Pre-Paving
Considerations
Robert Rodden, P.E.
www.robertrodden.com
5/25/2015
2
ConstructionandRehabilitationof
ConcretePavements
Lafarge Research Center (LCR)
www.lafarge.com
@LafargeGroup
Robert Rodden, P.E.
www.robertrodden.com
Infrastructure Solutions – Roads
5/25/2015
3
ConstructionandRehabilitationof
ConcretePavements
International Society for
Concrete Pavements (ISCP)
www.concretepavements.org
@ConcPaveSociety
Executive Director 
5/25/2015
4
ConstructionandRehabilitationof
ConcretePavements
ISCP’s Mission
“The mission of ISCP is to facilitate the
advancement of knowledge and
technology related to concrete pavements
through education, technology transfer and
research at an international level.”
5/25/2015
5
ConstructionandRehabilitationof
ConcretePavements
ISCP is Online @
www.concretepavements.org
ALL OF TODAY’S PRESENTATIONS
•  Can be downloaded at any time at:
http://bit.ly/1PO7ixS
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
6
Countries with the Largest Paved
Roadway Networks
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
7Source: USA CIA’s World Factbook
KilometersofPavedRoadway
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
8
Available in ACPA’s online bookstore:
http://www.acpa.org/publications-for-purchase/
EB237
Primary Reference
For This Presentation
Joint Layout
Pre-Paving Considerations
5/25/2015
9
ConstructionandRehabilitationof
ConcretePavements
Why Joint Concrete Pavement?
•  Historical Reason: control natural cracking
5/25/2015
10
ConstructionandRehabilitationof
ConcretePavements
40-80 ft
(12-24 m)
15-20 ft
(4.5-6 m)
Sawcut
@ 15 ft (4.5 m)
or less
Why Joint Concrete Pavement?
•  Other reasons we joint concrete pavements:
Divide pavement into construction lanes or increments.
Accommodate slab movements.
Provide load transfer via placed dowels.
Provide uniform sealant reservoir.
To leverage joint spacing in design!
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
11
Why Joint Concrete Pavement?
•  Not for lane delineation!
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
12
Types of Concrete Pavement
Steel Reinforcing, Joint Spacing, and Crack Spacing Differentiate Between the JPCP, JRCP, and CRCP
5/25/2015
13
ConstructionandRehabilitationof
ConcretePavements
Jointed
Plain
Concrete
Pavement
(JPCP)
Steel
0%
Joints
12-20 ft
(3.6-6 m)
Cracks
N/A
Jointed
Reinforced
Concrete
Pavement
(JRCP)
Steel
0.06-0.25%
Joints
40-100 ft
(12-30 m)
Cracks
15-20 ft
(4.5-6 m)
Continuously
Reinforced
Concrete
Pavement
(CRCP)
Steel
0.6-0.85%
Joints
N/A
Cracks
2-6 ft
(0.6-1.8 m)
Joint Layout
•  Critical to crack control
•  Typically decided by engineer and included in
project plans
– No knowledge of contractor, equipment, processes
– Hard to precisely place things like utilities
•  Contractor may be allowed to develop plans
but, even if not, field adjustments can and
should be made
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
14
The ACPA 10 Step Method
of Joint Layout for Intersections
5/25/2015
15
ConstructionandRehabilitationof
ConcretePavements
Field Adjustments are Necessary
•  Adjust joints that are within 5 ft (1.5 m) of a utility!
•  Must isolate utilities as shown on plans
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
16
Contractor must also
consider impact of
moving joints!!!
Joint Layout
Design…
References:
•  EB237 – Concrete Pavement Field
Reference: Pre-Paving
•  IS006, Intersection Joint Layout
•  IS061 – Design and Construction of
Joints for Concrete Streets
•  R&T Update 6.03 – Concrete
Roundabouts
•  TB010 – Design and Construction of
Joints for Concrete Highways
•  TB017 – Airfield Joints, Jointing
Arrangements and Steel
•  TB019 – Concrete Intersections: A
Guide for Design and Construction
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
17
wikipave.org
is now live!
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
18
Subgrade
Construction
Pre-Paving Considerations
5/25/2015
19
ConstructionandRehabilitationof
ConcretePavements
It Starts from the Ground Up
•  Roadbed (subgrade and subbase) design and
construction are key to:
–  Long-term performance
–  Smoothness (initial and long-term)
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
20
What is Good Support?
•  Roadbeds for a concrete pavement structure
should:
–  Be free from abrupt changes in character of the materials
