Standar Nasional Indonesia
SNI 2836:2008
Tata cara perhitungan harga satuan pekerjaan pondasi
untuk konstruksi bangunan gedung dan perumahan
ICS 91.010.20 Badan Standardisasi Nasional
SNI 2836:2008
i
Daftar isi
Daftar isi..........................................................................................................................................i
Prakata .......................................................................................................................................... ii
Pendahuluan................................................................................................................................. iii
1 Ruang lingkup.........................................................................................................................1
2 Acuan normatif........................................................................................................................1
3 Istilah dan definisi ...................................................................................................................1
4 Singkatan istilah......................................................................................................................2
5 Persyaratan ............................................................................................................................3
6 Penetapan indeks harga satuan pekerjaan pondasi...............................................................3
6.1 Memasang 1 m3
pondasi batu belah, campuran 1 PC : 3 PP .......................................3
6.2 Memasang 1 m3
pondasi batu belah, campuran 1 PC : 4 PP .......................................3
6.3 Memasang 1 m3
pondasi batu belah, campuran 1 PC : 5 PP .......................................4
6.4 Memasang 1 m3
pondasi batu belah, campuran 1 PC : 6 PP .......................................4
6.5 Memasang 1 m3
pondasi batu belah, campuran 1 PC : 8 PP .......................................4
6.6 Memasang 1 m3
pondasi batu belah, campuran 1 KP : 1 SM : 2 PP ............................4
6.7 Memasang 1 m3
pondasi batu belah, campuran 1 PC : 3 KP : 10 PP...........................5
6.8 Memasang 1 m3
pondasi batu belah, campuran ¼ PC : 1 KP : 4 PP............................5
6.9 Memasang 1 m3
batu kosong (aanstamping)................................................................5
6.10 Memasang 1 m3
pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR.................6
6.11 Memasang 1 m3 pondasi sumuran, diameter 100 cm .................................................6
Lampiran A ....................................................................................................................................7
Bibliografi.......................................................................................................................................8
SNI 2836:2008
ii
Prakata
Standar Nasional Indonesia (SNI) tentang Tata cara perhitungan harga satuan pekerjaan
pondasi untuk konstruksi bangunan gedung dan perumahan adalah revisi dari SNI 03-2836-
2002, Tata cara perhitungan harga satuan pekerjaan pondasi batu belah untuk bangunan
sederhana, dengan perubahan pada indeks harga bahan dan indeks harga tenaga kerja.
Standar ini disusun oleh Panitia Teknik Bahan Konstruksi Bangunan dan Rekayasa Sipil
melalui Gugus Kerja Struktur dan Konstruksi Bangunan pada Subpanitia Teknis Bahan,
Sains, Struktur dan Konstruksi Bangunan.
Tata cara penulisan disusun mengikuti Pedoman Standardisasi Nasional 08:2007 dan telah
dibahas dalam rapat konsensus yang diselenggarakan pada tanggal 7 s/d 8 Desember 2006
oleh Subpanitia Teknis yang melibatkan para nara sumber, pakar dan lembaga terkait. SNI
2836:2008 akan dipergunakan sebagai acuan analisis biaya konstruksi di Indonesia.
SNI 2836:2008
iii
Pendahuluan
Tata cara perhitungan harga satuan pekerjaan ini disusun berdasarkan pada hasil penelitian
Aanlisis Biaya Konstruksi di Pusat Litbang Permukiman 1988 – 1991. Penelitian ini dilakukan
dalam dua tahap. Tahap pertama dengan melakukan pengumpulan data sekunder analisis
biaya yang diperoleh dari beberapa BUMN, Kontraktor dan data yang berasal dari analisis
yang telah ada sebelumnya yaitu BOW. Dari data sekunder yang terkumpul dipilih data
dengan modus terbanyak. Tahap kedua adalah penelitian lapangan untuk memperoleh data
primer sebagai cross check terhadap data sekunder terpilih pada penelitian tahap pertama.
Penelitian lapangan berupa penelitian produktifitas tenaga kerja lapangan pada beberapa
proyek pembangunan gedung dan perumahan serta penelitian laboratorium bahan
bangunan untuk komposisi bahan yang digunakan pada setiap jenis pekerjaan dengan
pendekatan kinerja/performance dari jenis pekerjaan terkait.
DATA LAPANGAN
WAKTU DASAR INDIVIDU
WAKTU NORMAL INDIVIDU
TABULASI DATA
TES KESERAGAMAN DATA
TES KECUKUPAN DATA
WAKTU NORMAL
WAKTU STANDAR
BAHAN ANALISIS BIAYA
KONSTRUKSI/ BARU
Waktu produktif
Rating keterampilan,
mutu kerja, kondisi
kerja, cuaca, dll
Tingkat ketelitian 10% dan
tingkat keyakinam 95%
Kelonggaran
waktu/allowance
Tidak Cukup Cukup
1 dari 8
Tata cara perhitungan harga satuan pekerjaan pondasi
untuk konstruksi bangunan gedung dan perumahan
1 Ruang lingkup
Standar ini menetapkan indeks bahan bangunan dan indeks tenaga kerja yang dibutuhkan
untuk tiap satuan pekerjaan pondasi yang dapat dijadikan acuan dasar yang seragam bagi
para pelaksana pembangunan gedung dan perumahan dalam menghitung besarnya harga
satuan pekerjaan pondasi untuk bangunan gedung dan perumahan.
Jenis pekerjaan pondasi yang ditetapkan meliputi :
a) Pekerjaan pembuatan pondasi batu belah dalam berbagai komposisi campuran;
b) Pemasangan anstamping / batu kosong;
c) Pembuatan pondasi sumuran dan pondasi siklop.
2 Acuan normatif
Standar ini disusun mengacu kepada hasil pengkajian dari beberapa analisa pekerjaan yang
telah diaplikasikan oleh beberapa kontraktor dengan pembanding adalah analisis BOW 1921
dan penelitian analisis biaya konstruksi.
3 Istilah dan definisi
3.1
bangunan gedung dan perumahan
bangunan yang berfungsi untuk menampung kegiatan kehidupan bermasyarakat
3.2
harga satuan bahan
