SlideShare a Scribd company logo
1 of 14
Download to read offline
Reservoir lab. Core plugging
Date: Nov 19th
2015 Group:B lab. No:1
Koya University
Faculty of Engineering
Petroleum Engineering Department
Reservoir lab
Third stage
Lab. No:1
Core plugging
Prepared by: Sarwar Salam
Supervised by:
Mr. Barham–Mr.haval
Reservoir lab. Core plugging
Date: Nov 19th
2015 Group:B lab. No:1
Aim of experiment:
The purpose of this particular experiment is to plug or
prepare a core sample in a non-uniform rock sample of
about adequate size and smoothing the final core sample
and preparing it for further reservoir test, measurements
as well in the lab.
Reservoir lab. Core plugging
Date: Nov 19th
2015 Group:B lab. No:1
Introduction to Experiment:
Coring and core analysis form an integral part of
formation evaluation and provide vital information
unavailable from either log measurements or
productivity tests.
Core information includes detailed lithology,
microscopic and macroscopic definition of the
heterogeneity of the reservoir rock, capillary pressure
data defining fluid distribution in the reservoir rock
system, and the multiphase fluid flow properties of the
reservoir rock, including directional flow properties of
the system.
Also, selected core data are used to calibrate log
responses, such as acoustic, or neutron logs used to
determine porosity. As a result, core data becomes an
indispensable source in the collection of basic reservoir
data directed toward the ultimate evaluation of
recoverable hydrocarbons in the reservoir.
Core slabbing: Core slabbing is the first step in the
preparation of samples for core laboratory experiments.
The radial core slabbing saw is a machine for cutting
rocks into the smaller parts. This is basically for cutting a
big size outcrop rock into the smaller parts and/or cutting
the longer cores to the shorter ones. Radial core slabbing
Reservoir lab. Core plugging
Date: Nov 19th
2015 Group:B lab. No:1
saw is designed for diamond cutting discs only, which is
connected to the motor with a shaft and two pulleys and
the use of the cooling waters improves the slice quality
and cutting speed and reduces the heat which is produced
by sawing process.
Knowledge of petro-physical and hydrodynamic
properties of reservoir rocks are of fundamental
importance to the petroleum engineer, Samples are taken
at selected locations or at fixed intervals and are
subsequently used for a wide variety of analyses
performed to determine physical, chemical and
geological parameters important for the evaluation of
the (potential) reservoir. Plugs of standard length and
diameter are taken either “horizontal” (perpendicular to
the core axis and parallel to the inclination) or “vertical”
(parallel to the core axis).
These plugs are obtained by drilling cylinders from the
Core using lubricants such as Water, brine or oil and
trimming the ends of these cylindrical samples. Standard
plugs are used for the determination of oil and water
saturation, porosity, permeability and grain density
measurements (at ambient pressure or at higher pressures
to mimic sub-surface conditions) and for a variety of
Special Core Analysis tests.
Reservoir lab. Core plugging
Date: Nov 19th
2015 Group:B lab. No:1
Theory:
The task of the reservoir geoscientist is to describe the
reservoir as completely and accurately as possible using
a variety of methods, from seismic and well testing to
logging, cuttings analysis and coring. These methods
present the engineers with a valuable range of scales
from photomicrograph of a single filament of illite, to the
log investigating up to several feet around the borehole,
to the well test probing hundreds to thousands of feet
into the formation.
Many of these methods allow the engineer to estimate
three key formation descriptorsporosity, fluid saturation,
and permeability. But different methods may lead to
different values. Porosity, for example, measured on a
core, which is removed from in situ pressure,
temperature and fluid, then cleaned, dried and re-
saturated may not become close to porosity determined
from log measurement.
To form a commercial reservoir of hydrocarbons, a
formation must exhibit two essential characteristics.
There must be a capacity for storage and transmissibility
to the fluid concerned, i.e. the reservoir rock must be
able to produce and maintain fluids, when development
wells are drilled.
Reservoir lab. Core plugging
Date: Nov 19th
2015 Group:B lab. No:1
In general, several objectives must be met when taking
core samples.
But in the prime place, a careful on-site examination for
hydrocarbon traces is desirable (e.g. gas bubbling or oil
seeping from the core, core fluorescence on a freshly
exposed surface, fluorescence and staining in solvent
cuts etc.).
Advances in technology continuously make new
improved measurements and experiments available to the
industry. Today this process seems to move faster and
there is a demand for new standards both for coring and
core analysis.
Even with the current possibilities in computer
technology, much energy is used in the process of
transporting data between different software systems and
different formats.
A potential for improving acquisition and analysis at
reduced cost is obvious. In this paper, the basic concepts
of coring and core analysis were reviewed and used the
developmental advances as the main goal.
Reservoir lab. Core plugging
Date: Nov 19th
2015 Group:B lab. No:1
Equipment and machines:
Device description:
1-Core Slabbing Cross Cut Saw: this device is used in
preparing the core sample to cut a non-uniform rock into
pieces that can be plugged by plugging machine.
The machine has a motor which supplies the rotational
motion for sawing. The main machine parts are:
· Radial saw
· Electro motor
· Shaft, pulleys and rim
· Adjustable tilting table
· Cooling system, including pumps, water supply,
flexible pipes The rotational motion transmitted by two
pulleys from electro motor.
At either side, there are three different stepped pulley
couples. The speed of motion can be adapted by
positioning the compound diamond rim on the suitable
stepped pulley couple on the electro motor and saw
system. The dimension of rock sample should be smaller
than the max height of saw from table to be cut
electively. Bigger rocks should be broken to a proper
part with other methods. One drawback of this machine
Reservoir lab. Core plugging
Date: Nov 19th
2015 Group:B lab. No:1
