SlideShare a Scribd company logo
1 of 105
1
COUNTRY PROGRESS AND
REGIONAL COOPERATION
European Union Water Initiative Plus for the Eastern Partnership
THIRD STEERING COMMITTEE MEETING
UNECE / OECD / EU MS Consortium
Prepared for the Regional Steering Committee Meeting, Paris, 26 November 2019
2
COUNTRY PROGRESS ARMENIA
1. Progress, Outputs and Outcomes since the second SCM in November 2018
2. Specific challenges / recommendations / solutions
The EU-funded Action “European Union Water Initiative Plus for Eastern Partnership Countries (EUWI+ 4 EaP)” is implemented by the UNECE, OECD, responsible for the
implementation of Result 1 and an EU member state consortium of Austria and France responsible for the implementation of Result 2 and 3. This document was produced by
UNECE and/or OECD and/or the EU member state consortium with the financial assistance of the European Union. The views expressed herein can in no way be taken to reflect
the official opinion of the European Union or the Governments of the Eastern Partnership Countries. This document and any map included herein are without prejudice to the
status of, or sovereignty over, any territory, to the delimitation of international frontiers and boundaries, and to the name of any territory, city or area.
3
NATIONAL POLICY DIALOGUE
• 18th Meeting of the Steering Committee of the National Policy
Dialogue held on 15.10.2019 (54 participants, 19 female - 35 male)
EU WATER ACQUIS APPROXIMATION
• Draft roadmap for implementation of CEPA provisions (5 EU Water
Directives) completed
• Draft ministerial decrees for adoption of the roadmap were prepared
LEGISLATIVE REFORM
• Amendments to the Water Code, the Law on the National Water
Program etc. in line with the CEPA implementation roadmap ongoing
LEGISLATION POLICY & INSTITUTIONAL
STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
4
MULTILATERAL ENVIRONMENTAL AGREEMENTS
• Revised National Targets in the context of the Protocol on Water
and Health (in Armenian and English) and analysis of legislative
barriers to ensure equitable access to water and sanitation finalized
SUPPORT IN DEVELOPING A WATER-FOOD SECURITY POLICY
• An extended study on the irrigation sector reform is ongoing, scope
was discussed at the 18th NPD SC meeting.
LEGISLATION POLICY & INSTITUTIONAL
STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
5
TRANSBOUNDARY COOPERATION
• Support transboundary cooperation with Georgia on the
Khrami-Debed and possible bi-lateral agreement – bilateral
meeting held in Yerevan on 14 October 2019
CAPACITY DEVELOPMENT
• Workshop/Consultation meeting organized on the revised
targets in the context of the Protocol on Water and Health and
equitable access (19.02.2019)
LEGISLATION POLICY & INSTITUTIONAL
STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
6
RELOCATION OF THE EMIC LAB PROCUREMENT
• Renovation and relocation of laboratory almost completed and
supply of laboratory furniture. Total contracted volume 123,000 €
PROCUREMENT
• Procurement of an ion chromatograph, water purification system,
diverse chemical laboratory and field measurement equipment
and spare parts for diverse laboratory devices. Total contracted
volume 236,000 €.
LAB OPENING
• Under planning (early 2020)
LABORATORY DEVELOPMENT
7
CAPACITY BUILDING
• National and regional trainings
o 2 methodological training workshops provided with existing equipment
o 1 sub-regional methods training on “method validation, measurement uncertainty
and metrological traceability in accordance with EN ISO 17025:2017” in Kyev in April
2019
o 1 regional methods training for determination of organochlorine compounds
o 1 study visit to Austria in October 2019 to exchange experience on ways of
implementing WFD in an EU member country
o 1st round in participation in proficiency testing completed
LABORATORY ACCREDITATION
• focus on assistance in setting up the quality management system
documentation, as a prerequisite for laboratory accreditation
o 3 quality management missions to the EMIC laboratory in Yerevan between April
2018 and July 2019.
LABORATORY DEVELOPMENT
8
CAPACITY BUILDING
• 4 sub-regional training workshops provided / 10 trainees
MONITORING AND BASIN PLANNING
• Delineation report completed: 228 new surface water bodies
in Sevan and Hrazdan RBDs identified, delineated and
characterised.
• 1 HYMO & 2 biological surveys conducted in 2 RBDs.
1 survey report. 1 report under review. 2 survey manuals.
PROCUREMENT
• Renovation of hydrological monitoring posts, supply of
hydrological monitoring equipment and irrigation flow
measurement equipment. Total contracted volume: 163,000 €
SURFACE WATER MONITORING DEVELOPMENT
9
CAPACITY BUILDING
• 2 national training events provided / 15 trainees
MONITORING AND BASIN PLANNING
• Delineation report completed: 18 new groundwater bodies in
both RBDs identified, delineated and characterised.
• Assessment of available groundwater resource incl.
methodology ongoing.
• Adaptation of monitoring network to WFD under preparation.
• 2 groundwater surveys conducted in Sevan and Hrazdan
RBDs, survey reports under development. 1 survey manual.
PROCUREMENT
• Purchase of an ultrasonic flow measurement device: contracted
volume 8,600 €
GROUNDWATER MONITORING DEVELOPMENT
10
LABORATORY
• provision of 1 national training, 4 quality management
missions and 2nd rounds of participation in proficiency testing
SURFACE WATER
• 2 sub-regional trainings and at least 1 biological and 1
investigative monitoring
GROUNDWATER
• at least 1 national training and 1 survey
• Installation of new and rehabilitation of 18 existing monitoring
GW sites
FURTHER INVESTMENTS
• Small laboratory equipment and SW monitoring equipment.
