Engineering techniques developed to achieve longitudinal connectivity 
on the rivers. Case study developed on the DâmboviŃa River 
Dr.eng.Răzvan Voicu 
rzvnvoicu@yahoo.com , getiiliberi@gmail.com 
In Bucharest, the DâmboviŃa River is completely hydrotechnically arranged 
(lakes, dams, discharge sills, concrete bed etc.). There are different species of fish (chub, 
burbot, wild carp, common nase, common rudd and so on) in the DâmboviŃa River. The 
migration of these species is blocked by the presence of some hydro-building activities 
on the river. All such construction shall be equipped with systems for fish migration 
according to the Water Framework Directive (60/2000/CE). To achieve a system for 
ichthyofauna migration on the DâmboviŃa River upstream – downstream the discharge 
sill near Auto Vitan Market, I suggest the following solutions: 
SOLUTION I 
A metal or concrete pillar is installed at the pile 1, three meters away from the 
first concrete plate 2, approximately. A metal plate is welded on the metal pillar. Then a 
telescopic hydraulic cylinder is welded on the metal plate (Fig. 1 – telescopic hydraulic 
cylinder, pile 1, concrete plate 2, metal or concrete pillar, Positioning the metal or 
concrete pillar). 
pile 1 
telescopic hydraulic cylinder 
watercourse 
concrete plate 1 
metal or concrete pillar 
concrete plate 2
Figure 1 Positioning the metal or concrete pillar 
A metal bar, cogged on the inside, is fixed to the right bank of the watercourse, 
which is covered by concrete (as the entire watercourse is) vertically. An electric motor is 
attached to this cogged bar (Fig. 2 – pinion, electric motor, cogged bar, Fixing the electric 
motor to the cogged bar). The motor is driven by a pinion, following the rack nacelle 
principle known and used worldwide (Fig. 3 – Rack nacelle a and b). 
right bank pinion electric motor 
watercourse 
cogged bar 
Figure 2 Fixing the electric motor to the cogged bar 
a 
rack nacelle (nacelle-italiastar.ro)
b 
rack nacelle (nacelle-italiastar.ro) 
Figure 3 a and b - Rack nacelles 
A horizontal bar will be fixed to the cogged bar using two bearings. This bar is 
also fixed to the electric engine and with the help of which it can move vertically and 
inside the river as well. (Fig. 4 – metallic rectangular parallelepiped (1), metal bar with 
variable geometry, Fixing the electric motor to the cogged rail). Vertical bar can move 
vertically due to a hinge that locks the bar in the vertical plane. A rectangular 
parallelepiped made of a metal grid that has no upper horizontal surface is welded to the 
metal bar with variable geometry. (Fig. 5 –Fixing the metallic rectangular parallelepiped 
(1) to the metal bar with variable geometry)). 
bearings 
metal bar cogged bar 
pinion 
electric motor 
metal hinge 
metal bar with variable geometry 
Figure 4 Fixing the electric motor to the cogged rail
electric motor 
right bank pinion metallic rectangular parallelepiped (1) 
watercourse 
cogged bar 
Figure 5 Fixing the metallic rectangular parallelepiped (1) to the metal bar with 
variable geometry 
The four vertical surfaces of the metallic rectangular parallelepiped (1) are 
equipped with folding systems made from the same material (metal grid). The folding 
surfaces are fixed to some folding bars and they withdraw in line with the parallelepiped 
surfaces. (Fig. 6 – folding bar, folding surface, electric motor for folding mobile surfaces, 
metallic rectangular parallelepiped, Positioning the folding surfaces on the metallic 
rectangular parallelepiped). These bars can be folded due to small motors attached 
outside the metallic rectangular parallelepiped.
folding bar 
folding surface 
electric motor for folding mobile surfaces metallic rectangular parallelepiped (1) 
Figure 6 Positioning the folding surfaces on the metallic rectangular 
parallelepiped 
Many migratory fish, regardless of species (for example) gather in the concrete 
plate area 2 wanting to overcome the weirs with variable geometry. (Fig. 7 – Area of 
study and Fig. 8 – weir with variable geometry). The difference in level between concrete 
plate 1 and plate 2 is 1.5 m.
concrete plate 2 
Figure 7 Area of study 
Figure 8 Weir with variable geometry 
After withdrawing, these folding surfaces pass about 30 cm over the water level 
which allows catching fish fauna inside the metallic parallelepiped. In the case study, the 
lower rectangular basin reaches a depth of over one meter. After the metallic 
parallelepiped (1) reaches the maximum, due to the rod it is fixed to, the telescopic 
hydraulic cylinder pushes the parallelepiped up to the angle where all the fish fauna 
moves between the horizontal and one of the vertical surfaces of the parallelepiped. (Fig. 
