Current Total Installed Capacity : 21,059.5MW
57%
34%
9%
Gas
Hydro
Coal
Energy
WATCH
Source
:
Tenaga
Nasional
Berhad
RM15.20/mmbtu*
RM41.68/mmbtu**
GAS
GAS PRICE
* Gas quantity up to 1,000 mmscfd ** Gas quantity above 1,000 mmscfd
(Government regulated price) (Discounted LNG price)
RM276.50/tonne
(USD87.50/tonne)
COAL
COAL PRICE
January 1, 2014 Tariff Review Approval
ENERGY RESERVES FOR
RELIABLE POWER SUPPLY
Malaysia is rapidly growing and is gobbling up energy at a rapid pace. Due to the robustness of industries, the power sector not only needs
to generate enough energy, it also has to generate a little extra as back up; this back-up power supply is called the reserve margin. This is to
ensure reliable and sufficient supply as demand can spike up unexpectedly. Currently, the country has an installed capacity of 21,059.5 MW
to power up the nation.
What can we do
Energy is expensive with gas and coal prices sometimes skyrocketing. With this in mind, electricity provider is tweaking its fuel
mix around burning gas when coal is depleting or switching to coal when gas prices hit the roof.
The electricity provider has to juggle its fuel mix around to ensure that Malaysia and its people have sufficient and uninterrupted
power supply. The electricity provider spends billions of ringgit to generate electricity and with the reserve margin, Malaysians
can enjoy a reliable power supply.
The least we can do is to practice energy efficiency and to always switch off when not in use.
Reserve margin and its challenges
In the 1980s, reserve margin was at 30 percent more
than installed capacity. Which means, if the country
has an uptake of 15,000 MW, the electricity provider
has to generate 30 per cent more to ensure that
consumers have enough and that the country does
not experience power failure should national load
demand suddenly peak.
This reserve margin however cannot be stored
because unlike water, electricity cannot be stored.
Analysts have cautioned the need to plant up more
power plants to avert a reserve margin crisis in the
future. Reserve margin generation involves cost and
Malaysians must take cognisance.
Gas Hydro Coal
POWER STATIONS
S.J. Jambatan Connaught (CBPS)
778MW
S.J. Serdang/Putrajaya
577MW
S.J. Sultan Salahuddin Abdul Aziz,
Kapar (KEV)
2255MW
S.J. Kuala Langat (KLPP)/Genting (IPP)
720MW
Perlis Power / TTPC (IPP)
640MW
S.K.S Prai/Prai Power (IPP)
350MW
S.J. Gelugor
310MW
S.J. Kenering
120MW
S.J. Bersia
72MW
S.J. Temengor
348MW
S.J. Pergau
600MW
S.J. Chenderoh
40.5MW
S.J. Sg. Piah
68.6MW
S.J. GB3 (IPP)
640MW
S.J. Janamanjung
2070MW
S.J. Lumut/Segari (IPP)
1303MW
S.J. Sultan Yusof (JOR)
100MW
S.J. Sultan Idris (WOH)
150MW
Jimah (JEV) (IPP)
1400MW
S.J. Port Dickson (PD POWER) (IPP)
436.4MW
S.J. Tuanku Jaafar
(PD1) 703MW
(PD2) 708MW
S.J. Kenyir
400MW
S.J. Sultan Ismail (PAKA)
1029MW
YTL Paka (IPP)
780MW
S.J. Panglima (IPP)
720MW
S.J. Pahlawan/MPSS (IPP)
322MW
S.J. YTL Pasir Gudang (IPP)
390MW
Tanjung Bin (IPP)
2100MW
S.J. Sultan Iskandar (PGPS)
485MW
S.J. Powertek (IPP)
434MW
PERLIS
KELANTAN
TERENGGANU
PAHANG
P.PINANG
KEDAH
PERAK
SELANGOR
N.SEMBILAN
MELAKA
JOHOR
KUALA LUMPUR
The optimum reserve
margin for the peninsula
grid system is 20%-25%
Kapasiti Terpasang Semasa : 21,059.5MW
57%
34%
9%
Gas
Hidro
Arang
Batu
Energy
WATCH
Sumber
:
Tenaga
Nasional
Berhad
RM15.20/mmbtu*
RM41.68/mmbtu**
GAS
HARGA GAS
RM276.50/tan
(USD87.50/tan)
ARANG
BATU
HARGA ARANG BATU
S.J. Jambatan Connaught (CBPS)
778MW