OUTLOOK AND FURTHER PLANS FOR 2020
11
SIA: IMPLEMENTATION OF MEASURES FROM AKHURYAN RBMP
• protected areas, environmental flow
DEVELOPMENT OF RBMP IN SEVAN & HRAZDAN BASINS
• Finalised chapters: water bodies delineation, characterisation,
pressures, impacts, rick analysis, protected areas, main issues
• Following chapters on-going (economic analysis, programme of
measures)
• First consultation on Significant Water Management Issues
CAPACITY BUILDING/WORKSHOPS
• RBMP Water bodies status & risk analysis (Dec 2018) with UBA
• RBMP Environmental Flow Assessment (June 2019)
• RBMP and economic analysis (regional, 11-12 April 2019 and
6-countries on-line webinar)
PARTICIPATIVE RBM PLANNING
12
implementation of soft
measure: estimation of
ecological flow
First new RBMP development
13
AGREEMENTS WITH HYDROMET, EMIC AND WATER COMMITTEE
• Testing procedures of automatic data exchange through pilot actions
• A provisional operational platform was implemented
and is operational on the project server where
o Previous EPIRB layers are available through web services
o GIS layers from water cadaster are made available as web services
FIRST METADATA AND DATASETS PRODUCED AND INTEGRATED INTO THE PLATFORM
CAPACITY BUILDING
• Online support on platform’s tools management
o Metadata catalogue
o Web services
o Interactive maps
SUPPORT ON DATA BASES STRUCTURING
• Development of specifications for national databases
development
• Support to SWC information system update
DEVELOPMENT OF THE DATA MANAGEMENT PLATFORM
14
PUBLIC CONSULTATIONS
• 1st Public consultation on the first phase of the pilot RBMP
development (main water issues) from 12 March to 12 April 2019
• 120 opinions collected for Hrazdan
• 129 opinions for Sevan
SUPPORT TO LOCAL CONSULTATION STRATEGY
• Local consultant started in October 2018 (support to
consultations and communication&visibility activities)
• 1 Communication strategy and action plan for participative
RBM Planning
• 2 reports completed:
o stakeholder analysis
o on public consultation from March-April 2019
STAKEHOLDER INVOLVEMENT FOR PARTICIPATIVE
RBMP DEVELOPMENT
15
COMMUNICATION MATERIALS DEVELOPMENT
• 1 newsletter published in February 2019
• 1 EUWI+ leaflet & 1 banner in AM
• 2 factsheets (Hrazdan and Sevan river basins)
• 2 videos in AM and EN: World Environment Day, Sevan Day
• 4 cartoons in AM: Public consultation, RBMP, EUWI+ project,
Clean Beach (2018 edition)
OUTREACH EVENTS (Sept 2018-August 2019)
• 5 outreach events (World Water Day, World Environment
Day, Lake Sevan Day an awareness-raising campaign on
water quality )
• 452 people reached
FOCUS
• campaign on water quality knowledge to connect education
on water to local water issues and water management
projects (spring-autumn 2019)
Campaign on water quality knowledge: trainings
sessions for teachers in June 2019
COMMUNICATION AND AWARENESS RAISING
Study tour and final presentation of
the summer campaign’s results
during World Water Monitoring Day
on 18 September 2019
16
RBMP
• Finalisation of the Sevan and Hrazdan RBMP and SIA
DATA MANAGEMENT (IN COOPERATION WITH ENI-SEIS)
• Tender and development of emic/hydromet national databases
• Development of indicators databases
• Valorization of available data through web services and visualization tools (interactive
maps/ dashboards)
• Transfer of database and tools for visualization on national platform
STAKEHOLDER INVOLVEMENT/ COMMUNICATION AND VISIBILITY
• Public consultation draft RBMP: first quarter 2020
• Lab event: early 2020
• Regional workshop on public consultation for Armenia, Azerbaijan and Georgia (first
quarter 2020)
OUTLOOK AND FURTHER PLANS FOR 2020
17
RECOMMENDATIONS
• Need for adoption of the CEPA implementation roadmap to substantiate
relevant legislative changes
• Accession to the Protocol on Water and Health and formal adoption of
targets
CHALLENGES / RECOMMENDATIONS IN ARMENIA
18
COUNTRY PROGRESS AZERBAIJAN
1. Progress, Outputs and Outcomes since the second SCM in November 2018
2. Specific challenges / recommendations / solutions
The EU-funded Action “European Union Water Initiative Plus for Eastern Partnership Countries (EUWI+ 4 EaP)” is implemented by the UNECE, OECD, responsible for the
implementation of Result 1 and an EU member state consortium of Austria and France responsible for the implementation of Result 2 and 3. This document was produced by
UNECE and/or OECD and/or the EU member state consortium with the financial assistance of the European Union. The views expressed herein can in no way be taken to reflect
the official opinion of the European Union or the Governments of the Eastern Partnership Countries. This document and any map included herein are without prejudice to the
status of, or sovereignty over, any territory, to the delimitation of international frontiers and boundaries, and to the name of any territory, city or area.
19
NATIONAL POLICY DIALOGUE
• 8th Meeting of the Steering Committee of the National Policy Dialogue
held on 12.7.2019 (45 participants, 13 female and 32 male)
EU WATER ACQUIS APPROXIMATION
• Approximation promoted through the policy dialogue
LEGISLATIVE REFORM
• Methodology for identification of water abstraction limits depending on
ecological flow requirements developed
MULTILATERAL ENVIRONMENTAL AGREEMENTS
• National reporting exercise under the Protocol on Water and Health
supported and the report submitted to the Protocol secretariat
• Support to the Water Convention implementation and reporting
provided
LEGISLATION POLICY & INSTITUTIONAL
STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
20
SUPPORTING A NATIONAL WATER STRATEGY & ACTION PROGRAMME
• Consultation process on the national water strategy is completed and
now the document has been submitted for adoption. A range of
consultations with different Ministries and stakeholders was held in
Q1/2 2019. Provisions of the new bilateral agreement between AZ and
the EC were taken into consideration. Development of a National
Water Action Programme launched.
TRANSBOUNDARY COOPERATION
• Support to consultations on the bilateral Kura agreement with
Georgia provided. Note verbale to initiate formal negotiations sent by
Azerbaijan.
CAPACITY DEVELOPMENT
• Provided through regional trainings/events and through support to
reporting under MEAs.
LEGISLATION POLICY & INSTITUTIONAL
STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
21
REFURBISHMENT OF THE NATIONAL LABORATORY (MENR)
• Renovation and supply of air condition and laboratory furniture almost
completed. Total contracted volume 63,000 €
• Additionally, EUWI+ support and contribution to relocation and refurbishment of
provincial laboratory in Gazakh
PROCUREMENT
• Procurement of the Gas Chromatograph/MSMS, water purification system, atomic
absorption spectrophotometer, microwave digestion for sample preparation. Total
contracted volume 210,000 €.
• Review of technical preparations: last week
LAB OPENING
• On 10 December 2019 in Baku
LABORATORY DEVELOPMENT
22
CAPACITY BUILDING
• National and regional trainings
o 1 methodological training workshop provided with existing equipment
o 1 sub-regional training on “method validation, measurement uncertainty and
metrological traceability in accordance with EN ISO 17025:2017” in Kyev in April
2019
o 1 regional methods training for determination of organochlorine compounds
o 1 study visit to Austria in October 2019 to exchange experience in ways of
implementing WFD in an EU member country
o 1st round in participation in proficiency testing completed
LABORATORY ACCREDITATION
• focuses on assistance in setting up the quality management system
documentation, as a prerequisite for laboratory accreditation
o 1 quality management mission to the MENR laboratory in Baku in April 2019.
o 1 more quality management mission will take place in November 2019
LABORATORY DEVELOPMENT
23
SURFACE WATER AND COASTAL & TRANSITIONAL
MONITORING DEVELOPMENT
CAPACITY BUILDING
• 4 sub-regional SW training workshops provided / 10 trainees & 2
national CTW training provided / 10 trainees
MONITORING AND BASIN PLANNING
• SW Delineation report completed: 108 new surface water bodies in
the Upper Kura RBD identified, delineated and characterised.
• 1 HYMO & 2 biological surveys conducted in 1 RBD;
1 survey report. 1 report under review. 2 survey manuals.
PROCUREMENT
• Supplying of equipment for coastal water monitoring. Total
contracted volume 28,000 €
• Supply of equipment for SW and GW upcoming
24
CAPACITY BUILDING
• 2 national training workshops provided / 21 trainees
MONITORING AND BASIN PLANNING
• Delineation report completed: 9 new groundwater bodies in
the Upper Kura RBD identified, delineated and characterized.
• Adaptation of monitoring network to WFD under preparation.
• 1 groundwater survey conducted in Upper Kura RBD. 1
survey report. 1 survey manual.
GROUNDWATER MONITORING DEVELOPMENT
25
LABORATORY
• provision of 7 national trainings, quality management missions
and 2nd round of participation in proficiency testing
SURFACE WATER & COASTAL & TRANSITIONAL WATER
• SW: 2 sub-regional trainings and at least 1 biological and 1
investigative monitoring
• CTW: provision of 2 national trainings and 2 surveys
GROUNDWATER
• at least 1 national training and 1 survey (1 in Decembe 2019?)
FURTHER INVESTMENTS
• Rehabilitation of groundwater monitoring sites
• Purchase of planned SW and GW monitoring equipment
• Reassessment of existing budget and further investments in
works/supply/service.
