SlideShare a Scribd company logo
1 of 11
Download to read offline
1
GCC Interconnection Grid: Operational Studies for the GCC Interconnection
with United Arab Emirates (UAE)
A. AL-EBRAHIM
GCCIA
Bahrain
N. AL-SHAHRANI
GCCIA
Saudi Arabia
M. AL-SHAIKH
GCCIA
Bahrain
K. KAROUI
TRACTEBEL ENGINEERING
Belgium
D. ZENNER
ELIA SYSTEM OPERATOR
Belgium
P. MICHAL
RTE
France
SUMMARY
The Arab Gulf Cooperation Council (GCC) countries namely the United Arab Emirates, Bahrain,
Saudi Arabia, Oman, Qatar, and Kuwait have embraced changes to their power sectors with more
private sectors participation as a result of increasing demands for power due to rapid population,
commercial and industrial growth in their respective countries. Realizing the need for more reliable
GCC power grids with power exchange possibilities, the Governments of the GCC countries have
established the GCC Interconnection Authority to construct and operate a 400 kV interconnection
backbone grid between the six Member States (MS).
The GCC Interconnection network phase 1 was completed and successfully commissioned during the
first quarter of the year 2009. Phase 1 network consists of seven 400 kV substations interconnecting
the independent Member States’ Power Systems (MSPS): Kuwait, Saudi Arabia, Bahrain and Qatar
through a 900 km 400 kV overhead lines and a 51 km 400 KV submarine and land cables. This GCC
Interconnection phase I combines long distance high voltage overhead lines, high voltage cables and a
HVDC back-to-back substation. The HVDC connects the 50 Hz interconnected networks of the power
systems in Kuwait, Bahrain, Qatar, UAE and Oman with the 60 Hz system in Saudi Arabia.
The GCC Interconnection network phase 3 successfully completed when UAE 400 kV network was
connected to the GCC Interconnection network Phase 1 through double circuits 400 kV overhead
lines, and synchronised for the first time with Phase I network on April 2011 and Oman grid was
connected to UAE grid through double circuits 220 kV overhead lines on October 2011.
In order to prepare for the safe, secure and stable operation of the combined GCC interconnection
including UAE and Oman, a number of detailed operational studies were performed including system
studies, electromagnetic transients, protection studies, frequency control studies, and more. The paper
presents the results of these operational studies and the approach the operations issues arising from the
results of the studies were addressed.
KEYWORDS
Large system, interconnection, stability, primary frequency control, maximum transfer capability,
simulation.
21, rue d’Artois, F-75008 PARIS C4-107 CIGRE 2012
http : //www.cigre.org
2
INTRODUCTION
The electrical interconnection process between the GCC countries power systems is a three phase
process [1]:
- The Phase I is related to the North Grid of the GCC power system and interconnects four
Member States (MS) namely Kuwait, Saudi Arabia, Bahrain and Qatar. It is in operation since
the first quarter of 2009. This phase comprise about 900 km double circuits 400 kV AC
interconnection of Bahrain, Kuwait and Qatar and a 1800 MW HVDC back to back
interconnector with the Eastern part of Saudi Arabia 60 Hz power system [2].
- The Phase II involves the internal interconnection and enforcement of the South Grids (UAE
and Oman) to form UAE national grid and Oman northern grid which was achieved in parallel
to Phase-I. The UAE electricity system is already interconnecting the separate power grids of
its seven emirates to form the Emirates National Grid (ENG). Abu Dhabi is connected to
Dubai, Sharjah and the other emirates through a 400 kV line. GCCIA is not directly involved
in the execution of Phase II.
- The Phase III is related to the interconnection between the North and the South GCC regional
grids and involves the connection of UAE (Abu Dhabi) grid to Phase I, and the connection of
the UAE and Oman electricity systems through 220 kV lines. From the operational studies
perspective, the interconnection of the power system of Oman is performed through the
double circuit 220 kV line connecting the substation of Al Foha in UAE to the substation of
Mahadha in Oman. From the perspective of a 400 kV interconnection between Oman and the
UAE, the 220kV interconnection operation can be considered as a conservative assumption.
The Phase III has been completed in 2011 and consists of a double-circuit 400 kV corridor
from Salwa (Saudi Arabia) to Silaa (UAE-AbuDhabi) then to Shuwaihat (UAE). It is
successfully in operation since July 2011.
Schematic and geographical views of the GCC power system are presented in Figure 1 and 2. It
indicates a structure composed of rather lumped centres of consumption and generation interconnected
by long 400 kV corridors between the various MS. Unlike the other MS, the power grid of Oman
would be connected via a 220 kV links through the UAE network.
Figure 1 : Geographical structure of the GCCIA system
3
Figure 2: Topological structure of the GCCIA system
Prior to the Phase III interconnected operation, a number of operational studies have been performed
not only to ensure the successful synchronization and operation, but also to identify stable and reliable
operating regimes for the GCC interconnected system. They are related to the following aspects: short
circuit analysis, maximum power transfer limits analysis, transient and small signal stability analyses,
primary frequency control, adequacy of defence plans and EMTP switching simulations to assess the
capability of the new equipments.
GCC INTERCONNECTED SYSTEM
The GCC interconnection is composed of seven 400 kV substations connecting five MS through
approximately 900 km 400 kV OHL backbone connecting the substations of Al-Zour (Kuwait) in the
North to the substation of Silaa (UAE) in the South. It consists of a double circuit line rated at 1900
MVA. Bahrain is connected to the 400 kV back bone through two submarine cables rated each at 715
MVA. Kuwait, Bahrain and Qatar interconnect to the GCCIA system through respectively (3x650
MVA, 3x325 MVA and 3x400 MVA transformers). Saudi Arabia is connected through a back-to-back
HVDC converters rated at 3x600 MW at the 400 kV substation of Al-Fadhili. The HVDC station, in
addition to being designed for economic power exchanges, has a novel feature that enables Dynamic
Reserve Power Sharing (DRPS) between the 60 Hz and 50 Hz systems, and has been to date activated
on several occasions following severe active power unbalances for mutual support between the 50 Hz
and the 60 Hz systems.
The system is operated according to an Interconnection Transmission Code (ITC) that requires among
others, the N-1 security criterion for the largest credible contingency. The net transfer capacity (NTC)
is obtained by subtracting to the total transfer capacity (TTC) the transfer reliability margin (TRM).
The latter accounts for unintentional deviations such as physical flows due to power frequency control,
unexpected unbalances between MS system operators and inaccuracies deriving from collected data
and measurements. Additionally, the system is equipped with a set of nineteen 125 and 300 MVAr
line, cable and substation connected shunt reactors. The substation reactors are operated to balance the
MVAr exchanges and control voltages at the interface between GCCIA and the MS power systems.
4
Total peak load of the GCC countries power system is estimated at 92.5 GW when minimum load is
estimated at 35.4 GW. This high peak load vs. minimum load ratio is due to the high proportion of air
conditioning load during hot summer temperatures.
POWER SYSTEM MODEL AND CONSIDERED OPERATING CONDITIONS
Power system studies were performed using a detailed model of the interconnected MS power systems
developed with the assistance and cooperation of the Member States. It represents a 650 generator
system for the 50 Hz system while the units of KSA Eastern operating region (60 Hz) are also
represented in their real identity and where the three other operating regions (Western, Central and
Southern) are represented by equivalent models. The system model accounts not only for the various
security systems mainly the under frequency load shedding system but also for the HVDC back-to-
back station and its Dynamic Reserve Power Sharing (DRPS) function. In addition, the peak load
model includes a high proportion of rotating load in the load mix. This translates into an equivalent
induction motor at each load bus connected downstream an equivalent distribution transformer and
medium voltage feeder.
Peak load analyses are performed on three steady state operating conditions: i/ no power exchanges
between the MS, ii/ maximum power transfer stream from North to South and iii/ maximum power
transfer stream from South to North. The later two operating conditions are considered as most severe
normal conditions since the angle difference between Kuwait and Oman is maximized and reaches
52°.
Minimum load analysis is performed assuming no power exchanges between MS. This is
representative of the large volume of tertiary reserves available during winter period in each MS.
For all considered cases, the spinning reserve is adjusted to the minimum required as per the
interconnector code. This is a conservative assumption during winter period as desalination constraints
provide large primary reserve margins.
IMPACT OF THE INTERCONNECTOR ON THE SHORT CIRCUIT LEVELS
Single and three phase faults levels have been determined according to IEC 60909 standard before and
after Phase III interconnection assuming 50 ms contact parting time. Obtained results indicate that the
400 kV GCCIA substation breakers have the capability to interrupt successfully symmetric and
asymmetric 1-ph and 3-ph faults. Fault level at the 400 kV substations, Silaa remains significantly
below 30 kA for a breaker capability of 63 kA.
SMALL SIGNAL STABILITY
After Phase III interconnection, the 50 Hz part of the GCC system is characterized by a set of power
systems connected together through relatively long AC lines leading to a longitudinal system structure.
Although the GT, ST and CCGT generation mix of all MS is not prone to low damping inter-area
oscillation, the interconnection of North and South parts will change the shape of the existing
oscillation modes and new inter-area modes will be experienced. Phase I interconnection analysis had
already highlighted the need to improve inter-area modes between Kuwait, Bahrain and Qatar.
Installation and re-tuning of dedicated PSS are ongoing in Kuwait and Qatar large power plants
generators.
The analysis focuses on the modes comprised between 0.05 and 1 Hz i.e. the modes related to coherent
groups of units. The modes are considered as insufficiently damped when the damping factor falls
below 5% in all credible contingency conditions. After linearization of the differential-algebraic set of
non linear equations, the inter-area modes and their damping are calculated on base of an Arnoldi
method. In order to secure a conservative assessment of the damping, the following situations have
