SlideShare a Scribd company logo
1 of 7
Download to read offline
Personnel Particular
Name Barry Anak Colin H/P Contact No. 013-8390047
NRIC No. 851105-13-5223 Emergency Contact No. 014-5915036 (Wife)
Date Of Birth 05 November 1985 Email Address brycolin@yahoo.com.my
Place Of Birth Sibu, Sarawak Gender Male
Age 30 Years Old Marriage Status Marriage
Height 158 cm No. Of Children 2 @ Two only
Weight 78 kg KWSP / EPF NO. 71627471
Nationality Malaysian PERKESO / SOCSO 851105135223
State Bintulu. Sarawak Income Tax / PCB SG21365957030
Race Iban Address Rumah Ambu, Sungai
Semanok, 97200.Tatau,
Bintulu. Sarawak.
Malaysia.
Religion Christian
Classes of Driving License B2, D & GDL < 3000 kg
Education School Background
Year Name Of School Grade Qualification
2001 - 2002 Sekolah Menengah Teknik (S.M.T)
Bintulu, Sarawak. Malaysia.
Sijil Perperiksaan Malaysia
(S.P.M)
Pengajian Kejuteraan Awam
(Civil Engineering)
March 2015
– July 2016
Institute of professional
Development Open University
Malaysia (OUM)
Excecutive Diploma Industrial Executive Diploma in
Occupational Safety & Health
Language
Language Spoken Reading Written
English Good Good Good
Bahasa Melayu Good Good Good
Chinese (Mandarin) Good Moderate Moderate
Course @ Seminar In Attendant (Certificate Only)
NO. Month Year Course Attended Organized Reference No.
01. September 2004 Job Safety Analysis Course EDI edi/JSA/006
02. October 2004 Basic Fire Fighting EDI edi/BF/017
03. December 2004 Safety Supervisor EDI edi/ss/042
04. December 2006 Forklift Operator & Safety Training Toyota 23783
05. January 2007 ISO 14001:2004 (Understanding & Implementing EMS) SIRIM NIL
06. March 2007 OHSAS 18001 (Understanding & Implementing OHSMS) SIRIM NIL
07. June 2007 Asas Keselamatan Kebakaran (Basic Fire Fighting) BOMBA NIL
08. March 2008 Safety & Health Officer Course NIOSH NS 0679-I
09. July 2009 Seminar Of Occupational Safety, Health & Environmental
In Construction Industry
CIDB NIL
10. December 2011 2nd Borneo Conference & Exhibition On Occupational
Safety & Health (BOSH) 2011
NIOSH BC 0032-L
11. July 2012 OHSAS 18001 : 2007 (Health & Safety Management) PEDAS NIL
12. March 2012 Supervising Safety Course CSSB NIL
My Personnel Particular @ Resume
Designated To Applying Site Safety Supervisor (3S)
Competency Of Certification
Scope Of Duties
Working Experience
Industry Field Total (Years)
Construction 4 years 1 month
Manufacturing 3 years 2 months
Oil & Gas 4 years 8 months
Total 11 Years 12 Months
No. Month Course Attended Organized Reference No. Expired Date
01. Feb 2005 Basic Scaffolding – Tubular EDI edi/st/0082 NIL
DOSH SW/10/PP/01/153 09 Dec 2016
02. Nov 2006 Basic First Aid Course PBSMM 10356 Mac 2013
Oct 2013 57464 (BB0119239) 06 Oct 2016
03. Jan 2013 Site Safety Supervisor Course
(MBAMSSS/BTU/1302/13)
MBAM /
KLIA
MBAMSSS/A0662 NIL
03. May 2015 Authorized Entrant & Standby
Person for Confined Space
NIOSH NW-NSWKB-AE-
1787-S
27 May 2017
 ntroducing a system of safety, health and welfare at work as contained in the act that be gazetted by the
ministry or legislature.
 Ensure that all employers and employees have to understand and comply with all requirements of the
occupational health and safety legislation.
 Raise the level of awareness, guide, advise and understanding all responsibility for safety and health
at the workplace.
 Ensure each program occupational safety and health within the company will be implemented
effectively and achieve company goals.
 Discovering standards and performance of companies in the industry in line with the programme of
occupational safety and health in the workplace.
 Ensure that all jobs will be implemented is in line with the requirements of the legislation and
regulations that have been set.
 Maintaining good relations between the company and the authority entrusted by the Government in
the management of occupational safety and health in the workplace.
For specific task :
 Understand, introduce and enforce all safety, health, & environmental plan in construction
a site which was introduced by the main contractor or the client.
 be the Secretary and Assistant all responsibilities of the health and safety Manager / officer to
implement occupational safety and health program within the company.
 Assist safety and health officers in promoting, providing information and training to all parties.
 Inspection, observation, audit, improve and correct any unsafe practices & condition in the
workplace.
 Communicate directly with the contractor's safety supervisor appointed respect of safety of work
undertaken by subcontractors.
 To report any condition and behaviors of unsafe and plan actions to resolving the problem from
recurring.
 Implement and ensure each program is current, record and provide a full report to Safety Managers
or officers.
Job History
Name Of Employment
Project Title
Project Description
DOSH Site Registration
Project Site
Client
Main Contractor
Number of Workers Involved
Project Duration
Designated
Contract Duration
Status of Employee
Reason for Leaving
Achievement
JGC Malaysia SDN. BHD
Construction of Tank 7 & Piping Associated Facilities (PAF) at the MLNG-
Complex in Bintulu. Sarawak (Engineering, Procurement, Construction,
Commissioning Project - EPCC)
 Construction of Tank 7
The construction of this tank can accommodate a total of 160 m3 of
nitrogen, which has been processed before being channeled to the new
jetty for purposes of Marketing.
 Piping Associated Facilities (PAF)
Construction of 6.6 km of pipe along the trend 9 across the process plant
so that the new jetty is intended for the supply its raw materials and the
