RESUME/C.V:- VELPULA PULLAIAH
Mobile: +919913344110 & +918897187932 Email: pullaiah999@gmail.com
Mechanical Engineer/Process/Multi-discipline
Project Management / Installation & Commissioning/ Production, Operations & Maintenance /Service Operations
with lead organization.
OVER ALL EXPERIENCE:-
 14 years of rich experience with international exposure in Roads, MNC Mining &Infrastructure
Companies in Operations & Maintenance of Construction Plants & Machinery, Mining
Equipments, Heavy Erath moving Machinery, Water Supply & Sanitation projects and Material
handling equipments.
 Erection, commissioning, dismantling, operation & Maintenance of Crushing, Mineral processing,
Batching Plants, Mining Machinery, Laying D.I & UPVC pipes, Gen sets and Construction
Equipments related to Construction -Environment in various Organizations.
 Implemented cost saving and energy saving techniques/ measures and modifications to
achieve substantial reduction in O&M expenditures and work within the budget.
 On time Mobilization, Demobilization, Erection & Commissioning of P&M for establishing the
major Infrastructure projects as per schedule.
 Experience in application of RCFA (Root Cause Failure Analysis) to take corrective steps to avoid
costly premature repetitive failures.
 Experience in Preparation of Capital Equipment and Maintenance Budget, also controlling and
monitoring of Maintenance Costs v/s Budget.
 Contributing in the management process, working with in a multi-cultural environment and
identifying critical activities and advising corrective action to avoid Slippage.
 Planning, production including inventory management, Quality, Safety & Cost Control for
Minerals processing plants, Crushing & screening plants, Batching Plants And Construction
Machinery.
 Strong Computer skills, knowledge of ERP, Computer Managed Maintenance System, MS
-Office, MS Project, & Internet And Have Good communication & interpersonal skills adoptive.
 Familiarity with HSE standards & keen understand of ISO and OHSAS systems & procedures.
EDUCATIONAL QUALIFICATIONS:-
Education
Qualifications
Name of Institution University/ Board Percentag
e
Year of
Passin
g
B.E (Mechanical
Engineering)
Asian Institute of
Management and
Engineering in New Delhi.
AIME (Distance
Education)
65 % 2014
Diploma
(Electrical
Engineering)
S.V.Govt. Polytechnic
college,Triupathi,A.P.
SBTET, Andhra
Pradesh.
59% 2003
D.C.A
(Computers)
Pace
computers,Kavali,Nellore,
Andhra Pradesh.
National Computing
Council, India.
63% 2003
S.S.C Sai baba High School,
Kadapa, Andhra Pradesh.
Board of Secondary
Education
75% 1999
HANDS - ON EXPERIENCE
PLANTS HANDLED:-
 CRUSHER PLANTS (FIXED) :350TPH(Metso),320TPH(Metso),350TPH(Zenith),250TPH(Sandvik)
300 TPH (Lippmann), 250TPH (Propel), 200TPH (Sandvik) & 200TPH (puzzulona).
 CRUSHER PLANTS (MOBILE):350TPH (Power screen), 200TPH (Metso) and 200TPH(ASTEC).
 IMPACT CRUSHER: 400TPH (Lippmann), 300TPH (Metso) and 200TPH (ASTEC).
 BATCHING PLANTS :60 Cu.m3/hr (schwing setter),30 Cu.m3/hr (schwing setter),30 Cu.m3/hr
Greaves and 30 Cu.m3/hr (Macon).
 HOT MIX PLANTS: 200TPH (Praker) And 120 TPH (Apollo).
 WET MIX PLANTS: 200TPH (Gujrat Apollo) and 200TPH (Macon).
 SAND WASHING PLANTS: 300TPH (Metso) and 250TPH (Propel).
EQUIPMENTS HANDLED:-
 HYDRAULIC EXCAVATORS: L&T- Komatsu Model:PC-200 And HYUNDAI-R210.
 TRANSIT MIXERS : Schwing Stetter, Capacity : 6 Cu.m3, GREAVES: 6 Cu.m3
 TIPPERS: Tata & Ashok Leyland.
 CRANES: ACE, And Escort.
 GENERATORS : Mitsubishi -1250KVA,CAT- 500 KVA,250KVA and CUMMINS -380KVA,250KVA
 BACKHOE LOADERS: case - 770 and JCB -3D.
 SOIL COMPACTOR: case -1107.
 WHEEL LOADERS: CAT-950 and HMM -2021.
 DRILLING EQUIPMENTS: Ingersoll Rand: Water Well, LM-100.
 PAVERS: Apollo.
 JUNE-2016 TO TILL DATE: LARSEN & TOUBRO CONSTRUCTION LTD –CHEENAI, INDIA: MANAGER
(Quarrying & Crushing) The Special Bridge & Road Projects at varying sites, Installation, Commissioning,
Operation & maintenance of the Plants and Equipments. To attend trouble shootings, major repairs on Plants
and Equipments.
 MAY-2015 TO JUNE -2016:-AL-FATEH LEADING PROJECTS LLC -OMAN: Crusher Manager Development of
Installation & Commissioning Strategy (bases of planning, procedures and organization) for Crusher Plants
&Mining Equipments. Technical Support and Lead Foremen and Engineers.
 FEBUARY -2014 TO MAY -2015:-TECHNOFAB ENGINEERING LTD -NEW DELHI (Works on) TANZANIA (East
Africa): MANAGER (P&M) with Plant & Machinery Department. Development of Installation and
Commissioning Strategy (bases of planning, procedures and organization) for all Plants & Equipments.
Technical Support and Lead Engineers. On all heavy earth moving Equipments and Plants.
 SEPTMBER -2012 TO FEBUARY -2014 :-SUPRAS RESOURCES (TANZANIA) LTD TANZANIA (East Africa):
MANAGER (Production & Maintenance) on the Mining Projects at varying sites. Installation and Commissioning
of the Crusher Plants and Equipments. To attend trouble shootings and major repairs on crusher Plants and
equipments.
 FEBUARY -2011 TO SEPTMBER -2012 :- NAVYUG MINERALS & AGGREGATES LTD, HYDERABAD, India:
MANAGER (Plants &Machinery) on the Supplying of the Aggregates in Ultra Tech Installation and
Commissioning of the Crusher Plants and Equipments, To attend trouble shootings and major repairs on Crusher
Plants and equipments.
 JANAUARY -2005 TO FEBUARY -2011:- SOMA ENTERPRISE LTD, HYDERABAD, India: SENIOR ENGINEER and
ASSISTANT MANAGER on the Road Projects at varying States, Installation , Commissioning ,operation &
maintenance of the Crusher Plants and Equipment’s. To attend trouble shootings and major repairs on Crusher
Plants and equipment’s.
 APRIL -2003 TO JANAUARY -2005: K.N.R - PATEL ENGINEERING (JV) LTD, HYDERABAD, India: ENGINEER on the
Road Project at Andhra Pradesh, operation & maintenance of the Crusher Plants and Batching plant To attend
trouble shootings and maintenance on Crusher & Batching plants and Gen sets.
Experience Summary:-
LARSEN & TOUBRO CONSTRUCTION LTD, (Chennai, India.).
Period:-June -2016 to Till Date…
Project: Six Lining Road project including new four lanes Extra Dosed Cable Bridge.
Profile:-
Working as Manager (Quarrying & Crushing) in Larsen & Toubro Construction Ltd, Six lining and
strengthening of NH-8 from Vadodara KM (192) to Surat Section KM (198) Including Construction of new
four lane new Extra Dosed Cable Bridge across Narmada River in Bharuch District, Gujarat. Job profile
includes Erection, maintenance and operation of Crushing, Screening Plant 320 TPH metso stationary
crushing plant 200 TPH metso mobile plants related to National Highways Authority of India Road Projects
and report to General Manager.
The following machinery in that site:-
 C-106, C-110 Jaw crusher’s metso make.
 G.P-300, HP-200 Cone crusher’s metso make.
 B-6150SE, B-9100SE Barmac metso make.
 Crusher Protective Devices like (I.C-50, VOCS, and ACR).
 3412-DITA & 3406 DITA (750&250 KVA) Gen sets caterpillar makes.
 C.P-30 Batching plant schwing setter makes.
Responsibilities:-
 Plan, Organize and supervise of day to day production activities of crusher plant, quarry and heavy
equipments. Preparation of preventive maintenance schedule and follow up the execution of the same.
Preparation of maintenance history records of each machines and ensure the maintenance program is
as per the manufacturers recommendation. Operation Maintenance, Workshop Maintenance,
Maintenance of Heavy Earth Moving Equipments, Excavators, Loaders, Dumpers, Compressors,
Maintenance of rotating Equipments, Servicing of Crushing Plant Equipments, Preparation of Check lists,
Operation Maintenance of Crushing, Screening Plants.
 Over all in-charge for administration and operation & maintenance of the crushing aggregate and
concrete production Division, over all supervision & control of production, delivery of Aggregates,
concrete as project required, Monitor the sufficiency, availability and quality of Raw materials to meet the
daily requirements.
 Planning and developing preventive and predictive maintenance programs, Budget formulation and
planning of norms. Spare parts planning and Inventory Management, Breakdown analysis, cost control
programs and Monitoring.
 Maintaining good health of all Plants and equipments without loss of Production. Planning & mobilization
of plant and machinery as per the project’s requirements.
 Attending co-operative (project), internal &monthly meetings, to motivate the Technical staff & Shift-
Engineers to achieve the production target
 Contributing in the management process, working with in a multi-cultural environment rand identifying
critical activities and advising corrective action to avoid Slippage.
AL-FATEH LEADING PROJECTS LLC.(Dhank & Khasab in OMAN)
Period : May-2015 To June -2016.
Project: Its Mining projects of Limestone and Gabbro.
Profile:-
Worked as Crusher Manager in AL- FATEH LEADING PROJECTS LLC, for the Lime stone & Gabbro
projects at Dhank & Khasab sites in Oman. Job profile includes Planning Erection Commissioning,
