Quentin McColgin 310.699.1860
SECURITY Clearances
Secret – Updated / Renewed February 2015 – TS/SCI – Top Secret / Sensitive Classified Information (2007 – 2011)
WORK EXPERIENCE
Raytheon – RMS (Raytheon Missile Systems) – Tucson, AZ 11/2014 – 03/2015
Contracted Services provider – Employed through – The Fountain Group, Tampa Bay, FL
Program Planning & Scheduling
• Provided ad-hoc contract services and advice to managers in-charge of and responsible for a high profile
rapidly evolving program within Raytheon Missile Systems supporting Missile Defense Agency contracts.
• Provided integrated resource loaded schedules to a multimillion dollar program for planning, schedule
implementation, & execution in compliance with highly integrated earned value management (EVM) cost &
schedule control processes.
• Provided supplemental and what-if schedules for internally integrated program plans comprised of proposed
ECRs supporting rapid customer needs and expectations while filling that gap between formalized FRPs
and ATPs.
• I vertically & horizontally integrated task scheduling across functional groups & reported schedule status
weekly.
• Utilized MS Project 2010 highly customized with RPM, (Raytheon Program Management), add-on utilities
and reports.
• Developed / reported contract delivery margin trends; utilized OPDEC Critical Path tools/reports &
Milestone Pro.
Lockheed Martin – SSC (Space Systems Company) – Sunnyvale, CA 6/2007 – 3/2014
Engineering Planner – Staff
Program Planning & Scheduling 4/2011 – 3/2014
• Provided integrated resource loaded schedules to a multibillion dollar program for planning, schedule
implementation, & execution in compliance with highly integrated earned value management (EVM) cost &
schedule control processes.
• I vertically & horizontally integrated task scheduling across functional groups & reported schedule status
weekly.
• Established & detail planned contractual WBS scope & schedule changes to the program Integrated Master
Schedule (IMS) maintaining contract cost & schedule baselines, performance status, & forecast estimates-
to-completion (ETC).
• Utilized Microsoft Project 2007 / 2010 for detailed planning & RTP for rolled up swim lanes summarization.
• Coordinated & assisted account managers in decomposing WBS contract Statement of Work (SOW) scope.
• Incorporated WBS Statement of Work (SOW) deliverables into actionable detailed schedule IMS tasks &
Program Performance Milestones (PPM) compliant to internal cost, schedule, & technical risk requirements.
• Utilized Integrated Master Plan (IMP) events, accomplishments & integrated IMS criteria for program
control.
• Inputted task level resources into the IMS establishing & maintaining the performance management
baseline (PMB).
• Utilized Critical Path Methodology (CPM) to identify the longest path(s), to identify, mitigate, & reduce
schedule delays, gain margin, & reduce overall program costs while mitigating technical risk.
• Processed IMS budget change requests (BCR) for new or changed budget baseline scope.
• Advised & facilitated Integrated Product Teams (IPT) & stakeholders on best practices managing program
schedules.
• Provided production control organization with ERP customer order demand dates & quantities.
• Aligned & established independent & dependent demands in SAP ERP Master Production Schedule (MPS)
of components, assemblies, & end-item deliverables using the capacity constrained IMS with & without
margin.
• Synchronized ERP component lead-time durations calibrated with IMS task-durations for ERP backward
planned BOM exploded component procurement delivery need dates, subassembly, & assembly delivery
need/due dates.
• I tracked & reported schedule plans, performed risk analysis, & identified/resolved critical path & network
logic conflicts.
• Updated monthly task level budget performance & ETC values, then rolled-up performance & ETC labor
hours to account totals for monthly budget (BCWS), performance (BCWP), & estimate-to-complete (ETC)
reporting & analysis.
• Utilized Gantt, PERT, milestone charts, earned value management & other management techniques to
gauge progress & identify performance variances to facilitate focus & intervention on critical areas.
• Ensured compliance with DCMA 14 Point schedule metrics standards & I met robust IMS health standards
compliance.
• Worked with the cost managers, leads, & finance analysts to identify root cause & corrective actions of
variances.
• Updated schedule status weekly & processed task performance metrics for monitoring, reporting, &
mitigating delays.
• Met all product delivery & reporting requirements & passed all audits during entire period of employment.
Subcontract Planning & Scheduling 6/2007 – 3/2011
• Supported program subcontract product managers in the supplier’s schedule development, build, test,
delivery, & then the vehicle integration of various satellite components used within the satellite vehicle
infrastructure.
• Coordinated the preparation, review, & approval of key supplier cost & schedule plans, IMS, for responsible
subcontract product deliveries meeting internal satellite cost, build, & test schedule requirements.
