Austrian wastewater treatment upgrade
financed by EIBโ€™s Climate Awareness
Bonds (CAB)
Marco Beroลก,
Lead Engineer, Water Management Division
Projects Directorate
EUROPEAN INVESTMENT BANK
16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop 1
The presentation will be shared with participants after the session.
Contents:
- EIB, the Climate Bank
- A brief introduction to CAB and SAB
- Case Study: Viennaโ€™s sludge project
16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop 2
16.02.2022 3
EIB, the Climate Bank
EIBโ€™s Climate Action Commitment - General
OECD - DG ENV - Water Investment Planning & Financing Workshop
โ€œAs the largest multilateral provider of climate finance worldwide, we
commit at least 25% of our lending portfolio to low-carbon and
climate-resilient growth.โ€ (2016)
โ€œThe EIB will increase its level of support to climate action and
environmental sustainability to exceed 50% of its overall lending
activity by 2025.โ€ (EIB Group Climate Bank Roadmap 2020-2025)
We want to
demonstrate the
climate impact
(adaptation and/or
mitigation) of all
our projects!
In 2020 EIBโ€™s climate
financing totalled EUR 24.2
Billon (37% of total lending).
16.02.2022 4
EIB, the Climate Bank
EIBโ€™s Climate Action Commitment - Adaptation
OECD - DG ENV - Water Investment Planning & Financing Workshop
Standard Terms of reference for Climate Risk and Vulnerability Assessments (CRVA),
available upon request (in English, French, Russian)
16.02.2022 5
EIB, the Climate Bank
EIBโ€™s Climate Action Commitment - Technical Assistance
OECD - DG ENV - Water Investment Planning & Financing Workshop
A single access point to a comprehensive offer
of advisory and technical assistance services
for all stages of the project cycle
CAPACITY BUILDING RELATED TO PROJECTS
Capacity building on technical issues โ€“ Cooperation centres of expertise -
Dissemination best practices & case studies
UPSTREAM
โ€ข Policy &
program advice
โ€ข Preliminary
project
assessment
PREPARATION
โ€ข Technical advice to our
clients prior to appraisal (ToR,
CBA)
โ€ข Advice on financial
structuring (PPPs,
investment platform &
innovative projects)
โ€ข Selection & supervision of
consultants for project prep.
IMPLEMENTATION
โ€ข Advice on project
implementation
โ€ข Enhanced
monitoring in
delayed projects
A brief introduction to CAB and SAB
16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop 6
CAB SAB Investor Presentation (eib.org)
RAISING MONEY
ON THE CAPITAL MARKETS
BORROWING
IN 2021
billion
โ‚ฌ55.26
LARGEST
SUPRANATIONAL
ISSUER OF GREEN
BONDS
AMERICAS
EUROPE
ASIA
MIDDLE EAST
& AFRICA
14%
64%
2%
20%
16.02.2022
OECD - DG ENV - Water Investment Planning & Financing Workshop
7
A brief introduction to CAB and SAB
BORROWING
IN 2021
16.02.2022
OECD - DG ENV - Water Investment Planning & Financing Workshop
8
A brief introduction to CAB and SAB
CAB & SAB eligibilities (Objectives & Activities) today (January 2022)
BORROWING
IN 2021
16.02.2022
OECD - DG ENV - Water Investment Planning & Financing Workshop
9
A brief introduction to CAB and SAB
CAB & SAB issuance in EIBโ€™s total funding
Case Study: Vienna WWTPโ€™s new Sludge
Treatment plant
16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop 10
16.02.2022
OECD - DG ENV - Water Investment Planning & Financing Workshop
Case Study: EOS Project, Vienna WWTP
The EOS project is part of a larger
operation with EBS, Viennaโ€™s
wastewater utility:
โ€ข The EOS Project: new sludge
digestion system to use biogas as a
renewable energy source to produce
energy through a Combined Heat
and Power plant.
โ€ข Three storm water retention basins:
Simmering (34,500mยณ), Gelbe Haide
(7,000mยณ), and Blumental (20,000mยณ)
โ€ข Renovation and upgrading works at
the wastewater treatment plant (grit
removal, etc.) dating from 1980
11
1. Introduction
16.02.2022
OECD - DG ENV - Water Investment Planning & Financing Workshop
Case Study: EOS Project, Vienna WWTP
12
Component At appraisal
(2014)
At completion
(2021)
EOS project 200 204
Renovation works in the WWTP 10 19
Storm water basins 40 37
Contingencies 50 -
TOTAL 300 260
2. Cost breakdown and financing (in EUR million)
Origin of funds At appraisal
(2014)
At completion
(2021)
EIB Loan 150 130
Own resources & other loans 150 130
TOTAL 300 260
16.02.2022
OECD - DG ENV - Water Investment Planning & Financing Workshop
Case Study: EOS Project, Vienna WWTP
13
3. Timeline
โ€ข 2012: first contacts with EBS
โ€ข 2014: project appraisal
โ€ข 2015: signature of the finance contract and start of works
โ€ข 2020: end of works
โ€ข 2021: project completion and start of operation
4. Reporting under CAB for the yearly CAB & SAB audit, example 2019
CAB impact report 2019 (eib.org)
Project
number
Project name
Project
location
Sector
Main Sub-
Sector
Total
project cost
(EUR m)
EIB's share in
total project
cost (%)
EIB's signed
loan amount
(EUR M)
Project
economic life
(years)
CAB-eligible
component (%
of total project
cost)
RE
component
(% of total
project cost)
EE
component
(% of total
project cost)
20140123
EBS - ENERGY OPTIMISATION
SLUDGE TREATMENT
Austria RE
Energy from
waste
300 50% 150 30 41% 41% 0%
10 0 79 10 83 0.0 0 0 90 0 20.5
Smart
energy
meters
installed
2019 indicators PROJECT-LEVEL DATA
Expected total project result / impact for a representative year of project's operations
Renewable
electricity produced
(GWh-e/y)
Relative
GHG
emissions
(kt CO2e)-4
Allocation in
EUR m from
CAB (2019)
Total
transmissio
n lines (km)-
6
Renewable
electricity
capacity
rehabilitated
(MWe)
Renewable
electricity
capacity added
(MWe)
Absolute
GHG
emissions
(kt COโ‚‚e)-4
Primary
energy
savings
(GWh/y)
Renewable
heat
capacity
added (MW-
th)
Renewable
heat
produced
(GWh-th/y)
16.02.2022
OECD - DG ENV - Water Investment Planning & Financing Workshop
Case Study: EOS Project, Vienna WWTP
14
5. Results
โ€ข Project completed on budget and on
time (slight delay only due to COVID
crisis and challenging works under
operation)
โ€ข Viennaโ€™s central WWTP becomes a net
energy producer (total production of
electricity and heat of 160 GWh/year vs.
total needs of 103 GWh/year)
โ€ข Annual savings of 40,000 tons of CO2
Klimaschutz โ€“ ebswien
16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop 15
THANK YOU FOR YOUR ATTENTION!
For more information please contact :
Marco Beroลก (m.beros@eib.org), phone +352 43 79 827 48
EUROPEAN INVESTMENT BANK
http://www.eib.org/