finished product of each unit is channeled to a storage tank connected to
the jetty.
SW/13/03/5280
Petronas complex plant at Malaysia Liquid Natural Gas (MLNG) Bintulu.
Sarawak. Malaysia.
Petronas - Malaysia Liquid Natural Gas (MLNG)
JGC Malaysia SDN. BHD
More than 1500 manpower involved
January2015 – July 2017 (2 Years 6 Months)
Site Safety Supervisor (3S – Yellow Book)
August 2013 to present (July 2016 - 12 month)
Contract staff
N/A
2 Million safe main working hours without LTI
Name Of Employment
Project Title
Project Description
DOSH Site Registration
Project Site
Client
Main Contractor
Number of Workers Involved
Project Duration
Designated
Contract Duration
Status of Employee
Reason for Leaving
Achievement
Linde Engineering (Malaysia) SDN BHD (299829-H)
Marlin Nitrogen Generation Unit Plant Project at the MLNG-Complex in
Bintulu. Sarawak (Engineering, Procurement, Construction,
Commissioning Project - EPCC)
Nitrogen processing plant construction unit is a high technology from
Germany, aims to process waste gas before it is released from the
combustion. The the rest raw material will be processed and converted
into products for purposes of Marketing nitrogen gas.
SW/13/03/4741
Petronas complex plant at Malaysia Liquid Natural Gas (MLNG) Bintulu.
Sarawak. Malaysia.
Malaysia Liquid Natural Gas (MLNG)
Linde Engineering (Malaysia) SDN BHD (299829-H)
More than 2500 manpower involved
January2013 – July 2015 (2 Years 6 Months)
Site Safety Supervisor (3S – Yellow Book)
June 2013 – June 2015 (24 Months / 2 years)
Contract staff
Completion of contract agreement / project completion
6.5 Million safe main working hours without LTI
Name Of Employment
Project Title
Project Description
DOSH Site Registration
Project Site
Client
Main Contractor
Number of Workers Involved
Project Duration
Designated
Contract Duration
Status of Employee
Reason for Leaving
Achievement
Penta-Ocean (Malaysia) SDN.BHD. (993128-H)
Tokuyama Malaysia Polycrystalline Silicon Manufacturing Plant Phase 2
(Bintulu, Sarawak. Malaysia) - (Engineering, Procurement, Construction,
Commissioning Project - EPCC)
The plant aims to process raw materials into finished products such as
silicone products before it is marketed.
SW/12/03/4548
Tokuyama Malaysia SDN.BHD (868774-M) - Samalaju park area. Bintulu.
Sarawak. Malaysia.
Tokuyama Malaysia SDN.BHD (868774-M)
Chiyoda Sarawak SDN.BHD (CSSB)
More than 10 thousand involved
January2012 – September 2013
Safety & Health Supervisor
November 2012 – June 2013 (7 Months)
Contract staff
Completion of contract agreement / project completion
3 Million safe main working hours without LTI
Name Of Employment
Project Title
Project Description
DOSH Site Registration
Project Site
Client
Main Contractor
Number of Workers Involved
Project Duration
Designated
Contract Duration
Status of Employee
Reason for Leaving
Achievement
Taisei Corporation (993306-M)
Tokuyama Malaysia Polycrystalline Silicon Manufacturing Plant Phase 2
(Bintulu, Sarawak. Malaysia) - (Engineering, Procurement, Construction,
Commissioning Project - EPCC)
The plant aims to process raw materials into finished products such as
silicone products before it is marketed.
SW/12/03/4548
Tokuyama Malaysia SDN.BHD (868774-M) - Samalaju Park area. Bintulu
Tokuyama Malaysia SDN.BHD (868774-M)
Chiyoda Sarawak SDN.BHD (CSSB)
More than 10 thousand manpower involved
January2012 – October 2013
Safety & Health Supervisor (Acting for Safety & Health Officer)
February 2012 – October 2012 (8 Months)
Contract staff
Completion of contract agreement
750 Thousand safe main working hours without LTI
Name Of Employment
Project Title
Project Description
DOSH Site Registration
Project Site
Client
Main Contractor
Number of Workers Involved
Project Duration
Designated
Contract Duration
Status of Employee
Reason for Leaving
Achievement
Bintulu Engineering & Trading SDN.BHD. (B.E.T.S.B) – (110020-X)
Process Safety Upgrades Project - PSUP (Bintulu, Sarawak. Malaysia)
This project aims to upgrade the system of processing and transmission
from one unit to another makes more quality products and quality prior to
shipping.
-
Shell MDS (Malaysia) SDN.BHD (152396-W) - Bintulu, Sarawak. Malaysia.
Shell MDS (Malaysia)
JGC Singapore
More than 5 thousand manpower involved
April 2011 – November 2011 (7 Months)
Safety & Health Supervisor (Acting for Safety & Health Officer)
July 2011 – November 2011 (4 Months)
Contract staff
Completion of project & contract agreement
500 Thousand safe main working hours without LTI.
Name Of Employment
Project Title
Project Description
DOSH Site Registration
Project Site
Client
Main Contractor
Number of Workers Involved
Project Duration
Designated
Contract Duration
Status of Employee
Reason for Leaving
Achievement
DIALOG Engineering & Construction SDN.BHD. (189290-U)
Continue Construction New Cooling Tower Project (Bintulu, Sarawak.
Malaysia) - (Engineering, Procurement, Construction, Commissioning
Project - EPCC)
Resumption of cooling tower construction process that were not
completed before the completion of construction.
SW/11/03/4396
Petronas - Asian Bintulu Fertilizer (ABF) SDN. BHD. (65199-P) plant,
Bintulu. Sarawak. Malaysia.
Petronas -Asian Bintulu Fertilizer (ABF)
DIALOG Engineering & Construction SDN.BHD. (189290-U)
More than 1.5 thousand manpower involved
December 2010 – December 2011 (1 Years)
Safety & Health Supervisor
February 2011 – June 2011 (4 Months)
Contract staff
Getting a better offer
750 Thousand safe main working hours without LTI
Name Of Employment
Project Title
Project Description
DOSH Site Registration
Project Site