harga yang sesuai dengan satuan jenis bahan bangunan
3.3
harga satuan pekerjaan
harga yang dihitung berdasarkan analisis harga satuan bahan dan upah
3.4
indeks
faktor pengali / koefisien sebagai dasar penghitungan biaya bahan dan upah kerja
3.5
indeks bahan
indeks kuantum yang menunjukkan kebutuhan bahan bangunan untuk setiap satuan jenis
pekerjaan
3.6
2 dari 8
indeks tenaga kerja
indeks kuantum yang menunjukkan kebutuhan waktu untuk mengerjakan setiap satuan jenis
pekerjaan
3.7
pelaksana pembangunan gedung dan perumahan
pihak-pihak yang terkait dalam pembangunan gedung dan perumahan yaitu para perencana,
konsultan, kontraktor maupun perseorangan dalam memperkirakan biaya bangunan.
3.8
perhitungan harga satuan pekerjaan konstruksi
suatu cara perhitungan harga satuan pekerjaan konstruksi, yang dijabarkan dalam perkalian
indeks bahan bangunan dan upah kerja dengan harga bahan bangunan dan standar
pengupahan pekerja, untuk menyelesaikan per-satuan pekerjaan konstruksi
3.9
satuan pekerjaan
satuan jenis kegiatan konstruksi bangunan yang dinyatakan dalam satuan panjang, luas,
volume dan unit
4 Singkatan istilah
Singkatan Kepanjangan Istilah/arti
cm centimeter Satuan panjang
kg kilogram Satuan berat
m’ meter panjang Satuan panjang
m2
meter persegi Satuan luas
m3
meter kubik Satuan volume
OH Orang Hari Satuan tenaga kerja per hari
PC Portland Cement Semen Portland
PU Pasir urug Pasir yang digunakan untuk urugan
PP Pasir pasang Agregat halus ukuran ≤ 5 mm
KR Kerikil Agregat kasar ukuran 5 mm – 40 mm
KP Kapur padam Kapur tohor yang dipadamkan
SM Semen merah Semen hasil tumbukan bata merah
PB Pasir beton Agregat halus ukuran ≤ 5 mm
3 dari 8
5 Persyaratan
5.1 Persyaratan umum
Persyaratan umum dalam perhitungan harga satuan:
a) Perhitungan harga satuan pekerjaan berlaku untuk seluruh wilayah Indonesia,
berdasarkan harga bahan dan upah kerja sesuai dengan kondisi setempat;
b) Spesifikasi dan cara pengerjaan setiap jenis pekerjaan disesuaikan dengan standar
spesifikasi teknis pekerjaan yang telah dibakukan.
5.2 Persyaratan teknis
Persyaratan teknis dalam perhitungan harga satuan pekerjaan:
a) Pelaksanaan perhitungan satuan pekerjaan harus didasarkan kepada gambar teknis dan
rencana kerja serta syarat-syarat (RKS);
b) Perhitungan indeks bahan telah ditambahkan toleransi sebesar 5%-20%, dimana di
dalamnya termasuk angka susut, yang besarnya tergantung dari jenis bahan dan
komposisi adukan;
c) Jam kerja efektif untuk tenaga kerja diperhitungkan 5 jam perhari.
6 Penetapan indeks harga satuan pekerjaan pondasi
6.1 Memasang 1 m3
pondasi batu belah, campuran 1 PC : 3 PP
Kebutuhan Satuan Indeks
Bahan
Batu belah 15 cm/20 cm M3
1,200
PC Kg 202,000
PP M3
0,485
Tenaga kerja
Pekerja OH 1,500
Tukang batu OH 0,750
Kepala tukang OH 0,075
Mandor OH 0,075
6.2 Memasang 1 m3
pondasi batu belah, campuran 1 PC : 4 PP
Kebutuhan Satuan Indeks
Bahan
Batu belah 15 cm/20 cm M3
1,200
PC Kg 163,000
PP M3
0,520
Tenaga kerja
Pekerja OH 1,500
Tukang batu OH 0,750
Kepala tukang OH 0,075
Mandor OH 0,075
4 dari 8
6.3 Memasang 1 m3
pondasi batu belah, campuran 1 PC : 5 PP
Kebutuhan Satuan Indeks
Bahan
Batu belah 15 cm/20 cm M3
1,200
PC Kg 136,000
PP M3
0,544
Tenaga kerja
Pekerja OH 1,500
Tukang batu OH 0,750
Kepala tukang OH 0,075
Mandor OH 0,075
6.4 Memasang 1 m3
pondasi batu belah, campuran 1 PC : 6 PP
Kebutuhan Satuan Indeks
Bahan
Batu belah 15 cm/20 cm m3
1,200
PC kg 117,000
PP m3
0,561
Tenaga kerja
Pekerja OH 1,500
Tukang batu OH 0,750
Kepala tukang OH 0,075
Mandor OH 0,075
6.5 Memasang 1 m3
pondasi batu belah, campuran 1 PC : 8 PP
Kebutuhan Satuan Indeks
Bahan
Batu belah 15 cm/20 cm m3
1,200
PC kg 91,000
PP m3
0,584
Tenaga kerja
Pekerja OH 1,500
Tukang batu OH 0,750
Kepala tukang OH 0,075
Mandor OH 0,075
6.6 Memasang 1 m3
pondasi batu belah, campuran 1 KP : 1 SM : 2 PP
Kebutuhan Satuan Indeks
Bahan
Batu belah 15 cm/20 cm m3
1,200
KP m3
0,170
SM m3
0,170
PP m3
0,340
Tenaga kerja
Pekerja OH 1,500
Tukang batu OH 0,750
Kepala tukang OH 0,075
Mandor OH 0,075
5 dari 8
6.7 Memasang 1 m3
pondasi batu belah, campuran 1 PC : 3 KP : 10 PP
Kebutuhan Satuan Indeks
Bahan
Batu belah 15 cm/20 cm m3
1,200
PC kg 61,000
KP m3
0,147
PP m3
0,492
Tenaga kerja
Pekerja OH 1,500
Tukang batu OH 0,750
Kepala tukang OH 0,075
Mandor OH 0,075
6.8 Memasang 1 m3
pondasi batu belah, campuran ¼ PC : 1 KP : 4 PP
Kebutuhan Satuan Indeks
Bahan
Batu belah 15 cm/20 cm m3
1,200
PC kg 41,000
KP m3
0,131
PP m3
0,523
Tenaga kerja
Pekerja OH 1,500
Tukang batu OH 0,750
Kepala tukang OH 0,075
Mandor OH 0,075
6.9 Memasang 1 m3
batu kosong (anstamping)
Kebutuhan Satuan Indeks
Bahan
Batu belah 15 cm/20 cm m3
1,200
Pasir urug m3
0,432
Tenaga kerja
Pekerja OH 0,780
Tukang batu OH 0,390
Kepala tukang OH 0,039
Mandor OH 0,039
6 dari 8
6.10 Memasang 1 m3
pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR
dan 40% batu belah
Kebutuhan Satuan Indeks
Bahan
Batu belah 15 cm/20 cm m3
0,480
PC kg 194,000
Pasir beton m3
0,312
KR m3
0,468
Besi beton kg 126,000
Kawat beton kg 1,800
Tenaga kerja
Pekerja OH 3,400
Tukang batu OH 0,850
Kepala tukang OH 0,085
Mandor OH 0,170
6.11 Memasang 1 m3 pondasi sumuran, diameter 100 cm
Kebutuhan Satuan Indeks
Bahan
Batu belah 15 cm/20 cm m3
0,450
PC kg 194,000
PB m3
0,312
KR m3
0,468
Tenaga kerja
Pekerja OH 2,400
Tukang batu OH 0,800
Kepala tukang OH 0,080
Mandor OH 0,119
7 dari 8
Lampiran A
(Informatif)
Contoh penggunaan standar untuk menghitung harga satuan pekerjaan
A.1 Memasang 1 m3
pondasi batu belah, campuran 1 PC : 3 PP
Kebutuhan Satuan Indeks
Harga Satuan
Bahan/Upah
(Rp.)
Jumlah
(Rp.)
Bahan
Batu belah m3
1,200 40.000 48.000
PC kg 202,000 400 80.800
PP m3
0,485 45.000 21.825
Tenaga kerja
Pekerja OH 1,500 30.000 45.000
Tukang batu OH 0,750 40.000 30.000
Kepala tukang OH 0,075 50.000 3.750
Mandor OH 0,075 60.000 4.500
Jumlah harga per satuan pekerjaan 233.875
8 dari 8
Bibliografi
Pusat Penelitian dan Pengembangan Permukiman, Analisis Biaya Konstruksi (hasil
penelitian), tahun 1988–1991.
SNI 03-6861.1-2002, Spesifikasi bahan bangunan bagian A (bahan bangunan bukan logam)
SNI 03-6861.2-2002, Spesifikasi bahan bangunan bagian B (Bahan bangunan dari besi /
baja)