5
been considered in peak and off-peak load: i/ base case without contingency i.e. N case; ii/ N-1
contingency cases with for each considered case, one circuit out of service; iii/ N-2 situation where
Bahrain and Qatar are absent increasing the electrical distance between the North and the South parts
of the GCC system; iv/ simultaneous N-1 contingencies on all interconnection corridors.
All new inter-area modes display a damping rate higher than 5% with natural frequencies comprised
between 0.19 and 0.6 Hz. The lowest damping factor (7.5 %) is encountered in N-2 contingency
situation when Qatar is not connected. The damping of the existing GCC Phase I mode involving
Kuwait, Bahrain and Qatar increases to 6.75% due to the introduction of the PSS in Qatar and Kuwait.
Figure 3 below illustrates the inter-area oscillation modes on the GCCIA system.
Figure 3 : Inter-area oscillation modes on the GCCIA system
As these damping levels are model based conclusions, GCCIA is monitoring the effective damping
achieved on the GCCIA various corridors during the early phase on the interconnected operation. The
longitudinal and multi power flow pattern makes the GCCIA system a good candidate for a Phase
Measurement Unit (PMU) based wide area inter-area oscillations monitoring system. Optimal
locations for dynamic observability are the substations of the GCCIA system and the large power
plants connecting substations in the MS grids.
TRANSIENT STABILITY
Transient stability has been assessed to verify the ability of the system to withstand normally cleared
1-ph and 3-ph cleared in base (80 ms) and back-up (325 ms) time. As loss of synchronism following
faults inside the MS is prevented by the MS internal protection schemes, the main focus of the
assessment is the risk of cross border loss of stability. Obtained results are critical inputs for the
location and the settings of the out of step relays along the GCCIA 400 kV corridors. In addition,
following severe faults, the air conditioning load inside the MS impacts the voltage stability of the
system. However, its impact on the GCCIA interconnection is limited by the presence of low voltage
relays located the GCCIA substations connecting the MS.
Angular stability following 3-ph faults cleared in base time is verified with 100% impedance load on
the peak load high power transfer scenarios. Following 3-ph faults cleared in back-up time due to
breaker failure, losses of synchronism appear for faults located close to Al-Zour, Ghunan, Al Jasra,
Salwa and Shuweihat. This conclusion is confirmed by a set of critical clearing times found lower than
325 ms and justifies the installation of out of step relays at suitable locations of the GCCIA system.
KU BA QA
UAE OM
KU
BA
QA
KU
BA QA
UAE
OM
KU BA QA
UAE OM
2 groups mode: 15% <ξ< 37% and 0.19 Hz <f< 0.31 Hz
3 groups mode: 6.7% <ξ< 14% and 0.39 Hz <f< 0.50 Hz
KU
BA
QA
4 groups mode: 7.5% <ξ< 15% and 0.40 Hz <f< 0.47 Hz
KU
BA QA OM
UAE
3 groups mode: 13% <ξ< 20% and 0.34 Hz <f< 0.42 Hz
KU
BA
OM
KU
BA
OMQA UAE
QA UAE
6
INTERCONNECTION TRANSFER LIMITS
Together with the thermal limits, the knowledge of the maximum transfer limits is a key input of the
total transfer capacities and therefore the net transfer capacity assessment. Their comparison with the
thermal limits of the corridors defines if a corridor security limit is thermally or stability driven.
Maximum power transfer capacity is defined as the maximum power flow between two MS of the
system. For each pair of MS, two values are determined corresponding to the maximum transfer limit
in both directions. They are achieved in peak and minimum load in N and N-1 contingency situations
corresponding to the loss of the major elements of the GCCIA system (i.e. 400 kV circuit and MS-
GCCIA transformer).
Figure 4 : Maximum power transfer in MW vs.
voltage in p.u. between UAE and Kuwait in
normal conditions.
Table 1 : Maximum transfer capacity between
MS at peak load (N situation) in MW
Table 2 : Maximum transfer capacity between
MS at peak load (N-1 situation) in MW
Figure 4 presents the 1600 MW maximum power transfer between UAE and Kuwait in normal
conditions. Tables 1 and 2 present the obtained max transfer capacity results matrices in N and N-1
contingency situations. Effective transfer capacities are derived from the max transfer capacity by
subtracting a 20% margin.
PRIMARY FREQUENCY CONTROL
The interconnection of AC systems requires the definition of common rules for primary reserves and the
determination of the expected contribution of each system to the primary frequency control. Their main
impact is the determination of the transfer reliability margin. Contribution to the primary frequency control
is regulated by the interconnector code. It stipulates that the secured incident size must correspond to the
largest single credible incident (480 MW) following the loss of a unit in UAE) increased by a margin of
10%. The reserve allocated to each unit shall not exceed 5% of its size. The sharing of the spinning reserve
volume between the MS is in accordance to their generation size in the total synchronous system.
Minimum contribution in % to the total spinning reserve is presented in Table 3:
Table 3 : Spinning reserve allocation between MS Figure 5 : Transfer margin on GCCIA 400 kV
corridors for primary frequency control
-0 200 400 600 800 1000 1200 1400 1600
0.4
0.5
0.6
0.7
0.8
0.9
1.0
1.1
p.u.
[uae2k] UAE to Kuwait Transfer
[ua2k] VOLTAGE AT NODE : SALWA1 Unit : p.u.
[ua2k] VOLTAGE AT NODE : GHUNAN1 Unit : p.u.
[ua2k] VOLTAGE AT NODE : FADHILI1 Unit : p.u.
[ua2k] VOLTAGE AT NODE : ALZOUR1 Unit : p.u.
Kuwait KSA Bahrain Qatar UAE
Kuwait - 2000 1900 2200 2500
KSA 1900 - 1950 2450
Bahrain 1550 2050 - 2150 2500
Qatar 1500 1500 1500 - 2600
UAE 1600 1550 1800 2700 -
Kuwait KSA Bahrain Qatar UAE
Kuwait - 1490 1700 1750 2200
KSA 1280 - 1700 1360 2150
Bahrain 1200 1520 - 1450 2080
Qatar 1180 1380 1400 - 2260
UAE 1180 1320 1490 1950 -
Member State
Ci
(%)
Spinning
Reserve
(MW)
Bahrain 8.4 44
Oman 12.1 64
Qatar 15.5 82
Abu Dhabi 30.8 163
Kuwait 33.2 175
Total 100 528
7
The contribution of the primary frequency control to the transfer reliability margin is required to
permit the secure power flows on the various GCCIA interconnectors induced by the primary
frequency control. Those contributions vary with the corridor location and correspond to the largest
active power flow variation induced by the loss of the largest unit in each member state and the
subsequent primary frequency control activation. Margins required for a largest loss located in Qatar
are presented in Figure 5. The larger the system total size, the lower frequency deviation the system
will experience following the largest generation loss. This requires to monitor and to take into account
the governor voluntary dead-bands but also, above a given size, the impact of the frequency
insensitivity ranges to better predict the response of the MS following a generation trip.
ADEQUACY OF DEFENCE ACTIONS
Defence actions are of three types:
- Under frequency load shedding (UFLS) and, below a given frequency level, disconnection of
importing MS;
- MS disconnection below a given voltage level at the connecting substation;
- Out of step relay to avoid the spread of out of step operating conditions.
The Under Frequency Load Shedding adequacy has been harmonized to limit transient power flows
due to discrepancies between the various MS UFLS subsequent to their activation. Taking into
account the UFLS harmonization done for phase-1 countries and the large volumes related to each
load shedding stage (approximately 2400 MW corresponding to 5% of the 50 Hz system total
interconnected system peak load), Oman UFLS settings are adjusted to secure the frequency stability
of an islanded system by adjusting the first stage set at 49.3 Hz instead than 49.5 Hz and increase the
UFLS total from 35% to a value above 40% of the total load and UAE UFLS harmonization has been
achieved by splitting of the previous first UFLS stage into two distinct stages (49.3 Hz, 5%) and (49.2
Hz, 5%).
Minimum Voltage Relay: To mitigate the extension of delayed voltage recovery induced by a lack of
dynamic reactive power reserves or under voltage load shedding in one MS and the consequent risk of
voltage collapse, a low voltage back up protection prevents that low voltages at the point of common
coupling impact the integrity of the bulk GCCIA interconnection. It is activated if the voltage remains
below the range 0.8 – 0.85 p.u. during several seconds.
Out Of Step Relays presence is necessary to mitigate the detrimental impact of out of step operating
conditions between the various parts of the GCC system. Out of step relays (OOS) are located on the
various corridors potentially subject to a loss of synchronism. Their tuning is performed according the
following methodology:
- Definition of a ‘target trip matrix’ on base of the transient stability simulation results. The
location and activation requirements are based on the requirement to keep coherent groups of
generators;
- Assessment of the OOS relays ability to detect out of step operating conditions. An ‘achieved
trip matrix’ is therefore defined and compared to the ‘target trip matrix’ to confirm the
adequacy of the relay locations.
- Relay operation assessment on base of the simulated X/R trajectories and the detailed Areva –
MiCOM P754x logic. When necessary, zone 5 and zone 6 parameters and bandwidth crossing
time are adapted.
- The four OOS relays settings are validated on the simulation of a large number of fault
locations and initial operating conditions (74). Simulation results indicate a success rate of
92% for faults cleared in back-up time following a breaker failure. It is observed that the out
of step is not activated following a fault clearing in base time reducing further the risk of mal-
operation.
The behaviour of the GCCIA system has been assessed on the simulation of large disturbances
especially the stability of GCCIA various parts following the simultaneous loss of the two circuits
8
composing a transmission corridor. This leads to the split in two parts of the system and the activation
of the UFLS in case of large North-to-South or South-to-North power exchange. The response of the
system includes the activation of the UFLS and the HVDC back-to-back dynamic reserve power
sharing (DRPS) logic. The synthesis of the simulated loss of corridor results is presented in Table 4.
Table 4: Ability of the GCC subsystems to recover following a N-2 contingencies leading to a GCC system
split
Achieved results highlighted the need to extend the transfer reliability margin to the power flow
transients related to the first UFLS stage and to improve the HVDC back-to-back interconnector
response and underlying DRPS logic [4] to better cope with sudden large export rejection (i.e.
generation excess and over frequency transients) but also a following large generation deficit. An
ongoing project aims at improving the HVDC interconnector DRPS logic.
PROTECTION STUDIES