OUTLOOK AND FURTHER PLANS FOR 2020
26
DEVELOPMENT OF PILOT RBMP FOR THE KURA RIVER BASIN
UPSTREAM MINGACHEVIR DAM
• Finalised chapters: water bodies delineation, characterisation,
pressures, impacts, protected areas
• Following chapters on-going (economic analysis, programme of
measures)
• First consultation on Significant Water Management Issues
SPECIFIC IMPLEMENTATION ACTIVITY IN THE SAME PILOT BASIN
• Preparation of a water allocation strategy on going on the district
CAPACITY BUILDING/WORKSHOPS
• RBMP development launching workshop (3 July 2018)
• RBMP integration, Pressures and impacts (October 25-26, 2018)
• RBMP and economic analysis (regional, 11-12 April 2019 and
6-countries on-line webinar)
• RBMP Programme of measures (Joint AZ, GE, 2-3 October 2019)
PARTICIPATIVE RBM PLANNING
27
Kura upstream Mingachevir dam
river basin district (pilot basin)
28
DEVELOPMENT OF THE WIS INFRASTRUCTURE
• MoU for server acquisition signed (server purchased and hosted by
MENR)
• Installed server will be used as national WIS
CAPACITY BUILDING
• Online support on platform management
o Metadata catalogue
o Web services
o Interactive maps
AGREEMENTS WITH MENR/WATER QUALITY, MENR/HYDROLOGY
• Testing procedures of automatic data exchange through pilot actions
• A provisional operational platform was implemented
and is operational on the project server where:
o Previous EPIRB layers are available through
web services
DEVELOPMENT OF THE DATA MANAGEMENT PLATFORM
29
PUBLIC CONSULTATION
• 1 stakeholder consultation period (January-May 2019)
o Kura upstream Mingachevir dam Pilot Basin stakeholders meetings
on RBMP work programme and main water related issues
SUPPORT TO LOCAL CONSULTATION STRATEGY
• Local consultant contracted on 7 March 2019. (support to
consultations and communication&visibility activities)
• 1 Communication strategy and action plan for participative
RBM Planning
• Questionnaires for future public consultations
STAKEHOLDER INVOLVEMENT FOR PARTICIPATIVE
RBMP DEVELOPMENT
30
COMMUNICATION MATERIAL DEVELOPMENT
• 1 newsletter published in May 2019
• 1 EUWI+ leaflet & 1 banner in AZ
• 4 cartoons in AZ: Public consultation, RBMP,
EUWI+ project, Clean Beach (2018 edition)
OUTREACH EVENTS (Sept 2018-Aug 2019)
• 4 outreach events on the occasion of the EU
days in May 2019: lectures and stand with
practical sessions for schoolchildren and
students to raise their awareness on water
quality
• 700 people reached
COMMUNICATION AND AWARENESS RAISING
EUWI+ stand at EU Days in Mingachevir, May 2019
31
RBMP
• Finalisation of the Kura upstream Mingachevir dam RBMP and SIA
DATA MANAGEMENT (IN COOPERATION WITH ENI-SEIS)
• Tender and development of quality national databases
• Development of indicators databases
• Valorization of available data through web services and visualization
tools (interactive maps/ dashboards)
• Transfer of database/tools used for visualization on national platform
STAKEHOLDER INVOLVEMENT/ COMMUNICATION AND VISIBILITY
• Public consultation draft RBMP: first quarter 2020
• Lab event: 10 December
• Regional workshop on public consultation for Armenia, Azerbaijan and
Georgia (first quarter 2020)
OUTLOOK AND FURTHER PLANS FOR 2020
32
RECOMMENDATIONS
• Expedite adoption of national water strategy
COUNTRY INVESTMENT BUDGET
• Substantial budget volumes are currently unallocated. Effort will be
needed to add eligible and WFD-compliant investments. The MS
Consortium started in the summer to facilitate selection, preparation and
implementation within the remaining EUWI+ project period.
CHALLENGES / RECOMMENDATIONS IN AZERBAIJAN
33
COUNTRY PROGRESS BELARUS
1. Progress, Outputs and Outcomes since the second SCM in November 2018
2. Specific challenges / recommendations / solutions
The EU-funded Action “European Union Water Initiative Plus for Eastern Partnership Countries (EUWI+ 4 EaP)” is implemented by the UNECE, OECD, responsible for the
implementation of Result 1 and an EU member state consortium of Austria and France responsible for the implementation of Result 2 and 3. This document was produced by
UNECE and/or OECD and/or the EU member state consortium with the financial assistance of the European Union. The views expressed herein can in no way be taken to reflect
the official opinion of the European Union or the Governments of the Eastern Partnership Countries. This document and any map included herein are without prejudice to the
status of, or sovereignty over, any territory, to the delimitation of international frontiers and boundaries, and to the name of any territory, city or area.
34
NATIONAL POLICY DIALOGUE
• 1st meeting of the Inter-agency committee managing the
implementation of the EUWI+ project in Belarus held on 5
December 2018.
EU WATER ACQUIS APPROXIMATION AND LEGISLATIVE REFORM
• in progress
SUPPORT IN DEVELOPING A NATIONAL WATER STRATEGY
• Assistance to developing new Water Strategy to 2030, in the context
of Climate Change
o Draft new Water Strategy passed public hearings;
o Strategic Environmental Assessment of the
Water Strategy ongoing; Kick-off meeting and training held in July 2019
LEGISLATION POLICY & INSTITUTIONAL
STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
35
PILOT ACTIONS AT LOCAL LEVEL TO SUPPORT IMPLEMENTATION OF THE
WATER STRATEGY AND RESPECTIVE RBMP
• On-going pilot actions in Kopyl Rayon of Minsk Oblast: priority activities
identified through an Express survey of water resources and infrastructure in
the rayon:
o New water consumption and wastewater discharge norms developed and approved
by 4 most water intensive enterprises in the rayon, with immediate effect; and
o Recommendations on the future Master plan for portable water supply developed
and generally approved by the public administration of the rayon.
MULTILATERAL ENVIRONMENTAL AGREEMENTS/COMMITMENTS
• Methodology to monitor nationalised SDGs 6.3-6-5 developed, approved by
BelStat and integrated in the computed based State Water Cadaster data-
base allowing an automated calculation of time-series for reporting purposes
• Baseline study for updating the targets set under the Protocol on Water and
Health drafted and the revised targets are being discussed
• Reporting under the Water Convention and SDG 6.5.2. supported
LEGISLATION POLICY & INSTITUTIONAL
STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
36
TRANSBOUNDARY COOPERATION
• Support to transboundary cooperation in the Western Dvina-Daugava basin provided
by facilitating consultations on an inter-ministerial agreement with Latvia
CAPACITY DEVELOPMENT
• Trainees from Belarus attended a regional capacity development event on
strategic planning under high risks and uncertainty (October 2018) held jointly with
IIASA under another regional project funded by Norway (synergy)
• EUWI+ side event on reform of rural WSS, at an International Water conference in
Minsk in February 2019
• Training materials on economic instruments for WRM in RB developed and printed;
integration thereof in the curricular of recipient training institutions in Belarus started.
• Based on request from the EUWI+ Interagency SC, training
on methodology for reporting under 6.5.2 provided through regional and
global workshops
• Training on scoping study for SEA procedure, Minsk, 12 July 2019
LEGISLATION POLICY & INSTITUTIONAL
STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
37
PROCUREMENT
• Procurement of the Liquid chromatography–mass spectrometry (LC-MS)
and Atomic Fluorescence Spectroscopy (AFS). Total contracted volume
267,000 €.
LAB OPENING
• 5 December NPD with lab agenda item
• Main visibility event in spring 2020
LABORATORY DEVELOPMENT
38
CAPACITY BUILDING
• National and regional trainings
o 1 methodological training provided with existing equipment
o 2 sub-regional trainings: 1 on the new version of the international standard EN
ISO/IEC 17025:2017 in Tbilisi and 1 for internal auditors acc. to ISO 19011
guideline and EN ISO 17025:2017 in Chisinau
o 1 regional methods training for determination of organochlorine compounds
o 1 study visit to Austria in October 2019 to exchange experience in ways of
implementing WFD in an EU member state
o 1st round in participation in proficiency testing completed
LABORATORY ACCREDITATION
• Partner laboratory already accredited
o Re-accreditation and transposing their existing quality management system into
the new edition of the international standard EN ISO 17025:2017 is ongoing
LABORATORY DEVELOPMENT
39
SURFACE WATER MONITORING DEVELOPMENT
CAPACITY BUILDING
• 4 sub-regional SW trainings provided / 11 trainees
MONITORING AND BASIN PLANNING
• SW Delineation report completed: 715 new surface water
bodies in 1 RBD identified, delineated and characterised.