(should be uniform and constructed of a material that will
provide requisite stability over the life of the pavement)
–  Resist erosion
–  Be engineered to control subgrade soil expansion/frost
heave
•  Above all other concerns,
uniformity is of utmost
importance
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
21
Subgrades
•  Obtain uniform support by controlling:
–  Expansive soils
–  Frost-susceptible soils (frost heave)
–  Pumping
–  Wet Soils
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
22
Controlling Wet Soils
•  Enhancement
•  Reinforcement/Separation
•  Substitution
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
23
Unstabilized Subgrades
1.  Grade to match roadway plans
2.  Cross haul to avoid abrupt changes
3.  Compact at optimum moisture content
4.  Identify soft spots and fix
5.  Protect from rain by “tight blading” and
finishing with smooth drum roller
6.  Fine grade to plan elevations within
tolerances
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
24
Stabilized Subgrades
1.  Trim to match roadway plans but finish the
grade below the final grade elevation
2.  Spread stabilized agent as evenly as possible
3.  Mix, add water and
compact
4.  Finish grade
5.  Cure the subgrade
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
25
Step 3 for Cement-Treated Soils
•  Mix, add water, and compact (within 2 hours)
in one continuous operation
•  Moisture content within 2% of optimum
•  Min of 60% passing #4
(4.75 mm) sieve
•  Special attention to
longitudinal overlap
•  Strictly adhere to 2hr
working period
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
26
Step 3 for Lime-Stabilized Soils
•  Mix and add water simultaneously
•  Moisture content of optimum to +5% of optimum
•  Lightly compact and grade to drain excess water
•  Let soil sit idle for 24 to 72 hours
•  Re-mix, adding water as necessary to target
moisture content of optimum +3%; recompact
•  Min of 60% passing #4 (4.75 mm)
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
27
Subbase
Construction
Pre-Paving Considerations
5/25/2015
28
ConstructionandRehabilitationof
ConcretePavements
General Notes on Subbases
•  Thick subbases (greater than 6 in. [150 mm]) are
typically not beneficial, and therefore are not
recommended
•  The width of the subbase should accommodate the
paving equipment by extending approximately 3 ft (1
m) beyond the width of the pavement on each side
•  Recommended
minimum thickness:
–  Unstabilized: 4 in. (100 mm)
–  CTB or LCB: 4 in. (100 mm)
–  ATB: 2 in. (50 mm)
•  Recycled materials are
commonly used
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
29
Unstabilized Subbases
1.  Mix a uniformly moist, homogeneous material
2.  Place using preferred method
3.  Compact to required density w/min effort
4.  Trim to plan elevation and tolerances
5.  Moisture content key
during construction
of subbase AND
immediately before
paving
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
30
Cement-Treated Subbases (CTB)
1.  Central-mix and place material or road-mix
2.  Compact with rollers and trim to specified
grade
a)  Must place and trim within 4 hrs of mixing!
3.  Cure the subbase
4.  If trimmed after
curing, curing
compound must
be reapplied
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
31
Lean Concrete Subbases (LCB)
1.  Central-mix the concrete
2.  Place to plan elevation and tolerances
a)  No additional finishing
b)  No texturing
3.  Cure (if necessary)
4.  Joint (If necessary)
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
32
Asphalt-Treated Subbases (ATB)
1.  Mixed and placed with conventional asphalt
paving equipment
2.  Dense-graded mixtures require compaction
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
33
Pre-Paving Setup
Pre-Paving Considerations
5/25/2015
34
ConstructionandRehabilitationof
ConcretePavements
Safety
• Ride quality is pointless if
someone is hurt
• Plan out truck routes
• Use of highway patrol
• Daily safety meetings
• Employees get bold
• Teach employees to
watch traffic
5/25/2015
35
ConstructionandRehabilitationof
ConcretePavements
Safety
• Pay attention to broom
handles, saws and
protrusions in traffic
• Watch for backing
trucks and make sure
alarms are functional
• Be aware of
surroundings
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
36
FREE Safety Training!
•  Available	
  around	
  the	
  