is its noise. The machine noise level is around 70 dBa.
During the cutting process, the noise level depends on
the material to be cut, the type of disc used, the rotation
speed and the cooling.
2- Core plugging machine:
This machine having a drillable bit installed inside a
wide pit in which a rock specimen is tided carefully, in
which a bit having its teeth in the around it to drill a
cylindrical core plug.
The core cutting machine is designed to cut specimens
from cores of between 4 to 6 inches, or from blocks of a
similar size. The produced plugs are in two different size
of 1 and 1.5 inches. This machine can be installed on any
table. By screwing down of a hollow plug drill, plugs are
cut from the samples.
However, students should considered the following
safety notices:
-The core cutting machine should only be used by
qualified operators or students under supervision of the
teacher who have been suitably trained in how to
produce the quality of cut required under the prescribed
safety conditions.
Reservoir lab. Core plugging
Date: Nov 19th
2015 Group:B lab. No:1
Figure2: plugging machine
Reservoir lab. Core plugging
Date: Nov 19th
2015 Group:B lab. No:1
Experiment Procedure:
The procedure for cutting a given sample is as follows:
 If the rock is big then it should first be cut by
another method
 Put the sample on the table
 Check the tension on the pulleys
 Adjust the direction of water line on both saw and
sample
 Check water tanks and fill them if they are empty
 Start the water pump and check the direction of
water and check the flow
 Start the saw by pressing the start bottom
 Cut the sample by screwing up and down of the saw
and pushing the sample table of machine
 Press the stop button
Unclamp the core sample
However, in working with the machine consider the
following safety issues:
(i) prevent touching of saw with the machine
sample table, because of damaging of saw,
(ii) protect yourself from any splash and water
drops by wearing overall and safety glasses.
Reservoir lab. Core plugging
Date: Nov 19th
2015 Group:B lab. No:1
Core plugging test procedure:
 Check the tension on the pulleys
 Check the direction of the spindle
 Fill the recycling tank
 Screw down the core drill and lock it in place
 Close the core drill protective housing
 Press the power key
 Start the water circulation
 Start rotation for a few seconds before coming down
to the sample.
 Slowly come down to the sample and each (cm)
coming down go back to your start point and start
again until the maximum length that can be reached
drilled.
 Then if the plug come out of the rock, it can be
smoothed then, but if not use hummer to extract the
plug in the rock.
After plugging the core, it should be trimmed and
smoothed, this can be done using special devices or
also using slabbing device with same procedure of
slabbing but this time it is use for trimming so less
length of sample is put to the device.
Reservoir lab. Core plugging
Date: Nov 19th
2015 Group:B lab. No:1
Discussion:
1- Explain coring briefly?
 Retrieval and analysis of cores is essential to all
phases of the petroleum industry. Cores offer the
only opportunity to obtain intact, vertically
continuous samples that allow the visual
examination of depositional sequences and
variations in reservoir character. Properly analyzed
cores provide data available from no other source;
these data should provide direct evidence of the
presence, quantity, distribution, and deliverability
of hydrocarbons. Cores are essential to
understanding the nature of the pore system in the
potential reservoir unit. The knowledge gained
from cores enhances our ability to predict reservoir
performance and to select procedures to maximize
profitable hydrocarbon recovery.
2- Why it is crucial to take a plug as soon as possible
after getting the reservoir rock core?
 It is important to take plug samples within the first
24 hours after the core has arrived on surface in
order to isolate the centre section of core for
accurate invasion analysis data
3- What are the primary objectives of coring process?
 The primary objective of the coring process to
reduce uncertainty of the other Formation
Evaluation processes such as well logging.
Reservoir lab. Core plugging
Date: Nov 19th
2015 Group:B lab. No:1
4- Which type of data can be produced by coring?
 There are a lots of data that can be measured from
the reservoir rock sample, such as:
-Depositional environment
-Reservoir rock type
-Mineralogy and chemical composition of the rock.
-Porosity
-Permeability and Relative permeability
-Grain (matrix) geometry
And many other data can be measured either
directly or indirectly from the core sample.
5- What are the pre-main test preparations that should
be done to the sample?
 When a piece of rock or a core is wanted to be
used for analysis as a sample in the laboratory,
several steps, as per-processing steps, should be
considered on the sample to be prepared for
experiments. The main per-processing steps are as
follow: (i) slabbing; the cores need to be slabbed
with the aim of making the rock structure visible.
This can simply be done by sawning down the
middle of the core and cuting it at desired length.
(ii) plugging: one can drill the plugs at every one
foot of the core. (iii) trimming: both end of the
plugs and core samples can be trimmed in order to
produce high quality thin sliced samples without
disturbing the structure of the sample.
Reservoir lab. Core plugging
Date: Nov 19th
2015 Group:B lab. No:1
References:
 Donaldson, A., and Clydesdale, G. M.
(1990).: “Accurate reservoir evaluation
quality core samples—a good starting point,”
in P. F. Worthington, ed., Advances in core
evaluation: Gordon and Breach, New York, p.
35-53.
 Halvorson, C., and Hurst, A.(1990).: “
Principles, practice and applications of
laboratory mini-permeametry,” in P. F.
Worthington, ed., Advances in core
evaluation: Gordon and Breach, New York, p.
521-549
 American Petroleum Institute, 1960, RP-40
recommended practices for core analysis
procedures: Dallas, API, 55 p.
 Skopec, R. A.(1991).: “Rock characterization
in reservoirs targeted for horizontal drilling,”
paper SPE-22709 presented in Annual
Technical Conference and Exhibition
Proceedings, v. omega, p. 503-513.
 Dykstra, H., and Parsons, R. L., (1950).: “The
prediction of oil recovery by water flood,” in
Secondary recovery in the U.S.A., 2nd ed.:
American Petroleum Institute, New York, p.
160-174.