Operation And maintenance of Minerals processing Plants combination of 400 TPH Lippmann mobile
crushing plant, 300 TPH Power screen mobile plants and report to Project Manager.
The following machinery in that site:-
 36 X 50 Jaw crusher makes Lippmann.
 LLH 5196 LS Impact Crusher makes Lippmann.
 XA-400S Track mounted Jaw crusher makes Power screen.
 XH-500 Track Mounted Impact Crusher makes power screen.
 Warrior 1800 Track Mounted Double deck Screen makes power screen.
 PTSC-2618 Three deck Screen makes ASTEC.
 Warrior 1500 Track Mounted Three Deck Screen.
 500 KVA & 250 KVA Generators makes Caterpillar.
Responsibilities.
 As Manager carrying out study of drawings monitoring developments and timely erection &
commissioning, re commissioning of mobile & fixed crusher plants, with equipments like Jaw Crushers,
Cone Crushers, Vertical shaft Impact Crushers, Feeders, Vibrating Screens, Conveyors, Gen sets And
Maintenance of Heavy Earth Moving Equipments like Excavators, Loaders Compressors, Dumpers etc…
 Plan, Organize and supervise of day to day production activities of crusher plant, quarry and heavy
equipments. Preparation of preventive maintenance schedule and follow up the execution of the same.
Preparation of maintenance history records of each machines and ensure the maintenance program is
as per the manufacturers recommendation. Operation, Maintenance of Heavy Earth Moving Equipments,
Excavators, Loaders, Dumpers, Compressors, Maintenance of rotating Equipments, Servicing of Crushing
Plant Equipments, and Preparation of Check lists, Operation Maintenance of Crushing, Screening Plants.
 Planning and developing preventive and predictive maintenance programs, Budget formulation and
planning of norms. Spare parts planning and Inventory Management, Breakdown analysis, cost control
programs and Monitoring.
 I am responsible for the smooth running of plants, troubleshooting of problems in plants, planning and
execution of minor & major repairs to minimize down time and shutting down of plants. This also involves
solving problems include in the plants & quarries surroundings.
 Maintaining good health of all Plants and equipments without loss of Production. Planning & mobilization
of plant and machinery as per the project’s requirements.
Techno Fab Engineering Limited (Sumbawanga & Bukoba in Tanzania at East Africa).
Period: - February-2014 to May -2015.
Project: D.I & UPVC Pipes laying for Water supply and Sanitation projects.
Profile:-
Worked as Manager (Plants & Machinery) in Techno Fab Engineering Ltd, for the Water supply and
Sanitation projects at Sumbawanga & Bukoba Sites in Tanzania at East Africa. Operations & Maintenance
of Construction Plants & Machinery, Laying of D.I pipes and report to Project Manager.
The following machinery in that site:-
 C-106 Jaw crusher’s metso make.
 G.P-11F Cone crusher’s metso make.
 B-7150SE Barmac metso make.
 C.P-30 & C.P-90 Cum3 Batching Plants Schwing Setter makes.
 Excavators: Make: L&T- Komatsu Model: PC-200 And Make: HYUNDAI-R210.
 TRANSIT MIXERS : Schwing Stetter, Capacity : 6 Cu.m3, GREAVES: 6 Cu.m3
 BACKHOE LOADERS: case - 770and JCB -3D.
 3412-DITA & 3406 DITA (500 &250 KVA) Gen sets caterpillar make.
 SOIL COMPACTOR: case -1107.
 CRANES: ACE -14 tons, And Escort.
Responsibilities:-
 Operation & Maintenance of 200 METSO crushing and Screening Plant, 30, 60 cum/Hr Concrete Batching
Plants (Swing Setter, Greaves), 500 KVA Gen sets (Caterpillar), Construction Machinery, 450& 350mm D.I &
UPVC pipes Laying.
 Over all in-charge for administration and operation & maintenance of the crushing aggregate and
concrete production Division, over all supervision & control of production, delivery of Aggregates,
concrete as project required, Monitor the sufficiency, availability and quality of Raw materials to meet the
daily requirements.
 Preventive and Breakdown Maintenance of Entire fleet of Equipments like Plants, Crushing, Batching,
Transit Mixers, Concrete pumps, Vibratory Earth Compactors, Excavators, Wheel loaders, Hydraulic Crane,
Trippers, Pressure test machines, Transformers & Heavy Genets.
 Planning and developing preventive and predictive maintenance programs, Budget formulation and
planning of norms. Spare parts planning and Inventory Management, Breakdown analysis, cost control
programs and Monitoring.
 Maintaining good health of all Plants and equipments without loss of Production. Planning & mobilization
of plant and machinery as per the project’s requirements.
 Preparing daily / weekly action plan for functioning / maintenance of P & M with close co-ordination
with Project Head & Other Key Civil Personnel.
 Rendering technical guidance to the staff, Shift management activities, appraising the member’s
performance providing feedback
SUPRAS RESOURCES (TANAZINA) LIMITED. (Kibaha, in Tanzania at East Africa)
Period: -September -2012 to February -2014.
Project: Its Copper ore Project and Minerals Processing Unit.
Profile:-
Worked as Manager (Production &maintenance) in Supras Resources (TZ) Ltd, for the Copper ore
project at Kibaha site (40 Kms Away from Dar Es Salaam) in Tanzania at East Africa. Job profile includes
Erection, maintenance and operation of Minerals processing Plants combination of 200 TPH Metso mobile
crushing plant, 120 TPH SBM mobile plants and report to General Manager.
The following machinery in that site:-
 PE 250 X 400 Jaw crusher SBM makes.
 PE 250 X1200 Jaw crusher SBM make.
 C-106 jaw crusher metso make.
 GP-11F Cone crusher metso make.
 B-7150 Bramac metso make.
 200 TPH Crushing & Screening Plant Make: Propel.
 C.P-30 Batching plant schwing setter makes.
 3406 DITA (250 KVA) Gen sets caterpillar make & 500 KVA Transformers Maintenance.
 Construction Earth moving Equipments.
Responsibilities:-
 Plan, Organize and supervise of day to day production activities of crusher plant, Substation and heavy
equipments. Preparation of preventive maintenance schedule and follow up the execution of the same.
Preparation of maintenance history records of each machines and ensure the maintenance program is
as per the manufacturers recommendation. Operation Maintenance of Crusher plant, Workshop
Maintenance, Maintenance of Transformers& Gen sets, construction Equipments like Excavators,
Dumpers, Compressors, Maintenance of rotating Equipments, Servicing of Crushing Plant Equipments,
Preparation of Check lists, Operation Maintenance of Crushing, mineral processing Plants.
 As Manager carrying out study of drawings monitoring developments and timely erection &
commissioning, re commissioning of mobile & fixed crusher plants, with equipments like Jaw Crushers,
Cone Crushers, Feeders, Vibrating Screens, Conveyors, Gen sets And Maintenance of Substations,
Transfomers, Electrical Equipments And Mines etc…
 I am responsible for the smooth running of plants, troubleshooting of problems in plants& Substations
planning and execution of minor & major repairs to minimize down time and shutting down of plants. This
also involves solving problems include in the plants & quarries surroundings.
 Planning and developing preventive and predictive maintenance programs, Budget formulation and
planning of norms. Spare parts planning and Inventory Management, Breakdown analysis, cost control
programs and Monitoring.
 Rendering technical guidance to the staff, Shift management activities, appraising the member’s
performance providing feedback.
Navyug minerals & Aggregates Ltd (Hyderabad & Vizag in A.P).
Period: -February -2011 to September -2012.
Project: Commercial Crusher plants supplying Aggregates of Ultra tech Ltd (RMC).
Profile:-
Worked as Manager (P &M) in Navyug minerals & Aggregates Ltd, for the supplying of the
Aggregates in Ultra tech Ltd (RMC) at Hyderabad and Vizag sites in Andhra Pradesh, India. Job profile
includes Erection, maintenance and operation of Crushing & Screening Plants combination of320 TPH
Metso stationary crushing plant, 200 TPH metso mobile plants and of 30 Cum3 Schwing setter batching
plant and report to General Manager and Director.
The following machinery in that site:-
 C-106, C-110 Jaw crusher’s metso make.
 G.P-300, G.P-11F Cone crusher’s metso make.
 B-7150SE, B-9100SE Barmac metso make.
 3412-DITA & 3406 DITA (500 &250 KVA) Gen sets caterpillar make.
 G.P-30 DG AMF Control panel auto synchronizing & auto load sharing.
 C.P-30& M-1 Batching plants Schwing setter makes.
 Construction Earth moving Equipments.
Responsibilities:-
 As Manager carrying out study of drawings monitoring developments and timely erection &
commissioning, re commissioning of mobile & fixed crusher plants, with equipments like Jaw Crushers,
Cone Crushers, Vertical shaft Impact Crushers, Feeders, Vibrating Screens, Conveyors, Batching plants,
Gen sets And Maintenance of Heavy Earth Moving Equipments like Excavators, Loaders Compressors,
Dumpers etc…
 Planning and developing preventive and predictive maintenance programs, Budget formulation and
planning of norms. Spare parts planning and Inventory Management, Breakdown analysis, cost control
