MILORA -GROUP
Passion to improve Perseverance in results
Work experience industrial environment, HSE and demolition 2008-2015
Unilever Delft –Calvé factories (2008-2009)
Purpose: total demolition of buildings, installations and underground infrastructure.
Duration: approximately 9 months.
My personal work experience: preparation, planning, inspections, asbestos investigations and project managing
demolition.
Unilever Vlaardingen -Fabergé factories (2009)
Purpose: selective demolition of buildings and removal and relocate installations.
Duration: approximately 6 months.
My personal work experience: preparation, planning, inspections, asbestos investigations and managing
selective demolition.
MILORA -GROUP
Passion to improve Perseverance in results
Unilever Loosdrecht- Knorr factories (2009)
Purpose: preparation demolition of buildings and installations.
Duration: approximately 1 month.
My personal work experience: Inspections, asbestos investigations and analyse soil inventory data.
Kemira –Boltek fertilizer and sulfuric acid plant (2008-2012)
Purpose: total demolition of buildings, installations and underground infrastructure.
Duration: approximately 12 months.
My personal work experience phase one for Kemira: inspections, asbestos investigations and project managing
demolition and HSE-coordination.
MILORA -GROUP
Passion to improve Perseverance in results
MicroChemie( terrain Kemira- Botlek Fertilizer and sulfuric acid plant) -(2008-2012)
Purpose: site preparation for building tank farm.
Duration: approximately 12 months.
My personal work experience phase two for MicroChemie: managing soil remediation and surveying existing
posts.
OCI (terrain Kemira- Botlek Fertilizer and sulfuric acid plant) -(2008-2012)
Purpose: inspection out site NH3 tanks, selective demolition pipe racks and asbestos removal power plant.
Duration: approximately 3 months.
My personal work experience phase three for OCI: inspection outer shell tanks, asbestos survey and managing
asbestos removal.
MILORA -GROUP
Passion to improve Perseverance in results
OCI –NH3 terminal Botlek -2012
Purpose: inspection and removal chemicals and clearing out outside storage facility chemicals.
Duration: approximately 1 months.
My personal work experience phase four for OCI: inspection and sampling chemicals and managing removal of
chemicals and closing down storage facility.
Europoort Tank Terminal -2010
Purpose: demolition of tank, laboratory and office facilities.
Duration: approximately 1 month.
My personal work experience: inspection tanks and buildings, HSE- plan demolition and managing demolition
process.
MILORA -GROUP
Passion to improve Perseverance in results
Evonik - Carbon Black Botlek plant -2012-2013
Purpose: total demolition of buildings, installations and underground infrastructure. Relocate parts of facilities
all over the word to other Evonik plants. Contract preparation and international selection of contractors.
Duration: approximately 18 months.
My personal work experience phase one in team of two: preparation of quotations, selection of contractors,
planning , inspections, asbestos investigations and project managing the demolition of buildings and
installations. HSE planning and implementation.
Evonik - Carbon Black Botlek plant -2012-2013
Purpose: completion of land to the Port Authority
Duration: approximately 12 months.
My personal work experience phase two in team of two: managing land survey, surveying all existing posts, soil
-research and remediation. HSE planning and implementation. All contacts with local authorities.
MILORA -GROUP
Passion to improve Perseverance in results
Q8-KPE -2013
Purpose: turn around total refinery
Duration: approximately 6 months.
My personal work experience: manager environment -asbestos, ceramic wool and chemicals. Inspection fire
proofing. Documentation off all investigated spots and removed materials. Drafting documents for future safe
entrance of furnaces and stacks.
Total –Zeeland refinery -2014
Purpose: turn around total site
Duration: approximately 5 months.
My personal work experience: manager environment -asbestos, ceramic wool and chemicals. Documentation
off all investigated spots and removed materials. Inspections waste materials.
MILORA -GROUP
Passion to improve Perseverance in results
Oesterbaai/ Vrije Universiteit Amsterdam -2014/2015
Purpose: sooth remediation in laboratory building OL2 - De Boelelaan 1105 Amsterdam, after fire in the not yet
completed building.
Duration: approximately 3 months.
My personal work experience: project manager environment –sampling after cleaning and cleaning advise.
Documentation off all investigated and cleaned spots in the complete building and installations.
MILORA -GROUP
Passion to improve Perseverance in results
Work experience Health & Safety
Abbott – Weesp facilities -2013
Purpose: total demolition of selective buildings, installations and underground infrastructure.
Duration: approximately 12 months.
My personal work experience: drafting demolition and HSE plan. HSE manager for demolition contractor.