The protection studies mainly focused on the new interconnections and substations put in place to link
the North and the South GCC regional girds (Part III). Nevertheless a thorough analysis of the
protections of the adjacent interconnections and substations was performed to determine the
consistency with the new used protections.
The studies focused on three domains: control of the philosophy used to protect the installations as
well as its correct translation into the used block diagrams, cross-check of the protection settings via
calculations and, at last, simulations via PSS™SINCAL to have a full selectivity check on the
interaction of all used protections (Figure 6).
Different types of simulations were conducted where faults (three phase and single phase faults) were
simulated at the beginning (10%), middle (50%) and end (90%) of every interconnection and on bus
bars of every substation (and this all for peak and off-peak conditions) (Table 5). For each simulation,
the state of the protection was analyzed (trip, pick-up, no start) as well as the tripping zone/time and
the measured impedance. General conclusion is a correct behaviour of all used protections and
proposed settings and a guaranteed selectivity for types of simulated faults.
9
Figure 6: Simulated grid
Table 5: Response of fault clearance by backup distance protections for
faults on bus bars (1ph/3ph, peak/off-peak).
The major recommendations of the studies were optimizations on the auto reclose program as well as
on the philosophy of the breaker failure protection. The breaker failure protection scheme was
reviewed in order to lower the fault clearance time. The recommendation consisted in a second trip
command issued by the main protections of the interconnections and a simplification towards a one
stage breaker failure protection scheme and hence a gain in fault clearance time.
CONTRIBUTION TO PRIMARY FREQUENCY RESPONSE BY PHASE I MEMBER
STATES
In an interconnected system, the spinning reserve is shared among the members. The spinning reserve
includes primary and secondary reserves and is given by the sum of the values of power between the
set-power at the reference frequency, and the limiter position of each power plant. GCCIA has taken
the following principles for the spinning reserve [3]:
 The total primary reserve must cover the reference incident.
 As regards the duties towards the partners, the reference incident is taken equal to the largest unit
installed within the interconnected system. Otherwise, each partner may choose a more restricting
rule, (for instance simultaneously 2 power plants in Kuwait).
 The primary reserve is calculated in such a way that in the case of the tripping of the largest
generating unit, after the delivery of the primary reserve, the final frequency deviation should be
at maximum equal to 200 mHz.
 The available secondary reserve is the difference between the spinning reserve and the primary
reserve. It must be noticed that in addition, this reserve is distorted by the change of the set power.
 The primary and the secondary reserves are allocated amongst the members in proportion to their
largest installed generating unit.
FAULT @
3peak 3offpeak 1peak 1offpeak 3peak 3offpeak 1peak 1offpeak
Dist Salwa L5 OK OK OK OK OK OK OK OK
Dist Salwa L6 OK OK OK OK OK OK OK OK
Dist Salwa L7 OK OK OK OK OK OK OK OK
Dist Salwa L8 OK OK OK OK OK OK OK OK
Dist Salwa L11 OK OK OK OK OK OK OK OK
Dist Salwa L12 OK OK OK OK OK OK OK OK
Dist Silaa L11 OK OK OK OK OK OK OK OK
Dist Silaa L12 OK OK OK OK OK OK OK OK
Dist Silaa L13 OK OK OK OK OK OK OK OK
Dist Silaa L14 OK OK OK OK OK OK OK OK
Dist Ghuna L5 OK OK OK OK REM REM REM REM
Dist Ghuna L6 OK OK OK OK REM REM REM REM
Dist Doha S L7 OK OK OK OK REM REM REM REM
Dist Doha S L8 OK OK OK OK REM REM REM REM
Dist Schuwe L13 OK OK OK OK OK OK OK OK
Dist Schuwe L14 OK OK OK OK OK OK OK OK
SALWA SILAA
10
 For the reference incident, the frequency must not drop transiently below 49.50 Hz on the 50 Hz
side.
The HVDC station, in DRPS mode delivers 240 MW, 0.5 s after detection of the disturbance, if the
three following conditions are verified:
 The voltage variation rate dV/dt is greater than preset value. currently, it is set at 0;
 The frequency variation rate df/dt is greater than preset value. Currently, it is set at 0.05 Hz/s;
 The calculated contribution of the HVDC power station, based on a theoretical frequency gain, is
greater than 240 MW.
Once the DRPS of the HVDC power station is de-blocked, the initial contribution of the HVDC power
station is then reduced or increased in accordance with the calculation done with the frequency
controller gain. If requested, the second pole is de-blocked 4 s later.
The largest generating unit connected to the GCC system during the study amounts to 664 MW and
this unit is connected to the Saudi Arabia 60 Hz system. The tripping of that generating unit might be
the reference incident.
However, in case of tripping of the largest unit in Saudi Arabia (664 MW), the DRPS may not be
activated because the thresholds may not be reached and the spinning reserve in that case should not
change for Saudi Arabia.
On the 50 Hz side, the three systems are interconnected: i.e. Kuwait, Bahrain and Qatar. Because of
the results of the previous reference incident (loss of 664 MW in Saudi Arabia has no consequence on
the 50 Hz side), the largest generating unit on the 50 Hz side is considered as the reference. Even on
50 Hz side, of the HVDC back-to-back power station, is not always activated for the same amount of
generation loss. It depends on the load level, on the location of the tripped generating unit and on the
unit commitment.
Thus for safety reason, the potential contribution of the HVDC back-to-back power station is not taken
into consideration. This assumption avoids underestimating the primary reserve on the 50 Hz side,
which can drive to load shedding, if the HVDC back-to-back power station is not activated. If the
back-to-back is activated, the 60 Hz system contributes to the incident, thus the frequency deviation
should be smaller.
At the time of conducting the studies, the largest generating unit on the 50 Hz side is a combined cycle
in Qatar for 375 MW (one Gas Turbine and part of the associated steam turbine). Consequently, this
incident is simulated for peak and off-peak load. The results of these simulations will give the
necessary amount of primary reserve, in order to comply with GCCIA rules and determine the sharing
of primary and secondary reserves between each GCCIA member.
The two values for the minimum primary reserve, for both peak and off-peak periods are very close:
300 MW and 272 MW, but the reference incidents are quite different: in one hand the loss of 375 MW
and in other hand the loss of 283 MW. But the most important is the contributions of each country are
different, because the shares are based on the largest running generating units:
 Kuwait peak contribution: 91 MW and 150 MW for off-peak.
 Bahrain peak contribution 93 MW and 44 MW for off-peak.
 Qatar peak contribution 117 MW and 78 MW for off-peak.
For operations it would be very difficult for GCCIA to monitor the primary reserve and also to
determine, which set of primary reserve is requested. Therefore it is highly recommended to calculate
the contribution of each system on the base of the total active power generated in each system.
Obviously with the calculations based on the largest generating unit, the benefits of the reserve
reduction are equally shared among the participants, but for the reliability of the interconnected system
it is not recommended.
11
Regarding the behaviour of the back-to-back power station, for the two load levels, peak and off-peak,
the thresholds are not activated in case of the tripping of the generating unit in Ras Laffan B in Qatar,
with of power of 375 MW. But for off-peak and for a smaller amount of generation tripped in Kuwait,
only 283 MW, the back-to-back power station is activated. Therefore for the estimation of the primary
reserve the contribution of the back-to back power station cannot be taken into account, because it
highly depends on the location of the tripped generating unit and not on the amount of the generation
loss. The DRPS is activated only to stabilze the system in case for critical emergency but the HVDC is
available for commercial exchange through the Economic Transfer more. For Saudi Arabia, the
amount of primary reserve is not reduced yet with the interconnection, however, with enhancement of
the HVDC control system through a new triggering based on change in frequency (∆F) that is intended
to be added separately in addition to the already existing triggering; df/dt and dv/dt triggering criteria,
DRPS will be activated for losing the largest generator on the combined system as well as major
system disturbances.
CONCLUSIONS
The GCC interconnection is becoming a key element of the secure and reliable power supply to the
GCC countries. These high security and reliability requirements are mandatory conditions to further
optimize the GCC power system allowing power exchanges between the member states.
The longitudinal structure of the GCCIA Interconnection due to long distances of the transmission
corridors requires a careful assessment of the total transfer capacities and the transmission reliability
margins. The HVDC back-to-back interconnector is an important actuator to allow the optimization of
the mutual support between the 50 and 60 Hz synchronous system during normal and emergency
conditions.
The fast expansion of the member states power system and the opportunities offered by the GCCIA
system pose a number of operational new challenges:
- the data management and modelling coordination tasks between GCCIA and the member
states to master a continental size power system model especially when including the 60 Hz
KSA interconnection;
- the static and dynamic observability of the whole interconnection that is mainly concentrated
in the MS especially the contemplated roles of a PMU based wide area monitoring system
(WAMS) and in the longer term protection system (WAPS);
- the progressive migration from the actual interconnector transmission code focused on the
GCCIA system coupled with an harmonization of the key cross border features to a unified
technical code framework applicable to the whole GCC system.
Together with the member states, the GCCIA is a central and a key stakeholder to head these
challenges.
BIBLIOGRAPHY
[1] H.K. Al Asaad, A.A. Ebrahim ‘The GCC power grid: Benefits & Beyond’ Powergen 2008 Conf.
[2] A. A. Al-Ebrahim, N. Al-Shahrani, G. Stalens, J. Dubois, J. Warichet ‘Preparation GCC
Interconnection Operations through Operational Studies and Analysis’ GCC CIGRE 2009 Conf.
[3] N. Al-Shahrani, R. Lopez, N. Vidal, G. Nauton ‘GCCIA System Frequency Control Philosophy’
GCC CIGRE 2009 Conf.
[4] A. A. Al-Ebrahim, N. Al-Shahrani ‘The Dynamic Reserve Power Sharing Mode of
GCC Interconnection HVDC Link: Novel Design and Features’ GCC CIGRE 2010 Conf.