clock,	
  365	
  days	
  per	
  year.	
  
•  No	
  cost	
  to	
  par;cipants.	
  
•  Cer;ficates	
  of	
  comple;on	
  
may	
  count	
  toward	
  a	
  total	
  
of	
  11.0	
  professional	
  
development	
  hours	
  
(PDHs).	
  	
  
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
37
www.acpa.org/self-paced-online-courses/
Stringline
5/25/2015
38
ConstructionandRehabilitationof
ConcretePavements
Steering
Control
Elevation
Control
Stringline
Stringline Considerations
• Can be wire, cable, woven nylon,
polyethylene rope, or similar material
• Continuously check tension
• Clean and tight splices
• Stakes must be long enough
• Maximum stake spacing of 25 ft (7.6 m)
•  See Staking Interval Calculator at
apps.acpa.org for recommendations on curves
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
39
Stringline Considerations
(con’t)
• Place winches at ≤
1,000 ft (305 m)
• Beneficial to have
stringlines on both
sides of paving
• Some situations
require cantilever or
trusses for sensors to
reach stringline
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
40
Setting the Stringline
1.  Set reference hubs at proper interval and
place a stringline support stake outside of
each hub
2.  Set stake arm to
the proper elevation
3.  Install stringline
4.  Tighten stringline
5.  Check installation
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
41
Stringline
Setup
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
42
Benchmark
Control Points
(Paving Hubs–Pins)
25 ft (7.6) typ.
Survey Reference
Point
Stringline
Setup
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
43
Stringline
Setup
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
44
Notes on Setting
Reference Hubs
• Reference hubs are set using
a variety of methods
• Contractor determines offset
• Grade info on identifier next
to where hubs will be set
• Proper communication is KEY
to a successful operation!!
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
45
Once Set, the Paver Does the Rest
Uniform Slope in a Superelevation into and though a Horizontal Curve
5/25/2015
46
ConstructionandRehabilitationof
ConcretePavements
Once Set, the Paver Does the Rest
Rooftop Slope in a Straight Section to Encourage Drainage to Each Edge of Pavement
5/25/2015
47
ConstructionandRehabilitationof
ConcretePavements
Once Set, the Paver Does the Rest
Transition from Rooftop Slope to Uniform Slope into a Horizontal Curve
5/25/2015
48
ConstructionandRehabilitationof
ConcretePavements
Communication in Key!!
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
49
Maintain the Stringline!!!!!!!!!!!!!!!!!!
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
50
…or Go Stringless!
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
51
Setting Forms
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
52
…or Just Slipform!
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
53
Placing Embedded Steel
Pre-Placed in Baskets
•  Requires support system
•  Requires placement ahead of
paving or at the same time as
paving is occurring
•  Increased transport cost
•  Increased labor in placement
Placed with Insertion
•  No support system needed
•  Dowels or tiebars are inserted after
concrete is placed
•  Lower transport cost
•  Decreased labor in placement
5/25/2015
54
ConstructionandRehabilitationof
ConcretePavements
… both methods can place dowel bars and tiebars
within typical specifications, though the concrete mixture
characteristics are more important with insertion.
Placing Dowels
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
55
Placing & Staking
Dowel Baskets
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
56
Dowel Location Identification
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
57
Placing Tiebars
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
58
Slipform Paver Equipment Setup
5/25/2015
59
ConstructionandRehabilitationof
ConcretePavements
