1. Current Total Installed Capacity : 21,059.5MW
57%
34%
9%
Gas
Hydro
Coal
Energy
WATCH
Source
:
Tenaga
Nasional
Berhad
RM15.20/mmbtu*
RM41.68/mmbtu**
GAS
GAS PRICE
* Gas quantity up to 1,000 mmscfd ** Gas quantity above 1,000 mmscfd
(Government regulated price) (Discounted LNG price)
RM276.50/tonne
(USD87.50/tonne)
COAL
COAL PRICE
January 1, 2014 Tariff Review Approval
ENERGY RESERVES FOR
RELIABLE POWER SUPPLY
Malaysia is rapidly growing and is gobbling up energy at a rapid pace. Due to the robustness of industries, the power sector not only needs
to generate enough energy, it also has to generate a little extra as back up; this back-up power supply is called the reserve margin. This is to
ensure reliable and sufficient supply as demand can spike up unexpectedly. Currently, the country has an installed capacity of 21,059.5 MW
to power up the nation.
What can we do
Energy is expensive with gas and coal prices sometimes skyrocketing. With this in mind, electricity provider is tweaking its fuel
mix around burning gas when coal is depleting or switching to coal when gas prices hit the roof.
The electricity provider has to juggle its fuel mix around to ensure that Malaysia and its people have sufficient and uninterrupted
power supply. The electricity provider spends billions of ringgit to generate electricity and with the reserve margin, Malaysians
can enjoy a reliable power supply.
The least we can do is to practice energy efficiency and to always switch off when not in use.
Reserve margin and its challenges
In the 1980s, reserve margin was at 30 percent more
than installed capacity. Which means, if the country
has an uptake of 15,000 MW, the electricity provider
has to generate 30 per cent more to ensure that
consumers have enough and that the country does
not experience power failure should national load
demand suddenly peak.
This reserve margin however cannot be stored
because unlike water, electricity cannot be stored.
Analysts have cautioned the need to plant up more
power plants to avert a reserve margin crisis in the
future. Reserve margin generation involves cost and
Malaysians must take cognisance.
Gas Hydro Coal
POWER STATIONS
S.J. Jambatan Connaught (CBPS)
778MW
S.J. Serdang/Putrajaya
577MW
S.J. Sultan Salahuddin Abdul Aziz,
Kapar (KEV)
2255MW
S.J. Kuala Langat (KLPP)/Genting (IPP)
720MW
Perlis Power / TTPC (IPP)
640MW
S.K.S Prai/Prai Power (IPP)
350MW
S.J. Gelugor
310MW
S.J. Kenering
120MW
S.J. Bersia
72MW
S.J. Temengor
348MW
S.J. Pergau
600MW
S.J. Chenderoh
40.5MW
S.J. Sg. Piah
68.6MW
S.J. GB3 (IPP)
640MW
S.J. Janamanjung
2070MW
S.J. Lumut/Segari (IPP)
1303MW
S.J. Sultan Yusof (JOR)
100MW
S.J. Sultan Idris (WOH)
150MW
Jimah (JEV) (IPP)
1400MW
S.J. Port Dickson (PD POWER) (IPP)
436.4MW
S.J. Tuanku Jaafar
(PD1) 703MW
(PD2) 708MW
S.J. Kenyir
400MW
S.J. Sultan Ismail (PAKA)
1029MW
YTL Paka (IPP)
780MW
S.J. Panglima (IPP)
720MW
S.J. Pahlawan/MPSS (IPP)
322MW
S.J. YTL Pasir Gudang (IPP)
390MW
Tanjung Bin (IPP)
2100MW
S.J. Sultan Iskandar (PGPS)
485MW
S.J. Powertek (IPP)
434MW
PERLIS
KELANTAN
TERENGGANU
PAHANG
P.PINANG
KEDAH
PERAK
SELANGOR
N.SEMBILAN
MELAKA
JOHOR
KUALA LUMPUR
The optimum reserve
margin for the peninsula
grid system is 20%-25%
2. Kapasiti Terpasang Semasa : 21,059.5MW
57%
34%
9%
Gas
Hidro
Arang
Batu
Energy
WATCH
Sumber
:
Tenaga
Nasional
Berhad
RM15.20/mmbtu*
RM41.68/mmbtu**
GAS
HARGA GAS
RM276.50/tan
(USD87.50/tan)
ARANG
BATU
HARGA ARANG BATU
S.J. Jambatan Connaught (CBPS)
778MW