More Related Content

What's hot

A Case-Study on Blackout
A Case-Study on BlackoutA Case-Study on Blackout
A Case-Study on Blackoutijtsrd
 
EE8701 - HVE - Insulation coordination
EE8701 - HVE - Insulation coordinationEE8701 - HVE - Insulation coordination
EE8701 - HVE - Insulation coordinationKarthikeyanK816516
 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCLAman Rajput
 
O&m of hvdc station power grid india
O&m of hvdc station power grid indiaO&m of hvdc station power grid india
O&m of hvdc station power grid indiaVaibhav Jain
 
Protection schemes and zones
Protection schemes and zonesProtection schemes and zones
Protection schemes and zonesSlides Hub
 
Design and Development of 5MW Solar PV Grid Connected Power Plant using PVsyst
Design and Development of 5MW Solar PV Grid Connected Power Plant using PVsystDesign and Development of 5MW Solar PV Grid Connected Power Plant using PVsyst
Design and Development of 5MW Solar PV Grid Connected Power Plant using PVsystIRJET Journal
 
PGVCL Training Report
PGVCL Training ReportPGVCL Training Report
PGVCL Training ReportPriten Vasa
 
Power Quality and Monitoring
Power Quality and MonitoringPower Quality and Monitoring
Power Quality and Monitoringash08031996
 
Hybrid AC/DC microgrid and Electric Vehicles
Hybrid AC/DC microgrid and Electric VehiclesHybrid AC/DC microgrid and Electric Vehicles
Hybrid AC/DC microgrid and Electric VehiclesMd Shamiur Rahman
 
Ieee transfer schemes for M-T-M distribution systems
Ieee transfer schemes for M-T-M distribution systemsIeee transfer schemes for M-T-M distribution systems
Ieee transfer schemes for M-T-M distribution systemsVincent Wedelich, PE MBA
 
Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)Dhruv Agarwal
 
Automatic Load Frequency Control ppt.pdf
Automatic Load Frequency Control ppt.pdfAutomatic Load Frequency Control ppt.pdf
Automatic Load Frequency Control ppt.pdfPhenomAssassin
 
grid sub-station training Report
grid sub-station training Report grid sub-station training Report
grid sub-station training Report ravi kant
 
Distribution network reconfiguration for loss reduction and voltage
Distribution network reconfiguration for loss reduction and voltageDistribution network reconfiguration for loss reduction and voltage
Distribution network reconfiguration for loss reduction and voltageGaddafi Sani
 

What's hot (20)

A Case-Study on Blackout
A Case-Study on BlackoutA Case-Study on Blackout
A Case-Study on Blackout
 
EE8701 - HVE - Insulation coordination
EE8701 - HVE - Insulation coordinationEE8701 - HVE - Insulation coordination
EE8701 - HVE - Insulation coordination
 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL
 
O&m of hvdc station power grid india
O&m of hvdc station power grid indiaO&m of hvdc station power grid india
O&m of hvdc station power grid india
 
Protection schemes and zones
Protection schemes and zonesProtection schemes and zones
Protection schemes and zones
 
Power System Stablity
Power System StablityPower System Stablity
Power System Stablity
 
Design and Development of 5MW Solar PV Grid Connected Power Plant using PVsyst
Design and Development of 5MW Solar PV Grid Connected Power Plant using PVsystDesign and Development of 5MW Solar PV Grid Connected Power Plant using PVsyst
Design and Development of 5MW Solar PV Grid Connected Power Plant using PVsyst
 
PGVCL Training Report
PGVCL Training ReportPGVCL Training Report
PGVCL Training Report
 
Power Quality and Monitoring
Power Quality and MonitoringPower Quality and Monitoring
Power Quality and Monitoring
 
Distributed Generation
Distributed Generation Distributed Generation
Distributed Generation
 
Hybrid AC/DC microgrid and Electric Vehicles
Hybrid AC/DC microgrid and Electric VehiclesHybrid AC/DC microgrid and Electric Vehicles
Hybrid AC/DC microgrid and Electric Vehicles
 
Ieee transfer schemes for M-T-M distribution systems
Ieee transfer schemes for M-T-M distribution systemsIeee transfer schemes for M-T-M distribution systems
Ieee transfer schemes for M-T-M distribution systems
 
Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)
 
Automatic Load Frequency Control ppt.pdf
Automatic Load Frequency Control ppt.pdfAutomatic Load Frequency Control ppt.pdf
Automatic Load Frequency Control ppt.pdf
 
grid sub-station training Report
grid sub-station training Report grid sub-station training Report
grid sub-station training Report
 
Islanding
IslandingIslanding
Islanding
 
Saudi Arabian Power Grid Code 2020
Saudi Arabian Power Grid Code 2020Saudi Arabian Power Grid Code 2020
Saudi Arabian Power Grid Code 2020
 
Distribution network reconfiguration for loss reduction and voltage
Distribution network reconfiguration for loss reduction and voltageDistribution network reconfiguration for loss reduction and voltage
Distribution network reconfiguration for loss reduction and voltage
 
Generator capability curve
Generator capability curve Generator capability curve
Generator capability curve
 
PPT ON 220KV GSS
PPT ON 220KV GSSPPT ON 220KV GSS
PPT ON 220KV GSS
 

Similar to GCC Interconnection Grid Operational Studies

A flywheel energy storage system for an isolated micro-grid
A flywheel energy storage system for an isolated micro-gridA flywheel energy storage system for an isolated micro-grid
A flywheel energy storage system for an isolated micro-gridIJMER
 
9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libre9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libreAbanihi
 
Improving the voltage quality of Abu Hummus network in Egypt
Improving the voltage quality of Abu Hummus network in Egypt Improving the voltage quality of Abu Hummus network in Egypt
Improving the voltage quality of Abu Hummus network in Egypt IJECEIAES
 
GCCIA POWER SYSTEM installed by AREVA
GCCIA POWER SYSTEM installed by AREVA GCCIA POWER SYSTEM installed by AREVA
GCCIA POWER SYSTEM installed by AREVA Power System Operation
 
Over head electricity Ohe manual of trd railway.pdf
Over head electricity Ohe manual of trd railway.pdfOver head electricity Ohe manual of trd railway.pdf
Over head electricity Ohe manual of trd railway.pdfbikrambehara
 
Power-Sharing of Parallel Inverters in Micro-Grids via Droop control and Virt...
Power-Sharing of Parallel Inverters in Micro-Grids via Droop control and Virt...Power-Sharing of Parallel Inverters in Micro-Grids via Droop control and Virt...
Power-Sharing of Parallel Inverters in Micro-Grids via Droop control and Virt...IRJET Journal
 
Performance Analysis of DC Micro Grid with PV-Fuel Cell Hybrid Generation
Performance Analysis of DC Micro Grid with PV-Fuel Cell Hybrid GenerationPerformance Analysis of DC Micro Grid with PV-Fuel Cell Hybrid Generation
Performance Analysis of DC Micro Grid with PV-Fuel Cell Hybrid GenerationIJMREMJournal
 
IRJET- Optimization of Renewable Energy Sources for DC Microgrid
IRJET-  	  Optimization of Renewable Energy Sources for DC MicrogridIRJET-  	  Optimization of Renewable Energy Sources for DC Microgrid
IRJET- Optimization of Renewable Energy Sources for DC MicrogridIRJET Journal
 
IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...
IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...
IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...IRJET Journal
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportAneel-k Suthar
 
Impact of LCC–HVDC multiterminal on generator rotor angle stability
Impact of LCC–HVDC multiterminal on generator rotor  angle stability  Impact of LCC–HVDC multiterminal on generator rotor  angle stability
Impact of LCC–HVDC multiterminal on generator rotor angle stability IJECEIAES
 