Client
Main Contractor
Number of Workers Involved
Project Duration
Designated
Contract Duration
Status of Employee
Reason for Leaving
Achievement
Bintulu Engineering & Trading SDN.BHD. (B.E.T.S.B) – (110020-X)
Construction 2 Units New Water Tanks Project. (Engineering,
Procurement, Construction, Commissioning Project - EPCC)
Construction of 2 units water storage tank aim to for emergency use by
the fire and rescue during an emergency.
SW/10/03/4261
Shell MDS (Malaysia) SDN.BHD (152396-W) - Bintulu, Sarawak. Malaysia.
Shell MDS (Malaysia)
Bintulu Engineering & Tranding SDN.BHD. (B.E.T.S.B)
More than 300 manpower involved
June 2010 – March 2011 (9 Months)
Safety & Health Supervisor
July 2010 – January 2010 (6 Months)
Contract staff
Completion of project & contract agreement
300 Thousand safe main working hours without LTI.
Name Of Employment
Project Title
Project Description
DOSH Site Registration
Project Site
Client
Main Contractor
Number of Workers Involved
Project Duration
Designated
Contract Duration
Ikatan Inovasi SDN. BHD.
Construction New Cooling Tower Project (Bintulu, Sarawak. Malaysia) -
(Engineering, Procurement, Construction, Commissioning Project - EPCC)
Cooling tower construction is advanced technology from Holland country
and intended to cover the plant cooling system to ensure each unit
process as seamless and get a better product and quality. It has 7 fan
coolers for cooling process using water systems.
SW/08/03/439-BC/367
Petronas - Asian Bintulu Fertilizer (ABF) SDN. BHD. (65199-P) plant,
Bintulu. Sarawak. Malaysia.
Petronas - Asian Bintulu Fertilizer (ABF) SDN. BHD
Ikatan – Matrik – Hamon (MIH)
More than 8 hundred manpower involved
June 2009 – July 2010 (1 Years)
Safety & Health Supervisor
November 2009 – June 2010 (7 Months)
Status of Employee
Reason for Leaving
Achievement
Contract staff
Project termination by Client (ABF)
1.5 Million safe main working hours without LTI.
Name Of Employment
Manufacturing Title &
Description
DOSH Site Registration
Manufacturing Site
Client
Number of Workers Involved
Designated
Status of Employee
Reason for Leaving
Achievement
Forescom Plywood SDN. BHD. (023406-P)
Timber processing factory to be turned into plywood products for
purposes of market.
-
Forescom Plywood SDN. BHD, kemena industrial, Binyulu. Sarawak.
Malaysia.
Shin Yang Group
More than thousand manpower involved
Safety & Health Technician
Permanent staff (September 2006 – November 2009) – 3Years 2 Months
Getting a better offer
1 Million safe main working hours without LTI.
Name Of Employment
Project Title
Project Description
DOSH Site Registration
Project Site
Client
Main Contractor
Number of Workers Involved
Project Duration
Designated
Contract Duration
Status of Employee
Reason for Leaving
Achievement
EDI Training & Consultancy SDN. BHD (466620-u)
Bakun Hydro Electric Project (Bintulu, Sarawak. Malaysia)-
(Engineering, Procurement, Construction, Commissioning Project - EPCC)
Bakun dams construction is the 2nd largest in Asia with a depth of 740
meters and a cost of 5.2 billion and a capacity of 2,400 megawatts (MW)
are intended to Generating electricity from water resources accomodating
of requests for the purpose of industry and markets overseas.
-
Bakun, Belaga. Sarawak. Malaysia.
Sarawak Hydro
Malaysia-China Hydro (MCH) Joint Venture
More than 10 thousand manpower involved
August 2002 – March 2012 (More than 10 years)
Safety & Health Supervisor
January 2003 – October 2005 (2 Years & 10 Months)
Contract staff
Completion of contract agreement
-
Reference List
No. Name Designation Company Contact No.
01. Robert Labar Safety & Health Director EDI Training & Consultancy SDN.BHD 012-8153357
02. Martin Maru Assit. Safety & Helath
Deputy Manager
Toyo Kimatsu Malayisa (TKM) 019-8540966
013-8058393
03. John Lim Ei Ge Safety & Health Officer Sino Hydro Cooperation 019-8198839
012-8832373
04. Wong Ching Kiong Safety & Health Manager Forescom Plywood SDN. BHD. 019-8076335
05. Haji Razak Mohammad Safety & Health Manager Ikatan Inovasi SDN.BHD. 016-2019078
06. Mohd. Sukri Ismail Safety & Health Officer Ikatan Inovasi SDN.BHD. 019-9057298
07. Sylvester Seal Safety & Health Manager JGC Malaysia SDN BHD 013-8377147
08. Augustine Jawai Safety & Health Executive Shell MDS (Malaysia) SDN.BHD 019-4862152
09. Hugh Chunggat Mawar Managing Director Bintulu Engineering & Tranding
SDN.BHD. (B.E.T.S.B)
013-8301242
10. Ami Ucheng Safety & Health Supervisor PETRONAS Carigali 019-4898647
11. Paul Muhry Senior Safety & Health
Manager
Chiyoda Sarawak SDN.BHD (CSSB) 013-5339702
12. Marlod E. Martin Senior Safety & Health
Officer
Chiyoda Sarawak SDN.BHD (CSSB) 016-8437563
013-6286641
13. Rosli Langga Safety & Health Manager Sankyu (Malaysia) SDN.BHD. 013-8489099
14. Hamaguchi Shigeatsu Project Manager Taisei Corporation 013-8180173
15. Freddy Masaru
Fugazawa
Deputy Project Manager Taisei Corporation 013-8182770
16. Tamil Arasan Safety & Health Manager Taisei Corporation 019-3051141
019-8986175
17. Massaki Ando Project Manager Penta-Ocean (Malaysia) SDN. BHD. 019-8520193
18. Alizan Bujang Safety & Health Officer Penta-Ocean (Malaysia) SDN. BHD. 019-8528379
19. Madhavan A/L P.P Nair Safety & Health Officer Hyperwave Engineering 019-8843343
20. Stephen Weidner Safety & Health Manager Linde Engineering (Malaysia) SDN.BHD 014-5833677
21. Josef Heinrich Reiter Construction Manager Linde Engineering (Malaysia) SDN.BHD 010-5982123
22. Larry Albert Jalak Safety & Health Executive MLNG / Project Management Team 019-8839737
23. Wardzala Nira Safety & Health Supervisor MLNG / Project Management Team 012-8798225