9 – Maximum level of the telescopic hydraulic cylinder). The lower left corner of the 
metallic parallelepiped is higher than the other corners, resulting in a funnel within the 
two surfaces, which directs the fish to the left corner, but at a lower level after folding. 
(Fig. 10 – System of fish redirecting inside the metallic parallelepiped (1)). Fish gather 
near the weirs in order to go upstream, but if there is a system for fish redirecting made of 
electromagnetic field generators fixed to the left bank, then the fish will get near the 
metallic parallelepiped. Thereby, fish can be blocked and pass downstream of the weir. A 
fence made of metal grid can also be set as a system for fish redirecting.
metallic rectangular parallelepiped (1) 
right bank electric motor 
pinion 
metal hinge 
concrete plate 1 concrete plate 2 
cogged bar telescopic hydraulic cylinder 
Figure 9 Maximum level of the telescopic hydraulic cylinder 
Figure 10 System of fish redirecting inside the metallic parallelepiped (1) 
At the metallic parallelepiped base near the lower left corner, there is a circular 
window to which a durable flexible plastic tube is attached. (Fig. 11 - The flexible tube, 
Positioning the flexible tube in the metallic parallelepiped (1)). The flexible tube of about 
40 cm diameter will be located above the maximum level of the weir and will be fixed to
the right bank using some metal cables allowing it to move vertically. (Fig. 12 – Fixing 
tube system, metallic parallelepiped 2, Positioning the flexible tube towards the right 
bank). Fixing the tube to the right bank and its flexibility allow its anchoring to the 
metallic parallelepiped without affecting the discharge sill. For moving downstream – 
upstream the same flexible tube, but using other parallelepiped made of metal grid, will 
be used (Fig. 12). 
metallic parallelepiped (1) 
the flexible tube 
Figure 11 Positioning the flexible tube in the metallic parallelepiped (1)
SOLUTION II 
fixing tube system metallic parallelepiped (1) 
the flexible tube right bank pile 1 pile 2 
metallic parallelepiped (2) 
Figure 12 Positioning the flexible tube towards the right bank 
The rectangular parallelepiped 2 preserves the same characteristics regarding the 
mounting of the flexible tube, redirecting the fish inside and transporting the fish 
upstream of the discharge sill. The difference lies in the way of fixing the metallic 
parallelepiped 2 to the metal housing of the electric motor . (Fig. 13 metal support, 
folding bar, Mobile system supporting the metallic parallelepiped 2).
bearings 
metal bar cogged bar 
folding bar metal support 
motor electric 
metallic parallelepiped (2) 
Figure 13 Mobile system supporting the metallic parallelepiped 2 
The process of lifting the metallic parallelepiped 2 is performed on the same 
principle: rack nacelle, but in this case there is no telescopic hydraulic cylinder to incline 
the parallelepiped 2. The parallelepiped 2 will be inclined by using a folding bar for the 
fish to reach the flexible tube (it rotates in the same plane) fixed inside the electric motor. 
Because the water depth is about half a meter, the parallelepiped 2 is directly supported 
by the concrete river bed. (Fig. 14 – the concrete river bed, metal support, stationary 
metallic parallelepiped 2, folding bar). In this case the redirecting system consists of 
some electromagnetic field generators located on the left bank.
right bank 
metallic parallelepiped 2 
cogged bar 
the concrete river bed 
metal support 
folding bar 
Figure 14 Stationary metallic parallelepiped 2 
Electromagnetic field generators operate separately, both upstream and 
downstream. When lifting the metallic parallelepiped 2 by the means of the rack nacelle 
system, the upstream electromagnetic field generators stop for the fish fauna reaching 
upstream the discharge sill to continue the migration and not to come back, by the means 
of the upstream metallic parallelepiped (1), downstream of the spillway sill. This solution 
is not complicated, is modern, does not require large financial resources, is space saving, 
does not destroy the discharge sill components, and can operate entirely using solar 
energy. All the components of the system are stainless steel or are made of other non-corrosive 
materials. During winter, the system can be uninstalled and used for another 
discharge sill having approximately the same dimensions. The presented dimensions of 
the system are only trial, but accurate when needed. This system was introduced on a 
concrete area to better understand the positioning and operation thereof. It can be applied 
anywhere in the world.
All rights reserved 
Bucharest 
2013