Effect of converter dc fault on the transient stability of a multi machine po...
Effect of converter dc fault on the transient stability of a multi machine po...Effect of converter dc fault on the transient stability of a multi machine po...
Effect of converter dc fault on the transient stability of a multi machine po...Indra S Wahyudi
 
A Power Flow Analysis of the Nigerian 330 KV Electric Power System
A Power Flow Analysis of the Nigerian 330 KV Electric Power SystemA Power Flow Analysis of the Nigerian 330 KV Electric Power System
A Power Flow Analysis of the Nigerian 330 KV Electric Power SystemIOSR Journals
 
A Power Flow Analysis of the Nigerian 330 KV Electric Power System
A Power Flow Analysis of the Nigerian 330 KV Electric Power SystemA Power Flow Analysis of the Nigerian 330 KV Electric Power System
A Power Flow Analysis of the Nigerian 330 KV Electric Power SystemIOSR Journals
 
Power transfer control within the framework of vehicle-to-house technology
Power transfer control within the framework of  vehicle-to-house technologyPower transfer control within the framework of  vehicle-to-house technology
Power transfer control within the framework of vehicle-to-house technologyIJECEIAES
 
Design and Implementation of Fuzzy logic based Multilevel Inverter for Micro ...
Design and Implementation of Fuzzy logic based Multilevel Inverter for Micro ...Design and Implementation of Fuzzy logic based Multilevel Inverter for Micro ...
Design and Implementation of Fuzzy logic based Multilevel Inverter for Micro ...IRJET Journal
 

Similar to GCC Interconnection Grid Operational Studies (20)

A flywheel energy storage system for an isolated micro-grid
A flywheel energy storage system for an isolated micro-gridA flywheel energy storage system for an isolated micro-grid
A flywheel energy storage system for an isolated micro-grid
 
THINK GCCIA
THINK GCCIA THINK GCCIA
THINK GCCIA
 
9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libre9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libre
 
Improving the voltage quality of Abu Hummus network in Egypt
Improving the voltage quality of Abu Hummus network in Egypt Improving the voltage quality of Abu Hummus network in Egypt
Improving the voltage quality of Abu Hummus network in Egypt
 
GCCIA POWER SYSTEM installed by AREVA
GCCIA POWER SYSTEM installed by AREVA GCCIA POWER SYSTEM installed by AREVA
GCCIA POWER SYSTEM installed by AREVA
 
Sysc 5302 101079892
Sysc 5302 101079892Sysc 5302 101079892
Sysc 5302 101079892
 
Over head electricity Ohe manual of trd railway.pdf
Over head electricity Ohe manual of trd railway.pdfOver head electricity Ohe manual of trd railway.pdf
Over head electricity Ohe manual of trd railway.pdf
 
Power-Sharing of Parallel Inverters in Micro-Grids via Droop control and Virt...
Power-Sharing of Parallel Inverters in Micro-Grids via Droop control and Virt...Power-Sharing of Parallel Inverters in Micro-Grids via Droop control and Virt...
Power-Sharing of Parallel Inverters in Micro-Grids via Droop control and Virt...
 
A novel fast MPPT strategy used for grid-connected residential PV system appl...
A novel fast MPPT strategy used for grid-connected residential PV system appl...A novel fast MPPT strategy used for grid-connected residential PV system appl...
A novel fast MPPT strategy used for grid-connected residential PV system appl...
 
Performance Analysis of DC Micro Grid with PV-Fuel Cell Hybrid Generation
Performance Analysis of DC Micro Grid with PV-Fuel Cell Hybrid GenerationPerformance Analysis of DC Micro Grid with PV-Fuel Cell Hybrid Generation
Performance Analysis of DC Micro Grid with PV-Fuel Cell Hybrid Generation
 
IRJET- Optimization of Renewable Energy Sources for DC Microgrid
IRJET-  	  Optimization of Renewable Energy Sources for DC MicrogridIRJET-  	  Optimization of Renewable Energy Sources for DC Microgrid
IRJET- Optimization of Renewable Energy Sources for DC Microgrid
 
IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...
IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...
IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship report
 
Impact of LCC–HVDC multiterminal on generator rotor angle stability
Impact of LCC–HVDC multiterminal on generator rotor  angle stability  Impact of LCC–HVDC multiterminal on generator rotor  angle stability
Impact of LCC–HVDC multiterminal on generator rotor angle stability
 
Effect of converter dc fault on the transient stability of a multi machine po...
Effect of converter dc fault on the transient stability of a multi machine po...Effect of converter dc fault on the transient stability of a multi machine po...
Effect of converter dc fault on the transient stability of a multi machine po...
 
A Power Flow Analysis of the Nigerian 330 KV Electric Power System
A Power Flow Analysis of the Nigerian 330 KV Electric Power SystemA Power Flow Analysis of the Nigerian 330 KV Electric Power System
A Power Flow Analysis of the Nigerian 330 KV Electric Power System
 
A Power Flow Analysis of the Nigerian 330 KV Electric Power System
A Power Flow Analysis of the Nigerian 330 KV Electric Power SystemA Power Flow Analysis of the Nigerian 330 KV Electric Power System
A Power Flow Analysis of the Nigerian 330 KV Electric Power System
 
I010114657
I010114657I010114657
I010114657
 
Power transfer control within the framework of vehicle-to-house technology
Power transfer control within the framework of  vehicle-to-house technologyPower transfer control within the framework of  vehicle-to-house technology
Power transfer control within the framework of vehicle-to-house technology
 
Design and Implementation of Fuzzy logic based Multilevel Inverter for Micro ...
Design and Implementation of Fuzzy logic based Multilevel Inverter for Micro ...Design and Implementation of Fuzzy logic based Multilevel Inverter for Micro ...
Design and Implementation of Fuzzy logic based Multilevel Inverter for Micro ...
 

More from Power System Operation

Thermography test of electrical panels
Thermography test of electrical panelsThermography test of electrical panels
Thermography test of electrical panelsPower System Operation
 
Big Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsBig Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsPower System Operation
 
SPS to RAS Special Protection Scheme Remedial Action Scheme
SPS to RAS Special Protection Scheme  Remedial Action SchemeSPS to RAS Special Protection Scheme  Remedial Action Scheme
SPS to RAS Special Protection Scheme Remedial Action SchemePower System Operation
 
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...Power System Operation
 
Principles & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePrinciples & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePower System Operation
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)Power System Operation
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & PartsPower System Operation
 
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools
The Need for Enhanced Power System Modelling Techniques & Simulation Tools Power System Operation
 
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
Power Quality  Trends in the Transition to  Carbon-Free Electrical Energy SystemPower Quality  Trends in the Transition to  Carbon-Free Electrical Energy System
Power Quality Trends in the Transition to Carbon-Free Electrical Energy SystemPower System Operation
 

More from Power System Operation (20)

ENERGY TRANSITION OUTLOOK 2021
ENERGY TRANSITION OUTLOOK  2021ENERGY TRANSITION OUTLOOK  2021
ENERGY TRANSITION OUTLOOK 2021
 
Thermography test of electrical panels
Thermography test of electrical panelsThermography test of electrical panels
Thermography test of electrical panels
 
What does peak shaving mean
What does peak shaving meanWhat does peak shaving mean
What does peak shaving mean
 
What's short circuit level
What's short circuit levelWhat's short circuit level
What's short circuit level
 
Power System Restoration Guide
Power System Restoration Guide  Power System Restoration Guide
Power System Restoration Guide
 
Big Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsBig Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid Operations
 
SPS to RAS Special Protection Scheme Remedial Action Scheme
SPS to RAS Special Protection Scheme  Remedial Action SchemeSPS to RAS Special Protection Scheme  Remedial Action Scheme
SPS to RAS Special Protection Scheme Remedial Action Scheme
 
Substation Neutral Earthing
Substation Neutral EarthingSubstation Neutral Earthing
Substation Neutral Earthing
 
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
 
Principles & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePrinciples & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground Resistance
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & Parts
 
What is load management
What is load managementWhat is load management
What is load management
 
What does merit order mean
What does merit order meanWhat does merit order mean
What does merit order mean
 
What are Balancing Services ?
What are  Balancing Services ?What are  Balancing Services ?
What are Balancing Services ?
 