More Related Content

What's hot

Drilling Lab - pH Meter Measurement
Drilling Lab - pH Meter MeasurementDrilling Lab - pH Meter Measurement
Drilling Lab - pH Meter MeasurementMuhammadSRaniYah
 
Plastic viscosity(mud properties test)
Plastic viscosity(mud properties test)Plastic viscosity(mud properties test)
Plastic viscosity(mud properties test)Bakhtiar Mahmood
 
yield point and viscosity
yield point and viscosityyield point and viscosity
yield point and viscosityMuhammad Faisal
 
Viscosity and yield point exp. by jarjis
Viscosity and yield point exp. by jarjisViscosity and yield point exp. by jarjis
Viscosity and yield point exp. by jarjisJarjis Mohammed
 
Drilling Lab - Mud Weighting
Drilling Lab - Mud WeightingDrilling Lab - Mud Weighting
Drilling Lab - Mud WeightingMuhammadSRaniYah
 
Lab 12 measurement of sand contents present in drilling, mud by using and sa...
Lab 12  measurement of sand contents present in drilling, mud by using and sa...Lab 12  measurement of sand contents present in drilling, mud by using and sa...
Lab 12 measurement of sand contents present in drilling, mud by using and sa...Awais Qureshi
 
Core cleaning (reservoir engineering)
Core cleaning (reservoir engineering)Core cleaning (reservoir engineering)
Core cleaning (reservoir engineering)Bakhtiar Mahmood
 
Mud balance test (drilling fluid lab test)
Mud  balance test (drilling fluid lab test)Mud  balance test (drilling fluid lab test)
Mud balance test (drilling fluid lab test)Bakhtiar Mahmood
 
Drilling Lab - Drilling Fluid Viscometer
Drilling Lab - Drilling Fluid ViscometerDrilling Lab - Drilling Fluid Viscometer
Drilling Lab - Drilling Fluid ViscometerMuhammadSRaniYah
 
Drilling Lab - Sand Content
Drilling Lab - Sand ContentDrilling Lab - Sand Content
Drilling Lab - Sand ContentMuhammadSRaniYah
 
Marsh funnel viscosity2
Marsh funnel viscosity2Marsh funnel viscosity2
Marsh funnel viscosity2HazharDuhoki
 
Drilling Fluid Engineering-PH Lab-Drilling Lab#9.pdf
Drilling Fluid Engineering-PH Lab-Drilling Lab#9.pdfDrilling Fluid Engineering-PH Lab-Drilling Lab#9.pdf
Drilling Fluid Engineering-PH Lab-Drilling Lab#9.pdfSARWAR SALAM
 
Drilling Lab - Mud Weight Balancing
Drilling Lab - Mud Weight Balancing Drilling Lab - Mud Weight Balancing
Drilling Lab - Mud Weight Balancing MuhammadSRaniYah
 
Mud weight and density test ex.no(1)
Mud weight and density test ex.no(1)Mud weight and density test ex.no(1)
Mud weight and density test ex.no(1)chian zaxo
 
helium porosimeter (Reservoir lab)
helium porosimeter (Reservoir lab)helium porosimeter (Reservoir lab)
helium porosimeter (Reservoir lab)Bakhtiar Mahmood
 

What's hot (20)

Drilling Lab - pH Meter Measurement
Drilling Lab - pH Meter MeasurementDrilling Lab - pH Meter Measurement
Drilling Lab - pH Meter Measurement
 
Plastic viscosity(mud properties test)
Plastic viscosity(mud properties test)Plastic viscosity(mud properties test)
Plastic viscosity(mud properties test)
 
Marsh funnel
Marsh funnel Marsh funnel
Marsh funnel
 
yield point and viscosity
yield point and viscosityyield point and viscosity
yield point and viscosity
 
Viscosity and yield point exp. by jarjis
Viscosity and yield point exp. by jarjisViscosity and yield point exp. by jarjis
Viscosity and yield point exp. by jarjis
 
Drilling Lab - Mud Weighting
Drilling Lab - Mud WeightingDrilling Lab - Mud Weighting
Drilling Lab - Mud Weighting
 
Lab 12 measurement of sand contents present in drilling, mud by using and sa...
Lab 12  measurement of sand contents present in drilling, mud by using and sa...Lab 12  measurement of sand contents present in drilling, mud by using and sa...
Lab 12 measurement of sand contents present in drilling, mud by using and sa...
 
Core cleaning (reservoir engineering)
Core cleaning (reservoir engineering)Core cleaning (reservoir engineering)
Core cleaning (reservoir engineering)
 
Mud balance test (drilling fluid lab test)
Mud  balance test (drilling fluid lab test)Mud  balance test (drilling fluid lab test)
Mud balance test (drilling fluid lab test)
 
Drilling Lab - Drilling Fluid Viscometer
Drilling Lab - Drilling Fluid ViscometerDrilling Lab - Drilling Fluid Viscometer
Drilling Lab - Drilling Fluid Viscometer
 
Helium Porosimeter
Helium Porosimeter Helium Porosimeter
Helium Porosimeter
 
Drilling Lab - Sand Content
Drilling Lab - Sand ContentDrilling Lab - Sand Content
Drilling Lab - Sand Content
 
Marsh funnel viscosity2
Marsh funnel viscosity2Marsh funnel viscosity2
Marsh funnel viscosity2
 
Drilling Fluid Engineering-PH Lab-Drilling Lab#9.pdf
Drilling Fluid Engineering-PH Lab-Drilling Lab#9.pdfDrilling Fluid Engineering-PH Lab-Drilling Lab#9.pdf
Drilling Fluid Engineering-PH Lab-Drilling Lab#9.pdf
 
Drilling Lab - Mud Weight Balancing
Drilling Lab - Mud Weight Balancing Drilling Lab - Mud Weight Balancing
Drilling Lab - Mud Weight Balancing
 
Mud weight and density test ex.no(1)
Mud weight and density test ex.no(1)Mud weight and density test ex.no(1)
Mud weight and density test ex.no(1)
 