S.J. Serdang/Putrajaya
577MW
S.J. Sultan Salahuddin Abdul Aziz,
Kapar (KEV)
2255MW
S.J. Kuala Langat (KLPP)/Genting (IPP)
720MW
Perlis Power / TTPC (IPP)
640MW
S.K.S Prai/Prai Power (IPP)
350MW
S.J. Gelugor
310MW
S.J. Kenering
120MW
S.J. Bersia
72MW
S.J. Temengor
348MW
S.J. Pergau
600MW
S.J. Chenderoh
40.5MW
S.J. Sg. Piah
68.6MW
S.J. GB3 (IPP)
640MW
S.J. Janamanjung
2070MW
S.J. Lumut/Segari (IPP)
1303MW
S.J. Sultan Yusof (JOR)
100MW
S.J. Sultan Idris (WOH)
150MW
Jimah (JEV) (IPP)
1400MW
S.J. Port Dickson (PD POWER) (IPP)
436.4MW
S.J. Tuanku Jaafar
(PD1) 703MW
(PD2) 708MW
S.J. Kenyir
400MW
S.J. Sultan Ismail (PAKA)
1029MW
YTL Paka (IPP)
780MW
S.J. Panglima (IPP)
720MW
S.J. Pahlawan/MPSS (IPP)
322MW
S.J. YTL Pasir Gudang (IPP)
390MW
Tanjung Bin (IPP)
2100MW
S.J. Sultan Iskandar (PGPS)
485MW
S.J. Powertek (IPP)
434MW
PERLIS
KELANTAN
TERENGGANU
PAHANG
P.PINANG
KEDAH
PERAK
SELANGOR
N.SEMBILAN
MELAKA
JOHOR
KUALA LUMPUR
RIZAB KAPASITI TENAGA BAGI
MEMBEKAL ELEKTRIK BERDAYA HARAP
Malaysia berkembang pesat dan keperluan tenaga juga meningkat dengan sangat pantas. Keteguhan industri menyebabkan sektor tenaga bukan sahaja
perlu menjana elektrik yang cukup, ia juga perlu menjana bekalan tambahan sebagai rizab. Tenaga elektrik ini dipanggil sebagai rizab kapasiti. Ini adalah
bagi memastikan bekalan tenaga elektrik berdaya harap dan mencukupi jika permintaan melonjak secara tiba-tiba. Pada hari ini, negara mempunyai
kapasiti terpasang sebanyak 21,059.5 MW untuk menjana tenaga elektrik ke seluruh negara.
Kadar rizab kapasiti dan cabarannya
Pada tahun 1980-an, kadar rizab kapasiti adalah 30
peratus melebihi kapasiti terpasang. Ini bermakna, jika
negara ini menggunakan 15,000 MW, syarikat pembekal
elektrik perlu menjana lebih 30 peratus bagi memastikan
pengguna mendapat bekalan yang mencukupi agar
negara tidak mengalami masalah bekalan elektrik
terganggu ketika permintaan tiba-tiba memuncak.
Bagaimanapun, rizab kapasiti ini tidak boleh disimpan
kerana tenaga elektrik tidak boleh disimpan seperti
bekalan air.
Penganalisis juga telah mengingatkan keperluan
membina lebih banyak stesen janaelektrik bagi
mengelakkan krisis bekalan rizab kapasiti pada masa
akan datang. Rakyat Malaysia perlu sedar bahawa
penjanaan rizab kapasiti melibatkan kos yang amat
tinggi.
Gas Hidro Arang Batu
STESEN JANAELEKTRIK
* Untuk kuantiti gas sehingga 1,000 mmscfd
(Harga kawalan kerajaan)
Pindaan Tarif bertarikh 1 Januari 2014
Apa yang kita boleh lakukan
Kos penjanaan tenaga elektrik amat mahal dengan harga gas dan arang batu yang tidak menentu dan boleh melambung tinggi. Syarikat pembekal
tenaga elektrik sentiasa berusaha menukar penggunaan campuran bahan api antara gas dan arang batu bagi membolehkan gas digunakan ketika
arang batu berkurangan atau menggunakan arang batu apabila harga gas melambung tinggi.
Syarikat pembekal tenaga elektrik juga perlu mengimbangi campuran bahan api bagi memastikan rakyat Malaysia tidak terputus bekalan dan
mempunyai bekalan tenaga elektrik yang mencukupi. Rakyat Malaysia pula perlu sedar bahawa syarikat pembekal tenaga elektrik membelanjakan
berbilion ringgit untuk menjana rizab kapasiti tenaga. Kita sebagai rakyat Malaysia perlulah menghargai bekalan tenaga elektrik dengan
mengamalkan penggunaan tenaga yang cekap. Jangan lupa mematikan suis apabila tidak menggunakannya.
** Untuk kuantiti gas melebihi 1,000 mmscfd
(Berdasarkan diskaun harga LNG )
Paras rizab bekalan yang
optima bagi sistem grid
semenanjung adalah
20%-25%