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
 
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
Power Quality  Trends in the Transition to  Carbon-Free Electrical Energy SystemPower Quality  Trends in the Transition to  Carbon-Free Electrical Energy System
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
 
Power Purchase Agreement PPA
Power Purchase Agreement PPA Power Purchase Agreement PPA
Power Purchase Agreement PPA
 
Harmonic study and analysis
Harmonic study and analysisHarmonic study and analysis
Harmonic study and analysis
 
What is leakage current testing
What is leakage current testingWhat is leakage current testing
What is leakage current testing
 

Recently uploaded

OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 

Recently uploaded (20)

OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 

GCC Interconnection Grid Operational Studies

  • 1. 1 GCC Interconnection Grid: Operational Studies for the GCC Interconnection with United Arab Emirates (UAE) A. AL-EBRAHIM GCCIA Bahrain N. AL-SHAHRANI GCCIA Saudi Arabia M. AL-SHAIKH GCCIA Bahrain K. KAROUI TRACTEBEL ENGINEERING Belgium D. ZENNER ELIA SYSTEM OPERATOR Belgium P. MICHAL RTE France SUMMARY The Arab Gulf Cooperation Council (GCC) countries namely the United Arab Emirates, Bahrain, Saudi Arabia, Oman, Qatar, and Kuwait have embraced changes to their power sectors with more private sectors participation as a result of increasing demands for power due to rapid population, commercial and industrial growth in their respective countries. Realizing the need for more reliable GCC power grids with power exchange possibilities, the Governments of the GCC countries have established the GCC Interconnection Authority to construct and operate a 400 kV interconnection backbone grid between the six Member States (MS). The GCC Interconnection network phase 1 was completed and successfully commissioned during the first quarter of the year 2009. Phase 1 network consists of seven 400 kV substations interconnecting the independent Member States’ Power Systems (MSPS): Kuwait, Saudi Arabia, Bahrain and Qatar through a 900 km 400 kV overhead lines and a 51 km 400 KV submarine and land cables. This GCC Interconnection phase I combines long distance high voltage overhead lines, high voltage cables and a HVDC back-to-back substation. The HVDC connects the 50 Hz interconnected networks of the power systems in Kuwait, Bahrain, Qatar, UAE and Oman with the 60 Hz system in Saudi Arabia. The GCC Interconnection network phase 3 successfully completed when UAE 400 kV network was connected to the GCC Interconnection network Phase 1 through double circuits 400 kV overhead lines, and synchronised for the first time with Phase I network on April 2011 and Oman grid was connected to UAE grid through double circuits 220 kV overhead lines on October 2011. In order to prepare for the safe, secure and stable operation of the combined GCC interconnection including UAE and Oman, a number of detailed operational studies were performed including system studies, electromagnetic transients, protection studies, frequency control studies, and more. The paper presents the results of these operational studies and the approach the operations issues arising from the results of the studies were addressed. KEYWORDS Large system, interconnection, stability, primary frequency control, maximum transfer capability, simulation. 21, rue d’Artois, F-75008 PARIS C4-107 CIGRE 2012 http : //www.cigre.org
  • 2. 2 INTRODUCTION The electrical interconnection process between the GCC countries power systems is a three phase process [1]: - The Phase I is related to the North Grid of the GCC power system and interconnects four Member States (MS) namely Kuwait, Saudi Arabia, Bahrain and Qatar. It is in operation since the first quarter of 2009. This phase comprise about 900 km double circuits 400 kV AC interconnection of Bahrain, Kuwait and Qatar and a 1800 MW HVDC back to back interconnector with the Eastern part of Saudi Arabia 60 Hz power system [2]. - The Phase II involves the internal interconnection and enforcement of the South Grids (UAE and Oman) to form UAE national grid and Oman northern grid which was achieved in parallel to Phase-I. The UAE electricity system is already interconnecting the separate power grids of its seven emirates to form the Emirates National Grid (ENG). Abu Dhabi is connected to Dubai, Sharjah and the other emirates through a 400 kV line. GCCIA is not directly involved in the execution of Phase II. - The Phase III is related to the interconnection between the North and the South GCC regional grids and involves the connection of UAE (Abu Dhabi) grid to Phase I, and the connection of the UAE and Oman electricity systems through 220 kV lines. From the operational studies perspective, the interconnection of the power system of Oman is performed through the double circuit 220 kV line connecting the substation of Al Foha in UAE to the substation of Mahadha in Oman. From the perspective of a 400 kV interconnection between Oman and the UAE, the 220kV interconnection operation can be considered as a conservative assumption. The Phase III has been completed in 2011 and consists of a double-circuit 400 kV corridor from Salwa (Saudi Arabia) to Silaa (UAE-AbuDhabi) then to Shuwaihat (UAE). It is successfully in operation since July 2011. Schematic and geographical views of the GCC power system are presented in Figure 1 and 2. It indicates a structure composed of rather lumped centres of consumption and generation interconnected by long 400 kV corridors between the various MS. Unlike the other MS, the power grid of Oman would be connected via a 220 kV links through the UAE network. Figure 1 : Geographical structure of the GCCIA system
  • 3. 3 Figure 2: Topological structure of the GCCIA system Prior to the Phase III interconnected operation, a number of operational studies have been performed not only to ensure the successful synchronization and operation, but also to identify stable and reliable operating regimes for the GCC interconnected system. They are related to the following aspects: short circuit analysis, maximum power transfer limits analysis, transient and small signal stability analyses, primary frequency control, adequacy of defence plans and EMTP switching simulations to assess the capability of the new equipments. GCC INTERCONNECTED SYSTEM The GCC interconnection is composed of seven 400 kV substations connecting five MS through approximately 900 km 400 kV OHL backbone connecting the substations of Al-Zour (Kuwait) in the North to the substation of Silaa (UAE) in the South. It consists of a double circuit line rated at 1900 MVA. Bahrain is connected to the 400 kV back bone through two submarine cables rated each at 715 MVA. Kuwait, Bahrain and Qatar interconnect to the GCCIA system through respectively (3x650 MVA, 3x325 MVA and 3x400 MVA transformers). Saudi Arabia is connected through a back-to-back HVDC converters rated at 3x600 MW at the 400 kV substation of Al-Fadhili. The HVDC station, in addition to being designed for economic power exchanges, has a novel feature that enables Dynamic Reserve Power Sharing (DRPS) between the 60 Hz and 50 Hz systems, and has been to date activated on several occasions following severe active power unbalances for mutual support between the 50 Hz and the 60 Hz systems. The system is operated according to an Interconnection Transmission Code (ITC) that requires among others, the N-1 security criterion for the largest credible contingency. The net transfer capacity (NTC) is obtained by subtracting to the total transfer capacity (TTC) the transfer reliability margin (TRM). The latter accounts for unintentional deviations such as physical flows due to power frequency control, unexpected unbalances between MS system operators and inaccuracies deriving from collected data and measurements. Additionally, the system is equipped with a set of nineteen 125 and 300 MVAr line, cable and substation connected shunt reactors. The substation reactors are operated to balance the MVAr exchanges and control voltages at the interface between GCCIA and the MS power systems.
  • 4. 4 Total peak load of the GCC countries power system is estimated at 92.5 GW when minimum load is estimated at 35.4 GW. This high peak load vs. minimum load ratio is due to the high proportion of air conditioning load during hot summer temperatures. POWER SYSTEM MODEL AND CONSIDERED OPERATING CONDITIONS Power system studies were performed using a detailed model of the interconnected MS power systems developed with the assistance and cooperation of the Member States. It represents a 650 generator system for the 50 Hz system while the units of KSA Eastern operating region (60 Hz) are also represented in their real identity and where the three other operating regions (Western, Central and Southern) are represented by equivalent models. The system model accounts not only for the various security systems mainly the under frequency load shedding system but also for the HVDC back-to- back station and its Dynamic Reserve Power Sharing (DRPS) function. In addition, the peak load model includes a high proportion of rotating load in the load mix. This translates into an equivalent induction motor at each load bus connected downstream an equivalent distribution transformer and medium voltage feeder. Peak load analyses are performed on three steady state operating conditions: i/ no power exchanges between the MS, ii/ maximum power transfer stream from North to South and iii/ maximum power transfer stream from South to North. The later two operating conditions are considered as most severe normal conditions since the angle difference between Kuwait and Oman is maximized and reaches 52°. Minimum load analysis is performed assuming no power exchanges between MS. This is representative of the large volume of tertiary reserves available during winter period in each MS. For all considered cases, the spinning reserve is adjusted to the minimum required as per the interconnector code. This is a conservative assumption during winter period as desalination constraints provide large primary reserve margins. IMPACT OF THE INTERCONNECTOR ON THE SHORT CIRCUIT LEVELS Single and three phase faults levels have been determined according to IEC 60909 standard before and after Phase III interconnection assuming 50 ms contact parting time. Obtained results indicate that the 400 kV GCCIA substation breakers have the capability to interrupt successfully symmetric and asymmetric 1-ph and 3-ph faults. Fault level at the 400 kV substations, Silaa remains significantly below 30 kA for a breaker capability of 63 kA. SMALL SIGNAL STABILITY After Phase III interconnection, the 50 Hz part of the GCC system is characterized by a set of power systems connected together through relatively long AC lines leading to a longitudinal system structure. Although the GT, ST and CCGT generation mix of all MS is not prone to low damping inter-area oscillation, the interconnection of North and South parts will change the shape of the existing oscillation modes and new inter-area modes will be experienced. Phase I interconnection analysis had already highlighted the need to improve inter-area modes between Kuwait, Bahrain and Qatar. Installation and re-tuning of dedicated PSS are ongoing in Kuwait and Qatar large power plants generators. The analysis focuses on the modes comprised between 0.05 and 1 Hz i.e. the modes related to coherent groups of units. The modes are considered as insufficiently damped when the damping factor falls below 5% in all credible contingency conditions. After linearization of the differential-algebraic set of non linear equations, the inter-area modes and their damping are calculated on base of an Arnoldi method. In order to secure a conservative assessment of the damping, the following situations have
