SlideShare a Scribd company logo
1 of 18
Impact beyond insurances in the Danube Basin
October 29th, 2019
Brussels Meeting
Maja Turk Sekulic, Jelena Radonic
Boglárka Lakatos
Levente Huszti
Michel Wortmann
2
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
• Novi Sad Case Study
• Climate-proofing infrastructural investment
• EU Climate Change Impact assessment
• Association of Climate Friendly Municipalities
• International Commission for the Protection of the Danube River (ICPDR)
• EU Water Framework Directive
• EU Flood Directive
• Sava Commission
• Cost-Benefit Analysis workshop by TUD, Budapest
• Results publish on WWF Water Risk Filter (https://waterriskfilter.panda.org/)
• Results provided to EU InterReg Danube project (http://www.interreg-danube.eu)
Overview
3
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
Public interaction with the model results
4
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
Objectives  All activities are focused on the new Wastewater Treatment Plant, that is
planned to be constructed in Novi Sad (initiated in 2021)
 In order to provide added-value for the decision-making processes, in terms of
effectiveness, optimized technological opportunities and minimized risks
As Expected impact 3 of the Project, in fact: supporting better-informed decision-making of end-users and stakeholders
5
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
Highlights  To improve climate change resilience of the WWTP
 To facilitate overall hygienic conditions in Novi Sad, as well as the environment
 To safeguard the potable water resources and the quality of the environment
in the areas located downstream and under the influence of the Danube River
6
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
Outline 1. Selection of WWTP location
2. Selection of wastewater treatment options
3. Improving the design and construction of WWTP, retentions, pipelines and
pumping stations
4. Human health, safety and security
7
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
Selection of WWTP location
• 12 potential locations (radius of 5 km from Pumping
Station GC2) were identified as possible construction
sites for the WWTP
• According to Pre-feasibility Study, the most appropriate
locations - Rokov Potok and Kaćki Put
• The least cost option – WWTP at location of Rokov Potok
for 400,000 PE
8
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
Selection of wastewater treatment options
Option 1
Construction of a WWTP with primary and secondary treatment
facilities
Option 2
Construction of a WWTP with primary, secondary and tertiary
treatment facilities
Option 3
Construction of a WWTP with primary and secondary treatment
facilities and upgrading of the treatment plant at the second
phase adding tertiary treatment facilities
The marginal Financial Net Present Value: EUR 8.8 million
9
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
Adopted
Based on ToR of PFS, PFS & H2020_Insurance support
Pre-feasibility Study Novi Sad Wastewater Treatment Plant:
POSITIVE REVIEW OF THE
REVIEW COMMITTEE OF THE PROVINCE OF VOJVODINA
OBTAINED IN JAN 2019.
10
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
Adopted
Based on ToR of PFS, PFS & H2020_Insurance support
• One WWTP
• Location – Rokov Potok
• 400,000 PE
Proof that upgrade of WWTP up to 500,000 PE is
possible at the same location, in case of
population growth in future is required
11
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
Adopted
Based on ToR of PFS, PFS & H2020_Insurance support
• Treatment Level –primary and secondary
treatment facilities and upgrading of the
treatment plant at the second phase
adding tertiary treatment facilities
• Process options – conventional activated
sludge (CAS) and biological nutrient
removal (BNR) processes
12
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
• Providing protection against health risks from residual pathogens
• Ensuring the uninterrupted access to safe, healthy and sufficient drinking water for the
population of Novi Sad and suburbs
• Ensuring human right to live and develop in healthy environment as well as balanced economy
growth and protection of the environment in the Province of Vojvodina
Human health, safety and security
13
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
• Pre-feasibility Study for the WWTP in Novi Sad - positive review from The Committee of the Province of
Vojvodina (January, 2019)
• Conceptual Design for the WWTP Novi Sad – adopted
• Feasibility study (FS) design will be started in a few weeks
• Development of CC Risk Assessment Study for the FS of the WWTP in Novi Sad - approved
The chosen WWTP location is optimal
from almost all considerations, but in
terms of pluvial flood risk it is not the
best option.
Our results strongly suggested that
some sort of flood defence (climate
adaptation) should be included into the
design to counteract the risk of flash
floods - significant added value of using
the FDM
14
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
Subject of the analysis:
• Planned WWTP of Novi Sad
• Following the modelling process by
PIK Potsdam/DTU
• And the Feasibility study by FTN
Climate Impact Assessment of a waste water treatment plant
15
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
The analysis consists 7 steps embedded into the project life cycle:
1. Sensitivity analysis (SA)
2. Evaluation of exposure (EE)
3. Vulnerability analysis (VA)
4. Risk assessment (RA)
5. Identification of adaptation options (IAO)
6. Appraisal of adaptation options (AAO)
Structure of the analysis
16
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
Climate Friendly Municipalities
17
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
1. 3200 municipality in Hungary
2. Online questionnaire sent
3. Recruitment of city managers and urban planners for CBA training –
Cost Benefit Analyse of sustainable urban flood prevention
4. MABISZ 13-14 November 2019 Platform meetings
Climate Friendly Municipality
Thank you