More Related Content

Similar to tnb energy reserves.pdf

Kebijakan Energi Nasional Menuju Tahun 2050, Peran Batubara Mendukung Ketahan...
Kebijakan Energi Nasional Menuju Tahun 2050, Peran Batubara Mendukung Ketahan...Kebijakan Energi Nasional Menuju Tahun 2050, Peran Batubara Mendukung Ketahan...
Kebijakan Energi Nasional Menuju Tahun 2050, Peran Batubara Mendukung Ketahan...Publish What You Pay (PWYP) Indonesia
 
0.-Renewable-Energy_Trimo.pptx
0.-Renewable-Energy_Trimo.pptx0.-Renewable-Energy_Trimo.pptx
0.-Renewable-Energy_Trimo.pptxRositaTrijata
 
0.-Renewable-Energy_panelsurya/suryacell
0.-Renewable-Energy_panelsurya/suryacell0.-Renewable-Energy_panelsurya/suryacell
0.-Renewable-Energy_panelsurya/suryacelldwikristanto21
 
13 faktor yang mempengaruhi permintaan tenaga listrik sektor konsumtif
13 faktor yang mempengaruhi permintaan tenaga listrik sektor konsumtif13 faktor yang mempengaruhi permintaan tenaga listrik sektor konsumtif
13 faktor yang mempengaruhi permintaan tenaga listrik sektor konsumtifAminullah Assagaf
 
PENGENALAN KEPADA KECEKAPAN TENAGA UNTUK PENGGUNA TENAGA DOMESTIK
PENGENALAN KEPADA  KECEKAPAN TENAGA UNTUK PENGGUNA TENAGA DOMESTIKPENGENALAN KEPADA  KECEKAPAN TENAGA UNTUK PENGGUNA TENAGA DOMESTIK
PENGENALAN KEPADA KECEKAPAN TENAGA UNTUK PENGGUNA TENAGA DOMESTIKZAINI ABDUL WAHAB
 
Presentasi KESDM on PGN Gas Fest 2021
Presentasi KESDM on PGN Gas Fest 2021Presentasi KESDM on PGN Gas Fest 2021
Presentasi KESDM on PGN Gas Fest 2021Sampe Purba
 
Sosialisasi Perpres 112.pptx
Sosialisasi Perpres 112.pptxSosialisasi Perpres 112.pptx
Sosialisasi Perpres 112.pptxRezqiFathoniq
 
Driving Renewable Energy towards NZE2060
Driving Renewable Energy towards NZE2060Driving Renewable Energy towards NZE2060
Driving Renewable Energy towards NZE2060AbdRahman652438
 
Tugas Akhir Teknik Mesin
Tugas Akhir Teknik MesinTugas Akhir Teknik Mesin
Tugas Akhir Teknik Mesinmuhamad sauki
 
Tugasan 8- bekalan tenaga
Tugasan 8- bekalan tenagaTugasan 8- bekalan tenaga
Tugasan 8- bekalan tenagaamanlaily
 