More Related Content

What's hot

Sni 2839-2008-tata cara perhitungan harga satuan pekerjaan langit-langit untu...
Sni 2839-2008-tata cara perhitungan harga satuan pekerjaan langit-langit untu...Sni 2839-2008-tata cara perhitungan harga satuan pekerjaan langit-langit untu...
Sni 2839-2008-tata cara perhitungan harga satuan pekerjaan langit-langit untu...Ellan Syahnoorizal Siregar
 
Analisa harga pekerjaan bronjong
Analisa harga pekerjaan bronjongAnalisa harga pekerjaan bronjong
Analisa harga pekerjaan bronjongroxzjack
 
Sni 7394-2008-tata cara perhitungan harga satuan pekerjaan beton untuk konstr...
Sni 7394-2008-tata cara perhitungan harga satuan pekerjaan beton untuk konstr...Sni 7394-2008-tata cara perhitungan harga satuan pekerjaan beton untuk konstr...
Sni 7394-2008-tata cara perhitungan harga satuan pekerjaan beton untuk konstr...Ellan Syahnoorizal Siregar
 
3. analisa harga satuan
3. analisa harga satuan3. analisa harga satuan
3. analisa harga satuanim4m90
 
Analisa harga satuan pekerjaan (1)
Analisa harga satuan pekerjaan (1)Analisa harga satuan pekerjaan (1)
Analisa harga satuan pekerjaan (1)Ferdinand Nanubmat
 
Analisa pekerjaan bongkaran
Analisa pekerjaan bongkaranAnalisa pekerjaan bongkaran
Analisa pekerjaan bongkaranSaeful Fajri
 
Perencanaan Jembatan Komposit (Gambar Rencana & Rencana Anggaran Biaya)
Perencanaan Jembatan Komposit (Gambar Rencana & Rencana Anggaran Biaya)Perencanaan Jembatan Komposit (Gambar Rencana & Rencana Anggaran Biaya)
Perencanaan Jembatan Komposit (Gambar Rencana & Rencana Anggaran Biaya)caturprasetyo11tgb1
 
penulangan kolom, balok dan plat bangunan gedung
penulangan kolom, balok dan plat bangunan gedungpenulangan kolom, balok dan plat bangunan gedung
penulangan kolom, balok dan plat bangunan gedungAgus Fitriyanto
 
Materi perhitungan kebutuhan pasir urug pada pekerjaan konstruksi angga nug...
Materi perhitungan kebutuhan pasir urug pada pekerjaan konstruksi   angga nug...Materi perhitungan kebutuhan pasir urug pada pekerjaan konstruksi   angga nug...
Materi perhitungan kebutuhan pasir urug pada pekerjaan konstruksi angga nug...Angga Nugraha
 
Tata Cara Perhitungan Harga Satuan Pekerjaan Pipa dan Saniter
Tata Cara Perhitungan Harga Satuan Pekerjaan Pipa dan SaniterTata Cara Perhitungan Harga Satuan Pekerjaan Pipa dan Saniter
Tata Cara Perhitungan Harga Satuan Pekerjaan Pipa dan Saniterinfosanitasi
 
Soal Uji Sertifikat LSP Maret 31 Maret 2023.pdf
Soal Uji Sertifikat LSP Maret 31 Maret 2023.pdfSoal Uji Sertifikat LSP Maret 31 Maret 2023.pdf
Soal Uji Sertifikat LSP Maret 31 Maret 2023.pdfSipri Gamur
 
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan Gedung
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan GedungSNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan Gedung
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan GedungMira Pemayun
 
CONTOH LAPORAN KONSULTAN PENGAWAS
CONTOH LAPORAN KONSULTAN PENGAWASCONTOH LAPORAN KONSULTAN PENGAWAS
CONTOH LAPORAN KONSULTAN PENGAWASadedudi
 
Metode teknis dan flow chart of work
Metode teknis dan  flow chart of workMetode teknis dan  flow chart of work
Metode teknis dan flow chart of workZinet Yeha
 
Struktur Beton Bertulang
Struktur Beton BertulangStruktur Beton Bertulang
Struktur Beton BertulangMira Pemayun
 

What's hot (20)

Analisa harga satuan jasa
Analisa harga satuan jasaAnalisa harga satuan jasa
Analisa harga satuan jasa
 
Sni 2839-2008-tata cara perhitungan harga satuan pekerjaan langit-langit untu...
Sni 2839-2008-tata cara perhitungan harga satuan pekerjaan langit-langit untu...Sni 2839-2008-tata cara perhitungan harga satuan pekerjaan langit-langit untu...
Sni 2839-2008-tata cara perhitungan harga satuan pekerjaan langit-langit untu...
 
Analisa harga pekerjaan bronjong
Analisa harga pekerjaan bronjongAnalisa harga pekerjaan bronjong
Analisa harga pekerjaan bronjong
 
Sni 2008
Sni 2008Sni 2008
Sni 2008
 
Sni 7394-2008-tata cara perhitungan harga satuan pekerjaan beton untuk konstr...
Sni 7394-2008-tata cara perhitungan harga satuan pekerjaan beton untuk konstr...Sni 7394-2008-tata cara perhitungan harga satuan pekerjaan beton untuk konstr...
Sni 7394-2008-tata cara perhitungan harga satuan pekerjaan beton untuk konstr...
 
3. analisa harga satuan
3. analisa harga satuan3. analisa harga satuan
3. analisa harga satuan
 
Analisa harga satuan pekerjaan (1)
Analisa harga satuan pekerjaan (1)Analisa harga satuan pekerjaan (1)
Analisa harga satuan pekerjaan (1)
 
Analisa pekerjaan bongkaran
Analisa pekerjaan bongkaranAnalisa pekerjaan bongkaran
Analisa pekerjaan bongkaran
 
Perencanaan Jembatan Komposit (Gambar Rencana & Rencana Anggaran Biaya)
Perencanaan Jembatan Komposit (Gambar Rencana & Rencana Anggaran Biaya)Perencanaan Jembatan Komposit (Gambar Rencana & Rencana Anggaran Biaya)
Perencanaan Jembatan Komposit (Gambar Rencana & Rencana Anggaran Biaya)
 
Sni pekbeton 2008
Sni pekbeton 2008Sni pekbeton 2008
Sni pekbeton 2008
 
penulangan kolom, balok dan plat bangunan gedung
penulangan kolom, balok dan plat bangunan gedungpenulangan kolom, balok dan plat bangunan gedung
penulangan kolom, balok dan plat bangunan gedung
 
perhitungan-atap
perhitungan-atapperhitungan-atap
perhitungan-atap
 
Sni tiang pancang
Sni tiang pancangSni tiang pancang
Sni tiang pancang
 
Materi perhitungan kebutuhan pasir urug pada pekerjaan konstruksi angga nug...
Materi perhitungan kebutuhan pasir urug pada pekerjaan konstruksi   angga nug...Materi perhitungan kebutuhan pasir urug pada pekerjaan konstruksi   angga nug...
Materi perhitungan kebutuhan pasir urug pada pekerjaan konstruksi angga nug...
 
Tata Cara Perhitungan Harga Satuan Pekerjaan Pipa dan Saniter
Tata Cara Perhitungan Harga Satuan Pekerjaan Pipa dan SaniterTata Cara Perhitungan Harga Satuan Pekerjaan Pipa dan Saniter
Tata Cara Perhitungan Harga Satuan Pekerjaan Pipa dan Saniter
 
Soal Uji Sertifikat LSP Maret 31 Maret 2023.pdf
Soal Uji Sertifikat LSP Maret 31 Maret 2023.pdfSoal Uji Sertifikat LSP Maret 31 Maret 2023.pdf
Soal Uji Sertifikat LSP Maret 31 Maret 2023.pdf
 
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan Gedung
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan GedungSNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan Gedung
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan Gedung
 
CONTOH LAPORAN KONSULTAN PENGAWAS
CONTOH LAPORAN KONSULTAN PENGAWASCONTOH LAPORAN KONSULTAN PENGAWAS
CONTOH LAPORAN KONSULTAN PENGAWAS
 
Metode teknis dan flow chart of work
Metode teknis dan  flow chart of workMetode teknis dan  flow chart of work
Metode teknis dan flow chart of work
 
Struktur Beton Bertulang
Struktur Beton BertulangStruktur Beton Bertulang
Struktur Beton Bertulang
 

Viewers also liked

Beton2 tata 15-perencanaan-pondasi-telapak
Beton2 tata 15-perencanaan-pondasi-telapakBeton2 tata 15-perencanaan-pondasi-telapak
Beton2 tata 15-perencanaan-pondasi-telapakMaman Asep
 
Infopublik20120703102611
Infopublik20120703102611Infopublik20120703102611
Infopublik20120703102611Raafi Raafi
 
Perencanaan pondasi telapak persegi beton bertulang
Perencanaan pondasi telapak persegi beton bertulangPerencanaan pondasi telapak persegi beton bertulang
Perencanaan pondasi telapak persegi beton bertulangAfret Nobel
 
Transmisi daya dan gardu induk
Transmisi daya dan gardu indukTransmisi daya dan gardu induk
Transmisi daya dan gardu indukyendymw
 
Jenis jenis gardu induk
Jenis jenis gardu indukJenis jenis gardu induk
Jenis jenis gardu indukIrfan Nurhadi
 