• 1 HYMO & 2 biological surveys conducted in 1 RBDs.
1 survey report. 1 report under review. 2 survey manuals.
PROCUREMENT
• Purchase of SW monitoring equipment upcoming
40
CAPACITY BUILDING
• 2 national training workshop provided / 15 trainees
MONITORING AND BASIN PLANNING
• Delineation report completed: 11 new groundwater bodies
in Pripyat RB identified, delineated and characterised.
• Adaptation of monitoring network to WFD ongoing
• Transboundary coordination of GWBs with UA ongoing
• Pollution investigation (pesticides) ongoing.
• 2 groundwater surveys conducted in Pripyat RB. 1
survey report + 1 under preparation. 2 survey manuals.
GROUNDWATER MONITORING DEVELOPMENT
41
LABORATORY
• provision of 8 national trainings and 2nd round of participation
in proficiency testing
SURFACE WATER
• 2 sub-regional trainings and at least 1 biological and 1
investigative monitoring
GROUNDWATER
• at least 1 national training and 1 survey
FURTHER INVESTMENTS
• Purchase of planned SW and GW monitoring equipment
• Re-assessment of existing budget and further investments in
works/supply/service.
OUTLOOK AND FURTHER PLANS FOR 2020
42
PRIPYAT RBMP DEVELOPMENT
• Finalised chapters: Draft basin characterisation submitted at 1st consultation on
1st Nov. 2019 (20 participants)
DNIEPER RBMP REFINEMENT
• Documents available on EUWI+ website (1 report, 3 annexes)
• In the process of final approval
DNIEPER RBMP IMPLEMENTATION
• Sub-Basin Management Plan of Uza River Basin on-going
• Sub-Basin Management Plan of Mogilev urban watercourses on-going
SECONDARY LEGISLATION TECHNICAL GUIDES FOR NATIONAL USE ON-GOING
• Estimation of diffuse pollution
• Convergence of RBMPs content with WFD requirements
WORKSHOPS
• RBMP and economic analysis (regional, 27-28 March 2019 and
6-countries on-line webinar)
PARTICIPATIVE RBMP
43
SUPORT ON DATA BASES STRUCTURING
• Interest for data sharing formulated by main data producers but without
any engagements
CAPACITY BUILDING
• Online support on platform management
o Metadata catalogue
o Web services
o Interactive maps
DEVELOPMENT OF THE WIS INFRASTRUCTURE
• Tender for server acquisition was launched
• A provisional operational platform was
implemented and is operational on
project server with previous EPIRB
layers available through web services
DEVELOPMENT OF THE DATA MANAGEMENT PLATFORM
44
PUBLIC CONSULTATION
• 2 Basin Council meetings
• Dnieper- 25 October 2018
• Western Bug- December 2018
• 1 Public consultation meeting on Pripyat RBMP (from 1 November
2019)
SUPPORT TO LOCAL CONSULTATION STRATEGY
• Draft Participative RBMP Communication Strategy & Action plan
STAKEHOLDER INVOLVEMENT FOR PARTICIPATIVE
RBMP DEVELOPMENT
45
COMMUNICATION MATERIALS
o 1 newsletter published in June 2019
o 1 EUWI+ leaflet & 1 banner in BY
o 3 cartoons in BY: Public consultation, RBMP,
EUWI+ project
o 2 Factsheets in English (Dnieper and Pripyat
River Basin)
OUTREACH EVENTS (Sept 2018-Aug 2019)
o 1 outreach event: Minsk Festival "the EU and
Belarus, Creating Opportunities for
Youth", EUWI+ stand, June 2019
o 300 people reached
COMMUNICATION AND AWARENESS RAISING
EUWI+ stand at Minsk Festival " the EU and
Belarus, Creating Opportunities for Youth “
June 2019
46
RBMP
• Finalisation of the Pripyat RBMP and SIAs
DATA MANAGEMENT
• Finalizing server acquisition/ configuration
• Development of indicators databases
• Valorization of available data through web services and visualization
tools (interactive maps/ dashboards)
• Transfer of database/tools used for visualization on national platform
STAKEHOLDER INVOLVEMENT COMMUNICATION AND VISIBILITY
• Public consultation on Pripyat RBMP
• Lab event splited in two: 5 Dec 2019 back to back with NPD, students
visit in Spring 2020
OUTLOOK AND FURTHER PLANS FOR 2020
47
COUNTRY INVESTMENT BUDGET
• Substantial budget volumes are currently unallocated. Effort will be
needed to add eligible and WFD-compliant investments. The MS
Consortium started in the summer to facilitate selection,
preparation and implementation within the remaining EUWI+
project period.
CHALLENGES / RECOMMENDATIONS IN BELARUS
48
COUNTRY PROGRESS GEORGIA
1. Progress, Outputs and Outcomes since the second SCM in November 2018
2. Specific challenges / recommendations / solutions
The EU-funded Action “European Union Water Initiative Plus for Eastern Partnership Countries (EUWI+ 4 EaP)” is implemented by the UNECE, OECD, responsible for the
implementation of Result 1 and an EU member state consortium of Austria and France responsible for the implementation of Result 2 and 3. This document was produced by
UNECE and/or OECD and/or the EU member state consortium with the financial assistance of the European Union. The views expressed herein can in no way be taken to reflect
the official opinion of the European Union or the Governments of the Eastern Partnership Countries. This document and any map included herein are without prejudice to the
status of, or sovereignty over, any territory, to the delimitation of international frontiers and boundaries, and to the name of any territory, city or area.
49
NATIONAL POLICY DIALOGUE
• 6th Meeting of the Steering Committee of the National Policy Dialogue held on
2.10.2018 (46 participants, 23 female and 23 male)
EU WATER ACQUIS APPROXIMATION:
• Approximation promoted through the policy dialogue
LEGISLATIVE REFORM:
• Support to the organization of a high-level consultation workshop on the draft
law on water resources management on 9-11 February 2019 in Borjomi,
Georgia provided.
• Final draft law uploaded to the electronic inter-ministerial platform for
final comments and later submission to the parliament for adoption
• Secondary legislation “Review of the existing draft decree on monitoring of
water resources to ensure its compliance with the draft law on water resources
management and the EU WFD finalised
• Review of the existing draft of the normative act on Water Quality Ecological
Standards to ensure its compliance with the draft law on water resources
management and the EU Water Framework Directive WFD completed
• Support in the reform of water abstraction charges initiated
LEGISLATION POLICY & INSTITUTIONAL
STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
50
MULTILATERAL ENVIRONMENTAL AGREEMENTS
• Preparations conducted for the SEA for the Alazani-Iori RBMP
SUPPORT IN DEVELOPING A NATIONAL WATER STRATEGY
• Work is underway. Finalization of a policy (concept) paper providing a long-term
vision for further policy developments in the water sector of Georgia will serve as a
conceptual framework for the National Water Strategy.
• Work on the reform of water abstraction charges: scoping and review of international
experience launched
TRANSBOUNDARY COOPERATION
• Support transboundary cooperation with Georgia on the Khrami-Debed and possible
bi-lateral agreement – bilateral meeting held in Yerevan on 14 October 2019
• Support to consultations on the bilateral Kura agreement with Azerbaijan provided.