Energy roadmap to net-zero transmissions: MEMR, Indonesia
Energy roadmap to net-zero transmissions: MEMR, IndonesiaEnergy roadmap to net-zero transmissions: MEMR, Indonesia
Energy roadmap to net-zero transmissions: MEMR, IndonesiaOECD Environment
 
Univeristas negeri makassar materi elektro_kelistrikan
Univeristas negeri makassar materi elektro_kelistrikanUniveristas negeri makassar materi elektro_kelistrikan
Univeristas negeri makassar materi elektro_kelistrikanInchy Yaa Rfy
 
Lmcp1532 pembangunan bandar mapan
Lmcp1532 pembangunan bandar mapanLmcp1532 pembangunan bandar mapan
Lmcp1532 pembangunan bandar mapanfauziera abu bakar
 
Membangun desa-mandiri-energi
Membangun desa-mandiri-energiMembangun desa-mandiri-energi
Membangun desa-mandiri-energiSaoloan Naiborhu
 

Similar to tnb energy reserves.pdf (20)

Permasalahan kelistrikan nasional_dan_so
Permasalahan kelistrikan nasional_dan_so Permasalahan kelistrikan nasional_dan_so
Permasalahan kelistrikan nasional_dan_so
 
Tugasan8
Tugasan8Tugasan8
Tugasan8
 
Kebijakan Energi Nasional Menuju Tahun 2050, Peran Batubara Mendukung Ketahan...
Kebijakan Energi Nasional Menuju Tahun 2050, Peran Batubara Mendukung Ketahan...Kebijakan Energi Nasional Menuju Tahun 2050, Peran Batubara Mendukung Ketahan...
Kebijakan Energi Nasional Menuju Tahun 2050, Peran Batubara Mendukung Ketahan...
 
0.-Renewable-Energy_Trimo.pptx
0.-Renewable-Energy_Trimo.pptx0.-Renewable-Energy_Trimo.pptx
0.-Renewable-Energy_Trimo.pptx
 
0.-Renewable-Energy_panelsurya/suryacell
0.-Renewable-Energy_panelsurya/suryacell0.-Renewable-Energy_panelsurya/suryacell
0.-Renewable-Energy_panelsurya/suryacell
 
Hibrid
HibridHibrid
Hibrid
 
13 faktor yang mempengaruhi permintaan tenaga listrik sektor konsumtif
13 faktor yang mempengaruhi permintaan tenaga listrik sektor konsumtif13 faktor yang mempengaruhi permintaan tenaga listrik sektor konsumtif
13 faktor yang mempengaruhi permintaan tenaga listrik sektor konsumtif
 
PENGENALAN KEPADA KECEKAPAN TENAGA UNTUK PENGGUNA TENAGA DOMESTIK
PENGENALAN KEPADA  KECEKAPAN TENAGA UNTUK PENGGUNA TENAGA DOMESTIKPENGENALAN KEPADA  KECEKAPAN TENAGA UNTUK PENGGUNA TENAGA DOMESTIK
PENGENALAN KEPADA KECEKAPAN TENAGA UNTUK PENGGUNA TENAGA DOMESTIK
 
Tugasan 8
Tugasan 8Tugasan 8
Tugasan 8
 
audit energi
audit energiaudit energi
audit energi
 
Presentasi KESDM on PGN Gas Fest 2021
Presentasi KESDM on PGN Gas Fest 2021Presentasi KESDM on PGN Gas Fest 2021
Presentasi KESDM on PGN Gas Fest 2021
 
Ken 02052015 surabaya-its
Ken  02052015 surabaya-itsKen  02052015 surabaya-its
Ken 02052015 surabaya-its
 
Sosialisasi Perpres 112.pptx
Sosialisasi Perpres 112.pptxSosialisasi Perpres 112.pptx
Sosialisasi Perpres 112.pptx
 
Driving Renewable Energy towards NZE2060
Driving Renewable Energy towards NZE2060Driving Renewable Energy towards NZE2060
Driving Renewable Energy towards NZE2060
 
Tugas Akhir Teknik Mesin
Tugas Akhir Teknik MesinTugas Akhir Teknik Mesin
Tugas Akhir Teknik Mesin
 
