1. SLOPE
Integrated proceSsing and controL systems fOr sustainable forest Production in mountain arEas
WORK PACKAGE 6: SYSTEM INTEGRATION
FONDAZIONE GRAPHITECH
THEME:
Integrated processing and Control Systems for
Sustainable Production in Farms and Forests
Duration: 36 Months
Partners: 10
Coordinating institution: Fondazione Graphitech
Coordinator: Dr. Raffaele De Amicis
Kick-off Meeting
8-9/jan/2014
3. Work Package Goals
“Achieve a complete integration of the different components that are part of
the SLOPE platform”
WP 2 Components
WP 3 Components
WP 5 Components
Forest information
collection and analysis
COA,FLY,GT,ITE,TRE
Integration of novel
intelligent harvesting systems
CNR, GRE,KES,ITE,MHG
Forest information
system development
CNR,TRE,BO
WP6 Integration (All Partners)
SLOPE PLATFORM
Kick-off Meeting
8-9/jan/2014
4. Work Package Goals
• Build a WORKING System
• Ready for pilots and on the field testing
• 3 integration steps
T.6.2
• 3 main tasks (T.6.2,T.6.3,T.6.4)
• Technical and Economical Analysis
• Overall solution costs
• Social impacts
• Environmental impacts
T.6.3
T.6.4
Kick-off Meeting
8-9/jan/2014
6. Timeline
2014
2015
2016
G F M A M J J A S O N D G F M A M J J A S O N D G F M A M J J A S O N D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration – Forest inventory & harvesting systems
T.6.3 Second integration – Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
Kick-off Meeting
8-9/jan/2014
7. Timeline & Deliverables
2014
2015
2016
G F M A M J J A S O N D G F M A M J J A S O N D G F M A M J J A S O N D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration – Forest inventory & harvesting systems
T.6.3 Second integration – Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
D.6.01 System Integration and Validation Plan
D.6.021 System Integration Report I
D.6.041 SLOPE System Techno-Economic Evaluation Report I
D.6.022 System Integration Report II
D.6.042 SLOPE System Techno-Economic Evaluation Report II
D.6.023 System Integration Report III
D.6.043 SLOPE System Techno-Economic Evaluation Report III
D.6.03 SLOPE System Field Trials Readiness Assessment Report
Kick-off Meeting
8-9/jan/2014
8. Timeline & Deliverable & Milestone
2014
2015
2016
G F M A M J J A S O N D G F M A M J J A S O N D G F M A M J J A S O N D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration – Forest inventory & harvesting systems
T.6.3 Second integration – Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
D.6.01 System Integration and Validation Plan
MS04 SLOPE System Integration Planning is completed
D.6.021 System Integration Report I
D.6.041 SLOPE System Techno-Economic Evaluation Report I
MS05 Forest Inventory and Intelligent Harvesting system integration
D.6.022 System Integration Report II
D.6.042 SLOPE System Techno-Economic Evaluation Report II
MS07 Forest Management system integrated
D.6.023 System Integration Report III
D.6.043 SLOPE System Techno-Economic Evaluation Report III
D.6.03 SLOPE System Field Trials Readiness Assessment Report
MS09 System testing ending
Kick-off Meeting
8-9/jan/2014
9. Timeline & Deliverable & Milestone & Project Meetings
2014
2015
2016
G F M A M J J A S O N D G F M A M J J A S O N D G F M A M J J A S O N D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration – Forest inventory & harvesting systems
T.6.3 Second integration – Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
D.6.01 System Integration and Validation Plan
MS04 SLOPE System Integration Planning is completed
D.6.021 System Integration Report I
D.6.041 SLOPE System Techno-Economic Evaluation Report I
MS05 Forest Inventory and Intelligent Harvesting system integration
D.6.022 System Integration Report II
D.6.042 SLOPE System Techno-Economic Evaluation Report II
MS07 Forest Management system integrated
D.6.023 System Integration Report III
D.6.043 SLOPE System Techno-Economic Evaluation Report III
D.6.03 SLOPE System Field Trials Readiness Assessment Report
MS09 System testing ending
Kick-off Meeting
8-9/jan/2014
10. Deliverables
• D. 6.01 System Integration and Validation Plan
•
•
Integration and validation procedures and timeline to validate the SLOPE system
Based on the use cases in WP1
• D.6.03 SLOPE System Field Trials Readiness Assessment Report
•
•
Assessment of the initial user experience and recommendations for the field trials
operations.
Guidance and system operation manual for the Field Trials operators
Kick-off Meeting
8-9/jan/2014
11. Deliverables
• D. 6.021 System Integration Report I:
•
•
•
Integration test and validation concept procedures results
Assessment of the initial user experience
Recommendations for field trials operations
• D 6.022 System Integration Report II:
•
•
•
Integration test and validation concept procedures results (rev. 2)
Assessment of the initial user experience (rev. 2)
Recommendations for field trials operations (rev. 2)
• D 6.023 System Integration Report III:
•
•
•
Integration test and validation concept procedures results (rev. 3)
Assessment of the initial user experience (rev. 3)
Recommendations for field trials operations (rev. 3)
Kick-off Meeting
8-9/jan/2014
12. Deliverables
• D6.041 SLOPE System Techno-Economic Evaluation Report I:
•
•
•
Analysis of technical and economical aspects of SLOPE system
Current practices and the potential known alternatives comparison
Estimation phase
• D6.042 SLOPE System Techno-Economic Evaluation Report II:
•
•
•
Analysis of technical and economical aspects of SLOPE system
Current practices and the potential known alternatives comparison
Preliminary results phase
• D6.043 SLOPE System Techno-Economic Evaluation Report III:
•
•
•
Analysis of technical and economical aspects of SLOPE system
Current practices and the potential known alternatives comparison
Final results phase
Kick-off Meeting
8-9/jan/2014
13. Risks
• Data Formats
• DB Model
• Reduce Harmonization/adaptation
• Images
• Unreliable Services
• Hardware interfaces with software
• Rfid
• BT
• Unability to reproduce planned
test field/conditions
• Component testing takes time!
Kick-off Meeting
8-9/jan/2014
14. Mitigating Actions
•
•
•
•
Exhaustive System Architecture
Exhaustive requirement analysis
Common data model (T.1.4)
Communication
•
•
Skype (Small Group, no desktop sharing)
Webex (up to 25 persons with desktop sharing)
Kick-off Meeting
8-9/jan/2014
15. Contacts
Coordination
Dr. Raffaele De Amicis
Technical & Scientific Coordination
Dr. Federico Prandi
Technical Development
Giulio Panizzoni, Federico Devigili, Daniele Magliocchetti
Project Administration (financial reporting included)
Camilla Saiani, Letizia Santato
Kick-off Meeting
8-9/jan/2014
17. Thank you for your attention
DANIELE MAGLIOCCHETTI
daniele.magliocchetti@graphitech.it
Fondazione Graphitech
Via Alla Cascata 56C
38123 Trento (ITALY)
Phone: +39 0461.283395
Fax: +39 0461.283398
Kick-off Meeting
8-9/jan/2014
18. Task 6.5
Scientific Coordination
• Leader: Graphitech
Objectives
•
•
•
•
Technical supervision of technology functionalities as planned
Management of issues related to Software licenses and/or required hardware
Quality Assurance and assessment/evaluation of technology results
Regular reporting of the technical development of the project
Kick-off Meeting
8-9/jan/2014