• Performed Integrated Baseline Reviews (IBR) with subcontract suppliers after contract negotiations to
ensure supplier schedule viability of on-time supplier product(s) delivery while mitigating technical, cost, &
schedule risks.
• Determined responsible subcontractor’s IMS health/robustness, monitored, & reviewed subcontractor’s
costs, operational budgets, variances, & manpower requirements & assisted subcontract managers
determine monthly supplier subcontract performance measurements, analysis, & corrective actions.
• Successfully met all customer Integrated Baseline Reviews & internal audit reviews.
• Granted access to SCI (Sensitive Classified Information) by the U.S. Government.
• Completion of a Single Scope Background Investigation (SSBI) & Successful completion of a gov’t
polygraph.
Raytheon Intelligence & Info. Solutions – NASA Ames Research Center, Moffett Field, CA 10/2005 – 2/2007
Principal Engineering Planner – Next Generation Air Transportation System & VAMS Study
• Provided programmatic schedule planning, schedule updates, & decision support project controls to the
NASA Ames Research team supporting research on the Next Generation Air Transportation System & to an
established project IMS on a 165 million dollar NASA Ames research project specific to managing
simulation research tasks & deliverables.
• Delivered multi-purpose project management simulation schedule models on a budgeted $335 million
NASA project.
• Fulfilled customer required multi-rollup structured views designed in Primavera Ver. 5.0 Project
Management software application & in MS Project 2003.
• Implemented the project WBS developed from the project proposal & from customer consultations in
schedule design.
• Produced monthly master summary milestone status extracts from the integrated Master Schedule for use
in other program presentations.
• Facilitated work sessions with project technical managers to estimate workforce requirements versus the
remaining baseline budget for estimate to completion (ETC) adjustments.
• Updated & reported critical path analyses & conducted meetings with project office, systems engineering &
technical managers to present & discuss the implications of the critical path analyses.
• Produced graphic representations of critical path networks, Gantt Charts, relationship diagrams, &
milestone status reports to brief other team members & senior management biweekly.
• Utilized a formalized Baseline Change Requests (BCR) process to manage & control the IMS baseline.
• Processed & reviewed results of the Integrated Master Schedule (IMS) Health Metrics analysis & performed
updates to the IMS network to reflect changes in work planned & to improve & maintain the IMS health.
• Utilized MS Project 2003 & customized Visio Network Logic Diagrams to maintain constant status &
analysis of the projects’ critical paths.
• Credited – 2006 NASA – Group Achievement Honor Award – System Level Integrated Concept
Development Team –National Airspace System – NASA Ames Research Center – Raytheon Information
Solutions team contributions.
Northrop Grumman (Formally known as Litton Guidance Systems) Woodland Hills, CA 8/2002-10/2004
Master Scheduling Integrator – Division Business Operations
• Created & managed resource constrained price costed schedules for software & hardware development
project scope.
• Produced Gantt chart reports, network diagrams, & miscellaneous schedule/resource reports on all
responsible projects for program control & earned value management using MS Project 2000, MPM cost
control application, & Artemis Project View applications.
• Developed R&D program schedules utilizing proposal Basis of Estimates (BOE) & approved customer
change orders in establishing & maintaining program budget baselines applying EVM methodology.
• Worked with engineers in setting up & executing schedule tasks & milestones for all contract deliverables.
• Assisted in WBS and Control Account creation & trace-back to approved proposals.
• Updated BCWS & BCWP on weekly & monthly basis & maintained all schedule activity resource data.
• Provided all associated schedule/resource change/update data to program finance analysis for updating all
respective cost data & models.
• Provided leadership in initiating individual & team schedule update meetings & coordinated with program
cost analyst focal point ensuring time fence status dates/periods & baseline versions were accurate.
• Guided program managers, Control Account Managers (CAM), & performing work package managers/leads
in WBS / OBS structure creation, roll-up summarization, Control Account / Work Package definitions /
groupings, & marrying methods in regards to collecting actual costs using time & materials cost collection
business systems/accounts.
SECURITY Clearances
Secret – Updated / Renewed February 2015 – Active
Secret – DoD (2011 – 2013)
TS/SCI – Top Secret / Sensitive Classified Information (2007 – 2011)
CERTIFICATIONS
MCP Microsoft Certified Professional – ID# 2614462
MCSE Microsoft Certified Systems Engineer
MCDBA Microsoft Certified Database Administrator – Microsoft SQL Server DBMS
U.S. Army – four years active duty – Honorable Discharge
Education - B.A. University of Oklahoma