Tugasan 8- bekalan tenaga
Tugasan 8- bekalan tenagaTugasan 8- bekalan tenaga
Tugasan 8- bekalan tenaga
 
Energy roadmap to net-zero transmissions: MEMR, Indonesia
Energy roadmap to net-zero transmissions: MEMR, IndonesiaEnergy roadmap to net-zero transmissions: MEMR, Indonesia
Energy roadmap to net-zero transmissions: MEMR, Indonesia
 
Univeristas negeri makassar materi elektro_kelistrikan
Univeristas negeri makassar materi elektro_kelistrikanUniveristas negeri makassar materi elektro_kelistrikan
Univeristas negeri makassar materi elektro_kelistrikan
 
Lmcp1532 pembangunan bandar mapan
Lmcp1532 pembangunan bandar mapanLmcp1532 pembangunan bandar mapan
Lmcp1532 pembangunan bandar mapan
 
Membangun desa-mandiri-energi
Membangun desa-mandiri-energiMembangun desa-mandiri-energi
Membangun desa-mandiri-energi
 

Recently uploaded

MAKALAH HUKUM AGRARIA untunk orag orang yang mencari hukum argumen coba baca ...
MAKALAH HUKUM AGRARIA untunk orag orang yang mencari hukum argumen coba baca ...MAKALAH HUKUM AGRARIA untunk orag orang yang mencari hukum argumen coba baca ...
MAKALAH HUKUM AGRARIA untunk orag orang yang mencari hukum argumen coba baca ...sukmawatirajalan
 
Persyaratan Adminduk - Disdukcapil Kab. Kebumen
Persyaratan Adminduk - Disdukcapil Kab. KebumenPersyaratan Adminduk - Disdukcapil Kab. Kebumen
Persyaratan Adminduk - Disdukcapil Kab. KebumenPemdes Wonoyoso
 
WA 0821-2636-0569, Sekolah Pra Nikah Janda Duda Di Semarang
WA 0821-2636-0569, Sekolah Pra Nikah Janda Duda Di SemarangWA 0821-2636-0569, Sekolah Pra Nikah Janda Duda Di Semarang
WA 0821-2636-0569, Sekolah Pra Nikah Janda Duda Di SemarangKelas Online Pra Nikah Nikah
 
283649986-MATERI-RISIKO-DAN-TK-PENGEMBALIAN-ppt.ppt
283649986-MATERI-RISIKO-DAN-TK-PENGEMBALIAN-ppt.ppt283649986-MATERI-RISIKO-DAN-TK-PENGEMBALIAN-ppt.ppt
283649986-MATERI-RISIKO-DAN-TK-PENGEMBALIAN-ppt.pptmumtaza6
 
5e6a9e119c2fedec04b90d50fcb7700901916.pdf
5e6a9e119c2fedec04b90d50fcb7700901916.pdf5e6a9e119c2fedec04b90d50fcb7700901916.pdf
5e6a9e119c2fedec04b90d50fcb7700901916.pdfFendryGustianVandell
 
CTU552 GROUP ASSIGNMENT (FALSAFAH ALAM SEKITAR).pdf
CTU552 GROUP ASSIGNMENT (FALSAFAH ALAM SEKITAR).pdfCTU552 GROUP ASSIGNMENT (FALSAFAH ALAM SEKITAR).pdf
CTU552 GROUP ASSIGNMENT (FALSAFAH ALAM SEKITAR).pdfHarizalJanisah
 
Jual Obat Cytotec Di Palembang 0823.2222.3014 Pusat Pelancar Haid Ampuh Berga...
Jual Obat Cytotec Di Palembang 0823.2222.3014 Pusat Pelancar Haid Ampuh Berga...Jual Obat Cytotec Di Palembang 0823.2222.3014 Pusat Pelancar Haid Ampuh Berga...
Jual Obat Cytotec Di Palembang 0823.2222.3014 Pusat Pelancar Haid Ampuh Berga...ssupi412
 

Recently uploaded (9)

MAKALAH HUKUM AGRARIA untunk orag orang yang mencari hukum argumen coba baca ...
MAKALAH HUKUM AGRARIA untunk orag orang yang mencari hukum argumen coba baca ...MAKALAH HUKUM AGRARIA untunk orag orang yang mencari hukum argumen coba baca ...
MAKALAH HUKUM AGRARIA untunk orag orang yang mencari hukum argumen coba baca ...
 