CAPACITY DEVELOPMENT
• Workshop on the draft law on water resources management on 9-11 February 2019
in Borjomi
• Provided through regional trainings/events and through support to reporting
under MEAs.
LEGISLATION POLICY & INSTITUTIONAL
STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
51
CAPACITY BUILDING
• National and regional trainings
o 2 methodological trainings provided with existing equipment
o 1 training for internal auditors acc. to ISO 19011 guideline and EN ISO
17025:2017 in Tbilisi and 1 workshop on QM principles
o 1 regional methods training for determination of organochlorine compounds
o 2 sub-regional trainings for internal auditors acc. to ISO 19011 and on the new
version of the international standard EN ISO/IEC 17025:2017
o 1 study visit to Austria in October 2019 to exchange experience in ways of
implementing WFD in an EU member state
o 1st round in participation in proficiency testing completed
LABORATORY ACCREDITATION
• Partner laboratory already accredited
o Re-accreditation and transposing their existing quality management system into
the new edition of the international standard EN ISO 17025:2017 is ongoing
LABORATORY DEVELOPMENT
52
PROCUREMENT
• Procurement of the Gas Chromatograph/MSMS, Microwave Digestion
for sample preparation and Water Purification System. Total contracted
volume 187,000 €.
LAB OPENING
• Successfully realized on 30th October 2019 in Tbilisi.
LABORATORY DEVELOPMENT
53
SURFACE WATER AND COASTAL & TRANSITIONAL
MONITORING DEVELOPMENT
CAPACITY BUILDING
• 4 sub-regional SW trainings provided / 17 trainees & 3
national CTW trainings provided / 19 trainees
MONITORING AND BASIN PLANNING
• SW Delineation report completed: 818 new surface water
bodies in 2 RBD identified, delineated and characterised.
• 1 HYMO & 2 biological surveys conducted in 1 RBDs.
1 survey report. 1 report under review. 2 survey manuals.
• 2 surveys of coastal & transitional waters
PROCUREMENT
• Supplying of equipment for coastal water monitoring. Total
contracted volume 37,000 €.
54
CAPACITY BUILDING
• 2 national trainings provided / 23 trainees
MONITORING AND BASIN PLANNING
• Delineation report completed: 35 new groundwater bodies
in the 2 RBDs identified, delineated and characterised.
• Geophysical logging of wells ongoing, as part of
adaptation of monitoring network to WFD.
• 2 groundwater surveys conducted in the 2 RBDs. 1
survey report + 1 under preparation. 1 survey manual.
GROUNDWATER MONITORING DEVELOPMENT
55
LABORATORY
• provision of 4 national trainings and 2nd rounds of participation in
proficiency testing
SURFACE AND COASTAL & TRANSITIONAL WATER
• SW: 2 sub-regional trainings and at least 1 biological and 1 investigative
monitoring
• CTW: 3 national trainings and 1 survey
GROUNDWATER
• at least 1 national training and 1 survey
FURTHER INVESTMENTS
• Rehabilitation of GW monitoring sites and furnishing with logging equipment
• Purchase of planned SW, GW and CTW monitoring equipment
• Re-assessment of existing budget and further investments in
service/supply/works.
OUTLOOK AND FURTHER PLANS FOR 2020
56
DEVELOPMENT OF ALAZANI AND IORI RBMP
• Finalised chapters: water bodies delineation, characterisation, pressures,
impacts, protected areas + Thematic summary of the basin characterisation
• Following chapters on-going
• First consultation on Significant Water Management Issues
DEVELOPMENT OF KHRAMI AND DEBED RBMP
• Finalised chapters: water bodies delineation, characterisation, pressures,
impacts, protected areas + Thematic summary of the basin characterisation
• Following chapters on-going
• First consultation on Significant Water Management Issues
WORKSHOPS:
• RBMP development launching, 5 June 2018
• RBMP Characterisation, pressures, impact, 22-23 October 2018
• RBMP and economic analysis (regional, 11-12 April 2019 and
6-countries on-line webinar)
• RBMP Programme of measures (Joint AZ, GE, 2-3 October 2019)
PARTICIPATIVE RBM PLANNING
57
Need for harmonisation at the border for
a continuity in the share vision of water
body status
Need to experience
the adoption process
and implementation
monitoring
58
AGREEMENTS WITH NEA WATER QUALITY AND MEPA WATER USE
• Testing procedures of automatic data exchange through pilot actions
CAPACITY BUILDING
• Online support on platform management
o Metadata catalogue
o Web services
o Interactive maps
DEVELOPMENT OF THE WIS INFRASTRUCTURE
• A provisional operational platform was implemented
and is operational on project server where:
o Previous EPIRB layers are available through
web services.
o GIS layers from Water Cadaster were made
available as web services
• Letter of Agreement was signed and tender launched
for server strengthening
DEVELOPMENT OF THE DATA MANAGEMENT PLATFORM
59
PUBLIC CONSULTATION
o 2 Basin council meetings (Alazani-Iori and
Khrami-Debed river basins)
o 1 Public consultation for Alazani-Iori and
Khrami-Debed River Basins(13-16 May)
o 7 meetings at Tianeti, Telavi, Kvareli, Signagi,
Sagarejo, Bolnisi and Tetritskaro.
o 140 opinions gathered
SUPPORT TO LOCAL CONSULTATION
STRATEGY
o 1 Participative RBMP Communication strategy
& action plan
o 1 Public consultation report
STAKEHOLDER INVOLVEMENT FOR PARTICIPATIVE
RBMP DEVELOPMENT
60
COMMUNICATION MATERIALS DEVELOPMENT
• 1 newsletter published in June 2019
• 2 factsheets (Khrami Debed, Alazani-Iori)
• 1 EUWI+ leaflet & 1 banner in GE
• 3 cartoons in GE: Public consultation,
RBMP, EUWI+ project
• 2 videos: coastal water monitoring
(published on FB), Water Law
• 4 infographics in EN and GE about
Khrami Debed and Alasani-Iori main
issues
• OUTREACH EVENTS (SEPT 2018-AUG 2019)
o 1 outreach event:
o March 2019 World Water Day (Open
Space for schoolchildren in Bolsini +
campaign “Don’t leave anyone behind”)
o 40 people reached
COMMUNICATION AND AWARENESS RAISING
Tbilisi Water Laboratory Day on 30 October 2019
FOCUS: Water Laboratory Day
(30.10.2019)
• 44 news items in:
• 6 project partners media
• 15 Georgian media
• 3 European union media
• 1 express campaign on EUWI+ FB
page:
• 5 FB publications
• More than 3600 organic
reaches
61
RBMP
• Finalisation of the Alazani-Iori & Kharmi-Debed RBMPs
DATA MANAGEMENT(IN COOPERATION WITH ENI-SEIS)
• Development of indicators databases
• Valorization of available data through web services and visualization
tools (interactive maps/ dashboards)
• Transfer of database/tools used for visualization on national platform
STAKEHOLDER INVOLVEMENT COMMUNICATION AND VISIBILITY
• Public consultation on draft RBMP: first quarter 2020
• Regional workshop on public consultation for Armenia, Azerbaijan and
Georgia (first quarter 2020)
OUTLOOK AND FURTHER PLANS FOR 2020
62
RECOMMENDATION
• Expedite adoption of the New Water Law to serve as foundation
for reforms in the Water Sector
COUNTRY INVESTMENT BUDGET
• Substantial budget volumes are currently unallocated. Effort will be
needed to add eligible and WFD-compliant investments. The MS
Consortium started in the summer to facilitate selection,
preparation and implementation within the remaining EUWI+
project period.
