SlideShare a Scribd company logo
1 of 1
Download to read offline
Problem                            Accomplishment                                                     Result                                                           Company
                                   Release new component in ECG Monitoring component.
Component obsolescence in ECG                                                                         Manufacturing can continue with alternate components procured
                                   Developed verification plan and documented release of new                                                                        Cardiac Science
Monitoring component                                                                                  into inventory
                                   component in Agile documentation system
                                   Analyzed issue by measuring 5V regulator inrush current and
                                   circuit analysis of current limit. Determined root cause to be a
25% of WIP failing for LCD         compensation capacitor was too small in value for the electrical   25% of failing product on hold yielded 100% through
                                                                                                                                                                       Cardiac Science
Backlight will not light           current demand of the circuit on power up. Selected a larger       manufacturing test following rework of compensation capacitor.
                                   capcitor and released the change by performing verification
                                   activities and updated the product BOM.
                                   Identified compliance issues related to maximum allowable patient
Compliance patient leakage test    leakage and defib proof labeling specified in IEC60601 standard.
                                                                                                     Compliance testing passes for product enhancement.                Cardiac Science
failed                             Redesign of HV charging transformer which reduced patient
                                   leakage within limits.

10% yield fallout in manufacturing Determined root cause of reed switches cracking due to an
of glucose monitor for broken      interference problem with tooling on the line. Resolved yield issue
reed switch                        by                                                                  Manufacturing yield increased 10%.                              Medtronic Diabetes

More Related Content

Similar to Component obsolescence issue resolved through alternate sourcing

PID Advances in Industrial Control
PID Advances in Industrial ControlPID Advances in Industrial Control
PID Advances in Industrial ControlEmerson Exchange
 
Process validation conference 2006 san diego nk
Process validation conference 2006 san diego nkProcess validation conference 2006 san diego nk
Process validation conference 2006 san diego nkKatalin Nemák
 
Counterfeit Detection Services
Counterfeit Detection ServicesCounterfeit Detection Services
Counterfeit Detection ServicesUSBid Inc.
 
TOOLS OF CONTINUOUS IMPROVEMENT
TOOLS OF CONTINUOUS IMPROVEMENTTOOLS OF CONTINUOUS IMPROVEMENT
TOOLS OF CONTINUOUS IMPROVEMENTPharmaceutical
 
Maximizing the return on your control investment meet the experts sessions pa...
Maximizing the return on your control investment meet the experts sessions pa...Maximizing the return on your control investment meet the experts sessions pa...
Maximizing the return on your control investment meet the experts sessions pa...Emerson Exchange
 
DesignForTestMethodologyCaseStudy
DesignForTestMethodologyCaseStudyDesignForTestMethodologyCaseStudy
DesignForTestMethodologyCaseStudyJustin Hernandez
 
Risk reduction in tablet dosage form development and manufacturing
Risk reduction in tablet dosage form development and manufacturingRisk reduction in tablet dosage form development and manufacturing
Risk reduction in tablet dosage form development and manufacturingDipankar Dey
 
Smart Process Distillation Application Improves Recovery And Saves Energy
Smart Process Distillation Application Improves Recovery And Saves EnergySmart Process Distillation Application Improves Recovery And Saves Energy
Smart Process Distillation Application Improves Recovery And Saves EnergyJim Cahill
 
Enhancing Quality Control with Statistical Process Control (SPC) in the Semic...
Enhancing Quality Control with Statistical Process Control (SPC) in the Semic...Enhancing Quality Control with Statistical Process Control (SPC) in the Semic...
Enhancing Quality Control with Statistical Process Control (SPC) in the Semic...yieldWerx Semiconductor
 
power factor controlling using intregarted device controller
power factor controlling using intregarted device controllerpower factor controlling using intregarted device controller
power factor controlling using intregarted device controllerusic123
 
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMS
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING OF VSC HVDC SYSTEMS
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMSPower System Operation
 
Quality by Design for Legacy Products - A Contradiction ?
Quality by Design for Legacy Products - A Contradiction ?Quality by Design for Legacy Products - A Contradiction ?
Quality by Design for Legacy Products - A Contradiction ?Anthony Grenier
 
Dynamic Voltage Regulator
Dynamic Voltage RegulatorDynamic Voltage Regulator
Dynamic Voltage RegulatorRamesh Tholiya
 
CV Arif Nusyirwan - 20150510
CV Arif Nusyirwan - 20150510CV Arif Nusyirwan - 20150510
CV Arif Nusyirwan - 20150510Arif Nusyirwan
 
Yizhe_Liu_Resume_11092016
Yizhe_Liu_Resume_11092016Yizhe_Liu_Resume_11092016
Yizhe_Liu_Resume_11092016Yizhe Liu
 

Similar to Component obsolescence issue resolved through alternate sourcing (20)