More Related Content

What's hot

Price.rick
Price.rickPrice.rick
Price.rickNASAPMC
 
JAMES_MANNA_Revised_Resume (Paragon)v1
JAMES_MANNA_Revised_Resume (Paragon)v1JAMES_MANNA_Revised_Resume (Paragon)v1
JAMES_MANNA_Revised_Resume (Paragon)v1James Manna, MBA, PMP
 
What Programme do you need, when and why
What Programme do you need, when and whyWhat Programme do you need, when and why
What Programme do you need, when and whyDeclan Sherry
 
Schedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueSchedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueChris Carson
 
Use Of Schedule Logs 2012 Pmi Scop Conference
Use Of Schedule Logs   2012 Pmi Scop ConferenceUse Of Schedule Logs   2012 Pmi Scop Conference
Use Of Schedule Logs 2012 Pmi Scop ConferenceChris Carson
 
Buchanan Resume Deputy Program Manager -Oct 16
Buchanan Resume Deputy Program Manager -Oct 16Buchanan Resume Deputy Program Manager -Oct 16
Buchanan Resume Deputy Program Manager -Oct 16R. Bruce Buchanan
 
PMP-Schedule Management area
PMP-Schedule Management areaPMP-Schedule Management area
PMP-Schedule Management areaZaur Ahmadov, PMP
 
Dealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 MeetingDealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 MeetingChris Carson
 
CDS Construction Execution Process ^0 Strategy
CDS Construction Execution Process ^0 StrategyCDS Construction Execution Process ^0 Strategy
CDS Construction Execution Process ^0 StrategyRobert Doig
 
Calculating Physical Percent Complete on Agile Projects
Calculating Physical Percent Complete on Agile ProjectsCalculating Physical Percent Complete on Agile Projects
Calculating Physical Percent Complete on Agile ProjectsGlen Alleman
 
Building a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two DaysBuilding a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two DaysGlen Alleman
 
Danielle Parker CV February 2017
Danielle Parker CV February 2017Danielle Parker CV February 2017
Danielle Parker CV February 2017Danielle Parker
 
Schedule levels-as-presented 02-may11
Schedule levels-as-presented  02-may11Schedule levels-as-presented  02-may11
Schedule levels-as-presented 02-may11PMA Consultants
 
Project Management Professional (PMP) / 42 Processes
Project Management Professional (PMP) / 42 ProcessesProject Management Professional (PMP) / 42 Processes
Project Management Professional (PMP) / 42 Processesedtichy
 
Baseline Schedules 2
Baseline Schedules 2Baseline Schedules 2
Baseline Schedules 2Chris Carson
 
Use Of A Claims Triage Workshop To Choose An Analysis Method
Use Of A Claims Triage Workshop To Choose An Analysis MethodUse Of A Claims Triage Workshop To Choose An Analysis Method
Use Of A Claims Triage Workshop To Choose An Analysis MethodChris Carson
 
Schedule Design PMI
Schedule Design PMISchedule Design PMI
Schedule Design PMIChris Carson
 
U.s. air force probability of program success (po ps) spreadsheet operations ...
U.s. air force probability of program success (po ps) spreadsheet operations ...U.s. air force probability of program success (po ps) spreadsheet operations ...
U.s. air force probability of program success (po ps) spreadsheet operations ...FrancisYee1
 
WBS Compliance Challenges for Agile ERP Projects
WBS Compliance Challenges for Agile ERP ProjectsWBS Compliance Challenges for Agile ERP Projects
WBS Compliance Challenges for Agile ERP ProjectsGlen Alleman
 

What's hot (20)

Price.rick
Price.rickPrice.rick
Price.rick
 
JAMES_MANNA_Revised_Resume (Paragon)v1
JAMES_MANNA_Revised_Resume (Paragon)v1JAMES_MANNA_Revised_Resume (Paragon)v1
JAMES_MANNA_Revised_Resume (Paragon)v1
 