More Related Content

Similar to Impact beyond insurances in the Danube Basin

Presentation - Workshop 1: Water Investment Planning and Financing, Marco Beros
Presentation - Workshop 1: Water Investment Planning and Financing, Marco BerosPresentation - Workshop 1: Water Investment Planning and Financing, Marco Beros
Presentation - Workshop 1: Water Investment Planning and Financing, Marco BerosOECD Environment
 
Atlantic stakeholder platform conference MARIBE presentation
Atlantic stakeholder platform conference MARIBE presentationAtlantic stakeholder platform conference MARIBE presentation
Atlantic stakeholder platform conference MARIBE presentationBVG Associates
 
1606 MJB GOW16 Maribe - Will combining sectors reduce LCOE
1606 MJB GOW16 Maribe - Will combining sectors reduce LCOE1606 MJB GOW16 Maribe - Will combining sectors reduce LCOE
1606 MJB GOW16 Maribe - Will combining sectors reduce LCOEMike Blanch
 
Will combining sectors deliver blue growth
Will combining sectors deliver blue growthWill combining sectors deliver blue growth
Will combining sectors deliver blue growthBVG Associates
 
Replication considerations for the deployment of REnnovates in Europe
Replication considerations for the deployment of REnnovates in EuropeReplication considerations for the deployment of REnnovates in Europe
Replication considerations for the deployment of REnnovates in EuropeHenri Relyveld
 
Presentation - Workshop on Scaling-up the implementation of nature-based solu...
Presentation - Workshop on Scaling-up the implementation of nature-based solu...Presentation - Workshop on Scaling-up the implementation of nature-based solu...
Presentation - Workshop on Scaling-up the implementation of nature-based solu...OECD Environment
 
ULTIMATE project - Case Study 9 in Kalundborg, DK
ULTIMATE project - Case Study 9 in Kalundborg, DKULTIMATE project - Case Study 9 in Kalundborg, DK
ULTIMATE project - Case Study 9 in Kalundborg, DKDrKristineJung
 
COVID 19 impact on environment
COVID 19 impact on environment COVID 19 impact on environment
COVID 19 impact on environment DevMaan
 
Electrification as a Solution for Port Decarbonization by Bernat Adriá Mora,
Electrification as a Solution for Port Decarbonization by Bernat Adriá Mora,Electrification as a Solution for Port Decarbonization by Bernat Adriá Mora,
Electrification as a Solution for Port Decarbonization by Bernat Adriá Mora,Forth
 
Renewable Energy & Energy Efficiency within Urban Development. Case study: Vi...
Renewable Energy & Energy Efficiency within Urban Development. Case study: Vi...Renewable Energy & Energy Efficiency within Urban Development. Case study: Vi...
Renewable Energy & Energy Efficiency within Urban Development. Case study: Vi...RCREEE
 

Similar to Impact beyond insurances in the Danube Basin (20)

Oasis Innovation Hub for Catastrophe and Climate Extremes Risk Assessment Pro...
Oasis Innovation Hub for Catastrophe and Climate Extremes Risk Assessment Pro...Oasis Innovation Hub for Catastrophe and Climate Extremes Risk Assessment Pro...
Oasis Innovation Hub for Catastrophe and Climate Extremes Risk Assessment Pro...
 