More Related Content

What's hot

Dr john cv as hydrogeologist
Dr john   cv as hydrogeologist Dr john   cv as hydrogeologist
Dr john cv as hydrogeologist dr john devadas
 
Cv , khaled yousry 2018
Cv , khaled yousry 2018Cv , khaled yousry 2018
Cv , khaled yousry 2018khaled Yousry
 
Company profile PT.MADERLAND CREWING AGENCY
Company profile PT.MADERLAND CREWING AGENCY Company profile PT.MADERLAND CREWING AGENCY
Company profile PT.MADERLAND CREWING AGENCY wari ari
 
Senior2 Planning Engineer Anwar.c.v(word97)
Senior2 Planning Engineer Anwar.c.v(word97)Senior2 Planning Engineer Anwar.c.v(word97)
Senior2 Planning Engineer Anwar.c.v(word97)Anwar Elgarwany
 
CV - 2nd Mate YACHTS:DPO - FREDERIK LIEBENBERG
CV - 2nd Mate YACHTS:DPO - FREDERIK LIEBENBERGCV - 2nd Mate YACHTS:DPO - FREDERIK LIEBENBERG
CV - 2nd Mate YACHTS:DPO - FREDERIK LIEBENBERGDerik Liebenberg
 
Naveed shahzad land surveyor cv
Naveed shahzad land surveyor cvNaveed shahzad land surveyor cv
Naveed shahzad land surveyor cvNaveed Shahzad
 
Curriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project ManagerCurriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project ManagerDermawan Lumban Gaol
 
SELVA RESUME
SELVA RESUMESELVA RESUME
SELVA RESUMEselva raj
 
Multimediacollegeeastern Slide Presentation Latihan Industri (sem7) FINAL SEM...
Multimediacollegeeastern Slide Presentation Latihan Industri (sem7) FINAL SEM...Multimediacollegeeastern Slide Presentation Latihan Industri (sem7) FINAL SEM...
Multimediacollegeeastern Slide Presentation Latihan Industri (sem7) FINAL SEM...Kalam Pensell
 

What's hot (20)

CV CIVIL ENGINEER
CV CIVIL ENGINEERCV CIVIL ENGINEER
CV CIVIL ENGINEER
 
kabeer's CV
kabeer's CVkabeer's CV
kabeer's CV
 
Dr john cv as hydrogeologist
Dr john   cv as hydrogeologist Dr john   cv as hydrogeologist
Dr john cv as hydrogeologist
 
Cv , khaled yousry 2018
Cv , khaled yousry 2018Cv , khaled yousry 2018
Cv , khaled yousry 2018
 
Company profile PT.MADERLAND CREWING AGENCY
Company profile PT.MADERLAND CREWING AGENCY Company profile PT.MADERLAND CREWING AGENCY
Company profile PT.MADERLAND CREWING AGENCY
 
Senior2 Planning Engineer Anwar.c.v(word97)
Senior2 Planning Engineer Anwar.c.v(word97)Senior2 Planning Engineer Anwar.c.v(word97)
Senior2 Planning Engineer Anwar.c.v(word97)
 
ALAQ ALEZDEHAR1
ALAQ ALEZDEHAR1ALAQ ALEZDEHAR1
ALAQ ALEZDEHAR1
 
Ramendu cv - for Bd
Ramendu cv - for BdRamendu cv - for Bd
Ramendu cv - for Bd
 
Resume for Tech Suptd
Resume for Tech SuptdResume for Tech Suptd
Resume for Tech Suptd
 
