SlideShare a Scribd company logo
1 of 5
CURRICULUM
VITAE
NAME : RICHARD JOK @ NGAU JOCK.
I/C NO. : 690325-13-6135
DATE OF
BIRTH : 25th
March 1969
NATIONALITY : MALAYSIAN (SARAWAK)
NOS. OF
CHILDREN : 3
CONTACT NO : Mobile Phone +60198256938
HOBBY
LANGUAGE
EXPERIENCE
:
:
:
Watching TV, Fishing, Travelling & site seeing.
BAHASA MALAYSIA,ENGLISH AND OTHER.
SARAWAK( 1993-1995,2001 – 2003,2007-2008,2012-PRESENT ), West Malaysia(1996-
2000,2008-2011)
CONTACT
ADDRESS
: NO: 42, Long Laput Baram, Sarawak Malaysia.
EDUCATION
LEVEL
: SECONDARY SCHOOL ( MALAYSIAN CERTIFICATE OF EDUCATION ) 1986.
EMAIL : ngaurichardjok@yahoo.com
COMPUTER : MICROSOFT WORD/EXCEL
POSITION : As Qc, Site /Mechanical/Piping and Tanks Supervisor, Piping superintendent for various
project and maintenance job include coordination of subcontractors daily activities,
reporting directly to engineer or manager in charge. Liaise with client / owner to ensure
the safety, progress and standard of work done is according to procedures and schedule.
EXPERIENCE.
More than 20 years experiences in oil and gas and petrochemicalindustries. Familiar with
Isometrics Drawing , P&I.D, General Arrangement ,Standard Support, Daily Work Permit ,
Work/Lifting Procedures , JMS , JSA/JHA etc. Have work at MLNG Satu , Dua , Tiga ,
PP(M)SB , PP(T)SB , MCOT , SHELL (PD) , Ethylene and Polyethylene , TITAN , IDEMITSU,
PETRONAS Chemical, SMDS and etc.
April 2015
Onward till
Present
January 2014
to March2015.
Ranex (M) Sdn. Bhd.
Overall AE/Supervisor/Planner
SMDS Bintulu, Sarawak. Manpower supply for mechanicalmaintenance work for Oil & Wax
plant, including U8600 Wax Processing Plant and Fire Station. (Manpower Supply)
Ranex (M) Sdn. Bhd
As Area Engineer
SMDS Bintulu, Sarawak.Integrated Service Contractor mechanical maintenance work for
Oil & Wax plant on a 3 years contract.
August2013-
December2103
NAIM ENGINEERING SDN. BHD
As Mechanical & Piping Supervisor
PETRONAS LNG TRAIN 9 PROJECT, BINTULU SARAWAK.
May2013-
August2013.
INGRESS FABRICATORS SDN BHD
As Piping Superintendent
SABAH AMMONIA UREA(SAMUR) PROJECT, PETRONAS CHEMICAL SDN. BHD.
SIPITANG SABAH.
Shop fabrication and field erection of piping and support works for P-3 utility and offsite
area.
January 2013–
May 2013
NEWWIN ENGINEERING (M) SDN. BHD
As site coordinator/supervisor
MLNG Dua Plant Bintulu for Module 6 Total Shutdown June/July 2013
November
2012-December
2012
EESB (Seconded to Chiyoda Sarawak Sdn. Bhd.)
As site supervisor
Tokuyama Polysilicon Sdn. Bhd. New plant Project at Samalaju Industrial Area ,Bintulu
Sarawak,piping and equipment pre-comm and commissioning.
April 2012-
August 2012
NEWWIN Engineering (M) SDN BHD.
As Site Supervisor
MLNG Dua Plant Bintulu for Module 5 Total Shutdown June/July 2012.
April 2011-
December 2011
KWH Technologies Sdn Bhd.
As site supervisor
TITAN PetrochemicalSdn. Bhd Pasir Gudang total shutdown 2011.
March 2010-
March 2011
AnakBanyok General Contractor under Endaya Construction Sdn. Bhd. / JKR at Miri
Sarawak.
As Site Supervisor.
Mechanical and civil construction works.
May 2008-
February 2010
WARGA HIKMAT KEJ.S/B
As Tank Erection Supervisor
APCST PROJECT MELAKA PSR 2.
Additional PSR-2 crude oil storage tanks project.
Tank erection and fire fighting piping and equipment installation.
2 nos: 76m Diameter Tank X 22mH,
May 2007-April
2008
Rekayasa Industries (M)Sdn. Bhd.
As Mechanical/Piping Supervisor
MiriCrude Oil Terminal (MCOT) Rejuvenation Project Phase 2.
Structural, Piping and equipment installation works.
May 2007 Attend Sea Survival Course at SMTC, Miri Sarawak.
September
2003-April 2007
Doing own business.
January 2001-
August 2003
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Piping Supervisor /Tie-In Coordinator
MLNG Tiga Plant Project, Mechanical Works-Existing Area(MC2), structure erection,
piping, equipment installation, painting, insulation and fire proofing works.
September
2000-November
2000
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Mechanical/Piping Supervisor
PetronasPenapisan Melaka,major turnaround work of Hydro Craker Unit (U-30 & U-31) and
installation of 1 Unit 75 Ton Breech Lock Heat Exchanger.
May 2000-
August 2000
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Site/Piping Supervisor
PetronasPenapisan Melaka, shop fabrication and field installation, testing, pre-comm and
commissioning of Dolezal System for Boiler F5101/02 & F51201/202/203 and its associated
piping.
April 2000 WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Mechanical Supervisor
Idemitsu Petrochemical(M) Sdn. BhdPasirGudang Johor, major turnaround work
(including piping modification).
March 2000 WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Mechanical Supervisor
Polythelene and Ethylene (M) Sdn. BhdKertih Facilities Terengganu, major turnaround
work.
February 2000-
March 2000
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Site/Piping Supervisor
PetronasPenapisan Melaka,Condensate Filtration package modification work.
May 1999-
November1999
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Site/Piping Supervisor
PetronasPenapisan Melaka,shop fabrication and field installation and testing
SuperheaterII Tube for Boiler F5101/02 & F51201/202/203 and its associatedpiping.
June 1998-April
1999
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Piping Supervisor
Shell Refinery Port Dickson, LRCC-Project-Piping work, shop fabrication and field
installation and testing.
March1997-May
1998
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Piping Supervisor
PetronasPenapisan Melaka,PSR-2 Project Stage 1-Piping work Area C, shop fabrication
and field installation and testing.
November
1996-March
1997
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Installation Supervisor
KLIA Satelite and Main Terminal building, structural works.
December
1995-October
1996
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Site Supervisor
Idemitsu SM (Malaysia) Sdn. Bhd,Ethylbenzene/Styrene Monomer Plant Project- Tanks
construction works (19 nos).
July 1995-
November 1995
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As QC Inspector
Shell Refinery Port Dickson-CDU-2 Revamp Project, shop fabrication and field erection
cone roof Tanks (2nos).
August 1993-
June 1995
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As QC Inspector/Supervisor
MLNG DUA PLANT Project (existing complex)- Mechanical, piping, painting, insulation,
civil and structural works.
August 1993 Joint WARGA HIKMAT KEJURUTERAAN SDN. BHD
May 1992-May
1993
As mechanic for timber company in Baram Sarawak.
1990- 1991 As maintenance assistant for seismic survey work at Baram Delta.
Refference:Mr.John Chiok.
SeniorProject Manager
019-6616128
Mr. Adrian Thomas Perera
Director(Ranex(M) Sdn. Bhd)
019-6223668

