SlideShare a Scribd company logo
1 of 4
Download to read offline
Page 1 of 4 Ross Dugas
rdugas101@gmail.com
CELL PHONE (337)-412-4102
PERMANENT ADDRESS:
54 Park Place Drive
Independence Virginia 24348
USA
(Willing to Travel)
Experience:
I have had extensive experience in Land and Offshore Pipelines, Pipe Mills, Vessel Shops, Fabrication Yards, Deep Water
Riser Shops, Machine Shops, Offshore Platforms, Processing Plants, ETC.
Work History: 2013 - 2016
Pipeline Safety and Compliance - Three years NDE auditing, paperwork, procedures and film interpretation.
Clients and projects include but not limited to:
Plains All American – Mississippi (10 Mile Facility), (24” Pascagoula project)
Energy Transfer – Texas (Armore 3 meter station)
Sunoco – Ohio (Allegheny Access)
Kinder/Morgan – Texas- (Tejas Compressor Station #7)
Texas- (6” Y Grade), (8” Colburn Lateral), (12” Inlet), (16” Residue), (Bedias), (Slug Catcher),
(Lone Ranger), (Huntsville City Main Gate Pipeline)
Kansas- (Amarillo #2)
Iowa- (Columbus Junction)
Oklahoma-(Sayre)
Georgia- (Walmart Relocation Line Union City)
Arizona- (2026 Line Relocate)
Responsibilities:
• Insuring that the NDE Company is following proper procedure
• Reviewing all film, daily reports and procedural documentation
• Preparing for D.O.T auditing
Achievements:
• Strong client relations
• Client, Contractor and NDE Company relations
• Increased productivity through NDE scheduling
• Prepared client for D.O.T audits
• Resolved problems between contractor and client
• Initiated traceability systems where none where specified
Page 2 of 4
Ross Dugas
rdugas101@gmail.com
CELL PHONE (337)-412-4102
PERMANENT ADDRESS:
54 Park Place Drive
Independence Virginia 24348
USA
Work History continued: 2011 -2012
Oceaneering Asset Integrity: Two years Project manager
Main Client:
McDermott-On Site Project Manager
Responsibilities:
• Dispatching of crews
• Personnel placement
• Billing and Estimating job cost
• Ordering supplies
• On the job training
• Safety Audits
Achievements:
• Brought profits from out of the red to 38% and 48%
• Repaired customer relations
• Reclaimed jobs that Oceaneering lost
Work History continued: 1993 -2011
Global X - Ray and Testing – fourteen years Management experience, which included performing Level III and RSO duties.
Clients include but not limited to:
Oil and Gas companies - Chevron, Exxon, Mc Moran, Shell, Devon
Contractors - Dynamic, McDermott, Twin Brothers Marine
Responsibilities:
• Dispatching of crews
• Personnel placement
• Billing and Estimating job cost
• Ordering supplies
• On the job training
• Safety Audits
Achievements:
• Continuing customer relation made when working in the field
• Helping to expand operation
• Instrumental in creating safer work environment
• Became an onsite Project Manager for one of our main customers, with profits that rivaled the main office
Page 3 of 4 Ross Dugas
rdugas101@gmail.com
CELL PHONE (337)-412-4102
PERMANENT ADDRESS:
54 Park Place Drive
Independence Virginia 24348
USA
Work History continued: 1992
Vetco Gray – one year in Quality Control
Clients include but not limited to:
Diamond Offshore-(Diamond Six Pack)
Transocean- Various risers repair jobs
Responsibilities:
• Weld shop QC and traceability
• NDE scheduling including stress relieve
• Review of all film, charts and documents
• Review of all NDE procedures
• Sign off on final disposition of any part leaving weld shop
Achievements:
• Bring a more comprehensive filing system for both film and NDE paperwork
• Making changes to routing paper work to better accommodate new fabrication
• Rework traceability changes
• Arranging welding and NDE schedules for better productivity
• Helping prepare the yard for their first newly fabricated job, the Diamond Six Pack
Work History continued: 1986 -1991
Global X-Ray and Testing – six years Level II PT, MT, and RT field experience.
Clients include but not limited to:
Oil and Gas companies - Chevron, Exxon, Mc Moran, Shell, Devon
Contractors - Dynamic, McDermott, Twin Brothers Marine
Responsibilities:
• Crew leadership
• Applying NDE methods required by client
• In charge of traceability
• In charge of safety and safety documentation
• Interpretation and reporting of test results
• Customer relations
Achievements:
• Being the first to establish a third yard crew at our office
• Establishing working relationship with new customers
• Radiation safety record untarnished by any internal or outside audits
Page 4 of 4 Ross Dugas
rdugas101@gmail.com
CELL PHONE (337)-412-4102
PERMANENT ADDRESS:
54 Park Place Drive
Independence Virginia 24348
USA
Certifications:
• Pipeline Safety and Compliance level III Certification
• D.E.Q Industrial Radiography Certification
• T.W.I.C. card holder
• Falk Alfred Water Survival card holder
• ISNETWORLD OQ’S
• Kinder/Morgan Certs
• High School 1984 diploma
Skills:
• Extensive RT, PT and MT Level III duties
• Extensive RT Level II, MT Level II, PT Level II duties
• Management and coordination of multiple activities and schedules
• Maintain multiple schedules for appointments and dead lines
• Planning and coordination of projects
• Arrange and deploy personnel and equipment
Strengths:
• Highly organized, able to multi-task, and accomplish multiple objectives
• Successful leader, equally effective as member of a team
• Professional demeanor and attentive to detail
• Excellent verbal communication skills
• Proficiency in completing reports in a timely manner
• Able to motivate others to action
• Considerable experience planning and implementing meetings, projects, and events
• Ability to interact and form lasting relationships with customers and gain trust of team members
• Resourceful and innovative in problem-solving
• Able to troubleshoot and resolve disputes; Strong prioritization, delegation and planning skills
• Driven to complete and follow through with tasks or project
Summary:
In twenty six years of being in the managing, auditing and safety part of the NDE field, I have always managed to insert myself in
helping others in their responsibilities. Although some of these attributes are not listed I am not limited to only the job titles I have
held. My main goal will always be to help any project in quality and production.