More Related Content

Similar to Dâmboviţa river restoration 2!

Engineering mechanics for electrical engineering
Engineering mechanics for electrical engineering Engineering mechanics for electrical engineering
Engineering mechanics for electrical engineering Manish Gupta
 
DIRECT CURRENT (DC) Motors.pptx
DIRECT CURRENT (DC) Motors.pptxDIRECT CURRENT (DC) Motors.pptx
DIRECT CURRENT (DC) Motors.pptxJohnWarren757280
 
Fish passage system!
Fish passage system!Fish passage system!
Fish passage system!Răzvan Voicu
 
Fish passage presentation 1 Madison conference!
 Fish passage presentation 1 Madison conference! Fish passage presentation 1 Madison conference!
Fish passage presentation 1 Madison conference!Răzvan Voicu
 
Safety problem of Boguchansk rockfill dam with asphalt concrete core
Safety problem of Boguchansk rockfill dam with asphalt concrete coreSafety problem of Boguchansk rockfill dam with asphalt concrete core
Safety problem of Boguchansk rockfill dam with asphalt concrete coreYury Lyapichev
 
Solar hydrogen generation
Solar hydrogen generationSolar hydrogen generation
Solar hydrogen generationsbit
 
SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS...
SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS...SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS...
SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS...Răzvan Voicu
 
Removing the swanton dam on the missisquoi river
Removing the swanton dam on the missisquoi riverRemoving the swanton dam on the missisquoi river
Removing the swanton dam on the missisquoi riverRăzvan Voicu
 
A Review on Magnetic Levitation Vehicles
A Review on Magnetic Levitation VehiclesA Review on Magnetic Levitation Vehicles
A Review on Magnetic Levitation Vehiclesijtsrd
 
Corrosion in pipeline
Corrosion in pipelineCorrosion in pipeline
Corrosion in pipelineDuy Vu
 
13. magnetic effects of electric current.pptx
13. magnetic effects of electric current.pptx13. magnetic effects of electric current.pptx
13. magnetic effects of electric current.pptxshivyaarora5
 
089 CC2011 Crete (2011) Rail Straightness Control in Service
089 CC2011 Crete (2011) Rail Straightness Control in Service089 CC2011 Crete (2011) Rail Straightness Control in Service
089 CC2011 Crete (2011) Rail Straightness Control in ServiceAndrea Bracciali
 
I0330267076
I0330267076I0330267076
I0330267076theijes
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)theijes
 
Landslide Alarm system for Railways
Landslide Alarm system for RailwaysLandslide Alarm system for Railways
Landslide Alarm system for RailwaysAnushkaSahu
 

Similar to Dâmboviţa river restoration 2! (20)

Engineering mechanics for electrical engineering
Engineering mechanics for electrical engineering Engineering mechanics for electrical engineering
Engineering mechanics for electrical engineering
 
DIRECT CURRENT (DC) Motors.pptx
DIRECT CURRENT (DC) Motors.pptxDIRECT CURRENT (DC) Motors.pptx
DIRECT CURRENT (DC) Motors.pptx
 
Fish passage system!
Fish passage system!Fish passage system!
Fish passage system!
 
Fish passage presentation 1 Madison conference!
 Fish passage presentation 1 Madison conference! Fish passage presentation 1 Madison conference!
Fish passage presentation 1 Madison conference!
 