More Related Content

What's hot

Final submission be 2.0
Final submission be 2.0Final submission be 2.0
Final submission be 2.0ahmong4
 
Ahmad Mahmoud Ahmad - CV
Ahmad Mahmoud Ahmad - CVAhmad Mahmoud Ahmad - CV
Ahmad Mahmoud Ahmad - CVahmed ahmed
 
Altaraza Town Center by Ayala Land
Altaraza Town Center by Ayala LandAltaraza Town Center by Ayala Land
Altaraza Town Center by Ayala LandBenj Tabirara
 
Building Economics Presentation
Building Economics PresentationBuilding Economics Presentation
Building Economics PresentationLin Hui
 
CURRICULUM VITAE OF NAP GONZALES
CURRICULUM VITAE OF NAP GONZALESCURRICULUM VITAE OF NAP GONZALES
CURRICULUM VITAE OF NAP GONZALESNAPOLEON GONZALES
 
RMGresumeJune2015
RMGresumeJune2015RMGresumeJune2015
RMGresumeJune2015Rod Garcia
 
Bakie Anak Udang - UpdateCV 3rd
Bakie Anak Udang - UpdateCV 3rdBakie Anak Udang - UpdateCV 3rd
Bakie Anak Udang - UpdateCV 3rdBackie Udang
 