More Related Content

What's hot

MG Resume 160727
MG Resume 160727MG Resume 160727
MG Resume 160727Mike Gibson
 
Tony's Resume
Tony's  ResumeTony's  Resume
Tony's Resumetonylinn
 
Rory James 2015 Resume
Rory James 2015 ResumeRory James 2015 Resume
Rory James 2015 ResumeRory James
 
Updated Resume
Updated ResumeUpdated Resume
Updated ResumePaul Kawas
 
A Hilton - CV rev 1 - Current
A Hilton - CV rev 1 - CurrentA Hilton - CV rev 1 - Current
A Hilton - CV rev 1 - CurrentAndy Hilton
 
Die locator Pin Six-Sigma Project
Die locator Pin Six-Sigma ProjectDie locator Pin Six-Sigma Project
Die locator Pin Six-Sigma ProjectMatthew Hunt
 
Keystone-Eng-Capabilities-Statement-sml
Keystone-Eng-Capabilities-Statement-smlKeystone-Eng-Capabilities-Statement-sml
Keystone-Eng-Capabilities-Statement-smlCraig Heath
 
Wipf Sheldon resume 2015
Wipf Sheldon resume 2015Wipf Sheldon resume 2015
Wipf Sheldon resume 2015Sheldon Wipf
 
Bonneville Erosion Repairs Project - U.S. Army Corps of Engineers Evaluation ...
Bonneville Erosion Repairs Project - U.S. Army Corps of Engineers Evaluation ...Bonneville Erosion Repairs Project - U.S. Army Corps of Engineers Evaluation ...
Bonneville Erosion Repairs Project - U.S. Army Corps of Engineers Evaluation ...svandegrift
 