CV faurizul
CV faurizulCV faurizul
CV faurizul
 
CV - 2nd Mate YACHTS:DPO - FREDERIK LIEBENBERG
CV - 2nd Mate YACHTS:DPO - FREDERIK LIEBENBERGCV - 2nd Mate YACHTS:DPO - FREDERIK LIEBENBERG
CV - 2nd Mate YACHTS:DPO - FREDERIK LIEBENBERG
 
CV Muhammad Nazir Crane Operator NEW CV
CV Muhammad Nazir Crane Operator  NEW  CVCV Muhammad Nazir Crane Operator  NEW  CV
CV Muhammad Nazir Crane Operator NEW CV
 
MY RESUME
MY RESUMEMY RESUME
MY RESUME
 
Resume of Civil Engineer
Resume of Civil EngineerResume of Civil Engineer
Resume of Civil Engineer
 
Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014
 
sengu cv
sengu cvsengu cv
sengu cv
 
Naveed shahzad land surveyor cv
Naveed shahzad land surveyor cvNaveed shahzad land surveyor cv
Naveed shahzad land surveyor cv
 
Curriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project ManagerCurriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project Manager
 
SELVA RESUME
SELVA RESUMESELVA RESUME
SELVA RESUME
 
Multimediacollegeeastern Slide Presentation Latihan Industri (sem7) FINAL SEM...
Multimediacollegeeastern Slide Presentation Latihan Industri (sem7) FINAL SEM...Multimediacollegeeastern Slide Presentation Latihan Industri (sem7) FINAL SEM...
Multimediacollegeeastern Slide Presentation Latihan Industri (sem7) FINAL SEM...
 

Similar to Barry Colin CV @ Resume

Similar to Barry Colin CV @ Resume (20)

QALBI AMRI AHMED BISTARI
QALBI AMRI AHMED BISTARIQALBI AMRI AHMED BISTARI
QALBI AMRI AHMED BISTARI
 
CV SHAHROL AMIN
CV SHAHROL AMINCV SHAHROL AMIN
CV SHAHROL AMIN
 
Pari Resume 2015 India
Pari Resume 2015 IndiaPari Resume 2015 India
Pari Resume 2015 India
 
Sinbery Corporation Sdn Bhd Profile
Sinbery Corporation Sdn Bhd ProfileSinbery Corporation Sdn Bhd Profile
Sinbery Corporation Sdn Bhd Profile
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515new
 
sree cv.doc REV -03
sree cv.doc REV -03sree cv.doc REV -03
sree cv.doc REV -03
 
Andri Yulianto 2016
Andri Yulianto 2016Andri Yulianto 2016
Andri Yulianto 2016
 
Curiculum Vitae yanuar terbaru-1
Curiculum Vitae yanuar terbaru-1Curiculum Vitae yanuar terbaru-1
Curiculum Vitae yanuar terbaru-1
 
ayum cv
ayum cvayum cv
ayum cv
 
Rahmad Hidayat CV Update_2
Rahmad Hidayat CV Update_2Rahmad Hidayat CV Update_2
Rahmad Hidayat CV Update_2
 
Razmee CV
Razmee CVRazmee CV
Razmee CV
 
RESUME Adif Civil Latest 2015
RESUME Adif Civil Latest 2015RESUME Adif Civil Latest 2015
RESUME Adif Civil Latest 2015
 
CV PDF Haziem Che Hassan
CV PDF Haziem Che HassanCV PDF Haziem Che Hassan
CV PDF Haziem Che Hassan
 
TATIRA TATIRA CV Current 1
TATIRA TATIRA CV Current 1TATIRA TATIRA CV Current 1
TATIRA TATIRA CV Current 1
 
Nikhil S George_CV 2016 new
Nikhil S George_CV 2016 newNikhil S George_CV 2016 new
Nikhil S George_CV 2016 new
 
CV 2016
CV 2016CV 2016
CV 2016
 
CV Djoko 2016 (Rev.1)
CV Djoko 2016 (Rev.1)CV Djoko 2016 (Rev.1)
CV Djoko 2016 (Rev.1)
 
RICHARD_JOK_NEW_CV
RICHARD_JOK_NEW_CVRICHARD_JOK_NEW_CV
RICHARD_JOK_NEW_CV
 
Resume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFIResume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFI
 
Resume-Thitiporn P-6 JUNE 2016 rev 1
Resume-Thitiporn P-6 JUNE 2016 rev 1Resume-Thitiporn P-6 JUNE 2016 rev 1
Resume-Thitiporn P-6 JUNE 2016 rev 1
 