Map miri-to-kk-updated-mac-2011
Map miri-to-kk-updated-mac-2011Map miri-to-kk-updated-mac-2011
Map miri-to-kk-updated-mac-2011RZ_MEng78
 
Feras-TY-Abualkebash
Feras-TY-AbualkebashFeras-TY-Abualkebash
Feras-TY-AbualkebashFeras Talal
 
Ici final project
Ici   final projectIci   final project
Ici final projectJoeylau97
 
Final project(2)
Final project(2)Final project(2)
Final project(2)Xying Lee
 
Introduction to construction industry
Introduction to construction industryIntroduction to construction industry
Introduction to construction industryyenweizheng
 
Winwin friends arcade presentation
Winwin friends arcade presentationWinwin friends arcade presentation
Winwin friends arcade presentationZeeshan Malik
 
Construction Of Multistoreyed Building
Construction Of Multistoreyed BuildingConstruction Of Multistoreyed Building
Construction Of Multistoreyed BuildingSahla Fathima
 

What's hot (20)

Final submission be 2.0
Final submission be 2.0Final submission be 2.0
Final submission be 2.0
 
Ahmad Mahmoud Ahmad - CV
Ahmad Mahmoud Ahmad - CVAhmad Mahmoud Ahmad - CV
Ahmad Mahmoud Ahmad - CV
 
Altaraza Town Center by Ayala Land
Altaraza Town Center by Ayala LandAltaraza Town Center by Ayala Land
Altaraza Town Center by Ayala Land
 
DIANA VANESSA PASIA HOSENA, ME
DIANA VANESSA PASIA HOSENA, MEDIANA VANESSA PASIA HOSENA, ME
DIANA VANESSA PASIA HOSENA, ME
 
NEW_CV__-_RANJIT_SINGH[1]
NEW_CV__-_RANJIT_SINGH[1]NEW_CV__-_RANJIT_SINGH[1]
NEW_CV__-_RANJIT_SINGH[1]
 
Building Economics Presentation
Building Economics PresentationBuilding Economics Presentation
Building Economics Presentation
 
CURRICULUM VITAE OF NAP GONZALES
CURRICULUM VITAE OF NAP GONZALESCURRICULUM VITAE OF NAP GONZALES
CURRICULUM VITAE OF NAP GONZALES
 
RMGresumeJune2015
RMGresumeJune2015RMGresumeJune2015
RMGresumeJune2015
 
Bakie Anak Udang - UpdateCV 3rd
Bakie Anak Udang - UpdateCV 3rdBakie Anak Udang - UpdateCV 3rd
Bakie Anak Udang - UpdateCV 3rd
 
Map miri-to-kk-updated-mac-2011
Map miri-to-kk-updated-mac-2011Map miri-to-kk-updated-mac-2011
Map miri-to-kk-updated-mac-2011
 
cv nour
cv nourcv nour
cv nour
 
Feras-TY-Abualkebash
Feras-TY-AbualkebashFeras-TY-Abualkebash
Feras-TY-Abualkebash
 
CV AR 2015
CV AR 2015CV AR 2015
CV AR 2015
 
Ici final project
Ici   final projectIci   final project
Ici final project
 
Final project(2)
Final project(2)Final project(2)
Final project(2)
 
Introduction to construction industry
Introduction to construction industryIntroduction to construction industry
Introduction to construction industry
 
Budiman CV
Budiman CVBudiman CV
Budiman CV
 
Work Sample
Work SampleWork Sample
Work Sample
 
Winwin friends arcade presentation
Winwin friends arcade presentationWinwin friends arcade presentation
Winwin friends arcade presentation
 
Construction Of Multistoreyed Building
Construction Of Multistoreyed BuildingConstruction Of Multistoreyed Building
Construction Of Multistoreyed Building
 

Viewers also liked

Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis Deepu Rajan
 
ERECTION METHOD STATEMENT
ERECTION METHOD STATEMENTERECTION METHOD STATEMENT
ERECTION METHOD STATEMENTmustafa hussain
 
143137557 storage-tanks
143137557 storage-tanks143137557 storage-tanks
143137557 storage-tanksbernard347
 
Job Safety Analysis
Job Safety AnalysisJob Safety Analysis
Job Safety Analysisvtsiri
 
Welded steel tanks for storage oil
Welded steel tanks for storage oilWelded steel tanks for storage oil
Welded steel tanks for storage oilYahya Haggag
 