H2020 insurance meeting with ec dg s april 2020 vs4 final
H2020 insurance meeting with ec dg s april 2020 vs4 finalH2020 insurance meeting with ec dg s april 2020 vs4 final
H2020 insurance meeting with ec dg s april 2020 vs4 final
 
WP 2.1.1 Danube regional multi-hazard, multi-risk model suite
WP 2.1.1 Danube regional multi-hazard, multi-risk model suiteWP 2.1.1 Danube regional multi-hazard, multi-risk model suite
WP 2.1.1 Danube regional multi-hazard, multi-risk model suite
 
Session 1B: Connecting up the dots between science, municipalities, insurance...
Session 1B: Connecting up the dots between science, municipalities, insurance...Session 1B: Connecting up the dots between science, municipalities, insurance...
Session 1B: Connecting up the dots between science, municipalities, insurance...
 
Future Danube Model - H2020|Insurance model review meeting, London
Future Danube Model - H2020|Insurance model review meeting, LondonFuture Danube Model - H2020|Insurance model review meeting, London
Future Danube Model - H2020|Insurance model review meeting, London
 
Presentation - Workshop 1: Water Investment Planning and Financing, Marco Beros
Presentation - Workshop 1: Water Investment Planning and Financing, Marco BerosPresentation - Workshop 1: Water Investment Planning and Financing, Marco Beros
Presentation - Workshop 1: Water Investment Planning and Financing, Marco Beros
 
Detection of climate change impacts in current flood risk
Detection of climate change impacts in current flood riskDetection of climate change impacts in current flood risk
Detection of climate change impacts in current flood risk
 
Atlantic stakeholder platform conference MARIBE presentation
Atlantic stakeholder platform conference MARIBE presentationAtlantic stakeholder platform conference MARIBE presentation
Atlantic stakeholder platform conference MARIBE presentation
 
1606 MJB GOW16 Maribe - Will combining sectors reduce LCOE
1606 MJB GOW16 Maribe - Will combining sectors reduce LCOE1606 MJB GOW16 Maribe - Will combining sectors reduce LCOE
1606 MJB GOW16 Maribe - Will combining sectors reduce LCOE
 
The Future Danube Model - CBA climate change adaptation workshop, Budapest
The Future Danube Model - CBA climate change adaptation workshop, BudapestThe Future Danube Model - CBA climate change adaptation workshop, Budapest
The Future Danube Model - CBA climate change adaptation workshop, Budapest
 
Will combining sectors deliver blue growth
Will combining sectors deliver blue growthWill combining sectors deliver blue growth
Will combining sectors deliver blue growth
 
Links between science and insurance - The H2020 Insurance project within Oasi...
Links between science and insurance - The H2020 Insurance project within Oasi...Links between science and insurance - The H2020 Insurance project within Oasi...
Links between science and insurance - The H2020 Insurance project within Oasi...
 
Replication considerations for the deployment of REnnovates in Europe
Replication considerations for the deployment of REnnovates in EuropeReplication considerations for the deployment of REnnovates in Europe
Replication considerations for the deployment of REnnovates in Europe
 
Ocean finance
Ocean financeOcean finance
Ocean finance
 
Water Management Financing in the Caribbean - Part 2
Water Management Financing in the Caribbean - Part 2Water Management Financing in the Caribbean - Part 2
Water Management Financing in the Caribbean - Part 2
 
Presentation - Workshop on Scaling-up the implementation of nature-based solu...
Presentation - Workshop on Scaling-up the implementation of nature-based solu...Presentation - Workshop on Scaling-up the implementation of nature-based solu...
Presentation - Workshop on Scaling-up the implementation of nature-based solu...
 
ULTIMATE project - Case Study 9 in Kalundborg, DK
ULTIMATE project - Case Study 9 in Kalundborg, DKULTIMATE project - Case Study 9 in Kalundborg, DK
ULTIMATE project - Case Study 9 in Kalundborg, DK
 
COVID 19 impact on environment
COVID 19 impact on environment COVID 19 impact on environment
COVID 19 impact on environment
 
Electrification as a Solution for Port Decarbonization by Bernat Adriá Mora,
Electrification as a Solution for Port Decarbonization by Bernat Adriá Mora,Electrification as a Solution for Port Decarbonization by Bernat Adriá Mora,
Electrification as a Solution for Port Decarbonization by Bernat Adriá Mora,
 
Renewable Energy & Energy Efficiency within Urban Development. Case study: Vi...
Renewable Energy & Energy Efficiency within Urban Development. Case study: Vi...Renewable Energy & Energy Efficiency within Urban Development. Case study: Vi...
Renewable Energy & Energy Efficiency within Urban Development. Case study: Vi...
 