Persyaratan Adminduk - Disdukcapil Kab. Kebumen
Persyaratan Adminduk - Disdukcapil Kab. KebumenPersyaratan Adminduk - Disdukcapil Kab. Kebumen
Persyaratan Adminduk - Disdukcapil Kab. Kebumen
 
WA 0821-2636-0569, Sekolah Pra Nikah Janda Duda Di Semarang
WA 0821-2636-0569, Sekolah Pra Nikah Janda Duda Di SemarangWA 0821-2636-0569, Sekolah Pra Nikah Janda Duda Di Semarang
WA 0821-2636-0569, Sekolah Pra Nikah Janda Duda Di Semarang
 
283649986-MATERI-RISIKO-DAN-TK-PENGEMBALIAN-ppt.ppt
283649986-MATERI-RISIKO-DAN-TK-PENGEMBALIAN-ppt.ppt283649986-MATERI-RISIKO-DAN-TK-PENGEMBALIAN-ppt.ppt
283649986-MATERI-RISIKO-DAN-TK-PENGEMBALIAN-ppt.ppt
 
5e6a9e119c2fedec04b90d50fcb7700901916.pdf
5e6a9e119c2fedec04b90d50fcb7700901916.pdf5e6a9e119c2fedec04b90d50fcb7700901916.pdf
5e6a9e119c2fedec04b90d50fcb7700901916.pdf
 
CTU552 GROUP ASSIGNMENT (FALSAFAH ALAM SEKITAR).pdf
CTU552 GROUP ASSIGNMENT (FALSAFAH ALAM SEKITAR).pdfCTU552 GROUP ASSIGNMENT (FALSAFAH ALAM SEKITAR).pdf
CTU552 GROUP ASSIGNMENT (FALSAFAH ALAM SEKITAR).pdf
 
Jual Obat Cytotec Di Palembang 0823.2222.3014 Pusat Pelancar Haid Ampuh Berga...
Jual Obat Cytotec Di Palembang 0823.2222.3014 Pusat Pelancar Haid Ampuh Berga...Jual Obat Cytotec Di Palembang 0823.2222.3014 Pusat Pelancar Haid Ampuh Berga...
Jual Obat Cytotec Di Palembang 0823.2222.3014 Pusat Pelancar Haid Ampuh Berga...
 
Obat Aborsi Bandung ( Ampuh ) 082223109953 Jual Cytotec Asli Obat Telat Bulan...
Obat Aborsi Bandung ( Ampuh ) 082223109953 Jual Cytotec Asli Obat Telat Bulan...Obat Aborsi Bandung ( Ampuh ) 082223109953 Jual Cytotec Asli Obat Telat Bulan...
Obat Aborsi Bandung ( Ampuh ) 082223109953 Jual Cytotec Asli Obat Telat Bulan...
 
Obat Aborsi Medan 082223109953 Klinik Jual Obat Aborsi Di Medan
Obat Aborsi Medan 082223109953 Klinik Jual Obat Aborsi Di MedanObat Aborsi Medan 082223109953 Klinik Jual Obat Aborsi Di Medan
Obat Aborsi Medan 082223109953 Klinik Jual Obat Aborsi Di Medan
 