Efflunt treatment plant ppt
Efflunt treatment plant pptEfflunt treatment plant ppt
Efflunt treatment plant pptRajat Thapliyal
 
OHSAS Hazard identification & Risk assessment
OHSAS Hazard identification & Risk assessmentOHSAS Hazard identification & Risk assessment
OHSAS Hazard identification & Risk assessmentTechnoSysCon
 
Risk assessment presentation
Risk assessment presentationRisk assessment presentation
Risk assessment presentationmmagario
 
Storage tanks basic training (rev 2)
Storage tanks basic training (rev 2)Storage tanks basic training (rev 2)
Storage tanks basic training (rev 2)ledzung
 

Viewers also liked (11)

Job safety analysis
Job safety analysisJob safety analysis
Job safety analysis
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis
 
ERECTION METHOD STATEMENT
ERECTION METHOD STATEMENTERECTION METHOD STATEMENT
ERECTION METHOD STATEMENT
 
143137557 storage-tanks
143137557 storage-tanks143137557 storage-tanks
143137557 storage-tanks
 
Job Safety Analysis
Job Safety AnalysisJob Safety Analysis
Job Safety Analysis
 
Welded steel tanks for storage oil
Welded steel tanks for storage oilWelded steel tanks for storage oil
Welded steel tanks for storage oil
 
Tank design - word
Tank design - wordTank design - word
Tank design - word
 
Efflunt treatment plant ppt
Efflunt treatment plant pptEfflunt treatment plant ppt
Efflunt treatment plant ppt
 
OHSAS Hazard identification & Risk assessment
OHSAS Hazard identification & Risk assessmentOHSAS Hazard identification & Risk assessment
OHSAS Hazard identification & Risk assessment
 
Risk assessment presentation
Risk assessment presentationRisk assessment presentation
Risk assessment presentation
 
Storage tanks basic training (rev 2)
Storage tanks basic training (rev 2)Storage tanks basic training (rev 2)
Storage tanks basic training (rev 2)
 

Similar to RICHARD_JOK_NEW_CV

Similar to RICHARD_JOK_NEW_CV (20)

MY LatestCVincentHuc 8.5.15
MY LatestCVincentHuc 8.5.15MY LatestCVincentHuc 8.5.15
MY LatestCVincentHuc 8.5.15
 
Curriculum_Vitae_Azfarudin_Shaari
Curriculum_Vitae_Azfarudin_ShaariCurriculum_Vitae_Azfarudin_Shaari
Curriculum_Vitae_Azfarudin_Shaari
 
COMPANY PROFILE 2015
COMPANY PROFILE 2015COMPANY PROFILE 2015
COMPANY PROFILE 2015
 
CV Yudi Syah Putra OS
CV Yudi Syah Putra OSCV Yudi Syah Putra OS
CV Yudi Syah Putra OS
 
CV2016 NasseerQusyairi
CV2016 NasseerQusyairiCV2016 NasseerQusyairi
CV2016 NasseerQusyairi
 
Pari Resume 2015 India
Pari Resume 2015 IndiaPari Resume 2015 India
Pari Resume 2015 India
 
CV Hasrul Maswandy
CV Hasrul MaswandyCV Hasrul Maswandy
CV Hasrul Maswandy
 
Resume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFIResume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFI
 
Hassby's CV 2015
Hassby's CV 2015Hassby's CV 2015
Hassby's CV 2015
 
Isyak Yuzri Ahmad Resume
Isyak Yuzri Ahmad ResumeIsyak Yuzri Ahmad Resume
Isyak Yuzri Ahmad Resume
 
CV JANIN 2016
CV JANIN 2016CV JANIN 2016
CV JANIN 2016
 
WILLY-Resume B
WILLY-Resume BWILLY-Resume B
WILLY-Resume B
 
CURRICULUM VITAE f
CURRICULUM VITAE fCURRICULUM VITAE f
CURRICULUM VITAE f
 
Barry Colin CV @ Resume
Barry Colin CV @ ResumeBarry Colin CV @ Resume
Barry Colin CV @ Resume
 
CV Nadhirah (updated April 2016)
CV Nadhirah (updated April 2016)CV Nadhirah (updated April 2016)
CV Nadhirah (updated April 2016)
 
CV Hendra mai muklis
CV Hendra mai muklisCV Hendra mai muklis
CV Hendra mai muklis
 