Like extrusion processes but we pull the form.
Slipform Mold (Pan) Setup
•  Preliminary leveling of paving machine’s frame
and then slipform mold
•  Check joints in the pan
•  Adjust center to
account for cross slope
•  Check alignment
•  Adjust edges for
edge slump
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
60
Vibrator
Setup
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
61
Vibrator Setup
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
62
Slipform Paver Setup
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
63
Slipform Paver Setup
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
64
Final
Grade
and
Cross
Slope
Check
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
65
Concrete Mixture
Analysis and
Approval
Pre-Paving Considerations
5/25/2015
66
ConstructionandRehabilitationof
ConcretePavements
Concrete Mix Proportioner App
apps.acpa.org
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
67
Which
Tests
To Use
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
68
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
69
Which
Tests
To Use
Cement
•  The “glue” that hold concrete together
•  Increase cement content = increase strength,
but:
–  Need more air entraining admixture for desired air
–  Need more water, resulting in more drying shrinkage
–  Increased risk of segregation with more paste
–  More bleed water, increasing permeability
–  Earlier sawing required
–  Stiffer mixture
–  Less fatigue capacity
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
70
Cementitious Materials Content
•  Use least amount of cementitious materials
necessary to meet strength and workability
–  Typical minimum is about 500 lb/yd3 (300 kg/m3) for slipform
•  Dosage typically reported as cement
replacement:
•  SCMs may retard strength gain
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
71
Water-Cementitious Mataerial Ratio
•  Lower w/cm = higher strength
–  Slipform paving - maximum: 0.45; typical = 0.40
–  Fixed-form paving/hand pours - max: 0.50; typ = 0.45
•  For w/cm below
about 0.40,
autogenous
shrinkage
becomes a
concern
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
72
Aggregates
•  60-75% of mixture
•  Provide volume stability!
•  Coarse to fine ≈ 60/40
•  Selection in critical
–  All aggregate should be prequalified for durability to freeze-
thaw, ASR, alkali-carbonate, D-cracking
•  Coarse agg is major driver in concrete CTE
•  Agg hardness impacts sawing operations
•  Cleanliness and surface moisture important
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
73
Aggregate Gradation
•  CONTROLS workability!!
•  Well-graded combined aggregate gradation
will:
–  Reduce water demand
–  Lower drying shrinkage
–  Increase workability
–  Improve strength
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
74
Gradation Analyzer App
apps.acpa.org
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
75
Gradation Analyzer App
apps.acpa.org
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
76
Testing –
Temperature
•  ASTM C1064
•  EASY, just place thermometer in concrete
•  Results help verify conformance to
requirements
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
77
Testing –
Slump
•  ASTM C143 / AASHTO T119
•  Measures consistency;
NOT QUALITY!
•  Typical values:
–  Slipform: 0.5-1.5 in. (13-38 mm)
–  Fixed form: 3-4 in. (75-100 mm)
•  Slump is dependent on
mixture and also on time
of testing
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
78
Testing –
Density (Unit Weight)
•  ASTM C138 / AASHTO T121
•  Measures known volume
•  Typically 130 to 150 lb/ft3 (2,000 – 2,400 kg/m3)
•  Indicates batch-to-batch variability
•  Reduction in density may indicate:
–  Higher air content, higher water content, lower cement content,
change in proportions of ingredients, or change in aggregate
specific gravity or moisture
•  One of the most valuable tests for process control