Roger Mallory Resume 05 2010
Roger Mallory Resume  05 2010Roger Mallory Resume  05 2010
Roger Mallory Resume 05 2010roger mallory
 

What's hot (20)

Pat_RESUME
Pat_RESUMEPat_RESUME
Pat_RESUME
 
MG Resume 160727
MG Resume 160727MG Resume 160727
MG Resume 160727
 
Tony's Resume
Tony's  ResumeTony's  Resume
Tony's Resume
 
Rory James 2015 Resume
Rory James 2015 ResumeRory James 2015 Resume
Rory James 2015 Resume
 
Updated Resume
Updated ResumeUpdated Resume
Updated Resume
 
A Hilton - CV rev 1 - Current
A Hilton - CV rev 1 - CurrentA Hilton - CV rev 1 - Current
A Hilton - CV rev 1 - Current
 
Chris_du_Plessis - CV
Chris_du_Plessis - CVChris_du_Plessis - CV
Chris_du_Plessis - CV
 
Brandnew resume
Brandnew resumeBrandnew resume
Brandnew resume
 
Resume
ResumeResume
Resume
 
brian resume
brian resumebrian resume
brian resume
 
Die locator Pin Six-Sigma Project
Die locator Pin Six-Sigma ProjectDie locator Pin Six-Sigma Project
Die locator Pin Six-Sigma Project
 
My Resumee
My ResumeeMy Resumee
My Resumee
 
Keystone-Eng-Capabilities-Statement-sml
Keystone-Eng-Capabilities-Statement-smlKeystone-Eng-Capabilities-Statement-sml
Keystone-Eng-Capabilities-Statement-sml
 
Lagonegro james-t
Lagonegro james-tLagonegro james-t
Lagonegro james-t
 
Wipf Sheldon resume 2015
Wipf Sheldon resume 2015Wipf Sheldon resume 2015
Wipf Sheldon resume 2015
 
Bonneville Erosion Repairs Project - U.S. Army Corps of Engineers Evaluation ...
Bonneville Erosion Repairs Project - U.S. Army Corps of Engineers Evaluation ...Bonneville Erosion Repairs Project - U.S. Army Corps of Engineers Evaluation ...
Bonneville Erosion Repairs Project - U.S. Army Corps of Engineers Evaluation ...
 
Resume
Resume Resume
Resume
 
Adlr Construction Presentation
Adlr Construction PresentationAdlr Construction Presentation
Adlr Construction Presentation
 
David Purfield
David PurfieldDavid Purfield
David Purfield
 
Roger Mallory Resume 05 2010
Roger Mallory Resume  05 2010Roger Mallory Resume  05 2010
Roger Mallory Resume 05 2010
 

Viewers also liked

Apresentação mob seven
Apresentação mob seven Apresentação mob seven
Apresentação mob seven Mobile Seven
 
Grand Opening Ideas for Record Breaking Success
Grand Opening Ideas for Record Breaking SuccessGrand Opening Ideas for Record Breaking Success
Grand Opening Ideas for Record Breaking SuccessAir Ad Promotions
 
Bilancio sociale 2012 - MediolanumS.p.A.
Bilancio sociale 2012 - MediolanumS.p.A.Bilancio sociale 2012 - MediolanumS.p.A.
Bilancio sociale 2012 - MediolanumS.p.A.Banca Mediolanum
 
مفصل کابل از صفر تا صد
مفصل کابل از صفر تا صدمفصل کابل از صفر تا صد
مفصل کابل از صفر تا صدekahroba ir
 

Viewers also liked (9)

1(1)
1(1)1(1)
1(1)
 
resume'2016.docx
resume'2016.docxresume'2016.docx
resume'2016.docx
 
Apresentação mob seven
Apresentação mob seven Apresentação mob seven
Apresentação mob seven
 
Grand Opening Ideas for Record Breaking Success
Grand Opening Ideas for Record Breaking SuccessGrand Opening Ideas for Record Breaking Success
Grand Opening Ideas for Record Breaking Success
 