Mud weighting
 Mud weighting  Mud weighting
Mud weighting
 
Exp2 mud weight
Exp2 mud weightExp2 mud weight
Exp2 mud weight
 
helium porosimeter (Reservoir lab)
helium porosimeter (Reservoir lab)helium porosimeter (Reservoir lab)
helium porosimeter (Reservoir lab)
 
Core cleaning
Core cleaningCore cleaning
Core cleaning
 

Viewers also liked

Special core analysis
Special core analysisSpecial core analysis
Special core analysisWajid09
 
Coring and its types
Coring and its types Coring and its types
Coring and its types adnan zada
 
Electrical Properties of Reservoir Rocks
Electrical Properties of Reservoir RocksElectrical Properties of Reservoir Rocks
Electrical Properties of Reservoir RocksM.T.H Group
 
Porosity by saturation method
Porosity by saturation methodPorosity by saturation method
Porosity by saturation methodKamal Abdurahman
 
Porosity and permeability
Porosity and permeabilityPorosity and permeability
Porosity and permeabilityBelal El Nagar
 
Well logging analysis: methods and interpretation
Well logging analysis: methods and interpretationWell logging analysis: methods and interpretation
Well logging analysis: methods and interpretationCristiano Ascolani
 
PetroSync - Special Core Analysis
PetroSync - Special Core AnalysisPetroSync - Special Core Analysis
PetroSync - Special Core AnalysisPetroSync
 
Core analysis:State of SDN-NFV in wireless networks 2014
Core analysis:State of SDN-NFV in wireless networks 2014Core analysis:State of SDN-NFV in wireless networks 2014
Core analysis:State of SDN-NFV in wireless networks 2014Patrick Lopez
 
Methods of in site Permeability Test
Methods of in site Permeability TestMethods of in site Permeability Test
Methods of in site Permeability TestGaurang Kakadiya
 
Petrophysical Study of Reservoir Rocks: Use of Image Analysis Software (IAS...
Petrophysical Study of Reservoir Rocks: Use of Image Analysis Software (IAS...Petrophysical Study of Reservoir Rocks: Use of Image Analysis Software (IAS...
Petrophysical Study of Reservoir Rocks: Use of Image Analysis Software (IAS...Cristian Medina
 
Well Log Interpretation and Petrophysical Analisis in [Autosaved]
Well Log Interpretation and Petrophysical Analisis in [Autosaved]Well Log Interpretation and Petrophysical Analisis in [Autosaved]
Well Log Interpretation and Petrophysical Analisis in [Autosaved]Ridho Nanda Pratama
 
Downhole Coring and Sampling, pumpsandpipesmdhc
Downhole Coring and Sampling, pumpsandpipesmdhcDownhole Coring and Sampling, pumpsandpipesmdhc
Downhole Coring and Sampling, pumpsandpipesmdhctmhsweb
 
Well log _the_bore_hole_image_
Well log _the_bore_hole_image_Well log _the_bore_hole_image_
Well log _the_bore_hole_image_rajeshdeoli
 
Well loggining. Gamma Ray log
Well loggining. Gamma Ray logWell loggining. Gamma Ray log
Well loggining. Gamma Ray logAmir I. Abdelaziz
 

Viewers also liked (20)

Special core analysis
Special core analysisSpecial core analysis
Special core analysis
 
Coring and its types
Coring and its types Coring and its types
Coring and its types
 
Electrical Properties of Reservoir Rocks
Electrical Properties of Reservoir RocksElectrical Properties of Reservoir Rocks
Electrical Properties of Reservoir Rocks
 
Porosity by saturation method
Porosity by saturation methodPorosity by saturation method
Porosity by saturation method
 
Porosity and permeability
Porosity and permeabilityPorosity and permeability
Porosity and permeability
 
Well logging analysis: methods and interpretation
Well logging analysis: methods and interpretationWell logging analysis: methods and interpretation
Well logging analysis: methods and interpretation
 
PetroSync - Special Core Analysis
PetroSync - Special Core AnalysisPetroSync - Special Core Analysis
PetroSync - Special Core Analysis
 
Downhole Oil Tools
Downhole Oil ToolsDownhole Oil Tools
Downhole Oil Tools
 
Core analysis:State of SDN-NFV in wireless networks 2014
Core analysis:State of SDN-NFV in wireless networks 2014Core analysis:State of SDN-NFV in wireless networks 2014
Core analysis:State of SDN-NFV in wireless networks 2014
 
SchlumbergerProjects
SchlumbergerProjectsSchlumbergerProjects
SchlumbergerProjects
 
Petrophysical Properties
Petrophysical PropertiesPetrophysical Properties
Petrophysical Properties
 
Reservoir rock & fluid
Reservoir rock & fluidReservoir rock & fluid
Reservoir rock & fluid
 
Methods of in site Permeability Test
Methods of in site Permeability TestMethods of in site Permeability Test
Methods of in site Permeability Test
 
Petrophysical Study of Reservoir Rocks: Use of Image Analysis Software (IAS...
Petrophysical Study of Reservoir Rocks: Use of Image Analysis Software (IAS...Petrophysical Study of Reservoir Rocks: Use of Image Analysis Software (IAS...
Petrophysical Study of Reservoir Rocks: Use of Image Analysis Software (IAS...
 