programs and Monitoring.
 I am responsible for the smooth running of plants, troubleshooting of problems in plants, planning and
execution of minor & major repairs to minimize down time and shutting down of plants. This also involves
solving problems include in the plants & quarries surroundings.
 Contributing in the management process, working with in a multi-cultural environment and identifying
Critical activities and advising corrective action to avoid Slippage.
 Rendering technical guidance to the staff, Shift management activities, appraising the member’s
performance providing feedback.
 Attending co-operative (project), internal &monthly meetings, to motivate the Technical staff & Shift-
Engineers to achieve the production target.
Soma Enterprise Ltd, (Haryana & Punjab States in India).
Period: July-2009 to Febuary-2011 (Transfer from Udaipur in Rajasthan).
Project: Six lining and Strengthening of N.H-1 Road Project, From Panipat to Jalandhar.
Profile:-
Worked as an Assistant Manager in Soma Enterprise Ltd., Six lining and strengthening of NH-1
from panipat KM (96+000) to Jalandhar KM (387+100) in Ropar District, Punjab. Job profile includes
Erection, maintenance and operation of Crushing , Screening & Washing Plants combination of 350 TPH
Metso stationary crushing plant with support 700TPH metso Screening and 200 TPH metso mobile plant
with support of 400 TPH metso screening plant related to National Highways Authority of India Road
Projects; Territory covers the Panipat-Jaladhar and report to Assistant General Manager.
The following machinery in that site:-
 C-105, C-110 Jaw crusher’s metso make.
 G.P-300, G.P-11F Cone crusher’s metso make.
 B-7150SE, B-9100SE Barmac metso make.
 Crusher Protective Devices like (I.C-50, VOCS, and ACR).
 3412-DITA & 3406 DITA (500 &250 KVA) Gen sets caterpillar make.
 G.P-30 DG AMF Control panel auto synchronizing & auto load sharing.
 400TPH & 700 TPH Washing & Screening plants metso make.
 SF-2975 Sand trap (sand washing) metso make.
Responsibilities:-
 Plan, Organize and supervise of day to day production activities of crusher plant, quarry and heavy
equipments. Preparation of preventive maintenance schedule and follow up the execution of the same.
Preparation of maintenance history records of each machines and ensure the maintenance program is
as per the manufacturers recommendation. Operation Maintenance, Workshop Maintenance,
Maintenance of Heavy Earth Moving Equipments, Excavators, Loaders, Dumpers, Compressors,
Maintenance of rotating Equipments, Servicing of Crushing Plant Equipments, Preparation of Check lists,
Operation Maintenance of Crushing, Screening Plants.
 Planning and developing preventive and predictive maintenance programs, Budget formulation and
planning of norms. Spare parts planning and Inventory Management, Breakdown analysis, cost control
programs and Monitoring.
 I am responsible for the smooth running of plants, troubleshooting of problems in plants, planning and
execution of minor & major repairs to minimize down time and shutting down of plants. This also involves
solving problems include in the plants & quarries surroundings.
 Contributing in the management process, working with in a multi-cultural environment and identifying
Critical activities and advising corrective action to avoid Slippage.
Soma Enterprise Ltd, (Udaipur, Rajasthan in India).
Period:-May 2006 to July 2009 (Transfer From Probandar, Gujarat)
Project: Four Lining and Strengthening of R.J-2 & R.J-6 (N.H-76) Road projects.
Profile:-
Worked as Sr.Engineer, in four lining and strengthening of National Highway Project from Bekaria KM
(29+00) to Gogunda KM (73+00) on R.J-2 & R.J-6 road project NH-76 in Udaipur & Chitradurga district In
Rajasthan. The job profile includes Erection, maintenance, operation and dismantling of 200 & 320 TPH
Metso mobile Crusher Plants, 200TPH Sandvik stationery crusher plant and 160 TPH wet mix plant and
Quarry Implementation & Maintenance, report to Sr.Manager.
The following machinery in that site:-
 C-105, C-110 Jaw crusher’s metso makes.
 G.P-300, G.P-11F Cone crusher’s metso makes
 B-7150SE, B-9100SE Barmac metso makes.
 RM-1107 Jaw crusher sandvik makes.
 S-3800, H-3000 Cone crusher sandvik makes.
 T8R VSI sadvela makes.
Responsibilities:
 As an Senior Engineer responsible for supervising for various divisions like; Spares Requirement for Plants,
D.G Maintenance, Production Cost Estimation towards the Input/output, HSD Consumption, and close
Monitoring of 2 productions shifts team consisting of 20 personnel each, whom are Foremen’s, Senior
Electricians, Senior Welders, Fitters, operators, helpers and Data entry operators. Internal designation is
Rock Processing Division in-charge and reporting to Senior Manager (Plants & Machinery).
 Rendering technical guidance to the staff, Shift management activities, appraising the member’s
performance providing feedback.
 I have been carrying out study of drawings monitoring developments and timely erection &
commissioning, re commissioning of mobile & stationary crusher plants, Batching plants in totality as per
the requirement of project authority and that fullest satisfaction of my superiors.
 Knowledge for Plant operations, Fabrication & Erection Contractors for plants Erections problem solving
activities, Subcontractor performance for Drilling, Blasting, and Loading & Transportation as per the
project requirements.
Soma Enterprise Ltd, (Probandar, Gujarat in India).
Period:-January-2005 to May 2006.
Project : Four Lining And Strengthening of N.H-8B Road Project
Profile:-
Worked as an Electrical Engineer, in four lining and strengthening of National Highway Project from
Bhalid KM (42+00) to probandar KM (1.00+00) on road project NH-8B in probandar district Gujarat. The
job profile includes maintenance and operation of 200 TPH Metso mobile Crusher Plants, Batching plant
and 160 TPH wet mix plant and Operation Implementation & Maintenance, report to Project- Manager.
The following machinery in that site:-
 C-105, G.P-11F Jaw ,Cone & B-7150 SE Barmac metso makes.
 160 TPH Hot mix plant Parker makes.
 C.P-30 Batching plant schwing setter makes.
 3412 Gen sets (250 KVA) caterpillar makes.
Responsibilities:-
 Making the Control circuits of induction motors, cable laying & earthing of Barmac, Cone&Jaw motors.
 Commissioning of 250&500 KVA DG Sets Cable laying and earthing, Operation and Auto synchronizing.
 Commissioning Operation of vibrating feeders, ACR, VOCS, and Hydraulic lifting Pump Automatic
greasing System of the Barmac (B9100SE VSI).
 Operating of the A2020, IC50 of Cone Crushers (GP300EC).
 Knowledge for the A.C Motors, frequency converters (ABB).
K.N.R-PATEL ENGINEERING (JV) Ltd, (Nellore, Andhra Pradesh in India).
Period:-April-2003 to January-2005.
Project : Four Lining And Strengthening of N.H-5 Road Project.
Profile:-
Worked as Electrical Engineer, in four lining and strengthening of National Highway Project from
Nellore KM (78+00) to Kavali KM (138+00) on road project N.H-5 in Nellore district Andhra Pradesh. The job
profile includes maintenance and operation of 160 TPH puzzlolana Crusher Plant and Batching plant and
Operation Implementation & Maintenance, report to Deputy-manger.
The following machinery in that site:-
 160 TPH crushing & Screening plant Puzzoulna makes
 C.P-30 Batching plant schwing setter makes.
 120 TPH Wet mix plant Gujarat Apollo makes.
Responsibilities:-
 Regular maintenance of the Electrical panels.
 Checking for the regular maintenance of the generators
 Checking for the generators log books.
 Checking of Fuel consumption for 500 KVA Gen sets.
Achievements:-
Joined as a Electrical Engineer and Promoted as Senior Engineer to Look after a members team of 45 of
various Plants related crucial role playing professionals at Soma Enterprise Ltd., Udaipur, Rajasthan.
Trainings & Seminars:-
1. One day training attending the in metso minerals in Udaipur for the preventive & periodical maintenance
for the fixed & mobile crushers.
2. One day Caterpillar training attending the in Caterpillar Gen sets in hosur (Karnataka) for the General
Maintenance of the Engine & Alternator, overhaul of gen set.
PERSONAL DETAILS:-
• NAME : VELPULA.PULLAIAH.
• FATHER NAME : VELPULA. KONDAIAH.
• DATE OF BIRTH : 02-06-1984
• MARITAL STATUS : MARRIED.
• NATIONALALITY : INDIAN
• LANGUAGES KNOW: TELUGU, HINDI, ENGLISH, URDU, KANADA and SWAHILI.
• HOBBIES : READING BOOKS, PLAYING GAMES & WATCHING T.V.
OTHER DETAILS:-
 Operating systems : windows/Vista/XP/2000/98, Internet.
 Application Package : MS- Office.
 Passport No : M7360371 (Valid Up to March-2025)
Address of Correspondences: C/O. B.Nageswara Rao,
Door. No- 42/347,177,
Simhapuri colony,
4th
Road, near sai baba Temple,
Kadapa - (Dist),
Andhra Pradesh,
India.
Mail I.D : Pullaiah.velpula@rediffmail.com.
Pullaiah999@gmail.com.
Contact Mobile No : +919913344110 & +918897187932.
SKY PE I.D : Pullaiah .velpula
(VELPULA PULLAIAH)

