1. Austrian wastewater treatment upgrade
financed by EIBโs Climate Awareness
Bonds (CAB)
Marco Beroลก,
Lead Engineer, Water Management Division
Projects Directorate
EUROPEAN INVESTMENT BANK
16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop 1
The presentation will be shared with participants after the session.
2. Contents:
- EIB, the Climate Bank
- A brief introduction to CAB and SAB
- Case Study: Viennaโs sludge project
16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop 2
3. 16.02.2022 3
EIB, the Climate Bank
EIBโs Climate Action Commitment - General
OECD - DG ENV - Water Investment Planning & Financing Workshop
โAs the largest multilateral provider of climate finance worldwide, we
commit at least 25% of our lending portfolio to low-carbon and
climate-resilient growth.โ (2016)
โThe EIB will increase its level of support to climate action and
environmental sustainability to exceed 50% of its overall lending
activity by 2025.โ (EIB Group Climate Bank Roadmap 2020-2025)
We want to
demonstrate the
climate impact
(adaptation and/or
mitigation) of all
our projects!
In 2020 EIBโs climate
financing totalled EUR 24.2
Billon (37% of total lending).
4. 16.02.2022 4
EIB, the Climate Bank
EIBโs Climate Action Commitment - Adaptation
OECD - DG ENV - Water Investment Planning & Financing Workshop
Standard Terms of reference for Climate Risk and Vulnerability Assessments (CRVA),
available upon request (in English, French, Russian)
5. 16.02.2022 5
EIB, the Climate Bank
EIBโs Climate Action Commitment - Technical Assistance
OECD - DG ENV - Water Investment Planning & Financing Workshop
A single access point to a comprehensive offer
of advisory and technical assistance services
for all stages of the project cycle
CAPACITY BUILDING RELATED TO PROJECTS
Capacity building on technical issues โ Cooperation centres of expertise -
Dissemination best practices & case studies
UPSTREAM
โข Policy &
program advice
โข Preliminary
project
assessment
PREPARATION
โข Technical advice to our
clients prior to appraisal (ToR,
CBA)
โข Advice on financial
structuring (PPPs,
investment platform &
innovative projects)
โข Selection & supervision of
consultants for project prep.
IMPLEMENTATION
โข Advice on project
implementation
โข Enhanced
monitoring in
delayed projects
6. A brief introduction to CAB and SAB
16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop 6
CAB SAB Investor Presentation (eib.org)
7. RAISING MONEY
ON THE CAPITAL MARKETS
BORROWING
IN 2021
billion
โฌ55.26
LARGEST
SUPRANATIONAL
ISSUER OF GREEN
BONDS
AMERICAS
EUROPE
ASIA
MIDDLE EAST
& AFRICA
14%
64%
2%
20%
16.02.2022
OECD - DG ENV - Water Investment Planning & Financing Workshop
7
A brief introduction to CAB and SAB
8. BORROWING
IN 2021
16.02.2022
OECD - DG ENV - Water Investment Planning & Financing Workshop
8
A brief introduction to CAB and SAB
CAB & SAB eligibilities (Objectives & Activities) today (January 2022)
9. BORROWING
IN 2021
16.02.2022
OECD - DG ENV - Water Investment Planning & Financing Workshop
9
A brief introduction to CAB and SAB
CAB & SAB issuance in EIBโs total funding
10. Case Study: Vienna WWTPโs new Sludge
Treatment plant
16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop 10
11. 16.02.2022
OECD - DG ENV - Water Investment Planning & Financing Workshop
Case Study: EOS Project, Vienna WWTP
The EOS project is part of a larger
operation with EBS, Viennaโs
wastewater utility:
โข The EOS Project: new sludge
digestion system to use biogas as a
renewable energy source to produce
energy through a Combined Heat
and Power plant.
โข Three storm water retention basins:
Simmering (34,500mยณ), Gelbe Haide
(7,000mยณ), and Blumental (20,000mยณ)
โข Renovation and upgrading works at
the wastewater treatment plant (grit
removal, etc.) dating from 1980
11
1. Introduction
12. 16.02.2022
OECD - DG ENV - Water Investment Planning & Financing Workshop
Case Study: EOS Project, Vienna WWTP
12
Component At appraisal
(2014)
At completion
(2021)
EOS project 200 204
Renovation works in the WWTP 10 19
Storm water basins 40 37
Contingencies 50 -
TOTAL 300 260
2. Cost breakdown and financing (in EUR million)
Origin of funds At appraisal
(2014)
At completion
(2021)
EIB Loan 150 130
Own resources & other loans 150 130
TOTAL 300 260
13. 16.02.2022
OECD - DG ENV - Water Investment Planning & Financing Workshop
Case Study: EOS Project, Vienna WWTP
13
3. Timeline
โข 2012: first contacts with EBS
โข 2014: project appraisal
โข 2015: signature of the finance contract and start of works
โข 2020: end of works
โข 2021: project completion and start of operation
4. Reporting under CAB for the yearly CAB & SAB audit, example 2019
CAB impact report 2019 (eib.org)
Project
number
Project name
Project
location
Sector
Main Sub-
Sector
Total
project cost
(EUR m)
EIB's share in
total project
cost (%)
EIB's signed
loan amount
(EUR M)
Project
economic life
(years)
CAB-eligible
component (%
of total project
cost)
RE
component
(% of total
project cost)
EE
component
(% of total
project cost)
20140123
EBS - ENERGY OPTIMISATION
SLUDGE TREATMENT
Austria RE
Energy from
waste
300 50% 150 30 41% 41% 0%
10 0 79 10 83 0.0 0 0 90 0 20.5
Smart
energy
meters
installed
2019 indicators PROJECT-LEVEL DATA
Expected total project result / impact for a representative year of project's operations
Renewable
electricity produced
(GWh-e/y)
Relative
GHG
emissions
(kt CO2e)-4
Allocation in
EUR m from
CAB (2019)
Total
transmissio
n lines (km)-
6
Renewable
electricity
capacity
rehabilitated
(MWe)
Renewable
electricity
capacity added
(MWe)
Absolute
GHG
emissions
(kt COโe)-4
Primary
energy
savings
(GWh/y)
Renewable
heat
capacity
added (MW-
th)
Renewable
heat
produced
(GWh-th/y)
14. 16.02.2022
OECD - DG ENV - Water Investment Planning & Financing Workshop
Case Study: EOS Project, Vienna WWTP
14
5. Results
โข Project completed on budget and on
time (slight delay only due to COVID
crisis and challenging works under
operation)
โข Viennaโs central WWTP becomes a net
energy producer (total production of
electricity and heat of 160 GWh/year vs.
total needs of 103 GWh/year)
โข Annual savings of 40,000 tons of CO2
Klimaschutz โ ebswien
15. 16.02.2022 OECD - DG ENV - Water Investment Planning & Financing Workshop 15
THANK YOU FOR YOUR ATTENTION!
For more information please contact :
Marco Beroลก (m.beros@eib.org), phone +352 43 79 827 48
EUROPEAN INVESTMENT BANK
http://www.eib.org/