What Programme do you need, when and why
What Programme do you need, when and whyWhat Programme do you need, when and why
What Programme do you need, when and why
 
Mary anneaugustine it_projectmanager (1)
Mary anneaugustine it_projectmanager (1)Mary anneaugustine it_projectmanager (1)
Mary anneaugustine it_projectmanager (1)
 
Schedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueSchedule Recovery Using Earned Value
Schedule Recovery Using Earned Value
 
Use Of Schedule Logs 2012 Pmi Scop Conference
Use Of Schedule Logs   2012 Pmi Scop ConferenceUse Of Schedule Logs   2012 Pmi Scop Conference
Use Of Schedule Logs 2012 Pmi Scop Conference
 
Buchanan Resume Deputy Program Manager -Oct 16
Buchanan Resume Deputy Program Manager -Oct 16Buchanan Resume Deputy Program Manager -Oct 16
Buchanan Resume Deputy Program Manager -Oct 16
 
PMP-Schedule Management area
PMP-Schedule Management areaPMP-Schedule Management area
PMP-Schedule Management area
 
Dealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 MeetingDealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
 
CDS Construction Execution Process ^0 Strategy
CDS Construction Execution Process ^0 StrategyCDS Construction Execution Process ^0 Strategy
CDS Construction Execution Process ^0 Strategy
 
Calculating Physical Percent Complete on Agile Projects
Calculating Physical Percent Complete on Agile ProjectsCalculating Physical Percent Complete on Agile Projects
Calculating Physical Percent Complete on Agile Projects
 
Building a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two DaysBuilding a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two Days
 
Danielle Parker CV February 2017
Danielle Parker CV February 2017Danielle Parker CV February 2017
Danielle Parker CV February 2017
 
Schedule levels-as-presented 02-may11
Schedule levels-as-presented  02-may11Schedule levels-as-presented  02-may11
Schedule levels-as-presented 02-may11
 
Project Management Professional (PMP) / 42 Processes
Project Management Professional (PMP) / 42 ProcessesProject Management Professional (PMP) / 42 Processes
Project Management Professional (PMP) / 42 Processes
 
Baseline Schedules 2
Baseline Schedules 2Baseline Schedules 2
Baseline Schedules 2
 
Use Of A Claims Triage Workshop To Choose An Analysis Method
Use Of A Claims Triage Workshop To Choose An Analysis MethodUse Of A Claims Triage Workshop To Choose An Analysis Method
Use Of A Claims Triage Workshop To Choose An Analysis Method
 
Schedule Design PMI
Schedule Design PMISchedule Design PMI
Schedule Design PMI
 
U.s. air force probability of program success (po ps) spreadsheet operations ...
U.s. air force probability of program success (po ps) spreadsheet operations ...U.s. air force probability of program success (po ps) spreadsheet operations ...
U.s. air force probability of program success (po ps) spreadsheet operations ...
 
WBS Compliance Challenges for Agile ERP Projects
WBS Compliance Challenges for Agile ERP ProjectsWBS Compliance Challenges for Agile ERP Projects
WBS Compliance Challenges for Agile ERP Projects
 

Viewers also liked

.Vijay Kamboj-B.Tech., PGDBA_Delivery Head-IMS with 11.5Yrs Exp_ev8
.Vijay Kamboj-B.Tech., PGDBA_Delivery Head-IMS with 11.5Yrs Exp_ev8.Vijay Kamboj-B.Tech., PGDBA_Delivery Head-IMS with 11.5Yrs Exp_ev8
.Vijay Kamboj-B.Tech., PGDBA_Delivery Head-IMS with 11.5Yrs Exp_ev8Vijay Kamboj
 
Jollgin_SharePoint
Jollgin_SharePointJollgin_SharePoint
Jollgin_SharePointjollgin sam
 
David Reynolds Rev 01 2016
David Reynolds Rev 01 2016David Reynolds Rev 01 2016
David Reynolds Rev 01 2016David Reynolds
 
PHP Developer - 4 year exp
PHP Developer - 4 year expPHP Developer - 4 year exp
PHP Developer - 4 year expyogesh paghdal
 
pranayJ
pranayJpranayJ
pranayJPray B
 
Executive Summary
Executive SummaryExecutive Summary
Executive Summarysandeepiiht
 
Meinsen,David Final Resume
Meinsen,David Final ResumeMeinsen,David Final Resume
Meinsen,David Final ResumeDavid Meinsen
 