Well Log Interpretation and Petrophysical Analisis in [Autosaved]
Well Log Interpretation and Petrophysical Analisis in [Autosaved]Well Log Interpretation and Petrophysical Analisis in [Autosaved]
Well Log Interpretation and Petrophysical Analisis in [Autosaved]
 
9. design of experiment
9. design of experiment9. design of experiment
9. design of experiment
 
Downhole Coring and Sampling, pumpsandpipesmdhc
Downhole Coring and Sampling, pumpsandpipesmdhcDownhole Coring and Sampling, pumpsandpipesmdhc
Downhole Coring and Sampling, pumpsandpipesmdhc
 
porosity by saturation
porosity by saturationporosity by saturation
porosity by saturation
 
Well log _the_bore_hole_image_
Well log _the_bore_hole_image_Well log _the_bore_hole_image_
Well log _the_bore_hole_image_
 
Well loggining. Gamma Ray log
Well loggining. Gamma Ray logWell loggining. Gamma Ray log
Well loggining. Gamma Ray log
 

Similar to Core plugging

Reservoir Rock Properties Laboratory Manual Exp (#1)
Reservoir Rock Properties Laboratory Manual Exp (#1)Reservoir Rock Properties Laboratory Manual Exp (#1)
Reservoir Rock Properties Laboratory Manual Exp (#1)Muhammed Fuad Al-Barznji
 
Cswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 coursCswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 coursRafik Guerbous
 
IRJET- Response Spectrum Analysis of Elevated Water Tank
IRJET- Response Spectrum Analysis of Elevated Water TankIRJET- Response Spectrum Analysis of Elevated Water Tank
IRJET- Response Spectrum Analysis of Elevated Water TankIRJET Journal
 
To Study the Indirect Tensile Strength of Marble Stone Disc
To Study the Indirect Tensile Strength of Marble Stone DiscTo Study the Indirect Tensile Strength of Marble Stone Disc
To Study the Indirect Tensile Strength of Marble Stone DiscIRJET Journal
 
PLT - proposal2.pptxvvjvcdjvdjvfjbfubbcjvf
PLT - proposal2.pptxvvjvcdjvdjvfjbfubbcjvfPLT - proposal2.pptxvvjvcdjvdjvfjbfubbcjvf
PLT - proposal2.pptxvvjvcdjvdjvfjbfubbcjvfimae4
 
eraldo_totaj.poster
eraldo_totaj.postereraldo_totaj.poster
eraldo_totaj.posterEraldo Totaj
 
Petro equipment suppliers association credit suisse presentation
Petro equipment suppliers association   credit suisse presentationPetro equipment suppliers association   credit suisse presentation
Petro equipment suppliers association credit suisse presentationgiorgiogarrido6
 
Well_Completions.pdf
Well_Completions.pdfWell_Completions.pdf
Well_Completions.pdfAihamAltayeh1
 
Internship Report
Internship ReportInternship Report
Internship ReportMalik Ehsan
 
Transportation-Engg.-LABORATORY_MANUAL.pdf
Transportation-Engg.-LABORATORY_MANUAL.pdfTransportation-Engg.-LABORATORY_MANUAL.pdf
Transportation-Engg.-LABORATORY_MANUAL.pdfRESHMAFEGADE
 
formation evaluation for reservoir engineering
formation evaluation for reservoir engineeringformation evaluation for reservoir engineering
formation evaluation for reservoir engineeringmohammedsaaed1
 
Rock engineering and ground control
Rock engineering and ground controlRock engineering and ground control
Rock engineering and ground controlBhaskar Naidu
 
Need of Lapping Machine for Valve Component: A Case Study
Need of Lapping Machine for Valve Component: A Case StudyNeed of Lapping Machine for Valve Component: A Case Study
Need of Lapping Machine for Valve Component: A Case StudyIJMER
 
Subsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_ThomasSubsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_ThomasAshwin Gadgil
 
Geometric specification of bevel wrapping of double walled tubes, prediction ...
Geometric specification of bevel wrapping of double walled tubes, prediction ...Geometric specification of bevel wrapping of double walled tubes, prediction ...
Geometric specification of bevel wrapping of double walled tubes, prediction ...eSAT Journals
 
Tripping out automatic
Tripping out automaticTripping out automatic
Tripping out automaticRuba Alsoheil
 

Similar to Core plugging (20)

Reservoir Rock Properties Laboratory Manual Exp (#1)
Reservoir Rock Properties Laboratory Manual Exp (#1)Reservoir Rock Properties Laboratory Manual Exp (#1)
Reservoir Rock Properties Laboratory Manual Exp (#1)
 
Core holders
Core holdersCore holders
Core holders
 
Core holders
Core holdersCore holders
Core holders
 
Cswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 coursCswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 cours
 
Thesis new
Thesis newThesis new
Thesis new
 
IRJET- Response Spectrum Analysis of Elevated Water Tank
IRJET- Response Spectrum Analysis of Elevated Water TankIRJET- Response Spectrum Analysis of Elevated Water Tank
IRJET- Response Spectrum Analysis of Elevated Water Tank
 
To Study the Indirect Tensile Strength of Marble Stone Disc
To Study the Indirect Tensile Strength of Marble Stone DiscTo Study the Indirect Tensile Strength of Marble Stone Disc
To Study the Indirect Tensile Strength of Marble Stone Disc
 
PLT - proposal2.pptxvvjvcdjvdjvfjbfubbcjvf
PLT - proposal2.pptxvvjvcdjvdjvfjbfubbcjvfPLT - proposal2.pptxvvjvcdjvdjvfjbfubbcjvf
PLT - proposal2.pptxvvjvcdjvdjvfjbfubbcjvf
 
eraldo_totaj.poster
eraldo_totaj.postereraldo_totaj.poster
eraldo_totaj.poster
 
Petro equipment suppliers association credit suisse presentation
Petro equipment suppliers association   credit suisse presentationPetro equipment suppliers association   credit suisse presentation
Petro equipment suppliers association credit suisse presentation
 
Well_Completions.pdf
Well_Completions.pdfWell_Completions.pdf
Well_Completions.pdf
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Transportation-Engg.-LABORATORY_MANUAL.pdf
Transportation-Engg.-LABORATORY_MANUAL.pdfTransportation-Engg.-LABORATORY_MANUAL.pdf
Transportation-Engg.-LABORATORY_MANUAL.pdf
 
formation evaluation for reservoir engineering
formation evaluation for reservoir engineeringformation evaluation for reservoir engineering
formation evaluation for reservoir engineering
 
Rock engineering and ground control
Rock engineering and ground controlRock engineering and ground control
Rock engineering and ground control
 
Well intervention
Well  interventionWell  intervention
Well intervention
 
Need of Lapping Machine for Valve Component: A Case Study
Need of Lapping Machine for Valve Component: A Case StudyNeed of Lapping Machine for Valve Component: A Case Study
Need of Lapping Machine for Valve Component: A Case Study
 
Subsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_ThomasSubsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_Thomas
 
Geometric specification of bevel wrapping of double walled tubes, prediction ...
Geometric specification of bevel wrapping of double walled tubes, prediction ...Geometric specification of bevel wrapping of double walled tubes, prediction ...
Geometric specification of bevel wrapping of double walled tubes, prediction ...
 