KOMPONEN GARDU INDUK
KOMPONEN GARDU INDUKKOMPONEN GARDU INDUK
KOMPONEN GARDU INDUKAng Annur
 
Pembuatan JSA, HIRA, SOP, WI pada konstruksi gedung
Pembuatan JSA, HIRA, SOP, WI pada konstruksi gedungPembuatan JSA, HIRA, SOP, WI pada konstruksi gedung
Pembuatan JSA, HIRA, SOP, WI pada konstruksi gedungArdy Hermawan
 
perhitungan jembatan
perhitungan jembatanperhitungan jembatan
perhitungan jembatanFarid Thahura
 
K3 Konstruksi Bangungan
K3 Konstruksi BangunganK3 Konstruksi Bangungan
K3 Konstruksi BangunganAl Marson
 

Viewers also liked (13)

Jembatan
JembatanJembatan
Jembatan
 
Bab v struk bawah
Bab v   struk bawahBab v   struk bawah
Bab v struk bawah
 
Beton2 tata 15-perencanaan-pondasi-telapak
Beton2 tata 15-perencanaan-pondasi-telapakBeton2 tata 15-perencanaan-pondasi-telapak
Beton2 tata 15-perencanaan-pondasi-telapak
 
Infopublik20120703102611
Infopublik20120703102611Infopublik20120703102611
Infopublik20120703102611
 
Pondasi sumuran
Pondasi sumuranPondasi sumuran
Pondasi sumuran
 
Perencanaan pondasi telapak persegi beton bertulang
Perencanaan pondasi telapak persegi beton bertulangPerencanaan pondasi telapak persegi beton bertulang
Perencanaan pondasi telapak persegi beton bertulang
 
mengenal pondasi
mengenal pondasi mengenal pondasi
mengenal pondasi
 
Transmisi daya dan gardu induk
Transmisi daya dan gardu indukTransmisi daya dan gardu induk
Transmisi daya dan gardu induk
 
Jenis jenis gardu induk
Jenis jenis gardu indukJenis jenis gardu induk
Jenis jenis gardu induk
 
KOMPONEN GARDU INDUK
KOMPONEN GARDU INDUKKOMPONEN GARDU INDUK
KOMPONEN GARDU INDUK
 
Pembuatan JSA, HIRA, SOP, WI pada konstruksi gedung
Pembuatan JSA, HIRA, SOP, WI pada konstruksi gedungPembuatan JSA, HIRA, SOP, WI pada konstruksi gedung
Pembuatan JSA, HIRA, SOP, WI pada konstruksi gedung
 
perhitungan jembatan
perhitungan jembatanperhitungan jembatan
perhitungan jembatan
 
K3 Konstruksi Bangungan
K3 Konstruksi BangunganK3 Konstruksi Bangungan
K3 Konstruksi Bangungan
 

Similar to Pondasi Batu Belah

Revisi sni 03 2835-2002
Revisi sni 03 2835-2002Revisi sni 03 2835-2002
Revisi sni 03 2835-2002Erwin Rakasi
 
Sni 7394-2008 hit beton tulang
Sni 7394-2008 hit beton tulangSni 7394-2008 hit beton tulang
Sni 7394-2008 hit beton tulangRonny wisanggeni
 
50125213 sni-dt-91-0014-2007-tata-cara-perhitungan-harga-satuan-pek-besi-alum...
50125213 sni-dt-91-0014-2007-tata-cara-perhitungan-harga-satuan-pek-besi-alum...50125213 sni-dt-91-0014-2007-tata-cara-perhitungan-harga-satuan-pek-besi-alum...
50125213 sni-dt-91-0014-2007-tata-cara-perhitungan-harga-satuan-pek-besi-alum...yna962
 
Sni 20dt 2091-0008-2007-beton
Sni 20dt 2091-0008-2007-betonSni 20dt 2091-0008-2007-beton
Sni 20dt 2091-0008-2007-betoncakagha1307
 
PENGANTAR RAB.pptx
PENGANTAR RAB.pptxPENGANTAR RAB.pptx
PENGANTAR RAB.pptxAanAlFikri
 
SNI 3434_2008 Pekerjaan Kayu SNI.pdf
SNI 3434_2008 Pekerjaan Kayu SNI.pdfSNI 3434_2008 Pekerjaan Kayu SNI.pdf
SNI 3434_2008 Pekerjaan Kayu SNI.pdfssuser1c78c8
 
02. Definisi DED, RKS dan RAB.pdf
02. Definisi DED, RKS dan RAB.pdf02. Definisi DED, RKS dan RAB.pdf
02. Definisi DED, RKS dan RAB.pdfAsriAdi20
 
2. sni-2835-2008-pekerjaan-tanah
2. sni-2835-2008-pekerjaan-tanah2. sni-2835-2008-pekerjaan-tanah
2. sni-2835-2008-pekerjaan-tanahEka Faisal
 
Research Proposal Business Presentation in Dark Green Orange Geometric Style....
Research Proposal Business Presentation in Dark Green Orange Geometric Style....Research Proposal Business Presentation in Dark Green Orange Geometric Style....
Research Proposal Business Presentation in Dark Green Orange Geometric Style....RyoAryawan2
 
KAK Gedung Sekwan 2022.pdf
KAK Gedung  Sekwan 2022.pdfKAK Gedung  Sekwan 2022.pdf
KAK Gedung Sekwan 2022.pdfBUATDONLOTAJA
 
Modul TKP M6KB3 - Analisa Harga Satuan Pekerjaan
Modul TKP M6KB3 - Analisa Harga Satuan PekerjaanModul TKP M6KB3 - Analisa Harga Satuan Pekerjaan
Modul TKP M6KB3 - Analisa Harga Satuan PekerjaanPPGHybrid1
 
tugas akhir teknik sipil
tugas akhir teknik sipiltugas akhir teknik sipil
tugas akhir teknik sipilsuperival
 
Tor Pengawasan Jalan
Tor Pengawasan JalanTor Pengawasan Jalan
Tor Pengawasan Jalanssuser85bf14
 
Rks spek tek makam
Rks spek tek makamRks spek tek makam
Rks spek tek makamArdi Saputra
 
Permen PU Nomor 7 Tahun 2010 tentang Pemberlakuan Standar Kompetensi Kerja Na...
Permen PU Nomor 7 Tahun 2010 tentang Pemberlakuan Standar Kompetensi Kerja Na...Permen PU Nomor 7 Tahun 2010 tentang Pemberlakuan Standar Kompetensi Kerja Na...
Permen PU Nomor 7 Tahun 2010 tentang Pemberlakuan Standar Kompetensi Kerja Na...Penataan Ruang
 
Bab 4-tanggapan-terhadap-kak
Bab 4-tanggapan-terhadap-kakBab 4-tanggapan-terhadap-kak
Bab 4-tanggapan-terhadap-kakDALVY DALVY
 

Similar to Pondasi Batu Belah (20)

Revisi sni 03 2835-2002
Revisi sni 03 2835-2002Revisi sni 03 2835-2002
Revisi sni 03 2835-2002
 
Sni 7394-2008 hit beton tulang
Sni 7394-2008 hit beton tulangSni 7394-2008 hit beton tulang
Sni 7394-2008 hit beton tulang
 
50125213 sni-dt-91-0014-2007-tata-cara-perhitungan-harga-satuan-pek-besi-alum...
50125213 sni-dt-91-0014-2007-tata-cara-perhitungan-harga-satuan-pek-besi-alum...50125213 sni-dt-91-0014-2007-tata-cara-perhitungan-harga-satuan-pek-besi-alum...
50125213 sni-dt-91-0014-2007-tata-cara-perhitungan-harga-satuan-pek-besi-alum...
 