More Related Content

Similar to Presentation - Workshop 1: Water Investment Planning and Financing, Marco Beros

Session1.1 jts julia chenut
Session1.1 jts julia chenutSession1.1 jts julia chenut
Session1.1 jts julia chenut
SHAREPROJECT
ย 
BHC Conference : Joining forces on Hydrogen โ€“ Belgium, Benelux and its neighb...
BHC Conference : Joining forces on Hydrogen โ€“ Belgium, Benelux and its neighb...BHC Conference : Joining forces on Hydrogen โ€“ Belgium, Benelux and its neighb...
BHC Conference : Joining forces on Hydrogen โ€“ Belgium, Benelux and its neighb...
Cluster TWEED
ย 
ACB GHID ENGLEZA.pdf
ACB GHID ENGLEZA.pdfACB GHID ENGLEZA.pdf
ACB GHID ENGLEZA.pdf
ssuser2ab13f
ย 
EU Research and Development activities: HORIZON2020, LIFE, SME instrument - S...
EU Research and Development activities: HORIZON2020, LIFE, SME instrument - S...EU Research and Development activities: HORIZON2020, LIFE, SME instrument - S...
EU Research and Development activities: HORIZON2020, LIFE, SME instrument - S...
European Sustainable Phosphorus Platform
ย 
Emira Ajeti - REC Projects_Linkedin2
Emira Ajeti - REC Projects_Linkedin2Emira Ajeti - REC Projects_Linkedin2
Emira Ajeti - REC Projects_Linkedin2
Emira Ajeti
ย 

Similar to Presentation - Workshop 1: Water Investment Planning and Financing, Marco Beros (20)