Barry Colin CV @ Resume

  • 1. Personnel Particular Name Barry Anak Colin H/P Contact No. 013-8390047 NRIC No. 851105-13-5223 Emergency Contact No. 014-5915036 (Wife) Date Of Birth 05 November 1985 Email Address brycolin@yahoo.com.my Place Of Birth Sibu, Sarawak Gender Male Age 30 Years Old Marriage Status Marriage Height 158 cm No. Of Children 2 @ Two only Weight 78 kg KWSP / EPF NO. 71627471 Nationality Malaysian PERKESO / SOCSO 851105135223 State Bintulu. Sarawak Income Tax / PCB SG21365957030 Race Iban Address Rumah Ambu, Sungai Semanok, 97200.Tatau, Bintulu. Sarawak. Malaysia. Religion Christian Classes of Driving License B2, D & GDL < 3000 kg Education School Background Year Name Of School Grade Qualification 2001 - 2002 Sekolah Menengah Teknik (S.M.T) Bintulu, Sarawak. Malaysia. Sijil Perperiksaan Malaysia (S.P.M) Pengajian Kejuteraan Awam (Civil Engineering) March 2015 – July 2016 Institute of professional Development Open University Malaysia (OUM) Excecutive Diploma Industrial Executive Diploma in Occupational Safety & Health Language Language Spoken Reading Written English Good Good Good Bahasa Melayu Good Good Good Chinese (Mandarin) Good Moderate Moderate Course @ Seminar In Attendant (Certificate Only) NO. Month Year Course Attended Organized Reference No. 01. September 2004 Job Safety Analysis Course EDI edi/JSA/006 02. October 2004 Basic Fire Fighting EDI edi/BF/017 03. December 2004 Safety Supervisor EDI edi/ss/042 04. December 2006 Forklift Operator & Safety Training Toyota 23783 05. January 2007 ISO 14001:2004 (Understanding & Implementing EMS) SIRIM NIL 06. March 2007 OHSAS 18001 (Understanding & Implementing OHSMS) SIRIM NIL 07. June 2007 Asas Keselamatan Kebakaran (Basic Fire Fighting) BOMBA NIL 08. March 2008 Safety & Health Officer Course NIOSH NS 0679-I 09. July 2009 Seminar Of Occupational Safety, Health & Environmental In Construction Industry CIDB NIL 10. December 2011 2nd Borneo Conference & Exhibition On Occupational Safety & Health (BOSH) 2011 NIOSH BC 0032-L 11. July 2012 OHSAS 18001 : 2007 (Health & Safety Management) PEDAS NIL 12. March 2012 Supervising Safety Course CSSB NIL My Personnel Particular @ Resume Designated To Applying Site Safety Supervisor (3S)
  • 2. Competency Of Certification Scope Of Duties Working Experience Industry Field Total (Years) Construction 4 years 1 month Manufacturing 3 years 2 months Oil & Gas 4 years 8 months Total 11 Years 12 Months No. Month Course Attended Organized Reference No. Expired Date 01. Feb 2005 Basic Scaffolding – Tubular EDI edi/st/0082 NIL DOSH SW/10/PP/01/153 09 Dec 2016 02. Nov 2006 Basic First Aid Course PBSMM 10356 Mac 2013 Oct 2013 57464 (BB0119239) 06 Oct 2016 03. Jan 2013 Site Safety Supervisor Course (MBAMSSS/BTU/1302/13) MBAM / KLIA MBAMSSS/A0662 NIL 03. May 2015 Authorized Entrant & Standby Person for Confined Space NIOSH NW-NSWKB-AE- 1787-S 27 May 2017  ntroducing a system of safety, health and welfare at work as contained in the act that be gazetted by the ministry or legislature.  Ensure that all employers and employees have to understand and comply with all requirements of the occupational health and safety legislation.  Raise the level of awareness, guide, advise and understanding all responsibility for safety and health at the workplace.  Ensure each program occupational safety and health within the company will be implemented effectively and achieve company goals.  Discovering standards and performance of companies in the industry in line with the programme of occupational safety and health in the workplace.  Ensure that all jobs will be implemented is in line with the requirements of the legislation and regulations that have been set.  Maintaining good relations between the company and the authority entrusted by the Government in the management of occupational safety and health in the workplace. For specific task :  Understand, introduce and enforce all safety, health, & environmental plan in construction a site which was introduced by the main contractor or the client.  be the Secretary and Assistant all responsibilities of the health and safety Manager / officer to implement occupational safety and health program within the company.  Assist safety and health officers in promoting, providing information and training to all parties.  Inspection, observation, audit, improve and correct any unsafe practices & condition in the workplace.  Communicate directly with the contractor's safety supervisor appointed respect of safety of work undertaken by subcontractors.  To report any condition and behaviors of unsafe and plan actions to resolving the problem from recurring.  Implement and ensure each program is current, record and provide a full report to Safety Managers or officers.