More Related Content

What's hot

Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisorshaikh haroon
 
Project Manager CV -Rev
Project Manager CV -RevProject Manager CV -Rev
Project Manager CV -RevThanki M.L
 
emf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manageremf CV MEP Project-Construction Manager
emf CV MEP Project-Construction ManagerEdwardo Figuracion
 
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)Rajeev Kumar
 
Curriculum vitae contractor civil engineer -
Curriculum vitae contractor   civil engineer - Curriculum vitae contractor   civil engineer -
Curriculum vitae contractor civil engineer - Amir Mohammed
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSOHAIL SHAH
 
Senior Mechanical Engineer (Maintenance).
Senior Mechanical Engineer (Maintenance).Senior Mechanical Engineer (Maintenance).
Senior Mechanical Engineer (Maintenance).Dipak Kumar Banerjee
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikMOHAMAD ANWAR MALIK
 
Amir Khurshid HSE Officer
Amir Khurshid HSE OfficerAmir Khurshid HSE Officer
Amir Khurshid HSE OfficerAmir Khurshid
 
Mohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) Mudassir Nazar Dabilkar
 
Piping engineer cv
Piping engineer cvPiping engineer cv
Piping engineer cvMuhammad Ali
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)MOHAMMED ASLAM SHAREEF
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Sarim Mujtaba
 
Banesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBanesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBaneshwar Pai
 

What's hot (20)

Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisor
 
Project Manager CV -Rev
Project Manager CV -RevProject Manager CV -Rev
Project Manager CV -Rev
 
emf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manageremf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manager
 
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
 
Curriculum vitae contractor civil engineer -
Curriculum vitae contractor   civil engineer - Curriculum vitae contractor   civil engineer -
Curriculum vitae contractor civil engineer -
 
Anish's CV
Anish's CV Anish's CV
Anish's CV
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Senior Mechanical Engineer (Maintenance).
Senior Mechanical Engineer (Maintenance).Senior Mechanical Engineer (Maintenance).
Senior Mechanical Engineer (Maintenance).
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
Amir Khurshid HSE Officer
Amir Khurshid HSE OfficerAmir Khurshid HSE Officer
Amir Khurshid HSE Officer
 
CV_Sukumar
CV_SukumarCV_Sukumar
CV_Sukumar
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Mohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CV
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
 
Piping engineer cv
Piping engineer cvPiping engineer cv
Piping engineer cv
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
 
Banesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBanesh Pai _ MEP Engineer
Banesh Pai _ MEP Engineer
 

Viewers also liked

Централизация потокового ввода банковских документов и создание электронных а...
Централизация потокового ввода банковских документов и создание электронных а...Централизация потокового ввода банковских документов и создание электронных а...
Централизация потокового ввода банковских документов и создание электронных а...IT Group
 
Top ten Tips For A Newsletter
Top ten Tips For A NewsletterTop ten Tips For A Newsletter
Top ten Tips For A Newsletterkaikai200
 
Counsellor: An Android App for Career Guidance
Counsellor: An Android App for Career GuidanceCounsellor: An Android App for Career Guidance
Counsellor: An Android App for Career GuidanceDevanshi Desai
 
Presentación final integración
Presentación final integraciónPresentación final integración
Presentación final integraciónsusana1912
 
Member Acquisition Proposal
Member Acquisition ProposalMember Acquisition Proposal
Member Acquisition ProposalJared O'Connor
 
App Marketing at International Scale
App Marketing at International ScaleApp Marketing at International Scale
App Marketing at International ScaleFilippo Gallignani
 
Media technology
Media technologyMedia technology
Media technologythompsonl15
 

Viewers also liked (9)

Централизация потокового ввода банковских документов и создание электронных а...
Централизация потокового ввода банковских документов и создание электронных а...Централизация потокового ввода банковских документов и создание электронных а...
Централизация потокового ввода банковских документов и создание электронных а...
 