Resume - Rajendra Gunjal
Resume - Rajendra GunjalResume - Rajendra Gunjal
Resume - Rajendra GunjalRajendra gunjal
 

Viewers also liked (13)

.Vijay Kamboj-B.Tech., PGDBA_Delivery Head-IMS with 11.5Yrs Exp_ev8
.Vijay Kamboj-B.Tech., PGDBA_Delivery Head-IMS with 11.5Yrs Exp_ev8.Vijay Kamboj-B.Tech., PGDBA_Delivery Head-IMS with 11.5Yrs Exp_ev8
.Vijay Kamboj-B.Tech., PGDBA_Delivery Head-IMS with 11.5Yrs Exp_ev8
 
Jollgin_SharePoint
Jollgin_SharePointJollgin_SharePoint
Jollgin_SharePoint
 
David Reynolds Rev 01 2016
David Reynolds Rev 01 2016David Reynolds Rev 01 2016
David Reynolds Rev 01 2016
 
Yeahia Resume
Yeahia ResumeYeahia Resume
Yeahia Resume
 
CV_English_GalinaRubinshtein
CV_English_GalinaRubinshteinCV_English_GalinaRubinshtein
CV_English_GalinaRubinshtein
 
PHP Developer - 4 year exp
PHP Developer - 4 year expPHP Developer - 4 year exp
PHP Developer - 4 year exp
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
pranayJ
pranayJpranayJ
pranayJ
 
Executive Summary
Executive SummaryExecutive Summary
Executive Summary
 
Sumit resume
Sumit resumeSumit resume
Sumit resume
 
Meinsen,David Final Resume
Meinsen,David Final ResumeMeinsen,David Final Resume
Meinsen,David Final Resume
 
Sarath_Kumar_Prabhakaran_Graduate_Resume
Sarath_Kumar_Prabhakaran_Graduate_ResumeSarath_Kumar_Prabhakaran_Graduate_Resume
Sarath_Kumar_Prabhakaran_Graduate_Resume
 
Resume - Rajendra Gunjal
Resume - Rajendra GunjalResume - Rajendra Gunjal
Resume - Rajendra Gunjal
 

Similar to Resume_McColgin_Quentin_Master_Scheduling

Similar to Resume_McColgin_Quentin_Master_Scheduling (20)

OLA CV doc NRx (1)
OLA CV doc NRx (1)OLA CV doc NRx (1)
OLA CV doc NRx (1)
 
Mitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned ValueMitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned Value
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16
 
Project/Program Manager - Kjf13b1 chron
Project/Program Manager - Kjf13b1 chronProject/Program Manager - Kjf13b1 chron
Project/Program Manager - Kjf13b1 chron
 
Kjf13a1 chron
Kjf13a1 chronKjf13a1 chron
Kjf13a1 chron
 
Kjf13a1 chron
Kjf13a1 chronKjf13a1 chron
Kjf13a1 chron
 
Kjf12c2 Chron
Kjf12c2 ChronKjf12c2 Chron
Kjf12c2 Chron
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Danielle Gomm Resume
Danielle Gomm ResumeDanielle Gomm Resume
Danielle Gomm Resume
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - Latest
 
Kjf12b1 chron
Kjf12b1 chronKjf12b1 chron
Kjf12b1 chron
 
Kjf16d1 chron
Kjf16d1 chronKjf16d1 chron
Kjf16d1 chron
 
Kjf16d1 chron
Kjf16d1 chronKjf16d1 chron
Kjf16d1 chron
 
Kjf16d1 chron
Kjf16d1 chronKjf16d1 chron
Kjf16d1 chron
 
Alexander Joy Cartwright Iv Cpa V4
Alexander  Joy Cartwright Iv Cpa V4Alexander  Joy Cartwright Iv Cpa V4
Alexander Joy Cartwright Iv Cpa V4
 
