2. The data center real challenge is not the
individual discipline and parts on it but the
opposing effect of each it has onto one
another - which needs to be monitored and
controlled
3. Trade mark of Traditional Data Center
1. poor efficiency till the room is full
2. "for long term use" design - poor capex
investment
3. too many risk involved
a. technology change
b. air flow management strategy
c. water distribution
7. Data Center Challenges
(cooling and power)
Concern area
Equipment Cooling
Cooling
Equipment
Supply Demand
Max. Draw Power = Breaker Power * 80% Max. Actual Usage = Breaker Power * 50%
8. Capacity Management
• Optimize Use
– Reduce the gap between the actual usage and
design
• Right-Size
– Reduce the gap between the supply and demand
9. Relationship of Availability to Efficiency
Availability
As you increase the service availability
the efficiency of the Data Center drops
since more equipment needs to be powered
up and cool down for the same number of service.
The density of equipment also affect the way the
Data Center is being cooled down.
Efficiency
10. Relationship of Availability to Efficiency
Availability
Efficiency
As you increase the service availability the efficiency of the Data Center drops
since more equipment needs to be powered up and cool down for the same
number of service. The density of equipment also affect the way the Data Center is
being cooled down.