2. Mission Statement
Measurement Inspection Services is committed
to quality and progress through the use of, and
training in, the latest dimensional measuring
tools, software, and technologies to enhance
and build every department within Toshiba
Corporation.
2
4. Highly Qualified Inspectors
Combined measuring experience of more than 40 years
Inspection for:
- Utility - Steam Turbines and Generators
- Aerospace - Motors and Generators
- Military - Machine Shop Support
- Nuclear - First Article Inspection
- Hydro - Measurements for Reverse Engineering
Traveled the world for third party steam turbine and generator OEMs
Performed more than 65 steam turbine retrofit jobs for Toshiba alone
Utilizing Verisurf – advanced measuring, analysis, and reporting software
Ability to step up or down for technology requirements
4
5. Steam Turbine Retrofit
TIC, TANE, WEC and TSB
Other-OEM T/G owners and operators
Field Service Support
Generator Stator and Rotor mapping, Hydro turbine vertical alignment, STG
horizontal joint mapping, valve mapping, in-situ geometry recovery, new unit
installation on interface check, foundation & casing leveling, etc.
Shop Support
Reverse Engineering of shop components that are too difficult to maneuver on
the CMM tables, FAI at vendors, Dimension Recovery, etc.
In-House Training
Succession planning, expand capability
Non-Power Generation
Aerospace, military, etc.
5
6. Faro Technologies Inspection Equipment
Faro Technologies Edge Portable CMM
Accurate to +/- .003 inch (.1mm)
12’ Spherical Measuring Envelope
Faro Technologies Laser Tracker
Accurate to +/- .001 inch (.025mm)
120’ Measuring Envelope
Faro Technologies Focus Laser Scanner
Verisurf 3D CAD and CAD/CAM Capabilities
Measurement with any Inspection Device
CAD Modeling
First Article Inspection and Reporting
Reverse Engineering Measurements
Advanced Model Based Inspection
Experienced with Surface Plate and Precision Measurement Tools
6
7. Verisurf Software
Built on Master CAM
CAD/CAM capabilities
Build - (Inspection to) CAD models
Generate CAD Models and Blueprints
Verisurf 3D Measuring Package
Measurement with any Inspection Device
Scanned Point Cloud CAD Modeling
First Article Inspection and Reporting
Reverse Engineering Measurements
Advanced Model Based Inspection
Fast and Accurate
7
9. MIS technicians have
measured steam
turbines for retrofit for
more than 20 years –
domestic & globally.
• Nuclear
• Gas
• Coal
• Geo-thermal
• Hydro
9
10. 10
• 350 Coal Plants
• 200 Gas and CCGT
• 40 Hydro Plants
• 35 Nuclear Sites
• 40 International Sites
Our steam turbine
retrofit experience
includes measurements
at more than:
14. An HP rotor can be measured in about 4−5 hours with the Faro arm.
Toshiba High Pressure Rotor Replacement
14
15. Fast & Accurate Measurement
of Steam Turbine Components
HP or LP Rotor 4 to 5 hours
HP Upper Outer Shell 4 to 5 hours
HP Lower Outer Shell 8 hours
HP Inner Shells 5 to 6 hours each
N1 – N3 Gland Housings 1 to 2 hours each
LP Lower Shell 8 hours
LP Hood 3 to 4 hours
Under ideal conditions
16
17. Generator Measurement Examples
18
Stator Bars –
scanned and
surfaced
Scanning the stator produces
a “Point Cloud” model of the
core which can be sliced for
dimensioning.
18. Generator Measurement - Faro Arm Work
19
MIS completes
stator scanning
and Faro Arm
work in about
16 hours.
Rotor – 8 hours.
20. Nuclear Experience
23
Dressed out to
measure the
flatness on the
SONGS U2
steam generator
tube sheet.
MIS technicians have been Rad Worker qualified many times and have been trained in
Dress Out, ALARA, FME, Confined Space, Fall Protection and more.
22. Browns Ferry
25
Laser Tracker set up outside
of radiological zone. ALARA
The laser tracker was setup outside the Radiological Zone
Measurements were taken inside the Radiological Zone
24. 27
One hour to measure with Faro arm
Two hours to dimension & make report
25. 28
CAD Overlay – Accurate data verification
without installing components!
26. CAD Overlay
29
• Catch interference problems
• QC mating parts before assembly
• Get accurate measurements without assembly
“I see some
interference
there”
27. Hydro and Field Service
Examples
30
• Pelton
• Westinghouse
• ABB
• Horizontal & Vertical Units
• Level Units
• TIRs
• Reverse Engineer Parts
• Wicket Manufacturing
• Alignment
• TSO Valve Inspection
• Bearing Redesign
• Oil Slinger Redesign
28. Hydro Power Example at Big Creek
Problems
1. Unit had history of thrusting
2. Rotor rubbed at top of stator coils causing a fire
3. Needle valve / water jet was not set for optimum efficiency
Solutions
1. Set bearings at the same elevation
2. Lower rotor and center in stator coil bore
3. Measure needle valve to set water flow to correct pitch
diameter on Pelton wheel buckets
31
29. Hydro Power Example at Big Creek
32
Objectives
• Accurately Record Elevations of
all Horizontal Joints
• Measure Nozzle Waterflow to
Pelton Wheel contact Point
Measurements were taken with
Laser Tracker.
Waterflow line projected to Pelton
Wheel with accuracy of .030”
30. Big Creek Measurement of Horizontal Joint
& Shaft Elevations
33
Measured and
recorded the heights
of the bearing and
generator horizontal
joints compared to an
elevation datum.
Measured and
recorded the shaft
heights at the
bearings compared to
an elevation datum to
determine reason for
thrusting.
31. Hydro Oil Seal Modification
34
Oil seal easily measured with
Faro Arm Portable CMM.
42. Field Services and Shop Support
Examples
45
Diaphragm Alignment on
Outside Unit in Los Angeles
Laser Tracker uses
“Line of Sight” Measurements
43. Fast and clear reporting features in Verisurf – Deviations and Whisker Plot
This report shows the lower bearing deviations on both the TE and GE ends.
46
45. Horizontal Joint Evaluation
The points and shell outline
were taken in about two hours.
The report deviations and formatting
take only a couple minutes.
48
47. This circulation pump
was too big to setup on
the horizontal boring mill.
50
The laser tracker measured the
mill table and spindle. The
pump bore was aligned to the
mill coordinate axes.
Shop Support
48. Shop Support
51
Measuring the conicular OD
on the Circulation Pump
Impeller
Compared the impeller OD to
the Suction Bell ID
49. Shop Support
52
Hydro Project to
overhaul unit
included QC
measurements
on the Hub
(blue) bores and
impeller blade
profile slices
and blade tip
radial check.