tnb energy reserves.pdf

  • 1. Current Total Installed Capacity : 21,059.5MW 57% 34% 9% Gas Hydro Coal Energy WATCH Source : Tenaga Nasional Berhad RM15.20/mmbtu* RM41.68/mmbtu** GAS GAS PRICE * Gas quantity up to 1,000 mmscfd ** Gas quantity above 1,000 mmscfd (Government regulated price) (Discounted LNG price) RM276.50/tonne (USD87.50/tonne) COAL COAL PRICE January 1, 2014 Tariff Review Approval ENERGY RESERVES FOR RELIABLE POWER SUPPLY Malaysia is rapidly growing and is gobbling up energy at a rapid pace. Due to the robustness of industries, the power sector not only needs to generate enough energy, it also has to generate a little extra as back up; this back-up power supply is called the reserve margin. This is to ensure reliable and sufficient supply as demand can spike up unexpectedly. Currently, the country has an installed capacity of 21,059.5 MW to power up the nation. What can we do Energy is expensive with gas and coal prices sometimes skyrocketing. With this in mind, electricity provider is tweaking its fuel mix around burning gas when coal is depleting or switching to coal when gas prices hit the roof. The electricity provider has to juggle its fuel mix around to ensure that Malaysia and its people have sufficient and uninterrupted power supply. The electricity provider spends billions of ringgit to generate electricity and with the reserve margin, Malaysians can enjoy a reliable power supply. The least we can do is to practice energy efficiency and to always switch off when not in use. Reserve margin and its challenges In the 1980s, reserve margin was at 30 percent more than installed capacity. Which means, if the country has an uptake of 15,000 MW, the electricity provider has to generate 30 per cent more to ensure that consumers have enough and that the country does not experience power failure should national load demand suddenly peak. This reserve margin however cannot be stored because unlike water, electricity cannot be stored. Analysts have cautioned the need to plant up more power plants to avert a reserve margin crisis in the future. Reserve margin generation involves cost and Malaysians must take cognisance. Gas Hydro Coal POWER STATIONS S.J. Jambatan Connaught (CBPS) 778MW S.J. Serdang/Putrajaya 577MW S.J. Sultan Salahuddin Abdul Aziz, Kapar (KEV) 2255MW S.J. Kuala Langat (KLPP)/Genting (IPP) 720MW Perlis Power / TTPC (IPP) 640MW S.K.S Prai/Prai Power (IPP) 350MW S.J. Gelugor 310MW S.J. Kenering 120MW S.J. Bersia 72MW S.J. Temengor 348MW S.J. Pergau 600MW S.J. Chenderoh 40.5MW S.J. Sg. Piah 68.6MW S.J. GB3 (IPP) 640MW S.J. Janamanjung 2070MW S.J. Lumut/Segari (IPP) 1303MW S.J. Sultan Yusof (JOR) 100MW S.J. Sultan Idris (WOH) 150MW Jimah (JEV) (IPP) 1400MW S.J. Port Dickson (PD POWER) (IPP) 436.4MW S.J. Tuanku Jaafar (PD1) 703MW (PD2) 708MW S.J. Kenyir 400MW S.J. Sultan Ismail (PAKA) 1029MW YTL Paka (IPP) 780MW S.J. Panglima (IPP) 720MW S.J. Pahlawan/MPSS (IPP) 322MW S.J. YTL Pasir Gudang (IPP) 390MW Tanjung Bin (IPP) 2100MW S.J. Sultan Iskandar (PGPS) 485MW S.J. Powertek (IPP) 434MW PERLIS KELANTAN TERENGGANU PAHANG P.PINANG KEDAH PERAK SELANGOR N.SEMBILAN MELAKA JOHOR KUALA LUMPUR The optimum reserve margin for the peninsula grid system is 20%-25%