Safety problem of Boguchansk rockfill dam with asphalt concrete core
Safety problem of Boguchansk rockfill dam with asphalt concrete coreSafety problem of Boguchansk rockfill dam with asphalt concrete core
Safety problem of Boguchansk rockfill dam with asphalt concrete core
 
Solar hydrogen generation
Solar hydrogen generationSolar hydrogen generation
Solar hydrogen generation
 
SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS...
SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS...SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS...
SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS...
 
Eddy current
Eddy currentEddy current
Eddy current
 
Mutual induction
Mutual induction    Mutual induction
Mutual induction
 
Removing the swanton dam on the missisquoi river
Removing the swanton dam on the missisquoi riverRemoving the swanton dam on the missisquoi river
Removing the swanton dam on the missisquoi river
 
A Review on Magnetic Levitation Vehicles
A Review on Magnetic Levitation VehiclesA Review on Magnetic Levitation Vehicles
A Review on Magnetic Levitation Vehicles
 
EMC II.pptx
EMC II.pptxEMC II.pptx
EMC II.pptx
 
Corrosion in pipeline
Corrosion in pipelineCorrosion in pipeline
Corrosion in pipeline
 
13. magnetic effects of electric current.pptx
13. magnetic effects of electric current.pptx13. magnetic effects of electric current.pptx
13. magnetic effects of electric current.pptx
 
EMPS ME191 FINAL REPORT
EMPS ME191 FINAL REPORTEMPS ME191 FINAL REPORT
EMPS ME191 FINAL REPORT
 
089 CC2011 Crete (2011) Rail Straightness Control in Service
089 CC2011 Crete (2011) Rail Straightness Control in Service089 CC2011 Crete (2011) Rail Straightness Control in Service
089 CC2011 Crete (2011) Rail Straightness Control in Service
 
I0330267076
I0330267076I0330267076
I0330267076
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)
 
Dipendra project
Dipendra projectDipendra project
Dipendra project
 
Landslide Alarm system for Railways
Landslide Alarm system for RailwaysLandslide Alarm system for Railways
Landslide Alarm system for Railways
 

More from Răzvan Voicu

FISH MIGRATION SYSTEM OVER A WOODEN DISCHARGE SILL LOCATED ON THE BISTRA MĂRU...
FISH MIGRATION SYSTEM OVER A WOODEN DISCHARGE SILL LOCATED ON THE BISTRA MĂRU...FISH MIGRATION SYSTEM OVER A WOODEN DISCHARGE SILL LOCATED ON THE BISTRA MĂRU...
FISH MIGRATION SYSTEM OVER A WOODEN DISCHARGE SILL LOCATED ON THE BISTRA MĂRU...Răzvan Voicu
 
PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM ...
PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM ...PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM ...
PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM ...Răzvan Voicu
 
IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...
IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...
IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...Răzvan Voicu
 
CARAŞ RIVER GORGE ASPECTS OF SALMONIDS’ COMMUNITIES MANAGEMENT – TECHNICAL SO...
CARAŞ RIVER GORGE ASPECTS OF SALMONIDS’ COMMUNITIES MANAGEMENT – TECHNICAL SO...CARAŞ RIVER GORGE ASPECTS OF SALMONIDS’ COMMUNITIES MANAGEMENT – TECHNICAL SO...
CARAŞ RIVER GORGE ASPECTS OF SALMONIDS’ COMMUNITIES MANAGEMENT – TECHNICAL SO...Răzvan Voicu
 
Fish passage design on DŁUBNIA RIVER IN KRAKOW
Fish passage design on DŁUBNIA RIVER IN KRAKOWFish passage design on DŁUBNIA RIVER IN KRAKOW
Fish passage design on DŁUBNIA RIVER IN KRAKOWRăzvan Voicu
 
Msd10.2478 volume10 issue-2_01paper
Msd10.2478  volume10 issue-2_01paperMsd10.2478  volume10 issue-2_01paper
Msd10.2478 volume10 issue-2_01paperRăzvan Voicu
 
Fish passage system on Ialomița River!Lawrence G. Dominguez!
Fish passage system on Ialomița River!Lawrence G. Dominguez!Fish passage system on Ialomița River!Lawrence G. Dominguez!
Fish passage system on Ialomița River!Lawrence G. Dominguez!Răzvan Voicu
 