Sni 20dt 2091-0008-2007-beton
Sni 20dt 2091-0008-2007-betonSni 20dt 2091-0008-2007-beton
Sni 20dt 2091-0008-2007-beton
 
Sni 7393 2008
Sni 7393 2008Sni 7393 2008
Sni 7393 2008
 
PENGANTAR RAB.pptx
PENGANTAR RAB.pptxPENGANTAR RAB.pptx
PENGANTAR RAB.pptx
 
SNI 3434_2008 Pekerjaan Kayu SNI.pdf
SNI 3434_2008 Pekerjaan Kayu SNI.pdfSNI 3434_2008 Pekerjaan Kayu SNI.pdf
SNI 3434_2008 Pekerjaan Kayu SNI.pdf
 
02. Definisi DED, RKS dan RAB.pdf
02. Definisi DED, RKS dan RAB.pdf02. Definisi DED, RKS dan RAB.pdf
02. Definisi DED, RKS dan RAB.pdf
 
2. sni-2835-2008-pekerjaan-tanah
2. sni-2835-2008-pekerjaan-tanah2. sni-2835-2008-pekerjaan-tanah
2. sni-2835-2008-pekerjaan-tanah
 
Research Proposal Business Presentation in Dark Green Orange Geometric Style....
Research Proposal Business Presentation in Dark Green Orange Geometric Style....Research Proposal Business Presentation in Dark Green Orange Geometric Style....
Research Proposal Business Presentation in Dark Green Orange Geometric Style....
 
KAK Gedung Sekwan 2022.pdf
KAK Gedung  Sekwan 2022.pdfKAK Gedung  Sekwan 2022.pdf
KAK Gedung Sekwan 2022.pdf
 
Analisa Harga.pptx
Analisa Harga.pptxAnalisa Harga.pptx
Analisa Harga.pptx
 
Skkni 2017 232 octg
Skkni 2017 232 octgSkkni 2017 232 octg
Skkni 2017 232 octg
 
Modul TKP M6KB3 - Analisa Harga Satuan Pekerjaan
Modul TKP M6KB3 - Analisa Harga Satuan PekerjaanModul TKP M6KB3 - Analisa Harga Satuan Pekerjaan
Modul TKP M6KB3 - Analisa Harga Satuan Pekerjaan
 
tugas akhir teknik sipil
tugas akhir teknik sipiltugas akhir teknik sipil
tugas akhir teknik sipil
 
KAK PERENCANAAN
KAK PERENCANAANKAK PERENCANAAN
KAK PERENCANAAN
 
Tor Pengawasan Jalan
Tor Pengawasan JalanTor Pengawasan Jalan
Tor Pengawasan Jalan
 
Rks spek tek makam
Rks spek tek makamRks spek tek makam
Rks spek tek makam
 
Permen PU Nomor 7 Tahun 2010 tentang Pemberlakuan Standar Kompetensi Kerja Na...
Permen PU Nomor 7 Tahun 2010 tentang Pemberlakuan Standar Kompetensi Kerja Na...Permen PU Nomor 7 Tahun 2010 tentang Pemberlakuan Standar Kompetensi Kerja Na...
Permen PU Nomor 7 Tahun 2010 tentang Pemberlakuan Standar Kompetensi Kerja Na...
 
Bab 4-tanggapan-terhadap-kak
Bab 4-tanggapan-terhadap-kakBab 4-tanggapan-terhadap-kak
Bab 4-tanggapan-terhadap-kak
 

More from Ronny wisanggeni

More from Ronny wisanggeni (17)

Sni 03 3527-1994
Sni 03 3527-1994Sni 03 3527-1994
Sni 03 3527-1994
 
Outdoor spotlight series
Outdoor spotlight seriesOutdoor spotlight series
Outdoor spotlight series
 
Pompa teco
Pompa tecoPompa teco
Pompa teco
 
Piping
PipingPiping
Piping
 
Aplikasi excel-2007-dalam-bidang-teknik-mesin
Aplikasi excel-2007-dalam-bidang-teknik-mesinAplikasi excel-2007-dalam-bidang-teknik-mesin
Aplikasi excel-2007-dalam-bidang-teknik-mesin
 
Analisa koefisien gesek pipa acrylic
Analisa koefisien gesek pipa acrylicAnalisa koefisien gesek pipa acrylic
Analisa koefisien gesek pipa acrylic
 
Dasar2 perhitungan-pab
Dasar2 perhitungan-pabDasar2 perhitungan-pab
Dasar2 perhitungan-pab
 
Bab 04-aliran-fluida-dalam-pipa
Bab 04-aliran-fluida-dalam-pipaBab 04-aliran-fluida-dalam-pipa
Bab 04-aliran-fluida-dalam-pipa
 
Outdoor wall lamp series
Outdoor wall lamp seriesOutdoor wall lamp series
Outdoor wall lamp series
 
Pool light series
Pool light seriesPool light series
Pool light series
 
Fatro catalog downlight halogen series
Fatro catalog downlight halogen seriesFatro catalog downlight halogen series
Fatro catalog downlight halogen series
 
Downlight series
Downlight seriesDownlight series
Downlight series
 
Supreme multi pair kabel telephone indoor pt
Supreme multi pair kabel telephone indoor   ptSupreme multi pair kabel telephone indoor   pt
Supreme multi pair kabel telephone indoor pt
 
Ceiling lamp series
Ceiling lamp seriesCeiling lamp series
Ceiling lamp series
 
Led series
Led seriesLed series
Led series
 
Bangunan cara menghitung b.o
Bangunan  cara menghitung b.oBangunan  cara menghitung b.o
Bangunan cara menghitung b.o
 
1964 chapter viii
1964 chapter viii1964 chapter viii
1964 chapter viii
 

Recently uploaded

"Melompati Ramtoto: Keterampilan dan Kebahagiaan Anak-anak"
"Melompati Ramtoto: Keterampilan dan Kebahagiaan Anak-anak""Melompati Ramtoto: Keterampilan dan Kebahagiaan Anak-anak"
"Melompati Ramtoto: Keterampilan dan Kebahagiaan Anak-anak"HaseebBashir5
 
PPT Presentasimatkul Hukum Komersial.pptx
PPT Presentasimatkul Hukum Komersial.pptxPPT Presentasimatkul Hukum Komersial.pptx
PPT Presentasimatkul Hukum Komersial.pptxYasfinaQurrotaAyun
 
Cimahitoto: Situs Togel Online Terpercaya untuk Penggemar Judi
Cimahitoto: Situs Togel Online Terpercaya untuk Penggemar JudiCimahitoto: Situs Togel Online Terpercaya untuk Penggemar Judi
Cimahitoto: Situs Togel Online Terpercaya untuk Penggemar JudiHaseebBashir5
 
Investment Analysis Chapter 5 and 6 Material
Investment Analysis Chapter 5 and 6 MaterialInvestment Analysis Chapter 5 and 6 Material
Investment Analysis Chapter 5 and 6 MaterialValenciaAnggie
 
10. (D) LEASING (PSAK-73-Sewa-20012020) .pptx
10. (D)  LEASING (PSAK-73-Sewa-20012020) .pptx10. (D)  LEASING (PSAK-73-Sewa-20012020) .pptx
10. (D) LEASING (PSAK-73-Sewa-20012020) .pptxerlyndakasim2
 
Judul: Memahami Jabrix4D: Situs Togel dan Slot Online Terpercaya di Indonesia
Judul: Memahami Jabrix4D: Situs Togel dan Slot Online Terpercaya di IndonesiaJudul: Memahami Jabrix4D: Situs Togel dan Slot Online Terpercaya di Indonesia
Judul: Memahami Jabrix4D: Situs Togel dan Slot Online Terpercaya di IndonesiaHaseebBashir5
 
Tentang Gerhanatoto: Situs Judi Online yang Menarik Perhatian
Tentang Gerhanatoto: Situs Judi Online yang Menarik PerhatianTentang Gerhanatoto: Situs Judi Online yang Menarik Perhatian
Tentang Gerhanatoto: Situs Judi Online yang Menarik PerhatianHaseebBashir5
 
RISK BASED INTERNAL AUDIT - AUDITING .pptx
RISK BASED INTERNAL AUDIT - AUDITING .pptxRISK BASED INTERNAL AUDIT - AUDITING .pptx
RISK BASED INTERNAL AUDIT - AUDITING .pptxerlyndakasim2
 