More Related Content

Viewers also liked

Viewers also liked (6)

Resume 2016
Resume 2016Resume 2016
Resume 2016
 
IBM Gaming met Bluemix
IBM Gaming met BluemixIBM Gaming met Bluemix
IBM Gaming met Bluemix
 
SCHOOLS NOW BY KASHFI BUTT
SCHOOLS NOW BY KASHFI BUTTSCHOOLS NOW BY KASHFI BUTT
SCHOOLS NOW BY KASHFI BUTT
 
folio final_LOW
folio final_LOWfolio final_LOW
folio final_LOW
 
vijay 2
vijay 2vijay 2
vijay 2
 
The secret to true patient centricity parke ip
The secret to true patient centricity parke ipThe secret to true patient centricity parke ip
The secret to true patient centricity parke ip
 

Similar to introduction brochure

cv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentcv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentEugene van Brakel
 
Curriculum vitae 1
Curriculum vitae 1Curriculum vitae 1
Curriculum vitae 1Mahmoud Ali
 
lucas_trevor 10.11.14
lucas_trevor 10.11.14lucas_trevor 10.11.14
lucas_trevor 10.11.14Trevor Lucas
 
CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014Manuel Bartilotti
 
CURRICULUM VITAE English Stavros Stavrou
CURRICULUM VITAE English Stavros StavrouCURRICULUM VITAE English Stavros Stavrou
CURRICULUM VITAE English Stavros StavrouStavros Stavrou
 
INDERPAL SINGH CV AS QC
INDERPAL SINGH CV AS QCINDERPAL SINGH CV AS QC
INDERPAL SINGH CV AS QCInder Singh
 
Curriculum Vitae-Sverre W. Viland
Curriculum Vitae-Sverre W. VilandCurriculum Vitae-Sverre W. Viland
Curriculum Vitae-Sverre W. VilandSverre Viland
 
Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014Stuart Cooper
 
Resume Ayman Shaikh
Resume Ayman ShaikhResume Ayman Shaikh
Resume Ayman ShaikhAyman Shaikh
 
COATING/ INSULATION/ PASSIVE FIRE PROTECTION /SUPERVISOR
COATING/ INSULATION/ PASSIVE FIRE PROTECTION /SUPERVISORCOATING/ INSULATION/ PASSIVE FIRE PROTECTION /SUPERVISOR
COATING/ INSULATION/ PASSIVE FIRE PROTECTION /SUPERVISORArtem Velychko
 
Eng mostafa magdy cv
Eng mostafa magdy cvEng mostafa magdy cv
Eng mostafa magdy cvmostafa magdy
 
Modern waste management concept e
Modern waste management concept eModern waste management concept e
Modern waste management concept eAndreas Thoma
 
Mostafa Akl Coating Inspector-1-3-1-1 (1)
Mostafa Akl Coating Inspector-1-3-1-1 (1)Mostafa Akl Coating Inspector-1-3-1-1 (1)
Mostafa Akl Coating Inspector-1-3-1-1 (1)Mostafa Akl
 

Similar to introduction brochure (20)

cv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentcv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachment
 
Resume - Pawat Suwantanut
Resume - Pawat SuwantanutResume - Pawat Suwantanut
Resume - Pawat Suwantanut
 
Curriculum vitae 1
Curriculum vitae 1Curriculum vitae 1
Curriculum vitae 1
 
DKSHAH RESUME
DKSHAH RESUMEDKSHAH RESUME
DKSHAH RESUME
 
lucas_trevor 10.11.14
lucas_trevor 10.11.14lucas_trevor 10.11.14
lucas_trevor 10.11.14
 
helmy hamdy(1)
helmy hamdy(1)helmy hamdy(1)
helmy hamdy(1)
 
CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014
 
CURRICULUM VITAE English Stavros Stavrou
CURRICULUM VITAE English Stavros StavrouCURRICULUM VITAE English Stavros Stavrou
CURRICULUM VITAE English Stavros Stavrou
 
INDERPAL SINGH CV AS QC
INDERPAL SINGH CV AS QCINDERPAL SINGH CV AS QC
INDERPAL SINGH CV AS QC
 
Curriculum Vitae-Sverre W. Viland
Curriculum Vitae-Sverre W. VilandCurriculum Vitae-Sverre W. Viland
Curriculum Vitae-Sverre W. Viland
 
Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014
 
Resume Ayman Shaikh
Resume Ayman ShaikhResume Ayman Shaikh
Resume Ayman Shaikh
 
COATING/ INSULATION/ PASSIVE FIRE PROTECTION /SUPERVISOR
COATING/ INSULATION/ PASSIVE FIRE PROTECTION /SUPERVISORCOATING/ INSULATION/ PASSIVE FIRE PROTECTION /SUPERVISOR
COATING/ INSULATION/ PASSIVE FIRE PROTECTION /SUPERVISOR
 
AMRO C.V
AMRO C.VAMRO C.V
AMRO C.V
 
CV VUVU.2 docx
CV VUVU.2 docxCV VUVU.2 docx
CV VUVU.2 docx
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
Eng mostafa magdy cv
Eng mostafa magdy cvEng mostafa magdy cv
Eng mostafa magdy cv
 
Modern waste management concept e
Modern waste management concept eModern waste management concept e
Modern waste management concept e
 