Wetland restoration and fish passage solutions near Retiș Dam!
Wetland restoration and fish passage solutions near Retiș Dam!Wetland restoration and fish passage solutions near Retiș Dam!
Wetland restoration and fish passage solutions near Retiș Dam!Răzvan Voicu
 
Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...
  Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...  Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...
Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...Răzvan Voicu
 
THE PROPOSAL OF POTENTIAL SOLUTIONS IN ORDER TO RESTORE THE BÂRZEŞTI –BRĂHĂŞO...
THE PROPOSAL OF POTENTIAL SOLUTIONS IN ORDER TO RESTORE THE BÂRZEŞTI –BRĂHĂŞO...THE PROPOSAL OF POTENTIAL SOLUTIONS IN ORDER TO RESTORE THE BÂRZEŞTI –BRĂHĂŞO...
THE PROPOSAL OF POTENTIAL SOLUTIONS IN ORDER TO RESTORE THE BÂRZEŞTI –BRĂHĂŞO...Răzvan Voicu
 
Rivers and streams restoration - brochure 2010!
Rivers and streams restoration - brochure 2010!Rivers and streams restoration - brochure 2010!
Rivers and streams restoration - brochure 2010!Răzvan Voicu
 
Razvan voicu fish passage 2015 - agnita and manastur ii+iii
Razvan voicu  fish passage 2015 - agnita and manastur ii+iiiRazvan voicu  fish passage 2015 - agnita and manastur ii+iii
Razvan voicu fish passage 2015 - agnita and manastur ii+iiiRăzvan Voicu
 
Fish passage solution for Mănăştur dam!
Fish passage solution for Mănăştur dam!Fish passage solution for Mănăştur dam!
Fish passage solution for Mănăştur dam!Răzvan Voicu
 
Socializarea prin raportul banilor 2.2 - 2011!
Socializarea prin raportul banilor 2.2   - 2011!Socializarea prin raportul banilor 2.2   - 2011!
Socializarea prin raportul banilor 2.2 - 2011!Răzvan Voicu
 
Erosion of riverbanks and slopes! Răzvan Voicu
Erosion of riverbanks and slopes! Răzvan VoicuErosion of riverbanks and slopes! Răzvan Voicu
Erosion of riverbanks and slopes! Răzvan VoicuRăzvan Voicu
 
Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...
Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...
Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...Răzvan Voicu
 
LUPTA PENTRU PĂSTRAREA IDENTITĂŢII NAŢIONALE!
LUPTA PENTRU PĂSTRAREA IDENTITĂŢII NAŢIONALE!LUPTA PENTRU PĂSTRAREA IDENTITĂŢII NAŢIONALE!
LUPTA PENTRU PĂSTRAREA IDENTITĂŢII NAŢIONALE!Răzvan Voicu
 
Hydraulic and bioengineering solutions for rivers! 2
Hydraulic and bioengineering solutions for rivers! 2Hydraulic and bioengineering solutions for rivers! 2
Hydraulic and bioengineering solutions for rivers! 2Răzvan Voicu
 

More from Răzvan Voicu (20)

FISH MIGRATION SYSTEM OVER A WOODEN DISCHARGE SILL LOCATED ON THE BISTRA MĂRU...
FISH MIGRATION SYSTEM OVER A WOODEN DISCHARGE SILL LOCATED ON THE BISTRA MĂRU...FISH MIGRATION SYSTEM OVER A WOODEN DISCHARGE SILL LOCATED ON THE BISTRA MĂRU...
FISH MIGRATION SYSTEM OVER A WOODEN DISCHARGE SILL LOCATED ON THE BISTRA MĂRU...
 
PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM ...
PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM ...PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM ...
PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM ...
 
IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...
IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...
IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...
 
CARAŞ RIVER GORGE ASPECTS OF SALMONIDS’ COMMUNITIES MANAGEMENT – TECHNICAL SO...
CARAŞ RIVER GORGE ASPECTS OF SALMONIDS’ COMMUNITIES MANAGEMENT – TECHNICAL SO...CARAŞ RIVER GORGE ASPECTS OF SALMONIDS’ COMMUNITIES MANAGEMENT – TECHNICAL SO...
CARAŞ RIVER GORGE ASPECTS OF SALMONIDS’ COMMUNITIES MANAGEMENT – TECHNICAL SO...
 