HAG Resume 2016
HAG Resume 2016HAG Resume 2016
HAG Resume 2016
 
Top ten Tips For A Newsletter
Top ten Tips For A NewsletterTop ten Tips For A Newsletter
Top ten Tips For A Newsletter
 
Counsellor: An Android App for Career Guidance
Counsellor: An Android App for Career GuidanceCounsellor: An Android App for Career Guidance
Counsellor: An Android App for Career Guidance
 
Disney casestudy
Disney casestudyDisney casestudy
Disney casestudy
 
Presentación final integración
Presentación final integraciónPresentación final integración
Presentación final integración
 
Member Acquisition Proposal
Member Acquisition ProposalMember Acquisition Proposal
Member Acquisition Proposal
 
App Marketing at International Scale
App Marketing at International ScaleApp Marketing at International Scale
App Marketing at International Scale
 
Media technology
Media technologyMedia technology
Media technology
 

Similar to RESUME

Similar to RESUME (20)

road overseas updated 06.06.2016
road overseas updated 06.06.2016road overseas updated 06.06.2016
road overseas updated 06.06.2016
 
Avtar_singh CV 2016
Avtar_singh  CV 2016Avtar_singh  CV 2016
Avtar_singh CV 2016
 
Engr,imran cv.cement.
Engr,imran cv.cement.Engr,imran cv.cement.
Engr,imran cv.cement.
 
Resume(1)
Resume(1)Resume(1)
Resume(1)
 
Resume Pradeep Kumar (1) .
Resume Pradeep Kumar (1) .Resume Pradeep Kumar (1) .
Resume Pradeep Kumar (1) .
 
SuryaMohan_Resume_2015
SuryaMohan_Resume_2015SuryaMohan_Resume_2015
SuryaMohan_Resume_2015
 
Harsimar CV
Harsimar CVHarsimar CV
Harsimar CV
 
CV Abhishek Singh Gautam 1
CV Abhishek Singh Gautam 1CV Abhishek Singh Gautam 1
CV Abhishek Singh Gautam 1
 
Joseph A K Effah Resume -rev2
Joseph A K Effah Resume -rev2Joseph A K Effah Resume -rev2
Joseph A K Effah Resume -rev2
 
KANU STEPHEN CHINAZA cv
KANU STEPHEN CHINAZA cvKANU STEPHEN CHINAZA cv
KANU STEPHEN CHINAZA cv
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last update
 
CURRICULUM VITAE ADAMA
CURRICULUM VITAE ADAMA CURRICULUM VITAE ADAMA
CURRICULUM VITAE ADAMA
 
resume
resumeresume
resume
 
Umesh_BE_mechanical with experience in metal industry project,operation & mai...
Umesh_BE_mechanical with experience in metal industry project,operation & mai...Umesh_BE_mechanical with experience in metal industry project,operation & mai...
Umesh_BE_mechanical with experience in metal industry project,operation & mai...
 
MKPP
MKPPMKPP
MKPP
 
M.Kamran Resume
M.Kamran ResumeM.Kamran Resume
M.Kamran Resume
 
Resume_Deopura
Resume_DeopuraResume_Deopura
Resume_Deopura
 
SuryaMohan_Resume_2016
SuryaMohan_Resume_2016SuryaMohan_Resume_2016
SuryaMohan_Resume_2016
 
tausif alam resume
tausif alam resumetausif alam resume
tausif alam resume
 
Ghufran Resume 2015 a
Ghufran Resume 2015 aGhufran Resume 2015 a
Ghufran Resume 2015 a
 