More from Oasis Innovation Hub for Catastrophe and Climate (8)

H2020 Oasis project and its implications for the future of EU policy to promo...
H2020 Oasis project and its implications for the future of EU policy to promo...H2020 Oasis project and its implications for the future of EU policy to promo...
H2020 Oasis project and its implications for the future of EU policy to promo...
 
H2020 Oasis project and its implications for the future of EU policy to promo...
H2020 Oasis project and its implications for the future of EU policy to promo...H2020 Oasis project and its implications for the future of EU policy to promo...
H2020 Oasis project and its implications for the future of EU policy to promo...
 
Oasis Hub Ltd/Betterpoints Ltd
Oasis Hub Ltd/Betterpoints LtdOasis Hub Ltd/Betterpoints Ltd
Oasis Hub Ltd/Betterpoints Ltd
 
WP 2.3.2 Forest Demonstrator
WP 2.3.2 Forest DemonstratorWP 2.3.2 Forest Demonstrator
WP 2.3.2 Forest Demonstrator
 
Work package 2.3.1 - Climate Services for the Health Sector
Work package 2.3.1 - Climate Services for the Health SectorWork package 2.3.1 - Climate Services for the Health Sector
Work package 2.3.1 - Climate Services for the Health Sector
 
Links between science and insurance - WP 2.2.2. Micro Insurance Model East Af...
Links between science and insurance - WP 2.2.2. Micro Insurance Model East Af...Links between science and insurance - WP 2.2.2. Micro Insurance Model East Af...
Links between science and insurance - WP 2.2.2. Micro Insurance Model East Af...
 
Innovation web-based modeling solutions for wildfires
Innovation web-based modeling solutions for wildfiresInnovation web-based modeling solutions for wildfires
Innovation web-based modeling solutions for wildfires
 
New ways to understand climate risk and reduce health impacts for people with...
New ways to understand climate risk and reduce health impacts for people with...New ways to understand climate risk and reduce health impacts for people with...
New ways to understand climate risk and reduce health impacts for people with...
 

Recently uploaded

History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...OECD Environment
 
VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130
VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130
VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurSuhani Kapoor
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abrahamssuserbb03ff
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
Low Rate Call Girls Nashik Lavanya 7001305949 Independent Escort Service Nashik
Low Rate Call Girls Nashik Lavanya 7001305949 Independent Escort Service NashikLow Rate Call Girls Nashik Lavanya 7001305949 Independent Escort Service Nashik
Low Rate Call Girls Nashik Lavanya 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashikranjana rawat
 
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerLow Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerSuhani Kapoor
 

Recently uploaded (20)

History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
 
Call Girls In Delhi 9953056974 (Low Price) Escort Service Pushp Vihar
Call Girls In Delhi 9953056974 (Low Price) Escort Service Pushp ViharCall Girls In Delhi 9953056974 (Low Price) Escort Service Pushp Vihar
Call Girls In Delhi 9953056974 (Low Price) Escort Service Pushp Vihar
 
VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130
VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130
VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130
 
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Sustainable Packaging
Sustainable PackagingSustainable Packaging
Sustainable Packaging
 
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
 
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls ServicesGandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
 
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
 
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abraham
 
Green Banking
Green Banking Green Banking
Green Banking
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
Low Rate Call Girls Nashik Lavanya 7001305949 Independent Escort Service Nashik
Low Rate Call Girls Nashik Lavanya 7001305949 Independent Escort Service NashikLow Rate Call Girls Nashik Lavanya 7001305949 Independent Escort Service Nashik
Low Rate Call Girls Nashik Lavanya 7001305949 Independent Escort Service Nashik
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
 
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCREscort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
 
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerLow Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
 