CV Vipin Srivastava
CV Vipin SrivastavaCV Vipin Srivastava
CV Vipin Srivastava
 
Mostafa Akl Coating Inspector-1-3-1-1 (1)
Mostafa Akl Coating Inspector-1-3-1-1 (1)Mostafa Akl Coating Inspector-1-3-1-1 (1)
Mostafa Akl Coating Inspector-1-3-1-1 (1)
 

introduction brochure

  • 1. MILORA -GROUP Passion to improve Perseverance in results Work experience industrial environment, HSE and demolition 2008-2015 Unilever Delft –Calvé factories (2008-2009) Purpose: total demolition of buildings, installations and underground infrastructure. Duration: approximately 9 months. My personal work experience: preparation, planning, inspections, asbestos investigations and project managing demolition. Unilever Vlaardingen -Fabergé factories (2009) Purpose: selective demolition of buildings and removal and relocate installations. Duration: approximately 6 months. My personal work experience: preparation, planning, inspections, asbestos investigations and managing selective demolition.
  • 2. MILORA -GROUP Passion to improve Perseverance in results Unilever Loosdrecht- Knorr factories (2009) Purpose: preparation demolition of buildings and installations. Duration: approximately 1 month. My personal work experience: Inspections, asbestos investigations and analyse soil inventory data. Kemira –Boltek fertilizer and sulfuric acid plant (2008-2012) Purpose: total demolition of buildings, installations and underground infrastructure. Duration: approximately 12 months. My personal work experience phase one for Kemira: inspections, asbestos investigations and project managing demolition and HSE-coordination.
  • 3. MILORA -GROUP Passion to improve Perseverance in results MicroChemie( terrain Kemira- Botlek Fertilizer and sulfuric acid plant) -(2008-2012) Purpose: site preparation for building tank farm. Duration: approximately 12 months. My personal work experience phase two for MicroChemie: managing soil remediation and surveying existing posts. OCI (terrain Kemira- Botlek Fertilizer and sulfuric acid plant) -(2008-2012) Purpose: inspection out site NH3 tanks, selective demolition pipe racks and asbestos removal power plant. Duration: approximately 3 months. My personal work experience phase three for OCI: inspection outer shell tanks, asbestos survey and managing asbestos removal.
  • 4. MILORA -GROUP Passion to improve Perseverance in results OCI –NH3 terminal Botlek -2012 Purpose: inspection and removal chemicals and clearing out outside storage facility chemicals. Duration: approximately 1 months. My personal work experience phase four for OCI: inspection and sampling chemicals and managing removal of chemicals and closing down storage facility. Europoort Tank Terminal -2010 Purpose: demolition of tank, laboratory and office facilities. Duration: approximately 1 month. My personal work experience: inspection tanks and buildings, HSE- plan demolition and managing demolition process.
  • 5. MILORA -GROUP Passion to improve Perseverance in results Evonik - Carbon Black Botlek plant -2012-2013 Purpose: total demolition of buildings, installations and underground infrastructure. Relocate parts of facilities all over the word to other Evonik plants. Contract preparation and international selection of contractors. Duration: approximately 18 months. My personal work experience phase one in team of two: preparation of quotations, selection of contractors, planning , inspections, asbestos investigations and project managing the demolition of buildings and installations. HSE planning and implementation. Evonik - Carbon Black Botlek plant -2012-2013 Purpose: completion of land to the Port Authority Duration: approximately 12 months. My personal work experience phase two in team of two: managing land survey, surveying all existing posts, soil -research and remediation. HSE planning and implementation. All contacts with local authorities.
  • 6. MILORA -GROUP Passion to improve Perseverance in results Q8-KPE -2013 Purpose: turn around total refinery Duration: approximately 6 months. My personal work experience: manager environment -asbestos, ceramic wool and chemicals. Inspection fire proofing. Documentation off all investigated spots and removed materials. Drafting documents for future safe entrance of furnaces and stacks. Total –Zeeland refinery -2014 Purpose: turn around total site Duration: approximately 5 months. My personal work experience: manager environment -asbestos, ceramic wool and chemicals. Documentation off all investigated spots and removed materials. Inspections waste materials.
  • 7. MILORA -GROUP Passion to improve Perseverance in results Oesterbaai/ Vrije Universiteit Amsterdam -2014/2015 Purpose: sooth remediation in laboratory building OL2 - De Boelelaan 1105 Amsterdam, after fire in the not yet completed building. Duration: approximately 3 months. My personal work experience: project manager environment –sampling after cleaning and cleaning advise. Documentation off all investigated and cleaned spots in the complete building and installations.
  • 8. MILORA -GROUP Passion to improve Perseverance in results Work experience Health & Safety Abbott – Weesp facilities -2013 Purpose: total demolition of selective buildings, installations and underground infrastructure. Duration: approximately 12 months. My personal work experience: drafting demolition and HSE plan. HSE manager for demolition contractor.