RESUME

  • 1. RESUME/C.V:- VELPULA PULLAIAH Mobile: +919913344110 & +918897187932 Email: pullaiah999@gmail.com Mechanical Engineer/Process/Multi-discipline Project Management / Installation & Commissioning/ Production, Operations & Maintenance /Service Operations with lead organization. OVER ALL EXPERIENCE:-  14 years of rich experience with international exposure in Roads, MNC Mining &Infrastructure Companies in Operations & Maintenance of Construction Plants & Machinery, Mining Equipments, Heavy Erath moving Machinery, Water Supply & Sanitation projects and Material handling equipments.  Erection, commissioning, dismantling, operation & Maintenance of Crushing, Mineral processing, Batching Plants, Mining Machinery, Laying D.I & UPVC pipes, Gen sets and Construction Equipments related to Construction -Environment in various Organizations.  Implemented cost saving and energy saving techniques/ measures and modifications to achieve substantial reduction in O&M expenditures and work within the budget.  On time Mobilization, Demobilization, Erection & Commissioning of P&M for establishing the major Infrastructure projects as per schedule.  Experience in application of RCFA (Root Cause Failure Analysis) to take corrective steps to avoid costly premature repetitive failures.  Experience in Preparation of Capital Equipment and Maintenance Budget, also controlling and monitoring of Maintenance Costs v/s Budget.  Contributing in the management process, working with in a multi-cultural environment and identifying critical activities and advising corrective action to avoid Slippage.  Planning, production including inventory management, Quality, Safety & Cost Control for Minerals processing plants, Crushing & screening plants, Batching Plants And Construction Machinery.  Strong Computer skills, knowledge of ERP, Computer Managed Maintenance System, MS -Office, MS Project, & Internet And Have Good communication & interpersonal skills adoptive.  Familiarity with HSE standards & keen understand of ISO and OHSAS systems & procedures.
  • 2. EDUCATIONAL QUALIFICATIONS:- Education Qualifications Name of Institution University/ Board Percentag e Year of Passin g B.E (Mechanical Engineering) Asian Institute of Management and Engineering in New Delhi. AIME (Distance Education) 65 % 2014 Diploma (Electrical Engineering) S.V.Govt. Polytechnic college,Triupathi,A.P. SBTET, Andhra Pradesh. 59% 2003 D.C.A (Computers) Pace computers,Kavali,Nellore, Andhra Pradesh. National Computing Council, India. 63% 2003 S.S.C Sai baba High School, Kadapa, Andhra Pradesh. Board of Secondary Education 75% 1999 HANDS - ON EXPERIENCE PLANTS HANDLED:-  CRUSHER PLANTS (FIXED) :350TPH(Metso),320TPH(Metso),350TPH(Zenith),250TPH(Sandvik) 300 TPH (Lippmann), 250TPH (Propel), 200TPH (Sandvik) & 200TPH (puzzulona).  CRUSHER PLANTS (MOBILE):350TPH (Power screen), 200TPH (Metso) and 200TPH(ASTEC).  IMPACT CRUSHER: 400TPH (Lippmann), 300TPH (Metso) and 200TPH (ASTEC).  BATCHING PLANTS :60 Cu.m3/hr (schwing setter),30 Cu.m3/hr (schwing setter),30 Cu.m3/hr Greaves and 30 Cu.m3/hr (Macon).  HOT MIX PLANTS: 200TPH (Praker) And 120 TPH (Apollo).  WET MIX PLANTS: 200TPH (Gujrat Apollo) and 200TPH (Macon).  SAND WASHING PLANTS: 300TPH (Metso) and 250TPH (Propel). EQUIPMENTS HANDLED:-  HYDRAULIC EXCAVATORS: L&T- Komatsu Model:PC-200 And HYUNDAI-R210.  TRANSIT MIXERS : Schwing Stetter, Capacity : 6 Cu.m3, GREAVES: 6 Cu.m3  TIPPERS: Tata & Ashok Leyland.  CRANES: ACE, And Escort.  GENERATORS : Mitsubishi -1250KVA,CAT- 500 KVA,250KVA and CUMMINS -380KVA,250KVA  BACKHOE LOADERS: case - 770 and JCB -3D.  SOIL COMPACTOR: case -1107.  WHEEL LOADERS: CAT-950 and HMM -2021.  DRILLING EQUIPMENTS: Ingersoll Rand: Water Well, LM-100.
  • 3.  PAVERS: Apollo.  JUNE-2016 TO TILL DATE: LARSEN & TOUBRO CONSTRUCTION LTD –CHEENAI, INDIA: MANAGER (Quarrying & Crushing) The Special Bridge & Road Projects at varying sites, Installation, Commissioning, Operation & maintenance of the Plants and Equipments. To attend trouble shootings, major repairs on Plants and Equipments.  MAY-2015 TO JUNE -2016:-AL-FATEH LEADING PROJECTS LLC -OMAN: Crusher Manager Development of Installation & Commissioning Strategy (bases of planning, procedures and organization) for Crusher Plants &Mining Equipments. Technical Support and Lead Foremen and Engineers.  FEBUARY -2014 TO MAY -2015:-TECHNOFAB ENGINEERING LTD -NEW DELHI (Works on) TANZANIA (East Africa): MANAGER (P&M) with Plant & Machinery Department. Development of Installation and Commissioning Strategy (bases of planning, procedures and organization) for all Plants & Equipments. Technical Support and Lead Engineers. On all heavy earth moving Equipments and Plants.  SEPTMBER -2012 TO FEBUARY -2014 :-SUPRAS RESOURCES (TANZANIA) LTD TANZANIA (East Africa): MANAGER (Production & Maintenance) on the Mining Projects at varying sites. Installation and Commissioning of the Crusher Plants and Equipments. To attend trouble shootings and major repairs on crusher Plants and equipments.  FEBUARY -2011 TO SEPTMBER -2012 :- NAVYUG MINERALS & AGGREGATES LTD, HYDERABAD, India: MANAGER (Plants &Machinery) on the Supplying of the Aggregates in Ultra Tech Installation and Commissioning of the Crusher Plants and Equipments, To attend trouble shootings and major repairs on Crusher Plants and equipments.  JANAUARY -2005 TO FEBUARY -2011:- SOMA ENTERPRISE LTD, HYDERABAD, India: SENIOR ENGINEER and ASSISTANT MANAGER on the Road Projects at varying States, Installation , Commissioning ,operation & maintenance of the Crusher Plants and Equipment’s. To attend trouble shootings and major repairs on Crusher Plants and equipment’s.  APRIL -2003 TO JANAUARY -2005: K.N.R - PATEL ENGINEERING (JV) LTD, HYDERABAD, India: ENGINEER on the Road Project at Andhra Pradesh, operation & maintenance of the Crusher Plants and Batching plant To attend trouble shootings and maintenance on Crusher & Batching plants and Gen sets. Experience Summary:- LARSEN & TOUBRO CONSTRUCTION LTD, (Chennai, India.). Period:-June -2016 to Till Date… Project: Six Lining Road project including new four lanes Extra Dosed Cable Bridge. Profile:- Working as Manager (Quarrying & Crushing) in Larsen & Toubro Construction Ltd, Six lining and strengthening of NH-8 from Vadodara KM (192) to Surat Section KM (198) Including Construction of new four lane new Extra Dosed Cable Bridge across Narmada River in Bharuch District, Gujarat. Job profile includes Erection, maintenance and operation of Crushing, Screening Plant 320 TPH metso stationary crushing plant 200 TPH metso mobile plants related to National Highways Authority of India Road Projects and report to General Manager. The following machinery in that site:-  C-106, C-110 Jaw crusher’s metso make.  G.P-300, HP-200 Cone crusher’s metso make.  B-6150SE, B-9100SE Barmac metso make.  Crusher Protective Devices like (I.C-50, VOCS, and ACR).  3412-DITA & 3406 DITA (750&250 KVA) Gen sets caterpillar makes.
  • 4.  C.P-30 Batching plant schwing setter makes. Responsibilities:-  Plan, Organize and supervise of day to day production activities of crusher plant, quarry and heavy equipments. Preparation of preventive maintenance schedule and follow up the execution of the same. Preparation of maintenance history records of each machines and ensure the maintenance program is as per the manufacturers recommendation. Operation Maintenance, Workshop Maintenance, Maintenance of Heavy Earth Moving Equipments, Excavators, Loaders, Dumpers, Compressors, Maintenance of rotating Equipments, Servicing of Crushing Plant Equipments, Preparation of Check lists, Operation Maintenance of Crushing, Screening Plants.  Over all in-charge for administration and operation & maintenance of the crushing aggregate and concrete production Division, over all supervision & control of production, delivery of Aggregates, concrete as project required, Monitor the sufficiency, availability and quality of Raw materials to meet the daily requirements.  Planning and developing preventive and predictive maintenance programs, Budget formulation and planning of norms. Spare parts planning and Inventory Management, Breakdown analysis, cost control programs and Monitoring.  Maintaining good health of all Plants and equipments without loss of Production. Planning & mobilization of plant and machinery as per the project’s requirements.  Attending co-operative (project), internal &monthly meetings, to motivate the Technical staff & Shift- Engineers to achieve the production target  Contributing in the management process, working with in a multi-cultural environment rand identifying critical activities and advising corrective action to avoid Slippage. AL-FATEH LEADING PROJECTS LLC.(Dhank & Khasab in OMAN) Period : May-2015 To June -2016. Project: Its Mining projects of Limestone and Gabbro. Profile:- Worked as Crusher Manager in AL- FATEH LEADING PROJECTS LLC, for the Lime stone & Gabbro projects at Dhank & Khasab sites in Oman. Job profile includes Planning Erection Commissioning, Operation And maintenance of Minerals processing Plants combination of 400 TPH Lippmann mobile crushing plant, 300 TPH Power screen mobile plants and report to Project Manager. The following machinery in that site:-  36 X 50 Jaw crusher makes Lippmann.  LLH 5196 LS Impact Crusher makes Lippmann.  XA-400S Track mounted Jaw crusher makes Power screen.  XH-500 Track Mounted Impact Crusher makes power screen.  Warrior 1800 Track Mounted Double deck Screen makes power screen.  PTSC-2618 Three deck Screen makes ASTEC.  Warrior 1500 Track Mounted Three Deck Screen.  500 KVA & 250 KVA Generators makes Caterpillar.