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
79
Testing –
Air Content
•  ASTM C231 / AASHTO T152
•  Target air depends on agg size
•  Testing at plant or in front of paver doesn’t
account for air loss of up to 2% in paver
•  Quality critical to durability
•  AVA and petrography are
other means to measure
•  Super Air Meter latest tool!
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
80
Max Agg Size Target Air
3/8 in. (9.5 mm) 7 ½%
½ in. (13 mm) 7%
¾ in. (19 mm) 6%
1 in. (25 mm) 6%
1 ½ in. (38 mm) 5 ½%
Testing –
Air Content (continued)
•  Affected in the field by:
–  Cement
–  SCMs
–  Chemical admixtures
–  Gradation of aggregates
–  w/cm ratio
–  Temperature
–  Delays
–  Placement/consolidation
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
81
Testing –
Compressive & Flexural Strength
•  ASTM C39 / AASHTO T22 for cylinders
•  ASTM C78 / AASHTO T97 for beams
•  Typical strength requirements (low / avg / high)
–  Compressive: 3,000 psi (20 MPa) / 3,500 (24) / 4,000 (28)
–  Flexural 550 psi (3.8 MPa) / 600 (4.1) / 650 (4.5)
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
82
Testing –
Maturity to
Estimate
Strength
•  ASTM C1074 /
AASHTO T325
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
83
Testing –
Maturity to Estimate Strength
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
84
Testing –
Maturity
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
85
Maturity Calculator
apps.acpa.org
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
86
COMPASS
www.pccmix.com
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
87
Specifications
Pre-Paving Considerations
5/25/2015
88
ConstructionandRehabilitationof
ConcretePavements
Specifications
•  Address concrete materials durability and what
needs to be measured to control critical
elements of construction and design
•  All specifications act to assign risk.
–  Method specifications assign risk to the owner.
–  End result specifications assign risk to the contractor.
•  Alternative types of specifications and
contracting methods are being used on an
ever increasing number of projects:
–  Performance based specifications, design/build,
warranties and others
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
89
Quality Control
Pre-Paving Considerations
5/25/2015
90
ConstructionandRehabilitationof
ConcretePavements
Quality Control (QC) versus
Quality Assurance (QA)
•  QA is responsibility of
owner – ensure the end
product is of proper
quality and motivates QC
•  QC is responsibility of
contractor – makes the
product of proper quality
and motivated by QA
and acceptance
5/25/2015
91
ConstructionandRehabilitationof
ConcretePavements
Which
Tests
To Use
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
92
Which
Tests
To Use
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
93
Which
Tests
To Use
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
94
Which
Tests
To Use
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
95
Coordination
•  QC plan must be discussed at pre-paving meeting
•  Communication between owner, project engineer,
inspector, plant manager, etc. is crucial to project
success!
•  Hot/cold weather
contingencies
•  Who conducts QA tests?
•  Communicate necessary mix
adjustments based on QC
results!!!!!
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
96
Test Specimens
•  Hardened tests (e.g., strength, hardened air,
etc.) are more susceptible to ambient
conditions and handling than fresh tests (e.g.,
air content, unit weight, etc.)
•  Cylinders typically preferred over beams
– Less sensitive to handling and curing of specimen
– Smaller and easier to transport
• Portable containers available to control
both moisture and temp in transport
5/25/2015
ConstructionandRehabilitationof
ConcretePavements
97
Questions?
Robert Rodden, P.E.
www.robertrodden.com
5/25/2015
98
ConstructionandRehabilitationof
ConcretePavements