  • 5. 5 been considered in peak and off-peak load: i/ base case without contingency i.e. N case; ii/ N-1 contingency cases with for each considered case, one circuit out of service; iii/ N-2 situation where Bahrain and Qatar are absent increasing the electrical distance between the North and the South parts of the GCC system; iv/ simultaneous N-1 contingencies on all interconnection corridors. All new inter-area modes display a damping rate higher than 5% with natural frequencies comprised between 0.19 and 0.6 Hz. The lowest damping factor (7.5 %) is encountered in N-2 contingency situation when Qatar is not connected. The damping of the existing GCC Phase I mode involving Kuwait, Bahrain and Qatar increases to 6.75% due to the introduction of the PSS in Qatar and Kuwait. Figure 3 below illustrates the inter-area oscillation modes on the GCCIA system. Figure 3 : Inter-area oscillation modes on the GCCIA system As these damping levels are model based conclusions, GCCIA is monitoring the effective damping achieved on the GCCIA various corridors during the early phase on the interconnected operation. The longitudinal and multi power flow pattern makes the GCCIA system a good candidate for a Phase Measurement Unit (PMU) based wide area inter-area oscillations monitoring system. Optimal locations for dynamic observability are the substations of the GCCIA system and the large power plants connecting substations in the MS grids. TRANSIENT STABILITY Transient stability has been assessed to verify the ability of the system to withstand normally cleared 1-ph and 3-ph cleared in base (80 ms) and back-up (325 ms) time. As loss of synchronism following faults inside the MS is prevented by the MS internal protection schemes, the main focus of the assessment is the risk of cross border loss of stability. Obtained results are critical inputs for the location and the settings of the out of step relays along the GCCIA 400 kV corridors. In addition, following severe faults, the air conditioning load inside the MS impacts the voltage stability of the system. However, its impact on the GCCIA interconnection is limited by the presence of low voltage relays located the GCCIA substations connecting the MS. Angular stability following 3-ph faults cleared in base time is verified with 100% impedance load on the peak load high power transfer scenarios. Following 3-ph faults cleared in back-up time due to breaker failure, losses of synchronism appear for faults located close to Al-Zour, Ghunan, Al Jasra, Salwa and Shuweihat. This conclusion is confirmed by a set of critical clearing times found lower than 325 ms and justifies the installation of out of step relays at suitable locations of the GCCIA system. KU BA QA UAE OM KU BA QA KU BA QA UAE OM KU BA QA UAE OM 2 groups mode: 15% <ξ< 37% and 0.19 Hz <f< 0.31 Hz 3 groups mode: 6.7% <ξ< 14% and 0.39 Hz <f< 0.50 Hz KU BA QA 4 groups mode: 7.5% <ξ< 15% and 0.40 Hz <f< 0.47 Hz KU BA QA OM UAE 3 groups mode: 13% <ξ< 20% and 0.34 Hz <f< 0.42 Hz KU BA OM KU BA OMQA UAE QA UAE
  • 6. 6 INTERCONNECTION TRANSFER LIMITS Together with the thermal limits, the knowledge of the maximum transfer limits is a key input of the total transfer capacities and therefore the net transfer capacity assessment. Their comparison with the thermal limits of the corridors defines if a corridor security limit is thermally or stability driven. Maximum power transfer capacity is defined as the maximum power flow between two MS of the system. For each pair of MS, two values are determined corresponding to the maximum transfer limit in both directions. They are achieved in peak and minimum load in N and N-1 contingency situations corresponding to the loss of the major elements of the GCCIA system (i.e. 400 kV circuit and MS- GCCIA transformer). Figure 4 : Maximum power transfer in MW vs. voltage in p.u. between UAE and Kuwait in normal conditions. Table 1 : Maximum transfer capacity between MS at peak load (N situation) in MW Table 2 : Maximum transfer capacity between MS at peak load (N-1 situation) in MW Figure 4 presents the 1600 MW maximum power transfer between UAE and Kuwait in normal conditions. Tables 1 and 2 present the obtained max transfer capacity results matrices in N and N-1 contingency situations. Effective transfer capacities are derived from the max transfer capacity by subtracting a 20% margin. PRIMARY FREQUENCY CONTROL The interconnection of AC systems requires the definition of common rules for primary reserves and the determination of the expected contribution of each system to the primary frequency control. Their main impact is the determination of the transfer reliability margin. Contribution to the primary frequency control is regulated by the interconnector code. It stipulates that the secured incident size must correspond to the largest single credible incident (480 MW) following the loss of a unit in UAE) increased by a margin of 10%. The reserve allocated to each unit shall not exceed 5% of its size. The sharing of the spinning reserve volume between the MS is in accordance to their generation size in the total synchronous system. Minimum contribution in % to the total spinning reserve is presented in Table 3: Table 3 : Spinning reserve allocation between MS Figure 5 : Transfer margin on GCCIA 400 kV corridors for primary frequency control -0 200 400 600 800 1000 1200 1400 1600 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 p.u. [uae2k] UAE to Kuwait Transfer [ua2k] VOLTAGE AT NODE : SALWA1 Unit : p.u. [ua2k] VOLTAGE AT NODE : GHUNAN1 Unit : p.u. [ua2k] VOLTAGE AT NODE : FADHILI1 Unit : p.u. [ua2k] VOLTAGE AT NODE : ALZOUR1 Unit : p.u. Kuwait KSA Bahrain Qatar UAE Kuwait - 2000 1900 2200 2500 KSA 1900 - 1950 2450 Bahrain 1550 2050 - 2150 2500 Qatar 1500 1500 1500 - 2600 UAE 1600 1550 1800 2700 - Kuwait KSA Bahrain Qatar UAE Kuwait - 1490 1700 1750 2200 KSA 1280 - 1700 1360 2150 Bahrain 1200 1520 - 1450 2080 Qatar 1180 1380 1400 - 2260 UAE 1180 1320 1490 1950 - Member State Ci (%) Spinning Reserve (MW) Bahrain 8.4 44 Oman 12.1 64 Qatar 15.5 82 Abu Dhabi 30.8 163 Kuwait 33.2 175 Total 100 528
  • 7. 7 The contribution of the primary frequency control to the transfer reliability margin is required to permit the secure power flows on the various GCCIA interconnectors induced by the primary frequency control. Those contributions vary with the corridor location and correspond to the largest active power flow variation induced by the loss of the largest unit in each member state and the subsequent primary frequency control activation. Margins required for a largest loss located in Qatar are presented in Figure 5. The larger the system total size, the lower frequency deviation the system will experience following the largest generation loss. This requires to monitor and to take into account the governor voluntary dead-bands but also, above a given size, the impact of the frequency insensitivity ranges to better predict the response of the MS following a generation trip. ADEQUACY OF DEFENCE ACTIONS Defence actions are of three types: - Under frequency load shedding (UFLS) and, below a given frequency level, disconnection of importing MS; - MS disconnection below a given voltage level at the connecting substation; - Out of step relay to avoid the spread of out of step operating conditions. The Under Frequency Load Shedding adequacy has been harmonized to limit transient power flows due to discrepancies between the various MS UFLS subsequent to their activation. Taking into account the UFLS harmonization done for phase-1 countries and the large volumes related to each load shedding stage (approximately 2400 MW corresponding to 5% of the 50 Hz system total interconnected system peak load), Oman UFLS settings are adjusted to secure the frequency stability of an islanded system by adjusting the first stage set at 49.3 Hz instead than 49.5 Hz and increase the UFLS total from 35% to a value above 40% of the total load and UAE UFLS harmonization has been achieved by splitting of the previous first UFLS stage into two distinct stages (49.3 Hz, 5%) and (49.2 Hz, 5%). Minimum Voltage Relay: To mitigate the extension of delayed voltage recovery induced by a lack of dynamic reactive power reserves or under voltage load shedding in one MS and the consequent risk of voltage collapse, a low voltage back up protection prevents that low voltages at the point of common coupling impact the integrity of the bulk GCCIA interconnection. It is activated if the voltage remains below the range 0.8 – 0.85 p.u. during several seconds. Out Of Step Relays presence is necessary to mitigate the detrimental impact of out of step operating conditions between the various parts of the GCC system. Out of step relays (OOS) are located on the various corridors potentially subject to a loss of synchronism. Their tuning is performed according the following methodology: - Definition of a ‘target trip matrix’ on base of the transient stability simulation results. The location and activation requirements are based on the requirement to keep coherent groups of generators; - Assessment of the OOS relays ability to detect out of step operating conditions. An ‘achieved trip matrix’ is therefore defined and compared to the ‘target trip matrix’ to confirm the adequacy of the relay locations. - Relay operation assessment on base of the simulated X/R trajectories and the detailed Areva – MiCOM P754x logic. When necessary, zone 5 and zone 6 parameters and bandwidth crossing time are adapted. - The four OOS relays settings are validated on the simulation of a large number of fault locations and initial operating conditions (74). Simulation results indicate a success rate of 92% for faults cleared in back-up time following a breaker failure. It is observed that the out of step is not activated following a fault clearing in base time reducing further the risk of mal- operation. The behaviour of the GCCIA system has been assessed on the simulation of large disturbances especially the stability of GCCIA various parts following the simultaneous loss of the two circuits