Peter White CV
Peter White CV Peter White CV
Peter White CV
 
Kjf11a1 Chron
Kjf11a1 ChronKjf11a1 Chron
Kjf11a1 Chron
 
HIDAIPP
HIDAIPPHIDAIPP
HIDAIPP
 
ERP II Overview.ppt
ERP II Overview.pptERP II Overview.ppt
ERP II Overview.ppt
 

Resume_McColgin_Quentin_Master_Scheduling

  • 1. Quentin McColgin 310.699.1860 SECURITY Clearances Secret – Updated / Renewed February 2015 – TS/SCI – Top Secret / Sensitive Classified Information (2007 – 2011) WORK EXPERIENCE Raytheon – RMS (Raytheon Missile Systems) – Tucson, AZ 11/2014 – 03/2015 Contracted Services provider – Employed through – The Fountain Group, Tampa Bay, FL Program Planning & Scheduling • Provided ad-hoc contract services and advice to managers in-charge of and responsible for a high profile rapidly evolving program within Raytheon Missile Systems supporting Missile Defense Agency contracts. • Provided integrated resource loaded schedules to a multimillion dollar program for planning, schedule implementation, & execution in compliance with highly integrated earned value management (EVM) cost & schedule control processes. • Provided supplemental and what-if schedules for internally integrated program plans comprised of proposed ECRs supporting rapid customer needs and expectations while filling that gap between formalized FRPs and ATPs. • I vertically & horizontally integrated task scheduling across functional groups & reported schedule status weekly. • Utilized MS Project 2010 highly customized with RPM, (Raytheon Program Management), add-on utilities and reports. • Developed / reported contract delivery margin trends; utilized OPDEC Critical Path tools/reports & Milestone Pro. Lockheed Martin – SSC (Space Systems Company) – Sunnyvale, CA 6/2007 – 3/2014 Engineering Planner – Staff Program Planning & Scheduling 4/2011 – 3/2014 • Provided integrated resource loaded schedules to a multibillion dollar program for planning, schedule implementation, & execution in compliance with highly integrated earned value management (EVM) cost & schedule control processes. • I vertically & horizontally integrated task scheduling across functional groups & reported schedule status weekly. • Established & detail planned contractual WBS scope & schedule changes to the program Integrated Master Schedule (IMS) maintaining contract cost & schedule baselines, performance status, & forecast estimates- to-completion (ETC). • Utilized Microsoft Project 2007 / 2010 for detailed planning & RTP for rolled up swim lanes summarization. • Coordinated & assisted account managers in decomposing WBS contract Statement of Work (SOW) scope. • Incorporated WBS Statement of Work (SOW) deliverables into actionable detailed schedule IMS tasks & Program Performance Milestones (PPM) compliant to internal cost, schedule, & technical risk requirements. • Utilized Integrated Master Plan (IMP) events, accomplishments & integrated IMS criteria for program control. • Inputted task level resources into the IMS establishing & maintaining the performance management baseline (PMB). • Utilized Critical Path Methodology (CPM) to identify the longest path(s), to identify, mitigate, & reduce schedule delays, gain margin, & reduce overall program costs while mitigating technical risk. • Processed IMS budget change requests (BCR) for new or changed budget baseline scope. • Advised & facilitated Integrated Product Teams (IPT) & stakeholders on best practices managing program schedules. • Provided production control organization with ERP customer order demand dates & quantities. • Aligned & established independent & dependent demands in SAP ERP Master Production Schedule (MPS) of components, assemblies, & end-item deliverables using the capacity constrained IMS with & without margin. • Synchronized ERP component lead-time durations calibrated with IMS task-durations for ERP backward planned BOM exploded component procurement delivery need dates, subassembly, & assembly delivery need/due dates. • I tracked & reported schedule plans, performed risk analysis, & identified/resolved critical path & network logic conflicts. • Updated monthly task level budget performance & ETC values, then rolled-up performance & ETC labor hours to account totals for monthly budget (BCWS), performance (BCWP), & estimate-to-complete (ETC) reporting & analysis.
  • 2. • Utilized Gantt, PERT, milestone charts, earned value management & other management techniques to gauge progress & identify performance variances to facilitate focus & intervention on critical areas. • Ensured compliance with DCMA 14 Point schedule metrics standards & I met robust IMS health standards compliance. • Worked with the cost managers, leads, & finance analysts to identify root cause & corrective actions of variances. • Updated schedule status weekly & processed task performance metrics for monitoring, reporting, & mitigating delays. • Met all product delivery & reporting requirements & passed all audits during entire period of employment. Subcontract Planning & Scheduling 6/2007 – 3/2011 • Supported program subcontract product managers in the supplier’s schedule development, build, test, delivery, & then the vehicle integration of various satellite components used within the satellite vehicle infrastructure. • Coordinated the preparation, review, & approval of key supplier cost & schedule plans, IMS, for