Tripping out automatic
Tripping out automaticTripping out automatic
Tripping out automatic
 

More from SARWAR SALAM

Drilling Fluid Engineering-Viscosity & Yeild Point.pdf
Drilling Fluid Engineering-Viscosity & Yeild Point.pdfDrilling Fluid Engineering-Viscosity & Yeild Point.pdf
Drilling Fluid Engineering-Viscosity & Yeild Point.pdfSARWAR SALAM
 
Drilling Fluid Engineering-Rheological Proporties-M900.pdf
Drilling Fluid Engineering-Rheological Proporties-M900.pdfDrilling Fluid Engineering-Rheological Proporties-M900.pdf
Drilling Fluid Engineering-Rheological Proporties-M900.pdfSARWAR SALAM
 
Drilling Fluid Engineering-Funnel Viscosity Lab#4.pdf
Drilling Fluid Engineering-Funnel Viscosity Lab#4.pdfDrilling Fluid Engineering-Funnel Viscosity Lab#4.pdf
Drilling Fluid Engineering-Funnel Viscosity Lab#4.pdfSARWAR SALAM
 
Drillling Fluid Engineering-Filtration Lab#8.pdf
Drillling Fluid Engineering-Filtration Lab#8.pdfDrillling Fluid Engineering-Filtration Lab#8.pdf
Drillling Fluid Engineering-Filtration Lab#8.pdfSARWAR SALAM
 
WSM Yard-High-Pressure Safety-22.12.19
WSM Yard-High-Pressure Safety-22.12.19WSM Yard-High-Pressure Safety-22.12.19
WSM Yard-High-Pressure Safety-22.12.19SARWAR SALAM
 
Hand and Power tools safety
Hand and Power tools safetyHand and Power tools safety
Hand and Power tools safetySARWAR SALAM
 
A brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management SystemA brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management SystemSARWAR SALAM
 
Endless Round Web-sling
Endless Round Web-slingEndless Round Web-sling
Endless Round Web-slingSARWAR SALAM
 
Koya university induction
Koya university inductionKoya university induction
Koya university inductionSARWAR SALAM
 
Safety in working place
Safety in working placeSafety in working place
Safety in working placeSARWAR SALAM
 
Well control equipment
Well control equipmentWell control equipment
Well control equipmentSARWAR SALAM
 
General overview of Petroleum Engineering Depatment
General overview of Petroleum Engineering DepatmentGeneral overview of Petroleum Engineering Depatment
General overview of Petroleum Engineering DepatmentSARWAR SALAM
 
Experiment no 3 surface tension
Experiment no 3 surface tensionExperiment no 3 surface tension
Experiment no 3 surface tensionSARWAR SALAM
 
Harvard referencing style quick guide
Harvard referencing style quick guideHarvard referencing style quick guide
Harvard referencing style quick guideSARWAR SALAM
 
Krichhoff’s voltage law
Krichhoff’s voltage lawKrichhoff’s voltage law
Krichhoff’s voltage lawSARWAR SALAM
 
Drilling fluid dilution
Drilling fluid  dilution  Drilling fluid  dilution
Drilling fluid dilution SARWAR SALAM
 

More from SARWAR SALAM (19)

Drilling Fluid Engineering-Viscosity & Yeild Point.pdf
Drilling Fluid Engineering-Viscosity & Yeild Point.pdfDrilling Fluid Engineering-Viscosity & Yeild Point.pdf
Drilling Fluid Engineering-Viscosity & Yeild Point.pdf
 
Drilling Fluid Engineering-Rheological Proporties-M900.pdf
Drilling Fluid Engineering-Rheological Proporties-M900.pdfDrilling Fluid Engineering-Rheological Proporties-M900.pdf
Drilling Fluid Engineering-Rheological Proporties-M900.pdf
 
Drilling Fluid Engineering-Funnel Viscosity Lab#4.pdf
Drilling Fluid Engineering-Funnel Viscosity Lab#4.pdfDrilling Fluid Engineering-Funnel Viscosity Lab#4.pdf
Drilling Fluid Engineering-Funnel Viscosity Lab#4.pdf
 
Drillling Fluid Engineering-Filtration Lab#8.pdf
Drillling Fluid Engineering-Filtration Lab#8.pdfDrillling Fluid Engineering-Filtration Lab#8.pdf
Drillling Fluid Engineering-Filtration Lab#8.pdf
 
WSM Yard-High-Pressure Safety-22.12.19
WSM Yard-High-Pressure Safety-22.12.19WSM Yard-High-Pressure Safety-22.12.19
WSM Yard-High-Pressure Safety-22.12.19
 
Hand and Power tools safety
Hand and Power tools safetyHand and Power tools safety
Hand and Power tools safety
 
A brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management SystemA brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management System
 
Endless Round Web-sling
Endless Round Web-slingEndless Round Web-sling
Endless Round Web-sling
 
Lifting Safety
Lifting Safety  Lifting Safety
Lifting Safety
 
Rig move safety
Rig move safety Rig move safety
Rig move safety
 
Koya university induction
Koya university inductionKoya university induction
Koya university induction
 
Safety in working place
Safety in working placeSafety in working place
Safety in working place
 
Well control equipment
Well control equipmentWell control equipment
Well control equipment
 