Supporting MRV-able mitigation measures - BMU's IKI Project Portfolio on Clim...
Supporting MRV-able mitigation measures - BMU's IKI Project Portfolio on Clim...Supporting MRV-able mitigation measures - BMU's IKI Project Portfolio on Clim...
Supporting MRV-able mitigation measures - BMU's IKI Project Portfolio on Clim...
ย 
Welcome: Greater than the Sum of the Parts - Strengthening the European RCE N...
Welcome: Greater than the Sum of the Parts - Strengthening the European RCE N...Welcome: Greater than the Sum of the Parts - Strengthening the European RCE N...
Welcome: Greater than the Sum of the Parts - Strengthening the European RCE N...
ย 
Presentation - 9th Roundtable on financing water, Marco Beros
Presentation - 9th Roundtable on financing water, Marco BerosPresentation - 9th Roundtable on financing water, Marco Beros
Presentation - 9th Roundtable on financing water, Marco Beros
ย 
Session1.1 jts julia chenut
Session1.1 jts julia chenutSession1.1 jts julia chenut
Session1.1 jts julia chenut
ย 
Impact beyond insurances in the Danube Basin
Impact beyond insurances in the Danube BasinImpact beyond insurances in the Danube Basin
Impact beyond insurances in the Danube Basin
ย 
170601 Energy Community Electricity Forum
170601 Energy Community Electricity Forum170601 Energy Community Electricity Forum
170601 Energy Community Electricity Forum
ย 
EBRD_kosovo-country-strategy.pdf
EBRD_kosovo-country-strategy.pdfEBRD_kosovo-country-strategy.pdf
EBRD_kosovo-country-strategy.pdf
ย 
BHC Conference : Joining forces on Hydrogen โ€“ Belgium, Benelux and its neighb...
BHC Conference : Joining forces on Hydrogen โ€“ Belgium, Benelux and its neighb...BHC Conference : Joining forces on Hydrogen โ€“ Belgium, Benelux and its neighb...
BHC Conference : Joining forces on Hydrogen โ€“ Belgium, Benelux and its neighb...
ย 
ACB GHID ENGLEZA.pdf
ACB GHID ENGLEZA.pdfACB GHID ENGLEZA.pdf
ACB GHID ENGLEZA.pdf
ย 
Energy Infrastructure Package: What is in it for HVDC Grids?
Energy Infrastructure Package: What is in it for HVDC Grids?Energy Infrastructure Package: What is in it for HVDC Grids?
Energy Infrastructure Package: What is in it for HVDC Grids?
ย 
EU Research and Development activities: HORIZON2020, LIFE, SME instrument - S...
EU Research and Development activities: HORIZON2020, LIFE, SME instrument - S...EU Research and Development activities: HORIZON2020, LIFE, SME instrument - S...
EU Research and Development activities: HORIZON2020, LIFE, SME instrument - S...
ย 
EU4Environment water and data regional launch event
EU4Environment water and data regional launch eventEU4Environment water and data regional launch event
EU4Environment water and data regional launch event
ย 
EU4Env water and data regional launch event
EU4Env water and data regional launch eventEU4Env water and data regional launch event
EU4Env water and data regional launch event
ย 
Green Hydrogen Financial Model Toolkit
Green Hydrogen Financial Model ToolkitGreen Hydrogen Financial Model Toolkit
Green Hydrogen Financial Model Toolkit
ย 
MEI Presentation Tel Aviv 24 April 2012
MEI Presentation Tel Aviv 24 April 2012MEI Presentation Tel Aviv 24 April 2012
MEI Presentation Tel Aviv 24 April 2012
ย 
International H2 value chains: A German perspective - Kilian Crone, German En...
International H2 value chains: A German perspective - Kilian Crone, German En...International H2 value chains: A German perspective - Kilian Crone, German En...
International H2 value chains: A German perspective - Kilian Crone, German En...
ย 
Deep Retrofit: Life Cycle Cost Benefits Analysis
Deep Retrofit: Life Cycle Cost Benefits Analysis Deep Retrofit: Life Cycle Cost Benefits Analysis
Deep Retrofit: Life Cycle Cost Benefits Analysis
ย 
Emira Ajeti - REC Projects_Linkedin2
Emira Ajeti - REC Projects_Linkedin2Emira Ajeti - REC Projects_Linkedin2
Emira Ajeti - REC Projects_Linkedin2
ย 
Presentation - Workshop on Scaling-up the implementation of nature-based solu...
Presentation - Workshop on Scaling-up the implementation of nature-based solu...Presentation - Workshop on Scaling-up the implementation of nature-based solu...
Presentation - Workshop on Scaling-up the implementation of nature-based solu...
ย 
Financing energy efficiency - looking beyond horizon
Financing energy efficiency - looking beyond horizon Financing energy efficiency - looking beyond horizon
Financing energy efficiency - looking beyond horizon
ย 