  • 5. Responsibilities.  As Manager carrying out study of drawings monitoring developments and timely erection & commissioning, re commissioning of mobile & fixed crusher plants, with equipments like Jaw Crushers, Cone Crushers, Vertical shaft Impact Crushers, Feeders, Vibrating Screens, Conveyors, Gen sets And Maintenance of Heavy Earth Moving Equipments like Excavators, Loaders Compressors, Dumpers etc…  Plan, Organize and supervise of day to day production activities of crusher plant, quarry and heavy equipments. Preparation of preventive maintenance schedule and follow up the execution of the same. Preparation of maintenance history records of each machines and ensure the maintenance program is as per the manufacturers recommendation. Operation, Maintenance of Heavy Earth Moving Equipments, Excavators, Loaders, Dumpers, Compressors, Maintenance of rotating Equipments, Servicing of Crushing Plant Equipments, and Preparation of Check lists, Operation Maintenance of Crushing, Screening Plants.  Planning and developing preventive and predictive maintenance programs, Budget formulation and planning of norms. Spare parts planning and Inventory Management, Breakdown analysis, cost control programs and Monitoring.  I am responsible for the smooth running of plants, troubleshooting of problems in plants, planning and execution of minor & major repairs to minimize down time and shutting down of plants. This also involves solving problems include in the plants & quarries surroundings.  Maintaining good health of all Plants and equipments without loss of Production. Planning & mobilization of plant and machinery as per the project’s requirements. Techno Fab Engineering Limited (Sumbawanga & Bukoba in Tanzania at East Africa). Period: - February-2014 to May -2015. Project: D.I & UPVC Pipes laying for Water supply and Sanitation projects. Profile:- Worked as Manager (Plants & Machinery) in Techno Fab Engineering Ltd, for the Water supply and Sanitation projects at Sumbawanga & Bukoba Sites in Tanzania at East Africa. Operations & Maintenance of Construction Plants & Machinery, Laying of D.I pipes and report to Project Manager. The following machinery in that site:-  C-106 Jaw crusher’s metso make.  G.P-11F Cone crusher’s metso make.  B-7150SE Barmac metso make.  C.P-30 & C.P-90 Cum3 Batching Plants Schwing Setter makes.  Excavators: Make: L&T- Komatsu Model: PC-200 And Make: HYUNDAI-R210.  TRANSIT MIXERS : Schwing Stetter, Capacity : 6 Cu.m3, GREAVES: 6 Cu.m3  BACKHOE LOADERS: case - 770and JCB -3D.  3412-DITA & 3406 DITA (500 &250 KVA) Gen sets caterpillar make.  SOIL COMPACTOR: case -1107.  CRANES: ACE -14 tons, And Escort.
  • 6. Responsibilities:-  Operation & Maintenance of 200 METSO crushing and Screening Plant, 30, 60 cum/Hr Concrete Batching Plants (Swing Setter, Greaves), 500 KVA Gen sets (Caterpillar), Construction Machinery, 450& 350mm D.I & UPVC pipes Laying.  Over all in-charge for administration and operation & maintenance of the crushing aggregate and concrete production Division, over all supervision & control of production, delivery of Aggregates, concrete as project required, Monitor the sufficiency, availability and quality of Raw materials to meet the daily requirements.  Preventive and Breakdown Maintenance of Entire fleet of Equipments like Plants, Crushing, Batching, Transit Mixers, Concrete pumps, Vibratory Earth Compactors, Excavators, Wheel loaders, Hydraulic Crane, Trippers, Pressure test machines, Transformers & Heavy Genets.  Planning and developing preventive and predictive maintenance programs, Budget formulation and planning of norms. Spare parts planning and Inventory Management, Breakdown analysis, cost control programs and Monitoring.  Maintaining good health of all Plants and equipments without loss of Production. Planning & mobilization of plant and machinery as per the project’s requirements.  Preparing daily / weekly action plan for functioning / maintenance of P & M with close co-ordination with Project Head & Other Key Civil Personnel.  Rendering technical guidance to the staff, Shift management activities, appraising the member’s performance providing feedback SUPRAS RESOURCES (TANAZINA) LIMITED. (Kibaha, in Tanzania at East Africa) Period: -September -2012 to February -2014. Project: Its Copper ore Project and Minerals Processing Unit. Profile:- Worked as Manager (Production &maintenance) in Supras Resources (TZ) Ltd, for the Copper ore project at Kibaha site (40 Kms Away from Dar Es Salaam) in Tanzania at East Africa. Job profile includes Erection, maintenance and operation of Minerals processing Plants combination of 200 TPH Metso mobile crushing plant, 120 TPH SBM mobile plants and report to General Manager. The following machinery in that site:-  PE 250 X 400 Jaw crusher SBM makes.  PE 250 X1200 Jaw crusher SBM make.  C-106 jaw crusher metso make.  GP-11F Cone crusher metso make.  B-7150 Bramac metso make.  200 TPH Crushing & Screening Plant Make: Propel.  C.P-30 Batching plant schwing setter makes.  3406 DITA (250 KVA) Gen sets caterpillar make & 500 KVA Transformers Maintenance.  Construction Earth moving Equipments.
  • 7. Responsibilities:-  Plan, Organize and supervise of day to day production activities of crusher plant, Substation and heavy equipments. Preparation of preventive maintenance schedule and follow up the execution of the same. Preparation of maintenance history records of each machines and ensure the maintenance program is as per the manufacturers recommendation. Operation Maintenance of Crusher plant, Workshop Maintenance, Maintenance of Transformers& Gen sets, construction Equipments like Excavators, Dumpers, Compressors, Maintenance of rotating Equipments, Servicing of Crushing Plant Equipments, Preparation of Check lists, Operation Maintenance of Crushing, mineral processing Plants.  As Manager carrying out study of drawings monitoring developments and timely erection & commissioning, re commissioning of mobile & fixed crusher plants, with equipments like Jaw Crushers, Cone Crushers, Feeders, Vibrating Screens, Conveyors, Gen sets And Maintenance of Substations, Transfomers, Electrical Equipments And Mines etc…  I am responsible for the smooth running of plants, troubleshooting of problems in plants& Substations planning and execution of minor & major repairs to minimize down time and shutting down of plants. This also involves solving problems include in the plants & quarries surroundings.  Planning and developing preventive and predictive maintenance programs, Budget formulation and planning of norms. Spare parts planning and Inventory Management, Breakdown analysis, cost control programs and Monitoring.  Rendering technical guidance to the staff, Shift management activities, appraising the member’s performance providing feedback. Navyug minerals & Aggregates Ltd (Hyderabad & Vizag in A.P). Period: -February -2011 to September -2012. Project: Commercial Crusher plants supplying Aggregates of Ultra tech Ltd (RMC). Profile:- Worked as Manager (P &M) in Navyug minerals & Aggregates Ltd, for the supplying of the Aggregates in Ultra tech Ltd (RMC) at Hyderabad and Vizag sites in Andhra Pradesh, India. Job profile includes Erection, maintenance and operation of Crushing & Screening Plants combination of320 TPH Metso stationary crushing plant, 200 TPH metso mobile plants and of 30 Cum3 Schwing setter batching plant and report to General Manager and Director. The following machinery in that site:-  C-106, C-110 Jaw crusher’s metso make.  G.P-300, G.P-11F Cone crusher’s metso make.  B-7150SE, B-9100SE Barmac metso make.  3412-DITA & 3406 DITA (500 &250 KVA) Gen sets caterpillar make.  G.P-30 DG AMF Control panel auto synchronizing & auto load sharing.  C.P-30& M-1 Batching plants Schwing setter makes.  Construction Earth moving Equipments.