PRTOTO SITUS SPORTING BET DAN TOGEL TERPERCAYA
PRTOTO SITUS SPORTING BET DAN TOGEL TERPERCAYAPRTOTO SITUS SPORTING BET DAN TOGEL TERPERCAYA
PRTOTO SITUS SPORTING BET DAN TOGEL TERPERCAYALex PRTOTO
 
PCM STRUKTUR JALAN JONGKANGOK JONGKANG.pptx
PCM STRUKTUR JALAN JONGKANGOK JONGKANG.pptxPCM STRUKTUR JALAN JONGKANGOK JONGKANG.pptx
PCM STRUKTUR JALAN JONGKANGOK JONGKANG.pptxmuhammadfajri44049
 
Togel Online: Panduan Lengkap tentang Dkitoto, Dkitogel, dan Situs Togel
Togel Online: Panduan Lengkap tentang Dkitoto, Dkitogel, dan Situs TogelTogel Online: Panduan Lengkap tentang Dkitoto, Dkitogel, dan Situs Togel
Togel Online: Panduan Lengkap tentang Dkitoto, Dkitogel, dan Situs TogelHaseebBashir5
 
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Pintu Rumah 2 Pintu di Banda Aceh.pptx
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Pintu Rumah 2 Pintu di Banda Aceh.pptxTERBAIK!!! WA 0821 7001 0763 (FORTRESS) Pintu Rumah 2 Pintu di Banda Aceh.pptx
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Pintu Rumah 2 Pintu di Banda Aceh.pptxFORTRESS
 
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aneka Pintu Aluminium di Banda Aceh.pptx
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aneka Pintu Aluminium di Banda Aceh.pptxTERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aneka Pintu Aluminium di Banda Aceh.pptx
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aneka Pintu Aluminium di Banda Aceh.pptxFORTRESS
 
KEAGENAN KAPAL DALAM DUNIA MARITIME INDO
KEAGENAN KAPAL DALAM DUNIA MARITIME INDOKEAGENAN KAPAL DALAM DUNIA MARITIME INDO
KEAGENAN KAPAL DALAM DUNIA MARITIME INDOANNISAUMAYAHS
 
1.-Ruang-Lingkup-Studi-Kelayakan-Bisnis-2.pptx
1.-Ruang-Lingkup-Studi-Kelayakan-Bisnis-2.pptx1.-Ruang-Lingkup-Studi-Kelayakan-Bisnis-2.pptx
1.-Ruang-Lingkup-Studi-Kelayakan-Bisnis-2.pptxAndiAzhar9
 
Contoh contoh soal dan jawaban persediaan barang
Contoh contoh soal dan jawaban persediaan barangContoh contoh soal dan jawaban persediaan barang
Contoh contoh soal dan jawaban persediaan barangRadhialKautsar
 
10. (C) MERGER DAN AKUISISI Presentation.pptx
10. (C) MERGER DAN AKUISISI Presentation.pptx10. (C) MERGER DAN AKUISISI Presentation.pptx
10. (C) MERGER DAN AKUISISI Presentation.pptxerlyndakasim2
 
Teknik Proyeksi Bisnis (Peramalan Bisnis)
Teknik Proyeksi Bisnis (Peramalan Bisnis)Teknik Proyeksi Bisnis (Peramalan Bisnis)
Teknik Proyeksi Bisnis (Peramalan Bisnis)DenniPratama2
 
Judul: Mengenal Lebih Jauh Tentang Jamintoto: Platform Perjudian Online yang ...
Judul: Mengenal Lebih Jauh Tentang Jamintoto: Platform Perjudian Online yang ...Judul: Mengenal Lebih Jauh Tentang Jamintoto: Platform Perjudian Online yang ...
Judul: Mengenal Lebih Jauh Tentang Jamintoto: Platform Perjudian Online yang ...HaseebBashir5
 
KELOMPOK 7_ANALISIS INVESTASI PUBLIK.pdf
KELOMPOK 7_ANALISIS INVESTASI PUBLIK.pdfKELOMPOK 7_ANALISIS INVESTASI PUBLIK.pdf
KELOMPOK 7_ANALISIS INVESTASI PUBLIK.pdfPritaRatuliu
 

Recently uploaded (20)

"Melompati Ramtoto: Keterampilan dan Kebahagiaan Anak-anak"
"Melompati Ramtoto: Keterampilan dan Kebahagiaan Anak-anak""Melompati Ramtoto: Keterampilan dan Kebahagiaan Anak-anak"
"Melompati Ramtoto: Keterampilan dan Kebahagiaan Anak-anak"
 
PPT Presentasimatkul Hukum Komersial.pptx
PPT Presentasimatkul Hukum Komersial.pptxPPT Presentasimatkul Hukum Komersial.pptx
PPT Presentasimatkul Hukum Komersial.pptx
 
Cimahitoto: Situs Togel Online Terpercaya untuk Penggemar Judi
Cimahitoto: Situs Togel Online Terpercaya untuk Penggemar JudiCimahitoto: Situs Togel Online Terpercaya untuk Penggemar Judi
Cimahitoto: Situs Togel Online Terpercaya untuk Penggemar Judi
 
Investment Analysis Chapter 5 and 6 Material
Investment Analysis Chapter 5 and 6 MaterialInvestment Analysis Chapter 5 and 6 Material
Investment Analysis Chapter 5 and 6 Material
 
10. (D) LEASING (PSAK-73-Sewa-20012020) .pptx
10. (D)  LEASING (PSAK-73-Sewa-20012020) .pptx10. (D)  LEASING (PSAK-73-Sewa-20012020) .pptx
10. (D) LEASING (PSAK-73-Sewa-20012020) .pptx
 
Judul: Memahami Jabrix4D: Situs Togel dan Slot Online Terpercaya di Indonesia
Judul: Memahami Jabrix4D: Situs Togel dan Slot Online Terpercaya di IndonesiaJudul: Memahami Jabrix4D: Situs Togel dan Slot Online Terpercaya di Indonesia
Judul: Memahami Jabrix4D: Situs Togel dan Slot Online Terpercaya di Indonesia
 
Tentang Gerhanatoto: Situs Judi Online yang Menarik Perhatian
Tentang Gerhanatoto: Situs Judi Online yang Menarik PerhatianTentang Gerhanatoto: Situs Judi Online yang Menarik Perhatian
Tentang Gerhanatoto: Situs Judi Online yang Menarik Perhatian
 
RISK BASED INTERNAL AUDIT - AUDITING .pptx
RISK BASED INTERNAL AUDIT - AUDITING .pptxRISK BASED INTERNAL AUDIT - AUDITING .pptx
RISK BASED INTERNAL AUDIT - AUDITING .pptx
 
PRTOTO SITUS SPORTING BET DAN TOGEL TERPERCAYA
PRTOTO SITUS SPORTING BET DAN TOGEL TERPERCAYAPRTOTO SITUS SPORTING BET DAN TOGEL TERPERCAYA
PRTOTO SITUS SPORTING BET DAN TOGEL TERPERCAYA
 
PCM STRUKTUR JALAN JONGKANGOK JONGKANG.pptx
PCM STRUKTUR JALAN JONGKANGOK JONGKANG.pptxPCM STRUKTUR JALAN JONGKANGOK JONGKANG.pptx
PCM STRUKTUR JALAN JONGKANGOK JONGKANG.pptx
 
Togel Online: Panduan Lengkap tentang Dkitoto, Dkitogel, dan Situs Togel
Togel Online: Panduan Lengkap tentang Dkitoto, Dkitogel, dan Situs TogelTogel Online: Panduan Lengkap tentang Dkitoto, Dkitogel, dan Situs Togel
Togel Online: Panduan Lengkap tentang Dkitoto, Dkitogel, dan Situs Togel
 
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Pintu Rumah 2 Pintu di Banda Aceh.pptx
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Pintu Rumah 2 Pintu di Banda Aceh.pptxTERBAIK!!! WA 0821 7001 0763 (FORTRESS) Pintu Rumah 2 Pintu di Banda Aceh.pptx
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Pintu Rumah 2 Pintu di Banda Aceh.pptx
 
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aneka Pintu Aluminium di Banda Aceh.pptx
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aneka Pintu Aluminium di Banda Aceh.pptxTERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aneka Pintu Aluminium di Banda Aceh.pptx
TERBAIK!!! WA 0821 7001 0763 (FORTRESS) Aneka Pintu Aluminium di Banda Aceh.pptx
 