More from OECD Environment

More from OECD Environment (20)

GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdf
ย 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
ย 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
ย 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
ย 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
ย 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...
ย 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
ย 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...
ย 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
ย 
Problem formulation for environmental risk assessment โ€“ Finnish case study: ...
Problem formulation for environmental risk assessment โ€“ Finnish case study:  ...Problem formulation for environmental risk assessment โ€“ Finnish case study:  ...
Problem formulation for environmental risk assessment โ€“ Finnish case study: ...
ย 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...
ย 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
ย 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
ย 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
ย 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeaways
ย 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter results
ย 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara Falduto
ย 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth Singh
ย 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine Ang
ย 
CCXG global forum, April 2024, Raphaรซl Jachnik
CCXG global forum, April 2024, Raphaรซl JachnikCCXG global forum, April 2024, Raphaรซl Jachnik
CCXG global forum, April 2024, Raphaรซl Jachnik
ย 

Recently uploaded

VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
SUHANI PANDEY
ย 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
ย 
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
tanu pandey
ย 
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
SUHANI PANDEY
ย 
celebrity ๐Ÿ’‹ Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity ๐Ÿ’‹ Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...celebrity ๐Ÿ’‹ Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity ๐Ÿ’‹ Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
Call Girls in Nagpur High Profile
ย 
๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹
๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹
๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹
nirzagarg
ย 
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
SUHANI PANDEY
ย 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
garthraymundo123
ย 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
SUHANI PANDEY
ย 

Recently uploaded (20)

VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
ย 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
ย 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
ย 
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
ย 
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
ย 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
ย 
Deforestation
DeforestationDeforestation
Deforestation
ย 
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
ย 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
ย 
Plastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability ProgramsPlastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability Programs
ย 
celebrity ๐Ÿ’‹ Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity ๐Ÿ’‹ Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...celebrity ๐Ÿ’‹ Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity ๐Ÿ’‹ Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
ย 
๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹
๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹
๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹
ย 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptx
ย 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
ย 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
ย 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
ย 
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
ย 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
ย 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
ย 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
ย 