  • 8. Responsibilities:-  As Manager carrying out study of drawings monitoring developments and timely erection & commissioning, re commissioning of mobile & fixed crusher plants, with equipments like Jaw Crushers, Cone Crushers, Vertical shaft Impact Crushers, Feeders, Vibrating Screens, Conveyors, Batching plants, Gen sets And Maintenance of Heavy Earth Moving Equipments like Excavators, Loaders Compressors, Dumpers etc…  Planning and developing preventive and predictive maintenance programs, Budget formulation and planning of norms. Spare parts planning and Inventory Management, Breakdown analysis, cost control programs and Monitoring.  I am responsible for the smooth running of plants, troubleshooting of problems in plants, planning and execution of minor & major repairs to minimize down time and shutting down of plants. This also involves solving problems include in the plants & quarries surroundings.  Contributing in the management process, working with in a multi-cultural environment and identifying Critical activities and advising corrective action to avoid Slippage.  Rendering technical guidance to the staff, Shift management activities, appraising the member’s performance providing feedback.  Attending co-operative (project), internal &monthly meetings, to motivate the Technical staff & Shift- Engineers to achieve the production target. Soma Enterprise Ltd, (Haryana & Punjab States in India). Period: July-2009 to Febuary-2011 (Transfer from Udaipur in Rajasthan). Project: Six lining and Strengthening of N.H-1 Road Project, From Panipat to Jalandhar. Profile:- Worked as an Assistant Manager in Soma Enterprise Ltd., Six lining and strengthening of NH-1 from panipat KM (96+000) to Jalandhar KM (387+100) in Ropar District, Punjab. Job profile includes Erection, maintenance and operation of Crushing , Screening & Washing Plants combination of 350 TPH Metso stationary crushing plant with support 700TPH metso Screening and 200 TPH metso mobile plant with support of 400 TPH metso screening plant related to National Highways Authority of India Road Projects; Territory covers the Panipat-Jaladhar and report to Assistant General Manager. The following machinery in that site:-  C-105, C-110 Jaw crusher’s metso make.  G.P-300, G.P-11F Cone crusher’s metso make.  B-7150SE, B-9100SE Barmac metso make.  Crusher Protective Devices like (I.C-50, VOCS, and ACR).  3412-DITA & 3406 DITA (500 &250 KVA) Gen sets caterpillar make.  G.P-30 DG AMF Control panel auto synchronizing & auto load sharing.  400TPH & 700 TPH Washing & Screening plants metso make.  SF-2975 Sand trap (sand washing) metso make.
  • 9. Responsibilities:-  Plan, Organize and supervise of day to day production activities of crusher plant, quarry and heavy equipments. Preparation of preventive maintenance schedule and follow up the execution of the same. Preparation of maintenance history records of each machines and ensure the maintenance program is as per the manufacturers recommendation. Operation Maintenance, Workshop Maintenance, Maintenance of Heavy Earth Moving Equipments, Excavators, Loaders, Dumpers, Compressors, Maintenance of rotating Equipments, Servicing of Crushing Plant Equipments, Preparation of Check lists, Operation Maintenance of Crushing, Screening Plants.  Planning and developing preventive and predictive maintenance programs, Budget formulation and planning of norms. Spare parts planning and Inventory Management, Breakdown analysis, cost control programs and Monitoring.  I am responsible for the smooth running of plants, troubleshooting of problems in plants, planning and execution of minor & major repairs to minimize down time and shutting down of plants. This also involves solving problems include in the plants & quarries surroundings.  Contributing in the management process, working with in a multi-cultural environment and identifying Critical activities and advising corrective action to avoid Slippage. Soma Enterprise Ltd, (Udaipur, Rajasthan in India). Period:-May 2006 to July 2009 (Transfer From Probandar, Gujarat) Project: Four Lining and Strengthening of R.J-2 & R.J-6 (N.H-76) Road projects. Profile:- Worked as Sr.Engineer, in four lining and strengthening of National Highway Project from Bekaria KM (29+00) to Gogunda KM (73+00) on R.J-2 & R.J-6 road project NH-76 in Udaipur & Chitradurga district In Rajasthan. The job profile includes Erection, maintenance, operation and dismantling of 200 & 320 TPH Metso mobile Crusher Plants, 200TPH Sandvik stationery crusher plant and 160 TPH wet mix plant and Quarry Implementation & Maintenance, report to Sr.Manager. The following machinery in that site:-  C-105, C-110 Jaw crusher’s metso makes.  G.P-300, G.P-11F Cone crusher’s metso makes  B-7150SE, B-9100SE Barmac metso makes.  RM-1107 Jaw crusher sandvik makes.  S-3800, H-3000 Cone crusher sandvik makes.  T8R VSI sadvela makes. Responsibilities:  As an Senior Engineer responsible for supervising for various divisions like; Spares Requirement for Plants, D.G Maintenance, Production Cost Estimation towards the Input/output, HSD Consumption, and close Monitoring of 2 productions shifts team consisting of 20 personnel each, whom are Foremen’s, Senior Electricians, Senior Welders, Fitters, operators, helpers and Data entry operators. Internal designation is Rock Processing Division in-charge and reporting to Senior Manager (Plants & Machinery).  Rendering technical guidance to the staff, Shift management activities, appraising the member’s performance providing feedback.  I have been carrying out study of drawings monitoring developments and timely erection & commissioning, re commissioning of mobile & stationary crusher plants, Batching plants in totality as per the requirement of project authority and that fullest satisfaction of my superiors.  Knowledge for Plant operations, Fabrication & Erection Contractors for plants Erections problem solving activities, Subcontractor performance for Drilling, Blasting, and Loading & Transportation as per the project requirements.
  • 10. Soma Enterprise Ltd, (Probandar, Gujarat in India). Period:-January-2005 to May 2006. Project : Four Lining And Strengthening of N.H-8B Road Project Profile:- Worked as an Electrical Engineer, in four lining and strengthening of National Highway Project from Bhalid KM (42+00) to probandar KM (1.00+00) on road project NH-8B in probandar district Gujarat. The job profile includes maintenance and operation of 200 TPH Metso mobile Crusher Plants, Batching plant and 160 TPH wet mix plant and Operation Implementation & Maintenance, report to Project- Manager. The following machinery in that site:-  C-105, G.P-11F Jaw ,Cone & B-7150 SE Barmac metso makes.  160 TPH Hot mix plant Parker makes.  C.P-30 Batching plant schwing setter makes.  3412 Gen sets (250 KVA) caterpillar makes. Responsibilities:-  Making the Control circuits of induction motors, cable laying & earthing of Barmac, Cone&Jaw motors.  Commissioning of 250&500 KVA DG Sets Cable laying and earthing, Operation and Auto synchronizing.  Commissioning Operation of vibrating feeders, ACR, VOCS, and Hydraulic lifting Pump Automatic greasing System of the Barmac (B9100SE VSI).  Operating of the A2020, IC50 of Cone Crushers (GP300EC).  Knowledge for the A.C Motors, frequency converters (ABB). K.N.R-PATEL ENGINEERING (JV) Ltd, (Nellore, Andhra Pradesh in India). Period:-April-2003 to January-2005. Project : Four Lining And Strengthening of N.H-5 Road Project. Profile:- Worked as Electrical Engineer, in four lining and strengthening of National Highway Project from Nellore KM (78+00) to Kavali KM (138+00) on road project N.H-5 in Nellore district Andhra Pradesh. The job profile includes maintenance and operation of 160 TPH puzzlolana Crusher Plant and Batching plant and Operation Implementation & Maintenance, report to Deputy-manger. The following machinery in that site:-  160 TPH crushing & Screening plant Puzzoulna makes  C.P-30 Batching plant schwing setter makes.  120 TPH Wet mix plant Gujarat Apollo makes. Responsibilities:-  Regular maintenance of the Electrical panels.  Checking for the regular maintenance of the generators  Checking for the generators log books.  Checking of Fuel consumption for 500 KVA Gen sets. Achievements:- Joined as a Electrical Engineer and Promoted as Senior Engineer to Look after a members team of 45 of various Plants related crucial role playing professionals at Soma Enterprise Ltd., Udaipur, Rajasthan. Trainings & Seminars:- 1. One day training attending the in metso minerals in Udaipur for the preventive & periodical maintenance for the fixed & mobile crushers. 2. One day Caterpillar training attending the in Caterpillar Gen sets in hosur (Karnataka) for the General Maintenance of the Engine & Alternator, overhaul of gen set.
  • 11. PERSONAL DETAILS:- • NAME : VELPULA.PULLAIAH. • FATHER NAME : VELPULA. KONDAIAH. • DATE OF BIRTH : 02-06-1984 • MARITAL STATUS : MARRIED. • NATIONALALITY : INDIAN • LANGUAGES KNOW: TELUGU, HINDI, ENGLISH, URDU, KANADA and SWAHILI. • HOBBIES : READING BOOKS, PLAYING GAMES & WATCHING T.V. OTHER DETAILS:-  Operating systems : windows/Vista/XP/2000/98, Internet.  Application Package : MS- Office.  Passport No : M7360371 (Valid Up to March-2025) Address of Correspondences: C/O. B.Nageswara Rao, Door. No- 42/347,177, Simhapuri colony, 4th Road, near sai baba Temple, Kadapa - (Dist), Andhra Pradesh, India. Mail I.D : Pullaiah.velpula@rediffmail.com. Pullaiah999@gmail.com. Contact Mobile No : +919913344110 & +918897187932. SKY PE I.D : Pullaiah .velpula (VELPULA PULLAIAH)