  • 2. Kapasiti Terpasang Semasa : 21,059.5MW 57% 34% 9% Gas Hidro Arang Batu Energy WATCH Sumber : Tenaga Nasional Berhad RM15.20/mmbtu* RM41.68/mmbtu** GAS HARGA GAS RM276.50/tan (USD87.50/tan) ARANG BATU HARGA ARANG BATU S.J. Jambatan Connaught (CBPS) 778MW S.J. Serdang/Putrajaya 577MW S.J. Sultan Salahuddin Abdul Aziz, Kapar (KEV) 2255MW S.J. Kuala Langat (KLPP)/Genting (IPP) 720MW Perlis Power / TTPC (IPP) 640MW S.K.S Prai/Prai Power (IPP) 350MW S.J. Gelugor 310MW S.J. Kenering 120MW S.J. Bersia 72MW S.J. Temengor 348MW S.J. Pergau 600MW S.J. Chenderoh 40.5MW S.J. Sg. Piah 68.6MW S.J. GB3 (IPP) 640MW S.J. Janamanjung 2070MW S.J. Lumut/Segari (IPP) 1303MW S.J. Sultan Yusof (JOR) 100MW S.J. Sultan Idris (WOH) 150MW Jimah (JEV) (IPP) 1400MW S.J. Port Dickson (PD POWER) (IPP) 436.4MW S.J. Tuanku Jaafar (PD1) 703MW (PD2) 708MW S.J. Kenyir 400MW S.J. Sultan Ismail (PAKA) 1029MW YTL Paka (IPP) 780MW S.J. Panglima (IPP) 720MW S.J. Pahlawan/MPSS (IPP) 322MW S.J. YTL Pasir Gudang (IPP) 390MW Tanjung Bin (IPP) 2100MW S.J. Sultan Iskandar (PGPS) 485MW S.J. Powertek (IPP) 434MW PERLIS KELANTAN TERENGGANU PAHANG P.PINANG KEDAH PERAK SELANGOR N.SEMBILAN MELAKA JOHOR KUALA LUMPUR RIZAB KAPASITI TENAGA BAGI MEMBEKAL ELEKTRIK BERDAYA HARAP Malaysia berkembang pesat dan keperluan tenaga juga meningkat dengan sangat pantas. Keteguhan industri menyebabkan sektor tenaga bukan sahaja perlu menjana elektrik yang cukup, ia juga perlu menjana bekalan tambahan sebagai rizab. Tenaga elektrik ini dipanggil sebagai rizab kapasiti. Ini adalah bagi memastikan bekalan tenaga elektrik berdaya harap dan mencukupi jika permintaan melonjak secara tiba-tiba. Pada hari ini, negara mempunyai kapasiti terpasang sebanyak 21,059.5 MW untuk menjana tenaga elektrik ke seluruh negara. Kadar rizab kapasiti dan cabarannya Pada tahun 1980-an, kadar rizab kapasiti adalah 30 peratus melebihi kapasiti terpasang. Ini bermakna, jika negara ini menggunakan 15,000 MW, syarikat pembekal elektrik perlu menjana lebih 30 peratus bagi memastikan pengguna mendapat bekalan yang mencukupi agar negara tidak mengalami masalah bekalan elektrik terganggu ketika permintaan tiba-tiba memuncak. Bagaimanapun, rizab kapasiti ini tidak boleh disimpan kerana tenaga elektrik tidak boleh disimpan seperti bekalan air. Penganalisis juga telah mengingatkan keperluan membina lebih banyak stesen janaelektrik bagi mengelakkan krisis bekalan rizab kapasiti pada masa akan datang. Rakyat Malaysia perlu sedar bahawa penjanaan rizab kapasiti melibatkan kos yang amat tinggi. Gas Hidro Arang Batu STESEN JANAELEKTRIK * Untuk kuantiti gas sehingga 1,000 mmscfd (Harga kawalan kerajaan) Pindaan Tarif bertarikh 1 Januari 2014 Apa yang kita boleh lakukan Kos penjanaan tenaga elektrik amat mahal dengan harga gas dan arang batu yang tidak menentu dan boleh melambung tinggi. Syarikat pembekal tenaga elektrik sentiasa berusaha menukar penggunaan campuran bahan api antara gas dan arang batu bagi membolehkan gas digunakan ketika arang batu berkurangan atau menggunakan arang batu apabila harga gas melambung tinggi. Syarikat pembekal tenaga elektrik juga perlu mengimbangi campuran bahan api bagi memastikan rakyat Malaysia tidak terputus bekalan dan mempunyai bekalan tenaga elektrik yang mencukupi. Rakyat Malaysia pula perlu sedar bahawa syarikat pembekal tenaga elektrik membelanjakan berbilion ringgit untuk menjana rizab kapasiti tenaga. Kita sebagai rakyat Malaysia perlulah menghargai bekalan tenaga elektrik dengan mengamalkan penggunaan tenaga yang cekap. Jangan lupa mematikan suis apabila tidak menggunakannya. ** Untuk kuantiti gas melebihi 1,000 mmscfd (Berdasarkan diskaun harga LNG ) Paras rizab bekalan yang optima bagi sistem grid semenanjung adalah 20%-25%