CHALLENGES / RECOMMENDATIONS IN GEORGIA
63
COUNTRY PROGRESS MOLDOVA
1. Progress, Outputs and Outcomes since the second SCM in November 2018
2. Specific challenges / recommendations / solutions
The EU-funded Action “European Union Water Initiative Plus for Eastern Partnership Countries (EUWI+ 4 EaP)” is implemented by the UNECE, OECD, responsible for the
implementation of Result 1 and an EU member state consortium of Austria and France responsible for the implementation of Result 2 and 3. This document was produced by
UNECE and/or OECD and/or the EU member state consortium with the financial assistance of the European Union. The views expressed herein can in no way be taken to reflect
the official opinion of the European Union or the Governments of the Eastern Partnership Countries. This document and any map included herein are without prejudice to the
status of, or sovereignty over, any territory, to the delimitation of international frontiers and boundaries, and to the name of any territory, city or area.
64
NATIONAL POLICY DIALOGUE
• 5th Meeting of the Steering Committee of the National Policy Dialogue
held on 25.10.2019 (73 participants, 37 female and 36 male)
EU WATER ACQUIS APPROXIMATION
• Approximation promoted through the policy dialogue
LEGISLATIVE REFORM
• Draft Law on the amendments to the Water Law No.272 prepared, and
adopted by the Parliament in November 2018 as Law No.249/2018
• Work started on transforming the new temporary design and
construction norms for small-scale drinking water supply systems in
Moldova approved in April 2018 into permanent ones; and on drafting
similar new norms for small-scale sanitation systems
• A study started on the use of Economic instruments for WRM in
Moldova, incl. monetary evaluation of damage to water resources and
bodies; and identifying and assessing options for establishing a
dedicated Water Solidarity Fund.
LEGISLATION POLICY & INSTITUTIONAL
STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
65
MULTILATERAL ENVIRONMENTAL AGREEMENTS
• Methodological support for monitoring and reporting on SDG 6.5.2 indicator
provided and report submitted to the Convention secretariat
• An expert group is working on draft revisions to the National Programme for
the Protocol on Water and Health implementation and proposals for
legislative changes to ensure equitable access to water and sanitation to be
presented at the Stakeholder Consultation Meeting in early 2020.
SUPPORT IN DEVELOPING A NATIONAL WATER STRATEGY / MID-TERM
PLANS
• Support to drafting a Government Resolution on updating the national WSS
Strategy and approving new mid-term action plan for 2019-23 to support
implementation of the Strategy (submitted to the Government, comments
collected and are being addressed)
TRANSBOUNDARY COOPERATION
• General support provided through the Water Convention activities
LEGISLATION POLICY & INSTITUTIONAL
STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
66
CAPACITY DEVELOPMENT
• Trainees from Moldova attended the regional capacity development event on
strategic planning under high risks and uncertainty (October 2018)
• Capacity development event on applying the new norms and sustainable
business models in rural WSS (March 2019)
• Work started on developing training materials on EIs for WRM in Moldova
• Provided through regional trainings/events and through support
to reporting under MEAs.
LEGISLATION POLICY & INSTITUTIONAL
STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
67
CAPACITY BUILDING
• National and regional trainings
o 2 methodological trainings provided with existing equipment
o 1 sub-regional training event for internal auditors acc. to ISO 19011 guideline and EN
ISO 17025:2017 in Chisinau
o 1 regional methods training for determination of organochlorine compounds
o 1 sub-regional training on the new version of the international standard EN ISO/IEC
17025:2017
o 1 study visit to Austria in October 2019 to exchange experience in ways of
implementing WFD in an EU member state
o 1st round in participation in proficiency testing completed
LABORATORY ACCREDITATION
• Partner laboratory was already accredited
o Re-accreditation and transposing their existing quality management system into the
new edition of the international standard EN ISO 17025:2017 is outstanding
o However, after institutional changes from SHS to EAM, the accreditation status of the
partner laboratory was temporarily suspended until the end of 2019 and may be lost.
LABORATORY DEVELOPMENT
68
PROCUREMENT
• Procurement of the Gas Chromatograph/MSMS, Microwave Digestion
for sample preparation, Water Purification System, Atomic Absorption
Spectrophotometer, DOC/TOC and bench freeze dryer .Total contracted
volume 270,000 €.
LAB OPENING
• Early 2020 (tbd)
LABORATORY DEVELOPMENT
69
SURFACE WATER MONITORING DEVELOPMENT
CAPACITY BUILDING
• 4 sub-regional SW trainings provided / 7 trainees + 2
national trainings provided with 19 trainees
MONITORING AND BASIN PLANNING
• SW Delineation report completed: Existing surface water
bodies in DPBS RBD reviewed and revised, 96 new delineated.
• 1 HYMO & 1 biological survey conducted in DPBS RBD.
1 survey report, 1 report under review. 2 survey manuals.
• Participation at ICPDR Joint Danube Survey 4
PROCUREMENT
• Purchase of SW monitoring equipment upcoming
70
CAPACITY BUILDING
• 2 national training workshops provided / 13 trainees
MONITORING AND BASIN PLANNING
• Delineation report completed: 13 existing groundwater
bodies in DPBS RBD reviewed, 8 revised, 1 new
delineated.
• Adaptation of monitoring network to WFD ongoing.
• 2 groundwater surveys conducted in DPBS RBD. 1
survey report + 1 in preparation. 2 survey manuals.
GROUNDWATER MONITORING DEVELOPMENT
71
LABORATORY
• provision of 9 national trainings and 2nd round of
participation in proficiency testing
SURFACE WATER
• 2 sub-regional trainings and at least 1 biological and 1
investigative monitoring
GROUNDWATER
• at least 1 national training and 1 survey
FURTHER INVESTMENTS
• Rehabilitation and installation of new monitoring sites
• Purchase of planned SW and GW monitoring equipment
• Re-assessment of existing budget and further investments in
works/supply/service.
OUTLOOK AND FURTHER PLANS FOR 2020
72
DANUBE-PRUT AND BACK SEA DISTRICT RBMP 1ST CYCLE IMPLEMENTATION
• RBMP approved in Oct. 2018
• Program of measures implementation can be completed earlier by end of 2021
DANUBE-PRUT AND BACK SEA DISTRICT RBMP DEVELOPMENT, 2ND CYCLE
• Finalised chapters: Draft Thematic Summary of the basin characterization finalized in June 2019
• New contract on Programme of Measures on-going (contract signed on 7 June 2019)
SPECIFIC IMPLEMENTATION ACTIONS (under activity 2.3.2)
• Development of a Water Sanitation System (WSS) master plan for the Nirnova sub-basin within
the context of the inter-municipality pilot governance scheme development
• Supporting the development and adoption of a code of good agricultural practices in Moldova
CAPACITY BUILDING/WORKSHOPS
• First steps of RBMP 2nd cycle II on 17 September
• Cross-road workshop on RBMP development: Pressures-impact analysis, held on 13 November
2018, 25 participants including a Romanian expert from Prut branch of Apele Romane for
transboundary coordination
• Participative river basin management planning on 31 January to prepare the consultation process
including a Romanian expert from Prut branch of Apele Romane
• RBMP and economic analysis (regional, 27-28 March 2019 and 6-countries on-line webinar)
• Continuous exchange with the selected contractor: 6 Skype meeting (2.3.2) with the service
provider including the involvement of the beneficiary
PARTICIPATIVE RBM PLANNING
73
First interim RBMP
adopted in October
2018
Development of the 2nd
generation of Danube-Prut and
back sea RBMP 12/2021-12/2027
synchronised with EU MS and
with further transboundary
harmonisation with Romania
74
DEVELOPMENT OF THE WIS INFRASTRUCTURE
• A provisional operational platform was implemented
and is operational on project server where:
o Previous EPIRB layers are available through
web services.