General overview of Petroleum Engineering Depatment
General overview of Petroleum Engineering DepatmentGeneral overview of Petroleum Engineering Depatment
General overview of Petroleum Engineering Depatment
 
Experiment no 3 surface tension
Experiment no 3 surface tensionExperiment no 3 surface tension
Experiment no 3 surface tension
 
Harvard referencing style quick guide
Harvard referencing style quick guideHarvard referencing style quick guide
Harvard referencing style quick guide
 
Krichhoff’s voltage law
Krichhoff’s voltage lawKrichhoff’s voltage law
Krichhoff’s voltage law
 
Drilling fluid dilution
Drilling fluid  dilution  Drilling fluid  dilution
Drilling fluid dilution
 
Drilling fluid
Drilling fluidDrilling fluid
Drilling fluid
 

Recently uploaded

Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 

Recently uploaded (20)

🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 

Core plugging

  • 1. Reservoir lab. Core plugging Date: Nov 19th 2015 Group:B lab. No:1 Koya University Faculty of Engineering Petroleum Engineering Department Reservoir lab Third stage Lab. No:1 Core plugging Prepared by: Sarwar Salam Supervised by: Mr. Barham–Mr.haval
  • 2. Reservoir lab. Core plugging Date: Nov 19th 2015 Group:B lab. No:1 Aim of experiment: The purpose of this particular experiment is to plug or prepare a core sample in a non-uniform rock sample of about adequate size and smoothing the final core sample and preparing it for further reservoir test, measurements as well in the lab.
  • 3. Reservoir lab. Core plugging Date: Nov 19th 2015 Group:B lab. No:1 Introduction to Experiment: Coring and core analysis form an integral part of formation evaluation and provide vital information unavailable from either log measurements or productivity tests. Core information includes detailed lithology, microscopic and macroscopic definition of the heterogeneity of the reservoir rock, capillary pressure data defining fluid distribution in the reservoir rock system, and the multiphase fluid flow properties of the reservoir rock, including directional flow properties of the system. Also, selected core data are used to calibrate log responses, such as acoustic, or neutron logs used to determine porosity. As a result, core data becomes an indispensable source in the collection of basic reservoir data directed toward the ultimate evaluation of recoverable hydrocarbons in the reservoir. Core slabbing: Core slabbing is the first step in the preparation of samples for core laboratory experiments. The radial core slabbing saw is a machine for cutting rocks into the smaller parts. This is basically for cutting a big size outcrop rock into the smaller parts and/or cutting the longer cores to the shorter ones. Radial core slabbing
  • 4. Reservoir lab. Core plugging Date: Nov 19th 2015 Group:B lab. No:1 saw is designed for diamond cutting discs only, which is connected to the motor with a shaft and two pulleys and the use of the cooling waters improves the slice quality and cutting speed and reduces the heat which is produced by sawing process. Knowledge of petro-physical and hydrodynamic properties of reservoir rocks are of fundamental importance to the petroleum engineer, Samples are taken at selected locations or at fixed intervals and are subsequently used for a wide variety of analyses performed to determine physical, chemical and geological parameters important for the evaluation of the (potential) reservoir. Plugs of standard length and diameter are taken either “horizontal” (perpendicular to the core axis and parallel to the inclination) or “vertical” (parallel to the core axis). These plugs are obtained by drilling cylinders from the Core using lubricants such as Water, brine or oil and trimming the ends of these cylindrical samples. Standard plugs are used for the determination of oil and water saturation, porosity, permeability and grain density measurements (at ambient pressure or at higher pressures to mimic sub-surface conditions) and for a variety of Special Core Analysis tests.
  • 5. Reservoir lab. Core plugging Date: Nov 19th 2015 Group:B lab. No:1 Theory: The task of the reservoir geoscientist is to describe the reservoir as completely and accurately as possible using a variety of methods, from seismic and well testing to logging, cuttings analysis and coring. These methods present the engineers with a valuable range of scales from photomicrograph of a single filament of illite, to the log investigating up to several feet around the borehole, to the well test probing hundreds to thousands of feet into the formation. Many of these methods allow the engineer to estimate three key formation descriptorsporosity, fluid saturation, and permeability. But different methods may lead to different values. Porosity, for example, measured on a core, which is removed from in situ pressure, temperature and fluid, then cleaned, dried and re- saturated may not become close to porosity determined from log measurement. To form a commercial reservoir of hydrocarbons, a formation must exhibit two essential characteristics. There must be a capacity for storage and transmissibility to the fluid concerned, i.e. the reservoir rock must be able to produce and maintain fluids, when development wells are drilled.
  • 6. Reservoir lab. Core plugging Date: Nov 19th 2015 Group:B lab. No:1 In general, several objectives must be met when taking core samples. But in the prime place, a careful on-site examination for hydrocarbon traces is desirable (e.g. gas bubbling or oil seeping from the core, core fluorescence on a freshly exposed surface, fluorescence and staining in solvent cuts etc.). Advances in technology continuously make new improved measurements and experiments available to the industry. Today this process seems to move faster and there is a demand for new standards both for coring and core analysis. Even with the current possibilities in computer technology, much energy is used in the process of transporting data between different software systems and different formats. A potential for improving acquisition and analysis at reduced cost is obvious. In this paper, the basic concepts of coring and core analysis were reviewed and used the developmental advances as the main goal.
  • 7. Reservoir lab. Core plugging Date: Nov 19th 2015 Group:B lab. No:1 Equipment and machines: Device description: 1-Core Slabbing Cross Cut Saw: this device is used in preparing the core sample to cut a non-uniform rock into pieces that can be plugged by plugging machine. The machine has a motor which supplies the rotational motion for sawing. The main machine parts are: · Radial saw · Electro motor · Shaft, pulleys and rim · Adjustable tilting table · Cooling system, including pumps, water supply, flexible pipes The rotational motion transmitted by two pulleys from electro motor. At either side, there are three different stepped pulley couples. The speed of motion can be adapted by positioning the compound diamond rim on the suitable stepped pulley couple on the electro motor and saw system. The dimension of rock sample should be smaller than the max height of saw from table to be cut electively. Bigger rocks should be broken to a proper part with other methods. One drawback of this machine