Manhole Cable Rollers for Ducts - Cable Roller RR3
Manhole Cable Rollers for Ducts - Cable Roller RR3Manhole Cable Rollers for Ducts - Cable Roller RR3
Manhole Cable Rollers for Ducts - Cable Roller RR3
 
Festival proposal
Festival proposalFestival proposal
Festival proposal
 
Nishit Resume
Nishit ResumeNishit Resume
Nishit Resume
 
Bilancio sociale 2012 - MediolanumS.p.A.
Bilancio sociale 2012 - MediolanumS.p.A.Bilancio sociale 2012 - MediolanumS.p.A.
Bilancio sociale 2012 - MediolanumS.p.A.
 
مفصل کابل از صفر تا صد
مفصل کابل از صفر تا صدمفصل کابل از صفر تا صد
مفصل کابل از صفر تا صد
 

Similar to Ross Dugas Rsume

Resume Derek Enstam 2015 updated
Resume Derek Enstam 2015 updatedResume Derek Enstam 2015 updated
Resume Derek Enstam 2015 updatedDerek Enstam
 
Resume_Amruta_ Testing
Resume_Amruta_ TestingResume_Amruta_ Testing
Resume_Amruta_ Testingamruta salunke
 
2009 Quality Engineer Resume Weathers Mike
2009 Quality Engineer Resume Weathers Mike2009 Quality Engineer Resume Weathers Mike
2009 Quality Engineer Resume Weathers Mikepoppop2shea
 
Renee w foland_resume_09_2012b
Renee w foland_resume_09_2012bRenee w foland_resume_09_2012b
Renee w foland_resume_09_2012bRenee_Foland
 
Atanu_Sarkar_Resume
Atanu_Sarkar_ResumeAtanu_Sarkar_Resume
Atanu_Sarkar_ResumeAtanu Sarkar
 
Greg Carr Resume
Greg Carr ResumeGreg Carr Resume
Greg Carr ResumeGreg Carr
 
Richardson Stephen2009 P Mupdate Rev1
Richardson Stephen2009 P Mupdate Rev1Richardson Stephen2009 P Mupdate Rev1
Richardson Stephen2009 P Mupdate Rev1sgr1978
 
(2) 2016 RESUME-WORD
(2) 2016 RESUME-WORD(2) 2016 RESUME-WORD
(2) 2016 RESUME-WORDWendell Nagel
 
MichaelMorrisresume (1)
MichaelMorrisresume (1)MichaelMorrisresume (1)
MichaelMorrisresume (1)michael morris
 
Kurt Enderle Resume
Kurt Enderle ResumeKurt Enderle Resume
Kurt Enderle ResumeKurt Enderle
 
VIEIRA_NIGEL_RESUME_2016
VIEIRA_NIGEL_RESUME_2016VIEIRA_NIGEL_RESUME_2016
VIEIRA_NIGEL_RESUME_2016Nigel Vieira
 
Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'Allen Schmitgen
 
R mayers_CV 2302
R mayers_CV 2302R mayers_CV 2302
R mayers_CV 2302Rhod Mayers
 
James Angus Resume 02 2017revised
James Angus Resume 02 2017revisedJames Angus Resume 02 2017revised
James Angus Resume 02 2017revisedJames Angus
 

Similar to Ross Dugas Rsume (20)

Raghuraman
RaghuramanRaghuraman
Raghuraman
 
Resume JD
Resume JDResume JD
Resume JD
 
D Resume
D ResumeD Resume
D Resume
 
Resume Derek Enstam 2015 updated
Resume Derek Enstam 2015 updatedResume Derek Enstam 2015 updated
Resume Derek Enstam 2015 updated
 
Resume_Amruta_ Testing
Resume_Amruta_ TestingResume_Amruta_ Testing
Resume_Amruta_ Testing
 