  • 3. Job History Name Of Employment Project Title Project Description DOSH Site Registration Project Site Client Main Contractor Number of Workers Involved Project Duration Designated Contract Duration Status of Employee Reason for Leaving Achievement JGC Malaysia SDN. BHD Construction of Tank 7 & Piping Associated Facilities (PAF) at the MLNG- Complex in Bintulu. Sarawak (Engineering, Procurement, Construction, Commissioning Project - EPCC)  Construction of Tank 7 The construction of this tank can accommodate a total of 160 m3 of nitrogen, which has been processed before being channeled to the new jetty for purposes of Marketing.  Piping Associated Facilities (PAF) Construction of 6.6 km of pipe along the trend 9 across the process plant so that the new jetty is intended for the supply its raw materials and the finished product of each unit is channeled to a storage tank connected to the jetty. SW/13/03/5280 Petronas complex plant at Malaysia Liquid Natural Gas (MLNG) Bintulu. Sarawak. Malaysia. Petronas - Malaysia Liquid Natural Gas (MLNG) JGC Malaysia SDN. BHD More than 1500 manpower involved January2015 – July 2017 (2 Years 6 Months) Site Safety Supervisor (3S – Yellow Book) August 2013 to present (July 2016 - 12 month) Contract staff N/A 2 Million safe main working hours without LTI Name Of Employment Project Title Project Description DOSH Site Registration Project Site Client Main Contractor Number of Workers Involved Project Duration Designated Contract Duration Status of Employee Reason for Leaving Achievement Linde Engineering (Malaysia) SDN BHD (299829-H) Marlin Nitrogen Generation Unit Plant Project at the MLNG-Complex in Bintulu. Sarawak (Engineering, Procurement, Construction, Commissioning Project - EPCC) Nitrogen processing plant construction unit is a high technology from Germany, aims to process waste gas before it is released from the combustion. The the rest raw material will be processed and converted into products for purposes of Marketing nitrogen gas. SW/13/03/4741 Petronas complex plant at Malaysia Liquid Natural Gas (MLNG) Bintulu. Sarawak. Malaysia. Malaysia Liquid Natural Gas (MLNG) Linde Engineering (Malaysia) SDN BHD (299829-H) More than 2500 manpower involved January2013 – July 2015 (2 Years 6 Months) Site Safety Supervisor (3S – Yellow Book) June 2013 – June 2015 (24 Months / 2 years) Contract staff Completion of contract agreement / project completion 6.5 Million safe main working hours without LTI
  • 4. Name Of Employment Project Title Project Description DOSH Site Registration Project Site Client Main Contractor Number of Workers Involved Project Duration Designated Contract Duration Status of Employee Reason for Leaving Achievement Penta-Ocean (Malaysia) SDN.BHD. (993128-H) Tokuyama Malaysia Polycrystalline Silicon Manufacturing Plant Phase 2 (Bintulu, Sarawak. Malaysia) - (Engineering, Procurement, Construction, Commissioning Project - EPCC) The plant aims to process raw materials into finished products such as silicone products before it is marketed. SW/12/03/4548 Tokuyama Malaysia SDN.BHD (868774-M) - Samalaju park area. Bintulu. Sarawak. Malaysia. Tokuyama Malaysia SDN.BHD (868774-M) Chiyoda Sarawak SDN.BHD (CSSB) More than 10 thousand involved January2012 – September 2013 Safety & Health Supervisor November 2012 – June 2013 (7 Months) Contract staff Completion of contract agreement / project completion 3 Million safe main working hours without LTI Name Of Employment Project Title Project Description DOSH Site Registration Project Site Client Main Contractor Number of Workers Involved Project Duration Designated Contract Duration Status of Employee Reason for Leaving Achievement Taisei Corporation (993306-M) Tokuyama Malaysia Polycrystalline Silicon Manufacturing Plant Phase 2 (Bintulu, Sarawak. Malaysia) - (Engineering, Procurement, Construction, Commissioning Project - EPCC) The plant aims to process raw materials into finished products such as silicone products before it is marketed. SW/12/03/4548 Tokuyama Malaysia SDN.BHD (868774-M) - Samalaju Park area. Bintulu Tokuyama Malaysia SDN.BHD (868774-M) Chiyoda Sarawak SDN.BHD (CSSB) More than 10 thousand manpower involved January2012 – October 2013 Safety & Health Supervisor (Acting for Safety & Health Officer) February 2012 – October 2012 (8 Months) Contract staff Completion of contract agreement 750 Thousand safe main working hours without LTI Name Of Employment Project Title Project Description DOSH Site Registration Project Site Client Main Contractor Number of Workers Involved Project Duration Designated Contract Duration Status of Employee Reason for Leaving Achievement Bintulu Engineering & Trading SDN.BHD. (B.E.T.S.B) – (110020-X) Process Safety Upgrades Project - PSUP (Bintulu, Sarawak. Malaysia) This project aims to upgrade the system of processing and transmission from one unit to another makes more quality products and quality prior to shipping. - Shell MDS (Malaysia) SDN.BHD (152396-W) - Bintulu, Sarawak. Malaysia. Shell MDS (Malaysia) JGC Singapore More than 5 thousand manpower involved April 2011 – November 2011 (7 Months) Safety & Health Supervisor (Acting for Safety & Health Officer) July 2011 – November 2011 (4 Months) Contract staff Completion of project & contract agreement 500 Thousand safe main working hours without LTI.
  • 5. Name Of Employment Project Title Project Description DOSH Site Registration Project Site Client Main Contractor Number of Workers Involved Project Duration Designated Contract Duration Status of Employee Reason for Leaving Achievement DIALOG Engineering & Construction SDN.BHD. (189290-U) Continue Construction New Cooling Tower Project (Bintulu, Sarawak. Malaysia) - (Engineering, Procurement, Construction, Commissioning Project - EPCC) Resumption of cooling tower construction process that were not completed before the completion of construction. SW/11/03/4396 Petronas - Asian Bintulu Fertilizer (ABF) SDN. BHD. (65199-P) plant, Bintulu. Sarawak. Malaysia. Petronas -Asian Bintulu Fertilizer (ABF) DIALOG Engineering & Construction SDN.BHD. (189290-U) More than 1.5 thousand manpower involved December 2010 – December 2011 (1 Years) Safety & Health Supervisor February 2011 – June 2011 (4 Months) Contract staff Getting a better offer 750 Thousand safe main working hours without LTI Name Of Employment Project Title Project Description DOSH Site Registration Project Site Client