Fish passage design on DŁUBNIA RIVER IN KRAKOW
Fish passage design on DŁUBNIA RIVER IN KRAKOWFish passage design on DŁUBNIA RIVER IN KRAKOW
Fish passage design on DŁUBNIA RIVER IN KRAKOW
 
Msd10.2478 volume10 issue-2_01paper
Msd10.2478  volume10 issue-2_01paperMsd10.2478  volume10 issue-2_01paper
Msd10.2478 volume10 issue-2_01paper
 
201610204
201610204201610204
201610204
 
Fish passage system on Ialomița River!Lawrence G. Dominguez!
Fish passage system on Ialomița River!Lawrence G. Dominguez!Fish passage system on Ialomița River!Lawrence G. Dominguez!
Fish passage system on Ialomița River!Lawrence G. Dominguez!
 
Wetland restoration and fish passage solutions near Retiș Dam!
Wetland restoration and fish passage solutions near Retiș Dam!Wetland restoration and fish passage solutions near Retiș Dam!
Wetland restoration and fish passage solutions near Retiș Dam!
 
Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...
  Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...  Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...
Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...
 
THE PROPOSAL OF POTENTIAL SOLUTIONS IN ORDER TO RESTORE THE BÂRZEŞTI –BRĂHĂŞO...
THE PROPOSAL OF POTENTIAL SOLUTIONS IN ORDER TO RESTORE THE BÂRZEŞTI –BRĂHĂŞO...THE PROPOSAL OF POTENTIAL SOLUTIONS IN ORDER TO RESTORE THE BÂRZEŞTI –BRĂHĂŞO...
THE PROPOSAL OF POTENTIAL SOLUTIONS IN ORDER TO RESTORE THE BÂRZEŞTI –BRĂHĂŞO...
 
Rivers and streams restoration - brochure 2010!
Rivers and streams restoration - brochure 2010!Rivers and streams restoration - brochure 2010!
Rivers and streams restoration - brochure 2010!
 
Razvan voicu fish passage 2015 - agnita and manastur ii+iii
Razvan voicu  fish passage 2015 - agnita and manastur ii+iiiRazvan voicu  fish passage 2015 - agnita and manastur ii+iii
Razvan voicu fish passage 2015 - agnita and manastur ii+iii
 
Fish passage solution for Mănăştur dam!
Fish passage solution for Mănăştur dam!Fish passage solution for Mănăştur dam!
Fish passage solution for Mănăştur dam!
 
Ecologie!
Ecologie!Ecologie!
Ecologie!
 
Socializarea prin raportul banilor 2.2 - 2011!
Socializarea prin raportul banilor 2.2   - 2011!Socializarea prin raportul banilor 2.2   - 2011!
Socializarea prin raportul banilor 2.2 - 2011!
 
Erosion of riverbanks and slopes! Răzvan Voicu
Erosion of riverbanks and slopes! Răzvan VoicuErosion of riverbanks and slopes! Răzvan Voicu
Erosion of riverbanks and slopes! Răzvan Voicu
 
Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...
Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...
Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...
 
LUPTA PENTRU PĂSTRAREA IDENTITĂŢII NAŢIONALE!
LUPTA PENTRU PĂSTRAREA IDENTITĂŢII NAŢIONALE!LUPTA PENTRU PĂSTRAREA IDENTITĂŢII NAŢIONALE!
LUPTA PENTRU PĂSTRAREA IDENTITĂŢII NAŢIONALE!
 
Hydraulic and bioengineering solutions for rivers! 2
Hydraulic and bioengineering solutions for rivers! 2Hydraulic and bioengineering solutions for rivers! 2
Hydraulic and bioengineering solutions for rivers! 2
 

Recently uploaded

OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 

Recently uploaded (20)

OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 

Dâmboviţa river restoration 2!