2009 Quality Engineer Resume Weathers Mike
2009 Quality Engineer Resume Weathers Mike2009 Quality Engineer Resume Weathers Mike
2009 Quality Engineer Resume Weathers Mike
 
Renee w foland_resume_09_2012b
Renee w foland_resume_09_2012bRenee w foland_resume_09_2012b
Renee w foland_resume_09_2012b
 
Atanu_Sarkar_Resume
Atanu_Sarkar_ResumeAtanu_Sarkar_Resume
Atanu_Sarkar_Resume
 
Greg Carr Resume
Greg Carr ResumeGreg Carr Resume
Greg Carr Resume
 
Richardson Stephen2009 P Mupdate Rev1
Richardson Stephen2009 P Mupdate Rev1Richardson Stephen2009 P Mupdate Rev1
Richardson Stephen2009 P Mupdate Rev1
 
(2) 2016 RESUME-WORD
(2) 2016 RESUME-WORD(2) 2016 RESUME-WORD
(2) 2016 RESUME-WORD
 
RG Resume
RG ResumeRG Resume
RG Resume
 
The resume
The resumeThe resume
The resume
 
MichaelMorrisresume (1)
MichaelMorrisresume (1)MichaelMorrisresume (1)
MichaelMorrisresume (1)
 
Resume 2016 PH Updated
Resume 2016  PH UpdatedResume 2016  PH Updated
Resume 2016 PH Updated
 
Kurt Enderle Resume
Kurt Enderle ResumeKurt Enderle Resume
Kurt Enderle Resume
 
VIEIRA_NIGEL_RESUME_2016
VIEIRA_NIGEL_RESUME_2016VIEIRA_NIGEL_RESUME_2016
VIEIRA_NIGEL_RESUME_2016
 
Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'
 
R mayers_CV 2302
R mayers_CV 2302R mayers_CV 2302
R mayers_CV 2302
 
James Angus Resume 02 2017revised
James Angus Resume 02 2017revisedJames Angus Resume 02 2017revised
James Angus Resume 02 2017revised
 