Presentation - Workshop 1: Water Investment Planning and Financing, Marco Beros

  • 1. Austrian wastewater treatment upgrade financed by EIBโ€™s Climate Awareness Bonds (CAB) Marco Beroลก, Lead Engineer, Water Management Division Projects Directorate EUROPEAN INVESTMENT BANK 16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop 1 The presentation will be shared with participants after the session.
  • 2. Contents: - EIB, the Climate Bank - A brief introduction to CAB and SAB - Case Study: Viennaโ€™s sludge project 16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop 2
  • 3. 16.02.2022 3 EIB, the Climate Bank EIBโ€™s Climate Action Commitment - General OECD - DG ENV - Water Investment Planning & Financing Workshop โ€œAs the largest multilateral provider of climate finance worldwide, we commit at least 25% of our lending portfolio to low-carbon and climate-resilient growth.โ€ (2016) โ€œThe EIB will increase its level of support to climate action and environmental sustainability to exceed 50% of its overall lending activity by 2025.โ€ (EIB Group Climate Bank Roadmap 2020-2025) We want to demonstrate the climate impact (adaptation and/or mitigation) of all our projects! In 2020 EIBโ€™s climate financing totalled EUR 24.2 Billon (37% of total lending).
  • 4. 16.02.2022 4 EIB, the Climate Bank EIBโ€™s Climate Action Commitment - Adaptation OECD - DG ENV - Water Investment Planning & Financing Workshop Standard Terms of reference for Climate Risk and Vulnerability Assessments (CRVA), available upon request (in English, French, Russian)
  • 5. 16.02.2022 5 EIB, the Climate Bank EIBโ€™s Climate Action Commitment - Technical Assistance OECD - DG ENV - Water Investment Planning & Financing Workshop A single access point to a comprehensive offer of advisory and technical assistance services for all stages of the project cycle CAPACITY BUILDING RELATED TO PROJECTS Capacity building on technical issues โ€“ Cooperation centres of expertise - Dissemination best practices & case studies UPSTREAM โ€ข Policy & program advice โ€ข Preliminary project assessment PREPARATION โ€ข Technical advice to our clients prior to appraisal (ToR, CBA) โ€ข Advice on financial structuring (PPPs, investment platform & innovative projects) โ€ข Selection & supervision of consultants for project prep. IMPLEMENTATION โ€ข Advice on project implementation โ€ข Enhanced monitoring in delayed projects
  • 6. A brief introduction to CAB and SAB 16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop 6 CAB SAB Investor Presentation (eib.org)
  • 7. RAISING MONEY ON THE CAPITAL MARKETS BORROWING IN 2021 billion โ‚ฌ55.26 LARGEST SUPRANATIONAL ISSUER OF GREEN BONDS AMERICAS EUROPE ASIA MIDDLE EAST & AFRICA 14% 64% 2% 20% 16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop 7 A brief introduction to CAB and SAB
  • 8. BORROWING IN 2021 16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop 8 A brief introduction to CAB and SAB CAB & SAB eligibilities (Objectives & Activities) today (January 2022)
  • 9. BORROWING IN 2021 16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop 9 A brief introduction to CAB and SAB CAB & SAB issuance in EIBโ€™s total funding
  • 10. Case Study: Vienna WWTPโ€™s new Sludge Treatment plant 16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop 10
  • 11. 16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop Case Study: EOS Project, Vienna WWTP The EOS project is part of a larger operation with EBS, Viennaโ€™s wastewater utility: โ€ข The EOS Project: new sludge digestion system to use biogas as a renewable energy source to produce energy through a Combined Heat and Power plant. โ€ข Three storm water retention basins: Simmering (34,500mยณ), Gelbe Haide (7,000mยณ), and Blumental (20,000mยณ) โ€ข Renovation and upgrading works at the wastewater treatment plant (grit removal, etc.) dating from 1980 11 1. Introduction
  • 12. 16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop Case Study: EOS Project, Vienna WWTP 12 Component At appraisal (2014) At completion (2021) EOS project 200 204 Renovation works in the WWTP 10 19 Storm water basins 40 37 Contingencies 50 - TOTAL 300 260 2. Cost breakdown and financing (in EUR million) Origin of funds At appraisal (2014) At completion (2021) EIB Loan 150 130 Own resources & other loans 150 130 TOTAL 300 260
  • 13. 16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop Case Study: EOS Project, Vienna WWTP 13 3. Timeline โ€ข 2012: first contacts with EBS โ€ข 2014: project appraisal โ€ข 2015: signature of the finance contract and start of works โ€ข 2020: end of works โ€ข 2021: project completion and start of operation 4. Reporting under CAB for the yearly CAB & SAB audit, example 2019 CAB impact report 2019 (eib.org) Project number Project name Project location Sector Main Sub- Sector Total project cost (EUR m) EIB's share in total project cost (%) EIB's signed loan amount (EUR M) Project economic life (years) CAB-eligible component (% of total project cost) RE component (% of total project cost) EE component (% of total project cost) 20140123 EBS - ENERGY OPTIMISATION SLUDGE TREATMENT Austria RE Energy from waste 300 50% 150 30 41% 41% 0% 10 0 79 10 83 0.0 0 0 90 0 20.5 Smart energy meters installed 2019 indicators PROJECT-LEVEL DATA Expected total project result / impact for a representative year of project's operations Renewable electricity produced (GWh-e/y) Relative GHG emissions (kt CO2e)-4 Allocation in EUR m from CAB (2019) Total transmissio n lines (km)- 6 Renewable electricity capacity rehabilitated (MWe) Renewable electricity capacity added (MWe) Absolute GHG emissions (kt COโ‚‚e)-4 Primary energy savings (GWh/y) Renewable heat capacity added (MW- th) Renewable heat produced (GWh-th/y)
  • 14. 16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop Case Study: EOS Project, Vienna WWTP 14 5. Results โ€ข Project completed on budget and on time (slight delay only due to COVID crisis and challenging works under operation) โ€ข Viennaโ€™s central WWTP becomes a net energy producer (total production of electricity and heat of 160 GWh/year vs. total needs of 103 GWh/year) โ€ข Annual savings of 40,000 tons of CO2 Klimaschutz โ€“ ebswien
  • 15. 16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop 15 THANK YOU FOR YOUR ATTENTION! For more information please contact : Marco Beroลก (m.beros@eib.org), phone +352 43 79 827 48 EUROPEAN INVESTMENT BANK http://www.eib.org/