More Related Content

Similar to Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormigón Pre Paving Considerations

Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...Instituto del cemento y Hormigón de Chile
 
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...Instituto del cemento y Hormigón de Chile
 
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...Instituto del cemento y Hormigón de Chile
 
internship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering instituteinternship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering instituteSrikanthReddy345872
 
capstoe PPT FINAL GLAX G.S.pptx
capstoe PPT FINAL GLAX G.S.pptxcapstoe PPT FINAL GLAX G.S.pptx
capstoe PPT FINAL GLAX G.S.pptxYogitaSalunke1
 
Proper Maintenance for the Long Life of Concrete Pavements
Proper Maintenance for the Long Life of Concrete PavementsProper Maintenance for the Long Life of Concrete Pavements
Proper Maintenance for the Long Life of Concrete PavementsJill Reeves
 
Cavalline presentation 4 13-10
Cavalline presentation 4 13-10Cavalline presentation 4 13-10
Cavalline presentation 4 13-10zaqqy
 
Self Compacting Concrete - 2018
Self Compacting Concrete - 2018Self Compacting Concrete - 2018
Self Compacting Concrete - 2018Garima Lodha
 
Mivan Aluminum formwork ppt presentation
Mivan Aluminum formwork ppt presentationMivan Aluminum formwork ppt presentation
Mivan Aluminum formwork ppt presentationCivilTY09AdityaGaval
 
Land Subdivisions University Course
Land Subdivisions University CourseLand Subdivisions University Course
Land Subdivisions University CourseNettlemanU
 
Challenges and solution in Ready-Mixed Concrete(RMC) Industry/CONSTRUCTION/BU...
Challenges and solution in Ready-Mixed Concrete(RMC) Industry/CONSTRUCTION/BU...Challenges and solution in Ready-Mixed Concrete(RMC) Industry/CONSTRUCTION/BU...
Challenges and solution in Ready-Mixed Concrete(RMC) Industry/CONSTRUCTION/BU...VedantKotadiya
 
Mahakali Bridge Project Presentation (2077 chaitra 11)
Mahakali Bridge Project Presentation (2077 chaitra 11)Mahakali Bridge Project Presentation (2077 chaitra 11)
Mahakali Bridge Project Presentation (2077 chaitra 11)Rabindra Shrestha
 
Self Healing Bacterial Concrete Presentation
Self Healing Bacterial Concrete PresentationSelf Healing Bacterial Concrete Presentation
Self Healing Bacterial Concrete PresentationLuke Van de Vate
 
Construction practices aphb
Construction practices aphbConstruction practices aphb
Construction practices aphbhlksd
 
Lecture notes topic1 concrete_aug2015_part1
Lecture notes topic1 concrete_aug2015_part1Lecture notes topic1 concrete_aug2015_part1
Lecture notes topic1 concrete_aug2015_part1Est
 
Reshape Your CO2 Footprint With C/Clay
Reshape Your CO2 Footprint With C/ClayReshape Your CO2 Footprint With C/Clay
Reshape Your CO2 Footprint With C/ClayLOESCHE
 
IRJET- Feasible Study on Self Compacting Concrete
IRJET- Feasible Study on Self Compacting ConcreteIRJET- Feasible Study on Self Compacting Concrete
IRJET- Feasible Study on Self Compacting ConcreteIRJET Journal
 
Ready mix concrete
Ready mix concreteReady mix concrete
Ready mix concreteBala murali
 

Similar to Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormigón Pre Paving Considerations (20)

Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...
 
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...
 
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...
Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormi...
 
internship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering instituteinternship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering institute
 
capstoe PPT FINAL GLAX G.S.pptx
capstoe PPT FINAL GLAX G.S.pptxcapstoe PPT FINAL GLAX G.S.pptx
capstoe PPT FINAL GLAX G.S.pptx
 
Proper Maintenance for the Long Life of Concrete Pavements
Proper Maintenance for the Long Life of Concrete PavementsProper Maintenance for the Long Life of Concrete Pavements
Proper Maintenance for the Long Life of Concrete Pavements
 
Cavalline presentation 4 13-10
Cavalline presentation 4 13-10Cavalline presentation 4 13-10
Cavalline presentation 4 13-10
 
SELF-COMPACTING CONCRETE (SCC)
SELF-COMPACTING CONCRETE (SCC)SELF-COMPACTING CONCRETE (SCC)
SELF-COMPACTING CONCRETE (SCC)
 
Self Compacting Concrete - 2018
Self Compacting Concrete - 2018Self Compacting Concrete - 2018
Self Compacting Concrete - 2018
 
SANDEEP PPT
SANDEEP PPTSANDEEP PPT
SANDEEP PPT
 
Mivan Aluminum formwork ppt presentation
Mivan Aluminum formwork ppt presentationMivan Aluminum formwork ppt presentation
Mivan Aluminum formwork ppt presentation
 
Land Subdivisions University Course
Land Subdivisions University CourseLand Subdivisions University Course
Land Subdivisions University Course
 
Challenges and solution in Ready-Mixed Concrete(RMC) Industry/CONSTRUCTION/BU...
Challenges and solution in Ready-Mixed Concrete(RMC) Industry/CONSTRUCTION/BU...Challenges and solution in Ready-Mixed Concrete(RMC) Industry/CONSTRUCTION/BU...
Challenges and solution in Ready-Mixed Concrete(RMC) Industry/CONSTRUCTION/BU...
 