  • 1. Engineering techniques developed to achieve longitudinal connectivity on the rivers. Case study developed on the DâmboviŃa River Dr.eng.Răzvan Voicu rzvnvoicu@yahoo.com , getiiliberi@gmail.com In Bucharest, the DâmboviŃa River is completely hydrotechnically arranged (lakes, dams, discharge sills, concrete bed etc.). There are different species of fish (chub, burbot, wild carp, common nase, common rudd and so on) in the DâmboviŃa River. The migration of these species is blocked by the presence of some hydro-building activities on the river. All such construction shall be equipped with systems for fish migration according to the Water Framework Directive (60/2000/CE). To achieve a system for ichthyofauna migration on the DâmboviŃa River upstream – downstream the discharge sill near Auto Vitan Market, I suggest the following solutions: SOLUTION I A metal or concrete pillar is installed at the pile 1, three meters away from the first concrete plate 2, approximately. A metal plate is welded on the metal pillar. Then a telescopic hydraulic cylinder is welded on the metal plate (Fig. 1 – telescopic hydraulic cylinder, pile 1, concrete plate 2, metal or concrete pillar, Positioning the metal or concrete pillar). pile 1 telescopic hydraulic cylinder watercourse concrete plate 1 metal or concrete pillar concrete plate 2
  • 2. Figure 1 Positioning the metal or concrete pillar A metal bar, cogged on the inside, is fixed to the right bank of the watercourse, which is covered by concrete (as the entire watercourse is) vertically. An electric motor is attached to this cogged bar (Fig. 2 – pinion, electric motor, cogged bar, Fixing the electric motor to the cogged bar). The motor is driven by a pinion, following the rack nacelle principle known and used worldwide (Fig. 3 – Rack nacelle a and b). right bank pinion electric motor watercourse cogged bar Figure 2 Fixing the electric motor to the cogged bar a rack nacelle (nacelle-italiastar.ro)
  • 3. b rack nacelle (nacelle-italiastar.ro) Figure 3 a and b - Rack nacelles A horizontal bar will be fixed to the cogged bar using two bearings. This bar is also fixed to the electric engine and with the help of which it can move vertically and inside the river as well. (Fig. 4 – metallic rectangular parallelepiped (1), metal bar with variable geometry, Fixing the electric motor to the cogged rail). Vertical bar can move vertically due to a hinge that locks the bar in the vertical plane. A rectangular parallelepiped made of a metal grid that has no upper horizontal surface is welded to the metal bar with variable geometry. (Fig. 5 –Fixing the metallic rectangular parallelepiped (1) to the metal bar with variable geometry)). bearings metal bar cogged bar pinion electric motor metal hinge metal bar with variable geometry Figure 4 Fixing the electric motor to the cogged rail
  • 4. electric motor right bank pinion metallic rectangular parallelepiped (1) watercourse cogged bar Figure 5 Fixing the metallic rectangular parallelepiped (1) to the metal bar with variable geometry The four vertical surfaces of the metallic rectangular parallelepiped (1) are equipped with folding systems made from the same material (metal grid). The folding surfaces are fixed to some folding bars and they withdraw in line with the parallelepiped surfaces. (Fig. 6 – folding bar, folding surface, electric motor for folding mobile surfaces, metallic rectangular parallelepiped, Positioning the folding surfaces on the metallic rectangular parallelepiped). These bars can be folded due to small motors attached outside the metallic rectangular parallelepiped.
  • 5. folding bar folding surface electric motor for folding mobile surfaces metallic rectangular parallelepiped (1) Figure 6 Positioning the folding surfaces on the metallic rectangular parallelepiped Many migratory fish, regardless of species (for example) gather in the concrete plate area 2 wanting to overcome the weirs with variable geometry. (Fig. 7 – Area of study and Fig. 8 – weir with variable geometry). The difference in level between concrete plate 1 and plate 2 is 1.5 m.