CV Mohd Izzuddin
CV Mohd IzzuddinCV Mohd Izzuddin
CV Mohd Izzuddin
 
Alvin latest cv 2015
Alvin latest cv 2015Alvin latest cv 2015
Alvin latest cv 2015
 
Michael B. Nepomuceno Resume 2015
Michael B. Nepomuceno Resume 2015Michael B. Nepomuceno Resume 2015
Michael B. Nepomuceno Resume 2015
 
1 - NEW RESUME OKT 2016
1 - NEW RESUME OKT 20161 - NEW RESUME OKT 2016
1 - NEW RESUME OKT 2016
 

RICHARD_JOK_NEW_CV

  • 1. CURRICULUM VITAE NAME : RICHARD JOK @ NGAU JOCK. I/C NO. : 690325-13-6135 DATE OF BIRTH : 25th March 1969 NATIONALITY : MALAYSIAN (SARAWAK) NOS. OF CHILDREN : 3 CONTACT NO : Mobile Phone +60198256938 HOBBY LANGUAGE EXPERIENCE : : : Watching TV, Fishing, Travelling & site seeing. BAHASA MALAYSIA,ENGLISH AND OTHER. SARAWAK( 1993-1995,2001 – 2003,2007-2008,2012-PRESENT ), West Malaysia(1996- 2000,2008-2011) CONTACT ADDRESS : NO: 42, Long Laput Baram, Sarawak Malaysia. EDUCATION LEVEL : SECONDARY SCHOOL ( MALAYSIAN CERTIFICATE OF EDUCATION ) 1986. EMAIL : ngaurichardjok@yahoo.com COMPUTER : MICROSOFT WORD/EXCEL POSITION : As Qc, Site /Mechanical/Piping and Tanks Supervisor, Piping superintendent for various project and maintenance job include coordination of subcontractors daily activities, reporting directly to engineer or manager in charge. Liaise with client / owner to ensure the safety, progress and standard of work done is according to procedures and schedule. EXPERIENCE. More than 20 years experiences in oil and gas and petrochemicalindustries. Familiar with Isometrics Drawing , P&I.D, General Arrangement ,Standard Support, Daily Work Permit , Work/Lifting Procedures , JMS , JSA/JHA etc. Have work at MLNG Satu , Dua , Tiga , PP(M)SB , PP(T)SB , MCOT , SHELL (PD) , Ethylene and Polyethylene , TITAN , IDEMITSU, PETRONAS Chemical, SMDS and etc.
  • 2. April 2015 Onward till Present January 2014 to March2015. Ranex (M) Sdn. Bhd. Overall AE/Supervisor/Planner SMDS Bintulu, Sarawak. Manpower supply for mechanicalmaintenance work for Oil & Wax plant, including U8600 Wax Processing Plant and Fire Station. (Manpower Supply) Ranex (M) Sdn. Bhd As Area Engineer SMDS Bintulu, Sarawak.Integrated Service Contractor mechanical maintenance work for Oil & Wax plant on a 3 years contract. August2013- December2103 NAIM ENGINEERING SDN. BHD As Mechanical & Piping Supervisor PETRONAS LNG TRAIN 9 PROJECT, BINTULU SARAWAK. May2013- August2013. INGRESS FABRICATORS SDN BHD As Piping Superintendent SABAH AMMONIA UREA(SAMUR) PROJECT, PETRONAS CHEMICAL SDN. BHD. SIPITANG SABAH. Shop fabrication and field erection of piping and support works for P-3 utility and offsite area. January 2013– May 2013 NEWWIN ENGINEERING (M) SDN. BHD As site coordinator/supervisor MLNG Dua Plant Bintulu for Module 6 Total Shutdown June/July 2013 November 2012-December 2012 EESB (Seconded to Chiyoda Sarawak Sdn. Bhd.) As site supervisor Tokuyama Polysilicon Sdn. Bhd. New plant Project at Samalaju Industrial Area ,Bintulu Sarawak,piping and equipment pre-comm and commissioning. April 2012- August 2012 NEWWIN Engineering (M) SDN BHD. As Site Supervisor MLNG Dua Plant Bintulu for Module 5 Total Shutdown June/July 2012. April 2011- December 2011 KWH Technologies Sdn Bhd. As site supervisor TITAN PetrochemicalSdn. Bhd Pasir Gudang total shutdown 2011.