o GIS layers from water cadaster were made
available as web services
CAPACITY BUILDING
• Online support on platform management
o Metadata catalogue
o Web services
o Interactive maps
SUPORT ON DATA BASES STRUCTURING
• Technical analysis of some existing databases was done in order to analyze
conditions for updating
• A database of RBMP implementation indicators was created and can be visualized
on line (graphs, maps and interactive dashboard)
DEVELOPMENT OF THE DATA MANAGEMENT PLATFORM
75
• First PUBLIC CONSULTATION ON RBMP
CYCLE II
o from June to September 2019
o 5 public consultation meeting in sub-districts
(picture):
o 1 Basin Council meeting (20 September 2019)
o 170 opinions collected
• SUPPORT TO LOCAL CONSULTATION
STRATEGY
o Updated communication strategy and plan for
the DPBS river district
o 1 Public Consultation report
STAKEHOLDER INVOLVEMENT FOR PARTICIPATIVE
RBMP DEVELOPMENT
76
• COMMUNICATION MATERIALS
o 1 newsletter published in May 2019
o 1 EUWI+ leaflet & 1 banner in MD
o 4 cartoons in MD: Public consultation, RBMP,
EUWI+ project, Clean Beach (2018)
o 1 factsheet (Danube-Prut and Black Sea river
basin)
• OUTREACH EVENTS (Sept 2018-Aug 2019)
o 6 outreach events: International Clean Beach
Day 2018, EU days in Chisinau and Cahul,
Danube Day (cycling tour and D-Day),
International Clean Beach Day 2019 edition
o 730 people reached
COMMUNICATION AND AWARENESS RAISING
Danube Day 2019: Cycling tour from
Nemteni to Giurgiulesti
77
RBMP
• Finalisation of Draft Danube-Prut and Black Sea RBMP cycle II and SIAs
DATA MANAGEMENT
• Acquisition or rehabilitation of a specific server for Apele Moldovei?
• Supporting development of water use database and/or Water quality
database and/or hydrographic network standardize information layer?
• Development of indicators databases
• Valorization of available data through web services and visualization tools
(interactive maps/ dashboards)
• Transfer of database/tools used for visualization on Apele Moldovei
server?
STAKEHOLDER INVOLVEMENT COMMUNICATION AND VISIBILITY
• Public consultation draft RBMP: second quarter 2020
• Lab event: Early 2020
OUTLOOK AND FURTHER PLANS FOR 2020
78
THE CHANGE OF THE GOVERNMENT JUNE AND NOVEMBER 2019:
• Repeated uncertainty of sustained commitment for EUWI+ and of Ministerial guidance to the MD water
management institutions.
SURFACE WATER
• Insufficient capacity of the laboratory at the new National Environment Agency of Moldova on the level of staff
and operational budget allowing to deliver regular and, extended (WFD-compliant) monitoring. In 2019, upon
the move of the lab from SHS to the new EAM, there was a lack of regular SW monitoring, a loss of EUWI+
trained staff and there is partly too few staff to operate certain equipment, including new deliveries. Contracting
delays are still affecting the EUWI+ work schedule (i.e. regarding data collection and analysis, ESCS
development).
LABORATORY
• In spite of excellent pre-conditions during the EUWI+ assessment and of various EUWI+ support (trainings,
study tour, road map and additional expert support), the new and upgraded accreditation standard (ISO 10025-
2017) of the EAM lab will not be achieved. Also, the existing accreditation was suspended in early 2019 due to
the change of the accredited lab (from SHS to EAM).
COUNTRY INVESTMENT BUDGET
• Substantial budget volumes are currently unallocated. Effort will be needed to add eligible and WFD-compliant
investments. The MS Consortium started in the summer to facilitate selection, preparation and implementation
within the remaining EUWI+ project period.
CHALLENGES / RECOMMENDATIONS IN MOLDOVA
79
COUNTRY PROGRESS UKRAINE
1. Progress, Outputs and Outcomes since the second SCM in November 2018
2. Specific challenges / recommendations / solutions
The EU-funded Action “European Union Water Initiative Plus for Eastern Partnership Countries (EUWI+ 4 EaP)” is implemented by the UNECE, OECD, responsible for the
implementation of Result 1 and an EU member state consortium of Austria and France responsible for the implementation of Result 2 and 3. This document was produced by
UNECE and/or OECD and/or the EU member state consortium with the financial assistance of the European Union. The views expressed herein can in no way be taken to reflect
the official opinion of the European Union or the Governments of the Eastern Partnership Countries. This document and any map included herein are without prejudice to the
status of, or sovereignty over, any territory, to the delimitation of international frontiers and boundaries, and to the name of any territory, city or area.
80
NATIONAL POLICY DIALOGUE
• Last Meeting of the National Policy
Dialogue took place on 5-6 Nov
2019 (89 participants, 40 female
and 49 male)
LEGISLATION POLICY & INSTITUTIONAL
STRENGTHENING
81
MULTILATERAL ENVIRONMENTAL AGREEMENTS
NATIONAL POLICY DIALOGUE
• Revision of the national targets
under the Protocol on Water and
Health finalized and recommended
by the Interagency WG for approval
at appropriate government level
• Public consultations on the revision
of targets held in Kyiv on 19-20
December 2018
• Support was provided to reporting
under the Protocol on Water and
Health and the report submitted to
the Protocol secretariat
82
SUPPORT IN DEVELOPING A NATIONAL WATER STRATEGY
• A series of roundtable workshops were held with different focus groups (regional
WRM authorities, municipalities, water utilities) to discuss setting national water
targets and indicators to be included in the water strategy.
TRANSBOUNDARY COOPERATION
• General support provided under the Water Convention activities
• Support provided to Ukraine to meet commitments under the ICPDR through
participation in relevant ICPDR meetings and capacity development activities
LEGISLATION POLICY & INSTITUTIONAL
STRENGTHENING
83
PROCUREMENT
• Procurement of the Gas Chromatograph/MSMS, water purification
system, atomic absorption spectrophotometer, microwave digestion for
sample preparation and Atomic Fluorescence Spectroscopy. Total
contracted volume 263,000 €.
LAB OPENING
• Expected for the end of January 2020.
LABORATORY DEVELOPMENT
84
CAPACITY BUILDING
• National and regional trainings
o 3 methodological trainings provided with existing equipment
o 1 sub-regional methods training on “method validation, measurement uncertainty
and metrological traceability in accordance with EN ISO 17025:2017” in Kyev in April
2019
o 1 regional methods training for determination of organochlorine compounds
o 1 study visit to Austria inOctober 2019 to exchange experience in ways of
implementing WFD in an EU member state
o 1st round in participation in proficiency testing completed
LABORATORY ACCREDITATION
• focuses on assistance in setting up the quality management system
documentation, as a prerequisite for laboratory accreditation
o 4 quality management missions were conducted to support the Basin Laboratory in
Vyshghorod between June 2018 and August 2019.
o 2 more quality management missions are planned for 2020.
LABORATORY DEVELOPMENT
85
SURFACE WATER MONITORING DEVELOPMENT
CAPACITY BUILDING
• 4 sub-regional SW trainings provided / 7 trainees + 2
national training workshops provided with 19 trainees
MONITORING AND BASIN PLANNING
• SW Delineation report completed: 3811 new surface water
bodies in Dnipro RB identified, delineated and characterised.
• 1 HYMO & 1 biological survey conducted in Dnipro RB.
1 survey report. 1 report under review. 2 survey manuals.
PROCUREMENT
• Purchase of SW monitoring equipment upcoming
86
CAPACITY BUILDING
• 1 national training workshop provided / 8 trainees
MONITORING AND BASIN PLANNING
• Delineation report completed: 26 new groundwater bodies
in Dnipro RBD identified, delineated and characterised.
• 1 groundwater survey conducted in Dnipro RBD. 1
survey report in preparation. 1 survey manuals.