Impact beyond insurances in the Danube Basin

  • 1. Impact beyond insurances in the Danube Basin October 29th, 2019 Brussels Meeting Maja Turk Sekulic, Jelena Radonic Boglárka Lakatos Levente Huszti Michel Wortmann
  • 2. 2 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co • Novi Sad Case Study • Climate-proofing infrastructural investment • EU Climate Change Impact assessment • Association of Climate Friendly Municipalities • International Commission for the Protection of the Danube River (ICPDR) • EU Water Framework Directive • EU Flood Directive • Sava Commission • Cost-Benefit Analysis workshop by TUD, Budapest • Results publish on WWF Water Risk Filter (https://waterriskfilter.panda.org/) • Results provided to EU InterReg Danube project (http://www.interreg-danube.eu) Overview
  • 3. 3 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co Public interaction with the model results
  • 4. 4 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co Objectives  All activities are focused on the new Wastewater Treatment Plant, that is planned to be constructed in Novi Sad (initiated in 2021)  In order to provide added-value for the decision-making processes, in terms of effectiveness, optimized technological opportunities and minimized risks As Expected impact 3 of the Project, in fact: supporting better-informed decision-making of end-users and stakeholders
  • 5. 5 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co Highlights  To improve climate change resilience of the WWTP  To facilitate overall hygienic conditions in Novi Sad, as well as the environment  To safeguard the potable water resources and the quality of the environment in the areas located downstream and under the influence of the Danube River
  • 6. 6 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co Outline 1. Selection of WWTP location 2. Selection of wastewater treatment options 3. Improving the design and construction of WWTP, retentions, pipelines and pumping stations 4. Human health, safety and security
  • 7. 7 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co Selection of WWTP location • 12 potential locations (radius of 5 km from Pumping Station GC2) were identified as possible construction sites for the WWTP • According to Pre-feasibility Study, the most appropriate locations - Rokov Potok and Kaćki Put • The least cost option – WWTP at location of Rokov Potok for 400,000 PE
  • 8. 8 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co Selection of wastewater treatment options Option 1 Construction of a WWTP with primary and secondary treatment facilities Option 2 Construction of a WWTP with primary, secondary and tertiary treatment facilities Option 3 Construction of a WWTP with primary and secondary treatment facilities and upgrading of the treatment plant at the second phase adding tertiary treatment facilities The marginal Financial Net Present Value: EUR 8.8 million
  • 9. 9 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co Adopted Based on ToR of PFS, PFS & H2020_Insurance support Pre-feasibility Study Novi Sad Wastewater Treatment Plant: POSITIVE REVIEW OF THE REVIEW COMMITTEE OF THE PROVINCE OF VOJVODINA OBTAINED IN JAN 2019.
  • 10. 10 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co Adopted Based on ToR of PFS, PFS & H2020_Insurance support • One WWTP • Location – Rokov Potok • 400,000 PE Proof that upgrade of WWTP up to 500,000 PE is possible at the same location, in case of population growth in future is required
  • 11. 11 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co Adopted Based on ToR of PFS, PFS & H2020_Insurance support • Treatment Level –primary and secondary treatment facilities and upgrading of the treatment plant at the second phase adding tertiary treatment facilities • Process options – conventional activated sludge (CAS) and biological nutrient removal (BNR) processes
  • 12. 12 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co • Providing protection against health risks from residual pathogens • Ensuring the uninterrupted access to safe, healthy and sufficient drinking water for the population of Novi Sad and suburbs • Ensuring human right to live and develop in healthy environment as well as balanced economy growth and protection of the environment in the Province of Vojvodina Human health, safety and security
  • 13. 13 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co • Pre-feasibility Study for the WWTP in Novi Sad - positive review from The Committee of the Province of Vojvodina (January, 2019) • Conceptual Design for the WWTP Novi Sad – adopted • Feasibility study (FS) design will be started in a few weeks • Development of CC Risk Assessment Study for the FS of the WWTP in Novi Sad - approved The chosen WWTP location is optimal from almost all considerations, but in terms of pluvial flood risk it is not the best option. Our results strongly suggested that some sort of flood defence (climate adaptation) should be included into the design to counteract the risk of flash floods - significant added value of using the FDM
  • 14. 14 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co Subject of the analysis: • Planned WWTP of Novi Sad • Following the modelling process by PIK Potsdam/DTU • And the Feasibility study by FTN Climate Impact Assessment of a waste water treatment plant
  • 15. 15 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co The analysis consists 7 steps embedded into the project life cycle: 1. Sensitivity analysis (SA) 2. Evaluation of exposure (EE) 3. Vulnerability analysis (VA) 4. Risk assessment (RA) 5. Identification of adaptation options (IAO) 6. Appraisal of adaptation options (AAO) Structure of the analysis
  • 16. 16 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co Climate Friendly Municipalities
  • 17. 17 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co 1. 3200 municipality in Hungary 2. Online questionnaire sent 3. Recruitment of city managers and urban planners for CBA training – Cost Benefit Analyse of sustainable urban flood prevention 4. MABISZ 13-14 November 2019 Platform meetings Climate Friendly Municipality