Mahakali Bridge Project Presentation (2077 chaitra 11)
Mahakali Bridge Project Presentation (2077 chaitra 11)Mahakali Bridge Project Presentation (2077 chaitra 11)
Mahakali Bridge Project Presentation (2077 chaitra 11)
 
Self Healing Bacterial Concrete Presentation
Self Healing Bacterial Concrete PresentationSelf Healing Bacterial Concrete Presentation
Self Healing Bacterial Concrete Presentation
 
Construction practices aphb
Construction practices aphbConstruction practices aphb
Construction practices aphb
 
Lecture notes topic1 concrete_aug2015_part1
Lecture notes topic1 concrete_aug2015_part1Lecture notes topic1 concrete_aug2015_part1
Lecture notes topic1 concrete_aug2015_part1
 
Reshape Your CO2 Footprint With C/Clay
Reshape Your CO2 Footprint With C/ClayReshape Your CO2 Footprint With C/Clay
Reshape Your CO2 Footprint With C/Clay
 
IRJET- Feasible Study on Self Compacting Concrete
IRJET- Feasible Study on Self Compacting ConcreteIRJET- Feasible Study on Self Compacting Concrete
IRJET- Feasible Study on Self Compacting Concrete
 
Ready mix concrete
Ready mix concreteReady mix concrete
Ready mix concrete
 

More from Instituto del cemento y Hormigón de Chile

Caracterización experimental de propiedades de los hormigones reforzados con ...
Caracterización experimental de propiedades de los hormigones reforzados con ...Caracterización experimental de propiedades de los hormigones reforzados con ...
Caracterización experimental de propiedades de los hormigones reforzados con ...Instituto del cemento y Hormigón de Chile
 
Metodología simple de Especificación y Control de Hormigones por Durabilidad
Metodología simple de Especificación y Control de Hormigones por DurabilidadMetodología simple de Especificación y Control de Hormigones por Durabilidad
Metodología simple de Especificación y Control de Hormigones por DurabilidadInstituto del cemento y Hormigón de Chile
 
Solución de Pavimento de Hormigón Articulado con Geoceldas Hyson-Cells para U...
Solución de Pavimento de Hormigón Articulado con Geoceldas Hyson-Cells para U...Solución de Pavimento de Hormigón Articulado con Geoceldas Hyson-Cells para U...
Solución de Pavimento de Hormigón Articulado con Geoceldas Hyson-Cells para U...Instituto del cemento y Hormigón de Chile
 

More from Instituto del cemento y Hormigón de Chile (20)

Proyecto Puente Chacao: Desafío Técnico Logístico en Condiciones Extremas
Proyecto Puente Chacao: Desafío Técnico Logístico en Condiciones ExtremasProyecto Puente Chacao: Desafío Técnico Logístico en Condiciones Extremas
Proyecto Puente Chacao: Desafío Técnico Logístico en Condiciones Extremas
 
Nuevas líneas de Metro de Santiago
Nuevas líneas de Metro de Santiago Nuevas líneas de Metro de Santiago
Nuevas líneas de Metro de Santiago
 
Especificaciones en Concreto ¿Un Arte o Una Ciencia?
Especificaciones en Concreto ¿Un Arte o Una Ciencia?Especificaciones en Concreto ¿Un Arte o Una Ciencia?
Especificaciones en Concreto ¿Un Arte o Una Ciencia?
 