S.J. Serdang/Putrajaya
577MW
S.J. Sultan Salahuddin Abdul Aziz,
Kapar (KEV)
2255MW
S.J. Kuala Langat (KLPP)/Genting (IPP)
720MW
Perlis Power / TTPC (IPP)
640MW
S.K.S Prai/Prai Power (IPP)
350MW
S.J. Gelugor
310MW
S.J. Kenering
120MW
S.J. Bersia
72MW
S.J. Temengor
348MW
S.J. Pergau
600MW
S.J. Chenderoh
40.5MW
S.J. Sg. Piah
68.6MW
S.J. GB3 (IPP)
640MW
S.J. Janamanjung
2070MW
S.J. Lumut/Segari (IPP)
1303MW
S.J. Sultan Yusof (JOR)
100MW
S.J. Sultan Idris (WOH)
150MW
Jimah (JEV) (IPP)
1400MW
S.J. Port Dickson (PD POWER) (IPP)
436.4MW
S.J. Tuanku Jaafar
(PD1) 703MW
(PD2) 708MW
S.J. Kenyir
400MW
S.J. Sultan Ismail (PAKA)
1029MW
YTL Paka (IPP)
780MW
S.J. Panglima (IPP)
720MW
S.J. Pahlawan/MPSS (IPP)
322MW
S.J. YTL Pasir Gudang (IPP)
390MW
Tanjung Bin (IPP)
2100MW
S.J. Sultan Iskandar (PGPS)
485MW
S.J. Powertek (IPP)
434MW
PERLIS
KELANTAN
TERENGGANU
PAHANG
P.PINANG
KEDAH
PERAK
SELANGOR
N.SEMBILAN
MELAKA
JOHOR
KUALA LUMPUR
RIZAB KAPASITI TENAGA BAGI
MEMBEKAL ELEKTRIK BERDAYA HARAP
Malaysia berkembang pesat dan keperluan tenaga juga meningkat dengan sangat pantas. Keteguhan industri menyebabkan sektor tenaga bukan sahaja
perlu menjana elektrik yang cukup, ia juga perlu menjana bekalan tambahan sebagai rizab. Tenaga elektrik ini dipanggil sebagai rizab kapasiti. Ini adalah
bagi memastikan bekalan tenaga elektrik berdaya harap dan mencukupi jika permintaan melonjak secara tiba-tiba. Pada hari ini, negara mempunyai
kapasiti terpasang sebanyak 21,059.5 MW untuk menjana tenaga elektrik ke seluruh negara.
Kadar rizab kapasiti dan cabarannya
Pada tahun 1980-an, kadar rizab kapasiti adalah 30
peratus melebihi kapasiti terpasang. Ini bermakna, jika
negara ini menggunakan 15,000 MW, syarikat pembekal
elektrik perlu menjana lebih 30 peratus bagi memastikan
pengguna mendapat bekalan yang mencukupi agar
negara tidak mengalami masalah bekalan elektrik
terganggu ketika permintaan tiba-tiba memuncak.
Bagaimanapun, rizab kapasiti ini tidak boleh disimpan
kerana tenaga elektrik tidak boleh disimpan seperti
bekalan air.
Penganalisis juga telah mengingatkan keperluan
membina lebih banyak stesen janaelektrik bagi
mengelakkan krisis bekalan rizab kapasiti pada masa
akan datang. Rakyat Malaysia perlu sedar bahawa
penjanaan rizab kapasiti melibatkan kos yang amat
tinggi.
Gas Hidro Arang Batu
STESEN JANAELEKTRIK
* Untuk kuantiti gas sehingga 1,000 mmscfd
(Harga kawalan kerajaan)
Pindaan Tarif bertarikh 1 Januari 2014
Apa yang kita boleh lakukan
Kos penjanaan tenaga elektrik amat mahal dengan harga gas dan arang batu yang tidak menentu dan boleh melambung tinggi. Syarikat pembekal
tenaga elektrik sentiasa berusaha menukar penggunaan campuran bahan api antara gas dan arang batu bagi membolehkan gas digunakan ketika
arang batu berkurangan atau menggunakan arang batu apabila harga gas melambung tinggi.
Syarikat pembekal tenaga elektrik juga perlu mengimbangi campuran bahan api bagi memastikan rakyat Malaysia tidak terputus bekalan dan
mempunyai bekalan tenaga elektrik yang mencukupi. Rakyat Malaysia pula perlu sedar bahawa syarikat pembekal tenaga elektrik membelanjakan
berbilion ringgit untuk menjana rizab kapasiti tenaga. Kita sebagai rakyat Malaysia perlulah menghargai bekalan tenaga elektrik dengan
mengamalkan penggunaan tenaga yang cekap. Jangan lupa mematikan suis apabila tidak menggunakannya.
** Untuk kuantiti gas melebihi 1,000 mmscfd
(Berdasarkan diskaun harga LNG )
Paras rizab bekalan yang
optima bagi sistem grid
semenanjung adalah
20%-25%