  • 3. March 2010- March 2011 AnakBanyok General Contractor under Endaya Construction Sdn. Bhd. / JKR at Miri Sarawak. As Site Supervisor. Mechanical and civil construction works. May 2008- February 2010 WARGA HIKMAT KEJ.S/B As Tank Erection Supervisor APCST PROJECT MELAKA PSR 2. Additional PSR-2 crude oil storage tanks project. Tank erection and fire fighting piping and equipment installation. 2 nos: 76m Diameter Tank X 22mH, May 2007-April 2008 Rekayasa Industries (M)Sdn. Bhd. As Mechanical/Piping Supervisor MiriCrude Oil Terminal (MCOT) Rejuvenation Project Phase 2. Structural, Piping and equipment installation works. May 2007 Attend Sea Survival Course at SMTC, Miri Sarawak. September 2003-April 2007 Doing own business. January 2001- August 2003 WARGA HIKMAT KEJURUTERAAN SDN. BHD As Piping Supervisor /Tie-In Coordinator MLNG Tiga Plant Project, Mechanical Works-Existing Area(MC2), structure erection, piping, equipment installation, painting, insulation and fire proofing works. September 2000-November 2000 WARGA HIKMAT KEJURUTERAAN SDN. BHD As Mechanical/Piping Supervisor PetronasPenapisan Melaka,major turnaround work of Hydro Craker Unit (U-30 & U-31) and installation of 1 Unit 75 Ton Breech Lock Heat Exchanger. May 2000- August 2000 WARGA HIKMAT KEJURUTERAAN SDN. BHD As Site/Piping Supervisor PetronasPenapisan Melaka, shop fabrication and field installation, testing, pre-comm and commissioning of Dolezal System for Boiler F5101/02 & F51201/202/203 and its associated piping. April 2000 WARGA HIKMAT KEJURUTERAAN SDN. BHD As Mechanical Supervisor Idemitsu Petrochemical(M) Sdn. BhdPasirGudang Johor, major turnaround work (including piping modification).
  • 4. March 2000 WARGA HIKMAT KEJURUTERAAN SDN. BHD As Mechanical Supervisor Polythelene and Ethylene (M) Sdn. BhdKertih Facilities Terengganu, major turnaround work. February 2000- March 2000 WARGA HIKMAT KEJURUTERAAN SDN. BHD As Site/Piping Supervisor PetronasPenapisan Melaka,Condensate Filtration package modification work. May 1999- November1999 WARGA HIKMAT KEJURUTERAAN SDN. BHD As Site/Piping Supervisor PetronasPenapisan Melaka,shop fabrication and field installation and testing SuperheaterII Tube for Boiler F5101/02 & F51201/202/203 and its associatedpiping. June 1998-April 1999 WARGA HIKMAT KEJURUTERAAN SDN. BHD As Piping Supervisor Shell Refinery Port Dickson, LRCC-Project-Piping work, shop fabrication and field installation and testing. March1997-May 1998 WARGA HIKMAT KEJURUTERAAN SDN. BHD As Piping Supervisor PetronasPenapisan Melaka,PSR-2 Project Stage 1-Piping work Area C, shop fabrication and field installation and testing. November 1996-March 1997 WARGA HIKMAT KEJURUTERAAN SDN. BHD As Installation Supervisor KLIA Satelite and Main Terminal building, structural works. December 1995-October 1996 WARGA HIKMAT KEJURUTERAAN SDN. BHD As Site Supervisor Idemitsu SM (Malaysia) Sdn. Bhd,Ethylbenzene/Styrene Monomer Plant Project- Tanks construction works (19 nos). July 1995- November 1995 WARGA HIKMAT KEJURUTERAAN SDN. BHD As QC Inspector Shell Refinery Port Dickson-CDU-2 Revamp Project, shop fabrication and field erection cone roof Tanks (2nos). August 1993- June 1995 WARGA HIKMAT KEJURUTERAAN SDN. BHD As QC Inspector/Supervisor MLNG DUA PLANT Project (existing complex)- Mechanical, piping, painting, insulation, civil and structural works. August 1993 Joint WARGA HIKMAT KEJURUTERAAN SDN. BHD May 1992-May 1993 As mechanic for timber company in Baram Sarawak.
  • 5. 1990- 1991 As maintenance assistant for seismic survey work at Baram Delta. Refference:Mr.John Chiok. SeniorProject Manager 019-6616128 Mr. Adrian Thomas Perera Director(Ranex(M) Sdn. Bhd) 019-6223668