromagnetic (wading use)
Current meter, electromagnetic (wading use)Current meter, electromagnetic (wading use)
Current meter, electromagnetic (wading use)hydrologyproject0
 
Training at 132 kv substation
Training at 132 kv substation Training at 132 kv substation
Training at 132 kv substation Tejveer Choudhary
 
underground cable in transmission grid
underground cable in transmission gridunderground cable in transmission grid
underground cable in transmission gridEngr. naeem
 
commutation failure
commutation failurecommutation failure
commutation failureShiva Kumar
 
Introduction to HVDC
Introduction to HVDCIntroduction to HVDC
Introduction to HVDCSushma57624
 
Electric Traction Current Collection System.ppt
Electric Traction Current Collection System.pptElectric Traction Current Collection System.ppt
Electric Traction Current Collection System.pptDrAyyarKandasamy
 
01 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 963213697601 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 9632136976Southern Railway
 

Similar to Cableway guidance note 2 draft specification (20)

Boat outfit
Boat outfitBoat outfit
Boat outfit
 
Current meter, electromagnetic
Current meter, electromagneticCurrent meter, electromagnetic
Current meter, electromagnetic
 
Current meter, propeller type
Current meter, propeller typeCurrent meter, propeller type
Current meter, propeller type
 
Current meter, cup type
Current meter, cup typeCurrent meter, cup type
Current meter, cup type
 
Current meter, pygmy type
Current meter, pygmy typeCurrent meter, pygmy type
Current meter, pygmy type
 
10 different equipment used in Distribution Substation
10 different equipment used in Distribution Substation10 different equipment used in Distribution Substation
10 different equipment used in Distribution Substation
 
Electrical_substation_general_equipments.ppt
Electrical_substation_general_equipments.pptElectrical_substation_general_equipments.ppt
Electrical_substation_general_equipments.ppt
 
Accessories track electrifiction
Accessories  track electrifictionAccessories  track electrifiction
Accessories track electrifiction
 
Substation presentation by ram
Substation presentation by ramSubstation presentation by ram
Substation presentation by ram
 
Current meter, electromagnetic (wading use)
Current meter, electromagnetic (wading use)Current meter, electromagnetic (wading use)
Current meter, electromagnetic (wading use)
 
Fusing Metering Voltages for High Capacity Circuits
Fusing Metering Voltages for High Capacity CircuitsFusing Metering Voltages for High Capacity Circuits
Fusing Metering Voltages for High Capacity Circuits
 
Training at 132 kv substation
Training at 132 kv substation Training at 132 kv substation
Training at 132 kv substation
 
UNIT-5 TD_Study Notes.pptx
UNIT-5 TD_Study Notes.pptxUNIT-5 TD_Study Notes.pptx
UNIT-5 TD_Study Notes.pptx
 
underground cable in transmission grid
underground cable in transmission gridunderground cable in transmission grid
underground cable in transmission grid
 
commutation failure
commutation failurecommutation failure
commutation failure
 
Introduction to HVDC
Introduction to HVDCIntroduction to HVDC
Introduction to HVDC
 
Electric Traction Current Collection System.ppt
Electric Traction Current Collection System.pptElectric Traction Current Collection System.ppt
Electric Traction Current Collection System.ppt
 
01 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 963213697601 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 9632136976
 
CESC LTD. TRAINING REPORT
CESC LTD. TRAINING REPORTCESC LTD. TRAINING REPORT
CESC LTD. TRAINING REPORT
 
Substations
SubstationsSubstations
Substations
 

More from hydrologyproject0

More from hydrologyproject0 (20)

Specification purewater
Specification purewaterSpecification purewater
Specification purewater
 
Water purifier ion exchange resin column
Water purifier ion exchange resin columnWater purifier ion exchange resin column
Water purifier ion exchange resin column
 
Water purifier, double distillation unit
Water purifier, double distillation unitWater purifier, double distillation unit
Water purifier, double distillation unit
 
Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)
 
Water geyser (heater)
Water geyser (heater)Water geyser (heater)
Water geyser (heater)
 
Water bath, general purpose
Water bath, general purposeWater bath, general purpose
Water bath, general purpose
 
Water bath, bacteriological
Water bath, bacteriologicalWater bath, bacteriological
Water bath, bacteriological
 