  • 6. concrete plate 2 Figure 7 Area of study Figure 8 Weir with variable geometry After withdrawing, these folding surfaces pass about 30 cm over the water level which allows catching fish fauna inside the metallic parallelepiped. In the case study, the lower rectangular basin reaches a depth of over one meter. After the metallic parallelepiped (1) reaches the maximum, due to the rod it is fixed to, the telescopic hydraulic cylinder pushes the parallelepiped up to the angle where all the fish fauna moves between the horizontal and one of the vertical surfaces of the parallelepiped. (Fig. 9 – Maximum level of the telescopic hydraulic cylinder). The lower left corner of the metallic parallelepiped is higher than the other corners, resulting in a funnel within the two surfaces, which directs the fish to the left corner, but at a lower level after folding. (Fig. 10 – System of fish redirecting inside the metallic parallelepiped (1)). Fish gather near the weirs in order to go upstream, but if there is a system for fish redirecting made of electromagnetic field generators fixed to the left bank, then the fish will get near the metallic parallelepiped. Thereby, fish can be blocked and pass downstream of the weir. A fence made of metal grid can also be set as a system for fish redirecting.
  • 7. metallic rectangular parallelepiped (1) right bank electric motor pinion metal hinge concrete plate 1 concrete plate 2 cogged bar telescopic hydraulic cylinder Figure 9 Maximum level of the telescopic hydraulic cylinder Figure 10 System of fish redirecting inside the metallic parallelepiped (1) At the metallic parallelepiped base near the lower left corner, there is a circular window to which a durable flexible plastic tube is attached. (Fig. 11 - The flexible tube, Positioning the flexible tube in the metallic parallelepiped (1)). The flexible tube of about 40 cm diameter will be located above the maximum level of the weir and will be fixed to
  • 8. the right bank using some metal cables allowing it to move vertically. (Fig. 12 – Fixing tube system, metallic parallelepiped 2, Positioning the flexible tube towards the right bank). Fixing the tube to the right bank and its flexibility allow its anchoring to the metallic parallelepiped without affecting the discharge sill. For moving downstream – upstream the same flexible tube, but using other parallelepiped made of metal grid, will be used (Fig. 12). metallic parallelepiped (1) the flexible tube Figure 11 Positioning the flexible tube in the metallic parallelepiped (1)
  • 9. SOLUTION II fixing tube system metallic parallelepiped (1) the flexible tube right bank pile 1 pile 2 metallic parallelepiped (2) Figure 12 Positioning the flexible tube towards the right bank The rectangular parallelepiped 2 preserves the same characteristics regarding the mounting of the flexible tube, redirecting the fish inside and transporting the fish upstream of the discharge sill. The difference lies in the way of fixing the metallic parallelepiped 2 to the metal housing of the electric motor . (Fig. 13 metal support, folding bar, Mobile system supporting the metallic parallelepiped 2).
  • 10. bearings metal bar cogged bar folding bar metal support motor electric metallic parallelepiped (2) Figure 13 Mobile system supporting the metallic parallelepiped 2 The process of lifting the metallic parallelepiped 2 is performed on the same principle: rack nacelle, but in this case there is no telescopic hydraulic cylinder to incline the parallelepiped 2. The parallelepiped 2 will be inclined by using a folding bar for the fish to reach the flexible tube (it rotates in the same plane) fixed inside the electric motor. Because the water depth is about half a meter, the parallelepiped 2 is directly supported by the concrete river bed. (Fig. 14 – the concrete river bed, metal support, stationary metallic parallelepiped 2, folding bar). In this case the redirecting system consists of some electromagnetic field generators located on the left bank.
  • 11. right bank metallic parallelepiped 2 cogged bar the concrete river bed metal support folding bar Figure 14 Stationary metallic parallelepiped 2 Electromagnetic field generators operate separately, both upstream and downstream. When lifting the metallic parallelepiped 2 by the means of the rack nacelle system, the upstream electromagnetic field generators stop for the fish fauna reaching upstream the discharge sill to continue the migration and not to come back, by the means of the upstream metallic parallelepiped (1), downstream of the spillway sill. This solution is not complicated, is modern, does not require large financial resources, is space saving, does not destroy the discharge sill components, and can operate entirely using solar energy. All the components of the system are stainless steel or are made of other non-corrosive materials. During winter, the system can be uninstalled and used for another discharge sill having approximately the same dimensions. The presented dimensions of the system are only trial, but accurate when needed. This system was introduced on a concrete area to better understand the positioning and operation thereof. It can be applied anywhere in the world.
  • 12. All rights reserved Bucharest 2013