Comportamiento del Hormigón en Condiciones de Evaporación
Comportamiento del Hormigón en Condiciones de EvaporaciónComportamiento del Hormigón en Condiciones de Evaporación
Comportamiento del Hormigón en Condiciones de Evaporación
 
Hormigón, desafíos para mejorar la productividad
Hormigón, desafíos para mejorar la productividadHormigón, desafíos para mejorar la productividad
Hormigón, desafíos para mejorar la productividad
 
Criterios de aceptación de la Resistencia en Hormigón Proyectado
Criterios de aceptación de la Resistencia en Hormigón ProyectadoCriterios de aceptación de la Resistencia en Hormigón Proyectado
Criterios de aceptación de la Resistencia en Hormigón Proyectado
 
Caracterización experimental de propiedades de los hormigones reforzados con ...
Caracterización experimental de propiedades de los hormigones reforzados con ...Caracterización experimental de propiedades de los hormigones reforzados con ...
Caracterización experimental de propiedades de los hormigones reforzados con ...
 
Metodología simple de Especificación y Control de Hormigones por Durabilidad
Metodología simple de Especificación y Control de Hormigones por DurabilidadMetodología simple de Especificación y Control de Hormigones por Durabilidad
Metodología simple de Especificación y Control de Hormigones por Durabilidad
 
Nanotecnología: Fundamentos y Potenciales Aplicaciones en el Hormigón
Nanotecnología: Fundamentos y Potenciales Aplicaciones en el HormigónNanotecnología: Fundamentos y Potenciales Aplicaciones en el Hormigón
Nanotecnología: Fundamentos y Potenciales Aplicaciones en el Hormigón
 
Nuevo Hormigón Estructural que flota (Proyecto HEAT)
Nuevo Hormigón Estructural que flota (Proyecto HEAT)Nuevo Hormigón Estructural que flota (Proyecto HEAT)
Nuevo Hormigón Estructural que flota (Proyecto HEAT)
 
La importancia de una correcta especificación para sistemas de anclajes
La importancia de una correcta especificación para sistemas de anclajes La importancia de una correcta especificación para sistemas de anclajes
La importancia de una correcta especificación para sistemas de anclajes
 
Soluciones para reparación y reforzamiento estructural
Soluciones para reparación y reforzamiento estructuralSoluciones para reparación y reforzamiento estructural
Soluciones para reparación y reforzamiento estructural
 
Nueva Certificación ACI de instalador de anclajes
Nueva Certificación ACI de instalador de anclajesNueva Certificación ACI de instalador de anclajes
Nueva Certificación ACI de instalador de anclajes
 
Structural Strengthening, Proyectos Relevantes y Desafíos de Ingeniería
Structural Strengthening, Proyectos Relevantes y Desafíos de IngenieríaStructural Strengthening, Proyectos Relevantes y Desafíos de Ingeniería
Structural Strengthening, Proyectos Relevantes y Desafíos de Ingeniería
 
Proyectos subterráneos civiles
 Proyectos subterráneos civiles Proyectos subterráneos civiles
Proyectos subterráneos civiles
 
Avances hacia una normativa nacional de Shotcrete
Avances hacia una normativa nacional de ShotcreteAvances hacia una normativa nacional de Shotcrete
Avances hacia una normativa nacional de Shotcrete
 
Metro, infraestructura y desarrollo subterráneo
Metro, infraestructura y desarrollo subterráneoMetro, infraestructura y desarrollo subterráneo
Metro, infraestructura y desarrollo subterráneo
 
Solución de Pavimento de Hormigón Articulado con Geoceldas Hyson-Cells para U...
Solución de Pavimento de Hormigón Articulado con Geoceldas Hyson-Cells para U...Solución de Pavimento de Hormigón Articulado con Geoceldas Hyson-Cells para U...
Solución de Pavimento de Hormigón Articulado con Geoceldas Hyson-Cells para U...
 
Proyecto de Pavimentación Camino La Polvora
Proyecto de Pavimentación Camino La PolvoraProyecto de Pavimentación Camino La Polvora
Proyecto de Pavimentación Camino La Polvora
 
Claves de Éxito de un piso industrial
Claves de Éxito de un piso industrialClaves de Éxito de un piso industrial
Claves de Éxito de un piso industrial
 

Recently uploaded

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 

Seminario Internacional Construcción y Rehabilitación con Pavimentos de Hormigón Pre Paving Considerations