responsible subcontract product deliveries meeting internal satellite cost, build, & test schedule requirements. • Performed Integrated Baseline Reviews (IBR) with subcontract suppliers after contract negotiations to ensure supplier schedule viability of on-time supplier product(s) delivery while mitigating technical, cost, & schedule risks. • Determined responsible subcontractor’s IMS health/robustness, monitored, & reviewed subcontractor’s costs, operational budgets, variances, & manpower requirements & assisted subcontract managers determine monthly supplier subcontract performance measurements, analysis, & corrective actions. • Successfully met all customer Integrated Baseline Reviews & internal audit reviews. • Granted access to SCI (Sensitive Classified Information) by the U.S. Government. • Completion of a Single Scope Background Investigation (SSBI) & Successful completion of a gov’t polygraph. Raytheon Intelligence & Info. Solutions – NASA Ames Research Center, Moffett Field, CA 10/2005 – 2/2007 Principal Engineering Planner – Next Generation Air Transportation System & VAMS Study • Provided programmatic schedule planning, schedule updates, & decision support project controls to the NASA Ames Research team supporting research on the Next Generation Air Transportation System & to an established project IMS on a 165 million dollar NASA Ames research project specific to managing simulation research tasks & deliverables. • Delivered multi-purpose project management simulation schedule models on a budgeted $335 million NASA project. • Fulfilled customer required multi-rollup structured views designed in Primavera Ver. 5.0 Project Management software application & in MS Project 2003. • Implemented the project WBS developed from the project proposal & from customer consultations in schedule design. • Produced monthly master summary milestone status extracts from the integrated Master Schedule for use in other program presentations. • Facilitated work sessions with project technical managers to estimate workforce requirements versus the remaining baseline budget for estimate to completion (ETC) adjustments. • Updated & reported critical path analyses & conducted meetings with project office, systems engineering & technical managers to present & discuss the implications of the critical path analyses. • Produced graphic representations of critical path networks, Gantt Charts, relationship diagrams, & milestone status reports to brief other team members & senior management biweekly. • Utilized a formalized Baseline Change Requests (BCR) process to manage & control the IMS baseline. • Processed & reviewed results of the Integrated Master Schedule (IMS) Health Metrics analysis & performed updates to the IMS network to reflect changes in work planned & to improve & maintain the IMS health. • Utilized MS Project 2003 & customized Visio Network Logic Diagrams to maintain constant status & analysis of the projects’ critical paths. • Credited – 2006 NASA – Group Achievement Honor Award – System Level Integrated Concept Development Team –National Airspace System – NASA Ames Research Center – Raytheon Information Solutions team contributions. Northrop Grumman (Formally known as Litton Guidance Systems) Woodland Hills, CA 8/2002-10/2004 Master Scheduling Integrator – Division Business Operations • Created & managed resource constrained price costed schedules for software & hardware development project scope.
  • 3. • Produced Gantt chart reports, network diagrams, & miscellaneous schedule/resource reports on all responsible projects for program control & earned value management using MS Project 2000, MPM cost control application, & Artemis Project View applications. • Developed R&D program schedules utilizing proposal Basis of Estimates (BOE) & approved customer change orders in establishing & maintaining program budget baselines applying EVM methodology. • Worked with engineers in setting up & executing schedule tasks & milestones for all contract deliverables. • Assisted in WBS and Control Account creation & trace-back to approved proposals. • Updated BCWS & BCWP on weekly & monthly basis & maintained all schedule activity resource data. • Provided all associated schedule/resource change/update data to program finance analysis for updating all respective cost data & models. • Provided leadership in initiating individual & team schedule update meetings & coordinated with program cost analyst focal point ensuring time fence status dates/periods & baseline versions were accurate. • Guided program managers, Control Account Managers (CAM), & performing work package managers/leads in WBS / OBS structure creation, roll-up summarization, Control Account / Work Package definitions / groupings, & marrying methods in regards to collecting actual costs using time & materials cost collection business systems/accounts. SECURITY Clearances Secret – Updated / Renewed February 2015 – Active Secret – DoD (2011 – 2013) TS/SCI – Top Secret / Sensitive Classified Information (2007 – 2011) CERTIFICATIONS MCP Microsoft Certified Professional – ID# 2614462 MCSE Microsoft Certified Systems Engineer MCDBA Microsoft Certified Database Administrator – Microsoft SQL Server DBMS U.S. Army – four years active duty – Honorable Discharge Education - B.A. University of Oklahoma