  • 8. Reservoir lab. Core plugging Date: Nov 19th 2015 Group:B lab. No:1 is its noise. The machine noise level is around 70 dBa. During the cutting process, the noise level depends on the material to be cut, the type of disc used, the rotation speed and the cooling. 2- Core plugging machine: This machine having a drillable bit installed inside a wide pit in which a rock specimen is tided carefully, in which a bit having its teeth in the around it to drill a cylindrical core plug. The core cutting machine is designed to cut specimens from cores of between 4 to 6 inches, or from blocks of a similar size. The produced plugs are in two different size of 1 and 1.5 inches. This machine can be installed on any table. By screwing down of a hollow plug drill, plugs are cut from the samples. However, students should considered the following safety notices: -The core cutting machine should only be used by qualified operators or students under supervision of the teacher who have been suitably trained in how to produce the quality of cut required under the prescribed safety conditions.
  • 9. Reservoir lab. Core plugging Date: Nov 19th 2015 Group:B lab. No:1 Figure2: plugging machine
  • 10. Reservoir lab. Core plugging Date: Nov 19th 2015 Group:B lab. No:1 Experiment Procedure: The procedure for cutting a given sample is as follows:  If the rock is big then it should first be cut by another method  Put the sample on the table  Check the tension on the pulleys  Adjust the direction of water line on both saw and sample  Check water tanks and fill them if they are empty  Start the water pump and check the direction of water and check the flow  Start the saw by pressing the start bottom  Cut the sample by screwing up and down of the saw and pushing the sample table of machine  Press the stop button Unclamp the core sample However, in working with the machine consider the following safety issues: (i) prevent touching of saw with the machine sample table, because of damaging of saw, (ii) protect yourself from any splash and water drops by wearing overall and safety glasses.
  • 11. Reservoir lab. Core plugging Date: Nov 19th 2015 Group:B lab. No:1 Core plugging test procedure:  Check the tension on the pulleys  Check the direction of the spindle  Fill the recycling tank  Screw down the core drill and lock it in place  Close the core drill protective housing  Press the power key  Start the water circulation  Start rotation for a few seconds before coming down to the sample.  Slowly come down to the sample and each (cm) coming down go back to your start point and start again until the maximum length that can be reached drilled.  Then if the plug come out of the rock, it can be smoothed then, but if not use hummer to extract the plug in the rock. After plugging the core, it should be trimmed and smoothed, this can be done using special devices or also using slabbing device with same procedure of slabbing but this time it is use for trimming so less length of sample is put to the device.
  • 12. Reservoir lab. Core plugging Date: Nov 19th 2015 Group:B lab. No:1 Discussion: 1- Explain coring briefly?  Retrieval and analysis of cores is essential to all phases of the petroleum industry. Cores offer the only opportunity to obtain intact, vertically continuous samples that allow the visual examination of depositional sequences and variations in reservoir character. Properly analyzed cores provide data available from no other source; these data should provide direct evidence of the presence, quantity, distribution, and deliverability of hydrocarbons. Cores are essential to understanding the nature of the pore system in the potential reservoir unit. The knowledge gained from cores enhances our ability to predict reservoir performance and to select procedures to maximize profitable hydrocarbon recovery. 2- Why it is crucial to take a plug as soon as possible after getting the reservoir rock core?  It is important to take plug samples within the first 24 hours after the core has arrived on surface in order to isolate the centre section of core for accurate invasion analysis data 3- What are the primary objectives of coring process?  The primary objective of the coring process to reduce uncertainty of the other Formation Evaluation processes such as well logging.
  • 13. Reservoir lab. Core plugging Date: Nov 19th 2015 Group:B lab. No:1 4- Which type of data can be produced by coring?  There are a lots of data that can be measured from the reservoir rock sample, such as: -Depositional environment -Reservoir rock type -Mineralogy and chemical composition of the rock. -Porosity -Permeability and Relative permeability -Grain (matrix) geometry And many other data can be measured either directly or indirectly from the core sample. 5- What are the pre-main test preparations that should be done to the sample?  When a piece of rock or a core is wanted to be used for analysis as a sample in the laboratory, several steps, as per-processing steps, should be considered on the sample to be prepared for experiments. The main per-processing steps are as follow: (i) slabbing; the cores need to be slabbed with the aim of making the rock structure visible. This can simply be done by sawning down the middle of the core and cuting it at desired length. (ii) plugging: one can drill the plugs at every one foot of the core. (iii) trimming: both end of the plugs and core samples can be trimmed in order to produce high quality thin sliced samples without disturbing the structure of the sample.
  • 14. Reservoir lab. Core plugging Date: Nov 19th 2015 Group:B lab. No:1 References:  Donaldson, A., and Clydesdale, G. M. (1990).: “Accurate reservoir evaluation quality core samples—a good starting point,” in P. F. Worthington, ed., Advances in core evaluation: Gordon and Breach, New York, p. 35-53.  Halvorson, C., and Hurst, A.(1990).: “ Principles, practice and applications of laboratory mini-permeametry,” in P. F. Worthington, ed., Advances in core evaluation: Gordon and Breach, New York, p. 521-549  American Petroleum Institute, 1960, RP-40 recommended practices for core analysis procedures: Dallas, API, 55 p.  Skopec, R. A.(1991).: “Rock characterization in reservoirs targeted for horizontal drilling,” paper SPE-22709 presented in Annual Technical Conference and Exhibition Proceedings, v. omega, p. 503-513.  Dykstra, H., and Parsons, R. L., (1950).: “The prediction of oil recovery by water flood,” in Secondary recovery in the U.S.A., 2nd ed.: American Petroleum Institute, New York, p. 160-174.