KEAGENAN KAPAL DALAM DUNIA MARITIME INDO
KEAGENAN KAPAL DALAM DUNIA MARITIME INDOKEAGENAN KAPAL DALAM DUNIA MARITIME INDO
KEAGENAN KAPAL DALAM DUNIA MARITIME INDO
 
1.-Ruang-Lingkup-Studi-Kelayakan-Bisnis-2.pptx
1.-Ruang-Lingkup-Studi-Kelayakan-Bisnis-2.pptx1.-Ruang-Lingkup-Studi-Kelayakan-Bisnis-2.pptx
1.-Ruang-Lingkup-Studi-Kelayakan-Bisnis-2.pptx
 
Contoh contoh soal dan jawaban persediaan barang
Contoh contoh soal dan jawaban persediaan barangContoh contoh soal dan jawaban persediaan barang
Contoh contoh soal dan jawaban persediaan barang
 
10. (C) MERGER DAN AKUISISI Presentation.pptx
10. (C) MERGER DAN AKUISISI Presentation.pptx10. (C) MERGER DAN AKUISISI Presentation.pptx
10. (C) MERGER DAN AKUISISI Presentation.pptx
 
Teknik Proyeksi Bisnis (Peramalan Bisnis)
Teknik Proyeksi Bisnis (Peramalan Bisnis)Teknik Proyeksi Bisnis (Peramalan Bisnis)
Teknik Proyeksi Bisnis (Peramalan Bisnis)
 
Judul: Mengenal Lebih Jauh Tentang Jamintoto: Platform Perjudian Online yang ...
Judul: Mengenal Lebih Jauh Tentang Jamintoto: Platform Perjudian Online yang ...Judul: Mengenal Lebih Jauh Tentang Jamintoto: Platform Perjudian Online yang ...
Judul: Mengenal Lebih Jauh Tentang Jamintoto: Platform Perjudian Online yang ...
 
KELOMPOK 7_ANALISIS INVESTASI PUBLIK.pdf
KELOMPOK 7_ANALISIS INVESTASI PUBLIK.pdfKELOMPOK 7_ANALISIS INVESTASI PUBLIK.pdf
KELOMPOK 7_ANALISIS INVESTASI PUBLIK.pdf
 