  • 8. 8 composing a transmission corridor. This leads to the split in two parts of the system and the activation of the UFLS in case of large North-to-South or South-to-North power exchange. The response of the system includes the activation of the UFLS and the HVDC back-to-back dynamic reserve power sharing (DRPS) logic. The synthesis of the simulated loss of corridor results is presented in Table 4. Table 4: Ability of the GCC subsystems to recover following a N-2 contingencies leading to a GCC system split Achieved results highlighted the need to extend the transfer reliability margin to the power flow transients related to the first UFLS stage and to improve the HVDC back-to-back interconnector response and underlying DRPS logic [4] to better cope with sudden large export rejection (i.e. generation excess and over frequency transients) but also a following large generation deficit. An ongoing project aims at improving the HVDC interconnector DRPS logic. PROTECTION STUDIES The protection studies mainly focused on the new interconnections and substations put in place to link the North and the South GCC regional girds (Part III). Nevertheless a thorough analysis of the protections of the adjacent interconnections and substations was performed to determine the consistency with the new used protections. The studies focused on three domains: control of the philosophy used to protect the installations as well as its correct translation into the used block diagrams, cross-check of the protection settings via calculations and, at last, simulations via PSS™SINCAL to have a full selectivity check on the interaction of all used protections (Figure 6). Different types of simulations were conducted where faults (three phase and single phase faults) were simulated at the beginning (10%), middle (50%) and end (90%) of every interconnection and on bus bars of every substation (and this all for peak and off-peak conditions) (Table 5). For each simulation, the state of the protection was analyzed (trip, pick-up, no start) as well as the tripping zone/time and the measured impedance. General conclusion is a correct behaviour of all used protections and proposed settings and a guaranteed selectivity for types of simulated faults.
  • 9. 9 Figure 6: Simulated grid Table 5: Response of fault clearance by backup distance protections for faults on bus bars (1ph/3ph, peak/off-peak). The major recommendations of the studies were optimizations on the auto reclose program as well as on the philosophy of the breaker failure protection. The breaker failure protection scheme was reviewed in order to lower the fault clearance time. The recommendation consisted in a second trip command issued by the main protections of the interconnections and a simplification towards a one stage breaker failure protection scheme and hence a gain in fault clearance time. CONTRIBUTION TO PRIMARY FREQUENCY RESPONSE BY PHASE I MEMBER STATES In an interconnected system, the spinning reserve is shared among the members. The spinning reserve includes primary and secondary reserves and is given by the sum of the values of power between the set-power at the reference frequency, and the limiter position of each power plant. GCCIA has taken the following principles for the spinning reserve [3]:  The total primary reserve must cover the reference incident.  As regards the duties towards the partners, the reference incident is taken equal to the largest unit installed within the interconnected system. Otherwise, each partner may choose a more restricting rule, (for instance simultaneously 2 power plants in Kuwait).  The primary reserve is calculated in such a way that in the case of the tripping of the largest generating unit, after the delivery of the primary reserve, the final frequency deviation should be at maximum equal to 200 mHz.  The available secondary reserve is the difference between the spinning reserve and the primary reserve. It must be noticed that in addition, this reserve is distorted by the change of the set power.  The primary and the secondary reserves are allocated amongst the members in proportion to their largest installed generating unit. FAULT @ 3peak 3offpeak 1peak 1offpeak 3peak 3offpeak 1peak 1offpeak Dist Salwa L5 OK OK OK OK OK OK OK OK Dist Salwa L6 OK OK OK OK OK OK OK OK Dist Salwa L7 OK OK OK OK OK OK OK OK Dist Salwa L8 OK OK OK OK OK OK OK OK Dist Salwa L11 OK OK OK OK OK OK OK OK Dist Salwa L12 OK OK OK OK OK OK OK OK Dist Silaa L11 OK OK OK OK OK OK OK OK Dist Silaa L12 OK OK OK OK OK OK OK OK Dist Silaa L13 OK OK OK OK OK OK OK OK Dist Silaa L14 OK OK OK OK OK OK OK OK Dist Ghuna L5 OK OK OK OK REM REM REM REM Dist Ghuna L6 OK OK OK OK REM REM REM REM Dist Doha S L7 OK OK OK OK REM REM REM REM Dist Doha S L8 OK OK OK OK REM REM REM REM Dist Schuwe L13 OK OK OK OK OK OK OK OK Dist Schuwe L14 OK OK OK OK OK OK OK OK SALWA SILAA
  • 10. 10  For the reference incident, the frequency must not drop transiently below 49.50 Hz on the 50 Hz side. The HVDC station, in DRPS mode delivers 240 MW, 0.5 s after detection of the disturbance, if the three following conditions are verified:  The voltage variation rate dV/dt is greater than preset value. currently, it is set at 0;  The frequency variation rate df/dt is greater than preset value. Currently, it is set at 0.05 Hz/s;  The calculated contribution of the HVDC power station, based on a theoretical frequency gain, is greater than 240 MW. Once the DRPS of the HVDC power station is de-blocked, the initial contribution of the HVDC power station is then reduced or increased in accordance with the calculation done with the frequency controller gain. If requested, the second pole is de-blocked 4 s later. The largest generating unit connected to the GCC system during the study amounts to 664 MW and this unit is connected to the Saudi Arabia 60 Hz system. The tripping of that generating unit might be the reference incident. However, in case of tripping of the largest unit in Saudi Arabia (664 MW), the DRPS may not be activated because the thresholds may not be reached and the spinning reserve in that case should not change for Saudi Arabia. On the 50 Hz side, the three systems are interconnected: i.e. Kuwait, Bahrain and Qatar. Because of the results of the previous reference incident (loss of 664 MW in Saudi Arabia has no consequence on the 50 Hz side), the largest generating unit on the 50 Hz side is considered as the reference. Even on 50 Hz side, of the HVDC back-to-back power station, is not always activated for the same amount of generation loss. It depends on the load level, on the location of the tripped generating unit and on the unit commitment. Thus for safety reason, the potential contribution of the HVDC back-to-back power station is not taken into consideration. This assumption avoids underestimating the primary reserve on the 50 Hz side, which can drive to load shedding, if the HVDC back-to-back power station is not activated. If the back-to-back is activated, the 60 Hz system contributes to the incident, thus the frequency deviation should be smaller. At the time of conducting the studies, the largest generating unit on the 50 Hz side is a combined cycle in Qatar for 375 MW (one Gas Turbine and part of the associated steam turbine). Consequently, this incident is simulated for peak and off-peak load. The results of these simulations will give the necessary amount of primary reserve, in order to comply with GCCIA rules and determine the sharing of primary and secondary reserves between each GCCIA member. The two values for the minimum primary reserve, for both peak and off-peak periods are very close: 300 MW and 272 MW, but the reference incidents are quite different: in one hand the loss of 375 MW and in other hand the loss of 283 MW. But the most important is the contributions of each country are different, because the shares are based on the largest running generating units:  Kuwait peak contribution: 91 MW and 150 MW for off-peak.  Bahrain peak contribution 93 MW and 44 MW for off-peak.  Qatar peak contribution 117 MW and 78 MW for off-peak. For operations it would be very difficult for GCCIA to monitor the primary reserve and also to determine, which set of primary reserve is requested. Therefore it is highly recommended to calculate the contribution of each system on the base of the total active power generated in each system. Obviously with the calculations based on the largest generating unit, the benefits of the reserve reduction are equally shared among the participants, but for the reliability of the interconnected system it is not recommended.
  • 11. 11 Regarding the behaviour of the back-to-back power station, for the two load levels, peak and off-peak, the thresholds are not activated in case of the tripping of the generating unit in Ras Laffan B in Qatar, with of power of 375 MW. But for off-peak and for a smaller amount of generation tripped in Kuwait, only 283 MW, the back-to-back power station is activated. Therefore for the estimation of the primary reserve the contribution of the back-to back power station cannot be taken into account, because it highly depends on the location of the tripped generating unit and not on the amount of the generation loss. The DRPS is activated only to stabilze the system in case for critical emergency but the HVDC is available for commercial exchange through the Economic Transfer more. For Saudi Arabia, the amount of primary reserve is not reduced yet with the interconnection, however, with enhancement of the HVDC control system through a new triggering based on change in frequency (∆F) that is intended to be added separately in addition to the already existing triggering; df/dt and dv/dt triggering criteria, DRPS will be activated for losing the largest generator on the combined system as well as major system disturbances. CONCLUSIONS The GCC interconnection is becoming a key element of the secure and reliable power supply to the GCC countries. These high security and reliability requirements are mandatory conditions to further optimize the GCC power system allowing power exchanges between the member states. The longitudinal structure of the GCCIA Interconnection due to long distances of the transmission corridors requires a careful assessment of the total transfer capacities and the transmission reliability margins. The HVDC back-to-back interconnector is an important actuator to allow the optimization of the mutual support between the 50 and 60 Hz synchronous system during normal and emergency conditions. The fast expansion of the member states power system and the opportunities offered by the GCCIA system pose a number of operational new challenges: - the data management and modelling coordination tasks between GCCIA and the member states to master a continental size power system model especially when including the 60 Hz KSA interconnection; - the static and dynamic observability of the whole interconnection that is mainly concentrated in the MS especially the contemplated roles of a PMU based wide area monitoring system (WAMS) and in the longer term protection system (WAPS); - the progressive migration from the actual interconnector transmission code focused on the GCCIA system coupled with an harmonization of the key cross border features to a unified technical code framework applicable to the whole GCC system. Together with the member states, the GCCIA is a central and a key stakeholder to head these challenges. BIBLIOGRAPHY [1] H.K. Al Asaad, A.A. Ebrahim ‘The GCC power grid: Benefits & Beyond’ Powergen 2008 Conf. [2] A. A. Al-Ebrahim, N. Al-Shahrani, G. Stalens, J. Dubois, J. Warichet ‘Preparation GCC Interconnection Operations through Operational Studies and Analysis’ GCC CIGRE 2009 Conf. [3] N. Al-Shahrani, R. Lopez, N. Vidal, G. Nauton ‘GCCIA System Frequency Control Philosophy’ GCC CIGRE 2009 Conf. [4] A. A. Al-Ebrahim, N. Al-Shahrani ‘The Dynamic Reserve Power Sharing Mode of GCC Interconnection HVDC Link: Novel Design and Features’ GCC CIGRE 2010 Conf.