Main Contractor Number of Workers Involved Project Duration Designated Contract Duration Status of Employee Reason for Leaving Achievement Bintulu Engineering & Trading SDN.BHD. (B.E.T.S.B) – (110020-X) Construction 2 Units New Water Tanks Project. (Engineering, Procurement, Construction, Commissioning Project - EPCC) Construction of 2 units water storage tank aim to for emergency use by the fire and rescue during an emergency. SW/10/03/4261 Shell MDS (Malaysia) SDN.BHD (152396-W) - Bintulu, Sarawak. Malaysia. Shell MDS (Malaysia) Bintulu Engineering & Tranding SDN.BHD. (B.E.T.S.B) More than 300 manpower involved June 2010 – March 2011 (9 Months) Safety & Health Supervisor July 2010 – January 2010 (6 Months) Contract staff Completion of project & contract agreement 300 Thousand safe main working hours without LTI. Name Of Employment Project Title Project Description DOSH Site Registration Project Site Client Main Contractor Number of Workers Involved Project Duration Designated Contract Duration Ikatan Inovasi SDN. BHD. Construction New Cooling Tower Project (Bintulu, Sarawak. Malaysia) - (Engineering, Procurement, Construction, Commissioning Project - EPCC) Cooling tower construction is advanced technology from Holland country and intended to cover the plant cooling system to ensure each unit process as seamless and get a better product and quality. It has 7 fan coolers for cooling process using water systems. SW/08/03/439-BC/367 Petronas - Asian Bintulu Fertilizer (ABF) SDN. BHD. (65199-P) plant, Bintulu. Sarawak. Malaysia. Petronas - Asian Bintulu Fertilizer (ABF) SDN. BHD Ikatan – Matrik – Hamon (MIH) More than 8 hundred manpower involved June 2009 – July 2010 (1 Years) Safety & Health Supervisor November 2009 – June 2010 (7 Months)
  • 6. Status of Employee Reason for Leaving Achievement Contract staff Project termination by Client (ABF) 1.5 Million safe main working hours without LTI. Name Of Employment Manufacturing Title & Description DOSH Site Registration Manufacturing Site Client Number of Workers Involved Designated Status of Employee Reason for Leaving Achievement Forescom Plywood SDN. BHD. (023406-P) Timber processing factory to be turned into plywood products for purposes of market. - Forescom Plywood SDN. BHD, kemena industrial, Binyulu. Sarawak. Malaysia. Shin Yang Group More than thousand manpower involved Safety & Health Technician Permanent staff (September 2006 – November 2009) – 3Years 2 Months Getting a better offer 1 Million safe main working hours without LTI. Name Of Employment Project Title Project Description DOSH Site Registration Project Site Client Main Contractor Number of Workers Involved Project Duration Designated Contract Duration Status of Employee Reason for Leaving Achievement EDI Training & Consultancy SDN. BHD (466620-u) Bakun Hydro Electric Project (Bintulu, Sarawak. Malaysia)- (Engineering, Procurement, Construction, Commissioning Project - EPCC) Bakun dams construction is the 2nd largest in Asia with a depth of 740 meters and a cost of 5.2 billion and a capacity of 2,400 megawatts (MW) are intended to Generating electricity from water resources accomodating of requests for the purpose of industry and markets overseas. - Bakun, Belaga. Sarawak. Malaysia. Sarawak Hydro Malaysia-China Hydro (MCH) Joint Venture More than 10 thousand manpower involved August 2002 – March 2012 (More than 10 years) Safety & Health Supervisor January 2003 – October 2005 (2 Years & 10 Months) Contract staff Completion of contract agreement -
  • 7. Reference List No. Name Designation Company Contact No. 01. Robert Labar Safety & Health Director EDI Training & Consultancy SDN.BHD 012-8153357 02. Martin Maru Assit. Safety & Helath Deputy Manager Toyo Kimatsu Malayisa (TKM) 019-8540966 013-8058393 03. John Lim Ei Ge Safety & Health Officer Sino Hydro Cooperation 019-8198839 012-8832373 04. Wong Ching Kiong Safety & Health Manager Forescom Plywood SDN. BHD. 019-8076335 05. Haji Razak Mohammad Safety & Health Manager Ikatan Inovasi SDN.BHD. 016-2019078 06. Mohd. Sukri Ismail Safety & Health Officer Ikatan Inovasi SDN.BHD. 019-9057298 07. Sylvester Seal Safety & Health Manager JGC Malaysia SDN BHD 013-8377147 08. Augustine Jawai Safety & Health Executive Shell MDS (Malaysia) SDN.BHD 019-4862152 09. Hugh Chunggat Mawar Managing Director Bintulu Engineering & Tranding SDN.BHD. (B.E.T.S.B) 013-8301242 10. Ami Ucheng Safety & Health Supervisor PETRONAS Carigali 019-4898647 11. Paul Muhry Senior Safety & Health Manager Chiyoda Sarawak SDN.BHD (CSSB) 013-5339702 12. Marlod E. Martin Senior Safety & Health Officer Chiyoda Sarawak SDN.BHD (CSSB) 016-8437563 013-6286641 13. Rosli Langga Safety & Health Manager Sankyu (Malaysia) SDN.BHD. 013-8489099 14. Hamaguchi Shigeatsu Project Manager Taisei Corporation 013-8180173 15. Freddy Masaru Fugazawa Deputy Project Manager Taisei Corporation 013-8182770 16. Tamil Arasan Safety & Health Manager Taisei Corporation 019-3051141 019-8986175 17. Massaki Ando Project Manager Penta-Ocean (Malaysia) SDN. BHD. 019-8520193 18. Alizan Bujang Safety & Health Officer Penta-Ocean (Malaysia) SDN. BHD. 019-8528379 19. Madhavan A/L P.P Nair Safety & Health Officer Hyperwave Engineering 019-8843343 20. Stephen Weidner Safety & Health Manager Linde Engineering (Malaysia) SDN.BHD 014-5833677 21. Josef Heinrich Reiter Construction Manager Linde Engineering (Malaysia) SDN.BHD 010-5982123 22. Larry Albert Jalak Safety & Health Executive MLNG / Project Management Team 019-8839737 23. Wardzala Nira Safety & Health Supervisor MLNG / Project Management Team 012-8798225