Pondasi Batu Belah

  • 1. Standar Nasional Indonesia SNI 2836:2008 Tata cara perhitungan harga satuan pekerjaan pondasi untuk konstruksi bangunan gedung dan perumahan ICS 91.010.20 Badan Standardisasi Nasional
  • 2.
  • 3. SNI 2836:2008 i Daftar isi Daftar isi..........................................................................................................................................i Prakata .......................................................................................................................................... ii Pendahuluan................................................................................................................................. iii 1 Ruang lingkup.........................................................................................................................1 2 Acuan normatif........................................................................................................................1 3 Istilah dan definisi ...................................................................................................................1 4 Singkatan istilah......................................................................................................................2 5 Persyaratan ............................................................................................................................3 6 Penetapan indeks harga satuan pekerjaan pondasi...............................................................3 6.1 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 PP .......................................3 6.2 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP .......................................3 6.3 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PP .......................................4 6.4 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 6 PP .......................................4 6.5 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 8 PP .......................................4 6.6 Memasang 1 m3 pondasi batu belah, campuran 1 KP : 1 SM : 2 PP ............................4 6.7 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 KP : 10 PP...........................5 6.8 Memasang 1 m3 pondasi batu belah, campuran ¼ PC : 1 KP : 4 PP............................5 6.9 Memasang 1 m3 batu kosong (aanstamping)................................................................5 6.10 Memasang 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR.................6 6.11 Memasang 1 m3 pondasi sumuran, diameter 100 cm .................................................6 Lampiran A ....................................................................................................................................7 Bibliografi.......................................................................................................................................8
  • 4. SNI 2836:2008 ii Prakata Standar Nasional Indonesia (SNI) tentang Tata cara perhitungan harga satuan pekerjaan pondasi untuk konstruksi bangunan gedung dan perumahan adalah revisi dari SNI 03-2836- 2002, Tata cara perhitungan harga satuan pekerjaan pondasi batu belah untuk bangunan sederhana, dengan perubahan pada indeks harga bahan dan indeks harga tenaga kerja. Standar ini disusun oleh Panitia Teknik Bahan Konstruksi Bangunan dan Rekayasa Sipil melalui Gugus Kerja Struktur dan Konstruksi Bangunan pada Subpanitia Teknis Bahan, Sains, Struktur dan Konstruksi Bangunan. Tata cara penulisan disusun mengikuti Pedoman Standardisasi Nasional 08:2007 dan telah dibahas dalam rapat konsensus yang diselenggarakan pada tanggal 7 s/d 8 Desember 2006 oleh Subpanitia Teknis yang melibatkan para nara sumber, pakar dan lembaga terkait. SNI 2836:2008 akan dipergunakan sebagai acuan analisis biaya konstruksi di Indonesia.
  • 5. SNI 2836:2008 iii Pendahuluan Tata cara perhitungan harga satuan pekerjaan ini disusun berdasarkan pada hasil penelitian Aanlisis Biaya Konstruksi di Pusat Litbang Permukiman 1988 – 1991. Penelitian ini dilakukan dalam dua tahap. Tahap pertama dengan melakukan pengumpulan data sekunder analisis biaya yang diperoleh dari beberapa BUMN, Kontraktor dan data yang berasal dari analisis yang telah ada sebelumnya yaitu BOW. Dari data sekunder yang terkumpul dipilih data dengan modus terbanyak. Tahap kedua adalah penelitian lapangan untuk memperoleh data primer sebagai cross check terhadap data sekunder terpilih pada penelitian tahap pertama. Penelitian lapangan berupa penelitian produktifitas tenaga kerja lapangan pada beberapa proyek pembangunan gedung dan perumahan serta penelitian laboratorium bahan bangunan untuk komposisi bahan yang digunakan pada setiap jenis pekerjaan dengan pendekatan kinerja/performance dari jenis pekerjaan terkait. DATA LAPANGAN WAKTU DASAR INDIVIDU WAKTU NORMAL INDIVIDU TABULASI DATA TES KESERAGAMAN DATA TES KECUKUPAN DATA WAKTU NORMAL WAKTU STANDAR BAHAN ANALISIS BIAYA KONSTRUKSI/ BARU Waktu produktif Rating keterampilan, mutu kerja, kondisi kerja, cuaca, dll Tingkat ketelitian 10% dan tingkat keyakinam 95% Kelonggaran waktu/allowance Tidak Cukup Cukup
  • 6.
  • 7. 1 dari 8 Tata cara perhitungan harga satuan pekerjaan pondasi untuk konstruksi bangunan gedung dan perumahan 1 Ruang lingkup Standar ini menetapkan indeks bahan bangunan dan indeks tenaga kerja yang dibutuhkan untuk tiap satuan pekerjaan pondasi yang dapat dijadikan acuan dasar yang seragam bagi para pelaksana pembangunan gedung dan perumahan dalam menghitung besarnya harga satuan pekerjaan pondasi untuk bangunan gedung dan perumahan. Jenis pekerjaan pondasi yang ditetapkan meliputi : a) Pekerjaan pembuatan pondasi batu belah dalam berbagai komposisi campuran; b) Pemasangan anstamping / batu kosong; c) Pembuatan pondasi sumuran dan pondasi siklop. 2 Acuan normatif Standar ini disusun mengacu kepada hasil pengkajian dari beberapa analisa pekerjaan yang telah diaplikasikan oleh beberapa kontraktor dengan pembanding adalah analisis BOW 1921 dan penelitian analisis biaya konstruksi. 3 Istilah dan definisi 3.1 bangunan gedung dan perumahan bangunan yang berfungsi untuk menampung kegiatan kehidupan bermasyarakat 3.2 harga satuan bahan harga yang sesuai dengan satuan jenis bahan bangunan 3.3 harga satuan pekerjaan harga yang dihitung berdasarkan analisis harga satuan bahan dan upah 3.4 indeks faktor pengali / koefisien sebagai dasar penghitungan biaya bahan dan upah kerja 3.5 indeks bahan indeks kuantum yang menunjukkan kebutuhan bahan bangunan untuk setiap satuan jenis pekerjaan 3.6
  • 8. 2 dari 8 indeks tenaga kerja indeks kuantum yang menunjukkan kebutuhan waktu untuk mengerjakan setiap satuan jenis pekerjaan 3.7 pelaksana pembangunan gedung dan perumahan pihak-pihak yang terkait dalam pembangunan gedung dan perumahan yaitu para perencana, konsultan, kontraktor maupun perseorangan dalam memperkirakan biaya bangunan. 3.8 perhitungan harga satuan pekerjaan konstruksi suatu cara perhitungan harga satuan pekerjaan konstruksi, yang dijabarkan dalam perkalian indeks bahan bangunan dan upah kerja dengan harga bahan bangunan dan standar pengupahan pekerja, untuk menyelesaikan per-satuan pekerjaan konstruksi 3.9 satuan pekerjaan satuan jenis kegiatan konstruksi bangunan yang dinyatakan dalam satuan panjang, luas, volume dan unit 4 Singkatan istilah Singkatan Kepanjangan Istilah/arti cm centimeter Satuan panjang kg kilogram Satuan berat m’ meter panjang Satuan panjang m2 meter persegi Satuan luas m3 meter kubik Satuan volume OH Orang Hari Satuan tenaga kerja per hari PC Portland Cement Semen Portland PU Pasir urug Pasir yang digunakan untuk urugan PP Pasir pasang Agregat halus ukuran ≤ 5 mm KR Kerikil Agregat kasar ukuran 5 mm – 40 mm KP Kapur padam Kapur tohor yang dipadamkan SM Semen merah Semen hasil tumbukan bata merah PB Pasir beton Agregat halus ukuran ≤ 5 mm
  • 9. 3 dari 8 5 Persyaratan 5.1 Persyaratan umum Persyaratan umum dalam perhitungan harga satuan: a) Perhitungan harga satuan pekerjaan berlaku untuk seluruh wilayah Indonesia, berdasarkan harga bahan dan upah kerja sesuai dengan kondisi setempat; b) Spesifikasi dan cara pengerjaan setiap jenis pekerjaan disesuaikan dengan standar spesifikasi teknis pekerjaan yang telah dibakukan. 5.2 Persyaratan teknis Persyaratan teknis dalam perhitungan harga satuan pekerjaan: a) Pelaksanaan perhitungan satuan pekerjaan harus didasarkan kepada gambar teknis dan rencana kerja serta syarat-syarat (RKS); b) Perhitungan indeks bahan telah ditambahkan toleransi sebesar 5%-20%, dimana di dalamnya termasuk angka susut, yang besarnya tergantung dari jenis bahan dan komposisi adukan; c) Jam kerja efektif untuk tenaga kerja diperhitungkan 5 jam perhari. 6 Penetapan indeks harga satuan pekerjaan pondasi 6.1 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 PP Kebutuhan Satuan Indeks Bahan Batu belah 15 cm/20 cm M3 1,200 PC Kg 202,000 PP M3 0,485 Tenaga kerja Pekerja OH 1,500 Tukang batu OH 0,750 Kepala tukang OH 0,075 Mandor OH 0,075 6.2 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP Kebutuhan Satuan Indeks Bahan Batu belah 15 cm/20 cm M3 1,200 PC Kg 163,000 PP M3 0,520 Tenaga kerja Pekerja OH 1,500 Tukang batu OH 0,750 Kepala tukang OH 0,075 Mandor OH 0,075
  • 10. 4 dari 8 6.3 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PP Kebutuhan Satuan Indeks Bahan Batu belah 15 cm/20 cm M3 1,200 PC Kg 136,000 PP M3 0,544 Tenaga kerja Pekerja OH 1,500 Tukang batu OH 0,750 Kepala tukang OH 0,075 Mandor OH 0,075 6.4 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 6 PP Kebutuhan Satuan Indeks Bahan Batu belah 15 cm/20 cm m3 1,200 PC kg 117,000 PP m3 0,561 Tenaga kerja Pekerja OH 1,500 Tukang batu OH 0,750 Kepala tukang OH 0,075 Mandor OH 0,075 6.5 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 8 PP Kebutuhan Satuan Indeks Bahan Batu belah 15 cm/20 cm m3 1,200 PC kg 91,000 PP m3 0,584 Tenaga kerja Pekerja OH 1,500 Tukang batu OH 0,750 Kepala tukang OH 0,075 Mandor OH 0,075 6.6 Memasang 1 m3 pondasi batu belah, campuran 1 KP : 1 SM : 2 PP Kebutuhan Satuan Indeks Bahan Batu belah 15 cm/20 cm m3 1,200 KP m3 0,170 SM m3 0,170 PP m3 0,340 Tenaga kerja Pekerja OH 1,500 Tukang batu OH 0,750 Kepala tukang OH 0,075 Mandor OH 0,075
  • 11. 5 dari 8 6.7 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 KP : 10 PP Kebutuhan Satuan Indeks Bahan Batu belah 15 cm/20 cm m3 1,200 PC kg 61,000 KP m3 0,147 PP m3 0,492 Tenaga kerja Pekerja OH 1,500 Tukang batu OH 0,750 Kepala tukang OH 0,075 Mandor OH 0,075 6.8 Memasang 1 m3 pondasi batu belah, campuran ¼ PC : 1 KP : 4 PP Kebutuhan Satuan Indeks Bahan Batu belah 15 cm/20 cm m3 1,200 PC kg 41,000 KP m3 0,131 PP m3 0,523 Tenaga kerja Pekerja OH 1,500 Tukang batu OH 0,750 Kepala tukang OH 0,075 Mandor OH 0,075 6.9 Memasang 1 m3 batu kosong (anstamping) Kebutuhan Satuan Indeks Bahan Batu belah 15 cm/20 cm m3 1,200 Pasir urug m3 0,432 Tenaga kerja Pekerja OH 0,780 Tukang batu OH 0,390 Kepala tukang OH 0,039 Mandor OH 0,039
  • 12. 6 dari 8 6.10 Memasang 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah Kebutuhan Satuan Indeks Bahan Batu belah 15 cm/20 cm m3 0,480 PC kg 194,000 Pasir beton m3 0,312 KR m3 0,468 Besi beton kg 126,000 Kawat beton kg 1,800 Tenaga kerja Pekerja OH 3,400 Tukang batu OH 0,850 Kepala tukang OH 0,085 Mandor OH 0,170 6.11 Memasang 1 m3 pondasi sumuran, diameter 100 cm Kebutuhan Satuan Indeks Bahan Batu belah 15 cm/20 cm m3 0,450 PC kg 194,000 PB m3 0,312 KR m3 0,468 Tenaga kerja Pekerja OH 2,400 Tukang batu OH 0,800 Kepala tukang OH 0,080 Mandor OH 0,119
  • 13. 7 dari 8 Lampiran A (Informatif) Contoh penggunaan standar untuk menghitung harga satuan pekerjaan A.1 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 PP Kebutuhan Satuan Indeks Harga Satuan Bahan/Upah (Rp.) Jumlah (Rp.) Bahan Batu belah m3 1,200 40.000 48.000 PC kg 202,000 400 80.800 PP m3 0,485 45.000 21.825 Tenaga kerja Pekerja OH 1,500 30.000 45.000 Tukang batu OH 0,750 40.000 30.000 Kepala tukang OH 0,075 50.000 3.750 Mandor OH 0,075 60.000 4.500 Jumlah harga per satuan pekerjaan 233.875
  • 14. 8 dari 8 Bibliografi Pusat Penelitian dan Pengembangan Permukiman, Analisis Biaya Konstruksi (hasil penelitian), tahun 1988–1991. SNI 03-6861.1-2002, Spesifikasi bahan bangunan bagian A (bahan bangunan bukan logam) SNI 03-6861.2-2002, Spesifikasi bahan bangunan bagian B (Bahan bangunan dari besi / baja)