Wash bottle
Wash bottleWash bottle
Wash bottle
 
Volumetric flask
Volumetric flaskVolumetric flask
Volumetric flask
 
Visual accumulation tube
Visual accumulation tubeVisual accumulation tube
Visual accumulation tube
 
Vacuum pump
Vacuum pumpVacuum pump
Vacuum pump
 
Turbidity meter (nephelometer)
Turbidity meter (nephelometer)Turbidity meter (nephelometer)
Turbidity meter (nephelometer)
 
Tool kit
Tool kitTool kit
Tool kit
 
Toc analyser, microprocessor controlled
Toc analyser, microprocessor controlledToc analyser, microprocessor controlled
Toc analyser, microprocessor controlled
 
Tissue grinder
Tissue grinderTissue grinder
Tissue grinder
 
Thermometers, set of
Thermometers, set ofThermometers, set of
Thermometers, set of
 
Test tubes
Test tubesTest tubes
Test tubes
 
Test sieves with shaker
Test sieves with shakerTest sieves with shaker
Test sieves with shaker
 
Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)
 
Sterliser, autoclave
Sterliser, autoclaveSterliser, autoclave
Sterliser, autoclave
 

Cableway guidance note 2 draft specification

  • 1. 10.030 CABLEWAY GUIDANCE NOTE 2: DRAFT SPECIFICATION Approval Date: this is a guidance note only Version: 1 Purpose The cable way is to be used for discharge measurements by current meters, in rivers. Conditions and requirements • The cable way shall be of such a design that it operates reliably and safely under the prevailing environmental conditions. • The cable way shall be bank operated. • The cable way shall be easy to operate and maintain. • The cable way shall be supplied with accessories as needed for effective deployment. • All critical materials on the cable way exterior shall be non-corrosive. • The cable way shall have an expected technical lifetime of not less than 10 years. • Operating and maintenance manuals, related to the type and model of the cable way, shall be part of the delivery. • A hand driven winch system to traverse the trolley (instrument carrier) and to lower and hoist the current meter shall be provided at one of the towers on the riverbanks. • While winding, the cable shall be wound gradually guided from the one drum end to the other and vice versa, to lay the windings tidily next to each other. • The winch system shall have a distance and a depth counter, both re-settable. • The suspension cable, shall have an incorporated insulated electrical conductor, to connect the current meter to a pulse counter via a slip-ring set at the winch system. • The suspension cable shall match the cup/propeller type current meters. • If a propeller type flow meter is used then the suspension cable shall be torque free. • Instrument suspension cable shall disengage itself, in case drag load on it exceeds 2,500 Newton, due to either current on it or on attached debris etc. • Construction and support are not part of this specification. • It is recommended that the supplier be made responsible for all facets of the work, i.e. design, supply, installation and commissioning and training. • Optionally, and in addition to the hand driven system, a motor driven winch system could be included. The motor could be an electrical motor or a diesel engine. • If an electrical winch is specified, then a compatible power generator should be included in the delivery. • The winch motor shall be reliable both in starting and in control. • The motor driven winch system shall have a manual override. • The current meter shall be equipped with a bottom sensor below the current meter body. • Upon reaching and touching the bottom, the bottom sensor shall close a switch. The switch closure shall generate an electrical signal over the measuring cable to notify the observer, e.g. by an audible alarm and/or a signal light. • The speed of the winch shall be reliably controllable for accurate positioning of the interments. Equipment Guidance Note: CABLEWAY Version 1 10.030-1/2
  • 2. • After positioning and blocking the cables for measurements, none of the cables may slip except when overloaded. In the latter case of an overload the built in safety measures may be activated. Specifications The purchaser may execute his judicious discretion in the choice of configuration and options. river width •up to 100 m size 1 •up to 200 m size 2 river depth max. 20 m flow velocity max. 5 m/s mass of current meter up to 125 kg, including sinker weight Winch motor electrical 220 VAC ±25%, 47 to 53 Hz temperature range 0 to 50 °C housing splash waterproof OR diesel sufficient power Remarks The design for the cable way depends on the site specific conditions. The engineer in charge shall finalise details for tower height, minimum admissible clearance between peak water level and cable, bank where the winch shall be located, civil works etc, in collaboration with the supplier. Equipment Guidance Note: CABLEWAY Version 1 10.030-1/2