Ross Dugas Rsume

  • 1. Page 1 of 4 Ross Dugas rdugas101@gmail.com CELL PHONE (337)-412-4102 PERMANENT ADDRESS: 54 Park Place Drive Independence Virginia 24348 USA (Willing to Travel) Experience: I have had extensive experience in Land and Offshore Pipelines, Pipe Mills, Vessel Shops, Fabrication Yards, Deep Water Riser Shops, Machine Shops, Offshore Platforms, Processing Plants, ETC. Work History: 2013 - 2016 Pipeline Safety and Compliance - Three years NDE auditing, paperwork, procedures and film interpretation. Clients and projects include but not limited to: Plains All American – Mississippi (10 Mile Facility), (24” Pascagoula project) Energy Transfer – Texas (Armore 3 meter station) Sunoco – Ohio (Allegheny Access) Kinder/Morgan – Texas- (Tejas Compressor Station #7) Texas- (6” Y Grade), (8” Colburn Lateral), (12” Inlet), (16” Residue), (Bedias), (Slug Catcher), (Lone Ranger), (Huntsville City Main Gate Pipeline) Kansas- (Amarillo #2) Iowa- (Columbus Junction) Oklahoma-(Sayre) Georgia- (Walmart Relocation Line Union City) Arizona- (2026 Line Relocate) Responsibilities: • Insuring that the NDE Company is following proper procedure • Reviewing all film, daily reports and procedural documentation • Preparing for D.O.T auditing Achievements: • Strong client relations • Client, Contractor and NDE Company relations • Increased productivity through NDE scheduling • Prepared client for D.O.T audits • Resolved problems between contractor and client • Initiated traceability systems where none where specified
  • 2. Page 2 of 4 Ross Dugas rdugas101@gmail.com CELL PHONE (337)-412-4102 PERMANENT ADDRESS: 54 Park Place Drive Independence Virginia 24348 USA Work History continued: 2011 -2012 Oceaneering Asset Integrity: Two years Project manager Main Client: McDermott-On Site Project Manager Responsibilities: • Dispatching of crews • Personnel placement • Billing and Estimating job cost • Ordering supplies • On the job training • Safety Audits Achievements: • Brought profits from out of the red to 38% and 48% • Repaired customer relations • Reclaimed jobs that Oceaneering lost Work History continued: 1993 -2011 Global X - Ray and Testing – fourteen years Management experience, which included performing Level III and RSO duties. Clients include but not limited to: Oil and Gas companies - Chevron, Exxon, Mc Moran, Shell, Devon Contractors - Dynamic, McDermott, Twin Brothers Marine Responsibilities: • Dispatching of crews • Personnel placement • Billing and Estimating job cost • Ordering supplies • On the job training • Safety Audits Achievements: • Continuing customer relation made when working in the field • Helping to expand operation • Instrumental in creating safer work environment • Became an onsite Project Manager for one of our main customers, with profits that rivaled the main office
  • 3. Page 3 of 4 Ross Dugas rdugas101@gmail.com CELL PHONE (337)-412-4102 PERMANENT ADDRESS: 54 Park Place Drive Independence Virginia 24348 USA Work History continued: 1992 Vetco Gray – one year in Quality Control Clients include but not limited to: Diamond Offshore-(Diamond Six Pack) Transocean- Various risers repair jobs Responsibilities: • Weld shop QC and traceability • NDE scheduling including stress relieve • Review of all film, charts and documents • Review of all NDE procedures • Sign off on final disposition of any part leaving weld shop Achievements: • Bring a more comprehensive filing system for both film and NDE paperwork • Making changes to routing paper work to better accommodate new fabrication • Rework traceability changes • Arranging welding and NDE schedules for better productivity • Helping prepare the yard for their first newly fabricated job, the Diamond Six Pack Work History continued: 1986 -1991 Global X-Ray and Testing – six years Level II PT, MT, and RT field experience. Clients include but not limited to: Oil and Gas companies - Chevron, Exxon, Mc Moran, Shell, Devon Contractors - Dynamic, McDermott, Twin Brothers Marine Responsibilities: • Crew leadership • Applying NDE methods required by client • In charge of traceability • In charge of safety and safety documentation • Interpretation and reporting of test results • Customer relations Achievements: • Being the first to establish a third yard crew at our office • Establishing working relationship with new customers • Radiation safety record untarnished by any internal or outside audits
  • 4. Page 4 of 4 Ross Dugas rdugas101@gmail.com CELL PHONE (337)-412-4102 PERMANENT ADDRESS: 54 Park Place Drive Independence Virginia 24348 USA Certifications: • Pipeline Safety and Compliance level III Certification • D.E.Q Industrial Radiography Certification • T.W.I.C. card holder • Falk Alfred Water Survival card holder • ISNETWORLD OQ’S • Kinder/Morgan Certs • High School 1984 diploma Skills: • Extensive RT, PT and MT Level III duties • Extensive RT Level II, MT Level II, PT Level II duties • Management and coordination of multiple activities and schedules • Maintain multiple schedules for appointments and dead lines • Planning and coordination of projects • Arrange and deploy personnel and equipment Strengths: • Highly organized, able to multi-task, and accomplish multiple objectives • Successful leader, equally effective as member of a team • Professional demeanor and attentive to detail • Excellent verbal communication skills • Proficiency in completing reports in a timely manner • Able to motivate others to action • Considerable experience planning and implementing meetings, projects, and events • Ability to interact and form lasting relationships with customers and gain trust of team members • Resourceful and innovative in problem-solving • Able to troubleshoot and resolve disputes; Strong prioritization, delegation and planning skills • Driven to complete and follow through with tasks or project Summary: In twenty six years of being in the managing, auditing and safety part of the NDE field, I have always managed to insert myself in helping others in their responsibilities. Although some of these attributes are not listed I am not limited to only the job titles I have held. My main goal will always be to help any project in quality and production.