PID Advances in Industrial Control
PID Advances in Industrial ControlPID Advances in Industrial Control
PID Advances in Industrial Control
 
Relay testing procedure
Relay testing procedure Relay testing procedure
Relay testing procedure
 
Process validation conference 2006 san diego nk
Process validation conference 2006 san diego nkProcess validation conference 2006 san diego nk
Process validation conference 2006 san diego nk
 
Counterfeit Detection Services
Counterfeit Detection ServicesCounterfeit Detection Services
Counterfeit Detection Services
 
TOOLS OF CONTINUOUS IMPROVEMENT
TOOLS OF CONTINUOUS IMPROVEMENTTOOLS OF CONTINUOUS IMPROVEMENT
TOOLS OF CONTINUOUS IMPROVEMENT
 
Maximizing the return on your control investment meet the experts sessions pa...
Maximizing the return on your control investment meet the experts sessions pa...Maximizing the return on your control investment meet the experts sessions pa...
Maximizing the return on your control investment meet the experts sessions pa...
 
DesignForTestMethodologyCaseStudy
DesignForTestMethodologyCaseStudyDesignForTestMethodologyCaseStudy
DesignForTestMethodologyCaseStudy
 
Risk reduction in tablet dosage form development and manufacturing
Risk reduction in tablet dosage form development and manufacturingRisk reduction in tablet dosage form development and manufacturing
Risk reduction in tablet dosage form development and manufacturing
 
Smart Process Distillation Application Improves Recovery And Saves Energy
Smart Process Distillation Application Improves Recovery And Saves EnergySmart Process Distillation Application Improves Recovery And Saves Energy
Smart Process Distillation Application Improves Recovery And Saves Energy
 
Enhancing Quality Control with Statistical Process Control (SPC) in the Semic...
Enhancing Quality Control with Statistical Process Control (SPC) in the Semic...Enhancing Quality Control with Statistical Process Control (SPC) in the Semic...
Enhancing Quality Control with Statistical Process Control (SPC) in the Semic...
 
power factor controlling using intregarted device controller
power factor controlling using intregarted device controllerpower factor controlling using intregarted device controller
power factor controlling using intregarted device controller
 
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMS
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING OF VSC HVDC SYSTEMS
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMS
 
Quality by Design for Legacy Products - A Contradiction ?
Quality by Design for Legacy Products - A Contradiction ?Quality by Design for Legacy Products - A Contradiction ?
Quality by Design for Legacy Products - A Contradiction ?
 
QUALIFICATION OF HPTLC,HPTLC
QUALIFICATION  OF HPTLC,HPTLCQUALIFICATION  OF HPTLC,HPTLC
QUALIFICATION OF HPTLC,HPTLC
 
PCAPP Monthly Status Briefing - September 2011
PCAPP Monthly Status Briefing - September 2011PCAPP Monthly Status Briefing - September 2011
PCAPP Monthly Status Briefing - September 2011
 
Cii 29.12.08
Cii 29.12.08Cii 29.12.08
Cii 29.12.08
 
Dynamic Voltage Regulator
Dynamic Voltage RegulatorDynamic Voltage Regulator
Dynamic Voltage Regulator
 
CV Arif Nusyirwan - 20150510
CV Arif Nusyirwan - 20150510CV Arif Nusyirwan - 20150510
CV Arif Nusyirwan - 20150510
 
April 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Bri...
April 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Bri...April 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Bri...
April 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Bri...
 
Yizhe_Liu_Resume_11092016
Yizhe_Liu_Resume_11092016Yizhe_Liu_Resume_11092016
Yizhe_Liu_Resume_11092016
 

Component obsolescence issue resolved through alternate sourcing

  • 1. Problem Accomplishment Result Company Release new component in ECG Monitoring component. Component obsolescence in ECG Manufacturing can continue with alternate components procured Developed verification plan and documented release of new Cardiac Science Monitoring component into inventory component in Agile documentation system Analyzed issue by measuring 5V regulator inrush current and circuit analysis of current limit. Determined root cause to be a 25% of WIP failing for LCD compensation capacitor was too small in value for the electrical 25% of failing product on hold yielded 100% through Cardiac Science Backlight will not light current demand of the circuit on power up. Selected a larger manufacturing test following rework of compensation capacitor. capcitor and released the change by performing verification activities and updated the product BOM. Identified compliance issues related to maximum allowable patient Compliance patient leakage test leakage and defib proof labeling specified in IEC60601 standard. Compliance testing passes for product enhancement. Cardiac Science failed Redesign of HV charging transformer which reduced patient leakage within limits. 10% yield fallout in manufacturing Determined root cause of reed switches cracking due to an of glucose monitor for broken interference problem with tooling on the line. Resolved yield issue reed switch by Manufacturing yield increased 10%. Medtronic Diabetes