• Transboundary coordination with BY at Pripyat ongoing
GROUNDWATER DEVELOPMENT
PROGRESS / OUTPUTS / OUTCOMES
87
LABORATORY
• provision of 3 national trainings and 2nd round of
participation in proficiency testing
SURFACE WATER
• 2 sub-regional trainings and at least 1 biological and 1
investigative monitoring
GROUNDWATER
• at least 1 national training and 1 survey
FURTHER INVESTMENTS
• Purchase of planned SW and GW monitoring equipment
• Re-assessment of existing budget and further investments
in works/supply/service.
OUTLOOK AND FURTHER PLANS FOR 2020
88
DNIPER RBMP DEVELOPMENT
• Chapter characterisation and summary available on EUWI+ website
• Chapter protected areas in the process of technical validation
• Chapters pressures impact, risk analysis, environmental objectives for surface water and
groundwater, economic analysis part 1 on going
TECHNICAL GUIDELINES
• 3 secondary legislation technical guides for national use on-going: pressures and risk
assessment for groundwater; protected areas delineation and objectives definition;
improvement of National methodology for pressures and risk assessment for surface water
CAPACITY BUILDING
• Technical workshop about RBMP characterisation, water bodies, delineation, risk analysis
held on 11-12 Dec. 2018, 70 participants incl. experts from Belarus and Georgia
• RBMP and economic analysis regional workshop, 27-28 March 2019 in Kiev and 6-
countries on-line webinar)
• 5 lectures at State Agency of Water Resources Training Centre for 100 representatives of
water management each time
• 7 lectures in Dnipro BUVR for local water representatives
PARTICIPATIVE RBMP
89
DEVELOPMENT OF THE WIS INFRASTRUCTURE
• Letter of Agreement was signed and tender launched for server acquisition for SAWR
• A provisional operational platform was implemented
and is operational on project server where:
o Previous EPIRB layers are available through
web services
o GIS layers from Water Cadaster were made
available as web services
• LoA under preparation for acquisition of a server for Hydromet
CAPACITY BUILDING
• Online support on platform management
o Metadata catalogue
o Web services
o Interactive maps
SUPORT ON DATA BASES STRUCTURING
• Technical analysis of some existing databases was done in order to analyze conditions for
updating
DEVELOPMENT OF THE DATA MANAGEMENT PLATFORM
90
PUBLIC CONSULTATION
o 3 Basin Council meetings
o Lower Dnipro in Kherson,
o Middle Dnipro in Cherkasy
o Desna in Chernihiv
o 4 stakeholder meetings
SUPPORT TO LOCAL CONSULTATION STRATEGY
o 1 Updated participative RBM Planning Communication strategy for the
Dnieper (Dnipro) river district
o Event reports
CAPACITY BUILDING
o 5 conferences
STAKEHOLDER INVOLVEMENT FOR PARTICIPATIVE
RBMP DEVELOPMENT
91
• COMMUNICATION MATERIAL DEVELOPMENT
o 1 newsletter published in April 2019
o 1 EUWI+ leaflet & 1 banner in UA
o 6 cartoons in UA: Public consultation, RBMP, EUWI+ project, Clean Beach (2018, 2019), EU
compliant monitoring in UA
o 1 Infographics on the Protocol Water & Health
o Active Facebook group https://www.facebook.com/groups/Dniprounites/: 559 members
• OUTREACH EVENTS (Sept 2018-Aug 2019)
o 5 outreach events: International Clean Beach Day 2018 edition, World Water Day, Danube Day,
Dnipro Day
o 6410 people reached
• FOCUS: Clean Beach Day (Sept 2019)
o 7000 participants
o 234 river bank clean-ups
o 1 public media challenge #I clean- your turn 2”
o 1 campaign on plastic pollution prevention
o 1 cartoon: plastic pollution (EUWI+ and EMBLAS-Plus)
o 1 video: Clean Beach Day at Dnipro riverbanks
o 1 Infographics on Clean Beach Day results
COMMUNICATION AND AWARENESS RAISING
92
Video on media challenge #I clean- your turn 2”
Large-scale public awareness rising event: “Dnipro Day” 2019
Clean Beach Day (Sept 2019): 234 clean ups. almost 3
times more than the 2018 edition (around 2700
participants)
infographics on Clean Beach Day results
(2019 edition)
Cartoon on Plastic-pollution prevention
93
RBMP
• Finalisation of the main characterization for the whole Dnieper
DATA MANAGEMENT
• Support acquisition of a server for Hydromet (LoA, tender, installation)
• Support update of the State Water Monitoring Information System ?
• Support development of Hydromet hydro biological database?
• Support develop of interoperability between Hydromet database and State
Water Monitoring Information System?
• Development of indicators databases
• Valorization of available data through web services and visualization tools
(interactive maps/ dashboards)
• Transfer of database/tools used for visualization on national platform
STAKEHOLDER INVOLVEMENT COMMUNICATION AND VISIBILITY
• Public consultation RBMP main issues: first quarter 2020
• Lab event: early 2020
OUTLOOK AND FURTHER PLANS FOR 2020
94
MEAS IMPLEMENTATION
• Formal adoption of the revised targets under the Protocol on Water
and Health
COUNTRY INVESTMENT BUDGET
• Substantial budget volumes are currently unallocated. Effort will be
needed to add eligible and WFD-compliant investments. The MS
Consortium started in the summer to facilitate selection, preparation and
implementation within the remaining EUWI+ project period.
CHALLENGES / RECOMMENDATIONS IN UKRAINE
95
REGIONAL COOPERATION
The EU-funded Action “European Union Water Initiative Plus for Eastern Partnership Countries (EUWI+ 4 EaP)” is implemented by the UNECE, OECD, responsible for the
implementation of Result 1 and an EU member state consortium of Austria and France responsible for the implementation of Result 2 and 3. This document was produced by
UNECE and/or OECD and/or the EU member state consortium with the financial assistance of the European Union. The views expressed herein can in no way be taken to reflect
the official opinion of the European Union or the Governments of the Eastern Partnership Countries. This document and any map included herein are without prejudice to the
status of, or sovereignty over, any territory, to the delimitation of international frontiers and boundaries, and to the name of any territory, city or area.
96
• Transboundary cooperation supported in the Kura, Neman,
Dniester, Western Dvina/Daugava, Khrami-Debed, Danube
(ICPDR) basins
• Capacity development event on Water Strategy preparation
under high risks and uncertainty (synergy with another regional
project funded by Norway)
• Exchange of experience in reform of rural WSS at the EUWI+
side-event at the International water forum in Minsk
• Special session, organised by EUWI+ on 7 June 2019 at the 15th
Environmental Forum in Novogrudok, Belarus
RESULT 1
97
• Training opportunities provided at the regional trainings/events
under the Water Convention and the Protocol on Water and Health
(reporting on SDG 6.5.2, reporting under the Protocol and the Water
Convention, WG on IWRM, etc.)
• A regional training on Synergies and joint implementation of the
Protocol on Water and Health, related EU Directives and SDGs in
the Eastern Partnership countries was held in Geneva on 2 April
2019
• Special session on EUWI+ at the Working Group on IWRM
(Geneva, 23 October 2019)
• Side-event and special session at the Water Convention MOP
(October 2018)
• Side-event and special session at the Protocol on Water and Health
MOP (19-20 November 2019)
RESULT 1
98
LABORATORY DEVELOPMENT
• Joint participation in laboratory proficiency testing
• Harmonised high-level laboratory quality management system
• Coordinated steps towards international EN ISO 17025:2017 laboratory standard
MONITORING OF SURFACE AND GROUNDWATER AND COASTAL & TRANSITIONAL WATERS
• Building up of an updated comprehensive knowledge base about the ecological status of international River
Basin Districts as a starting point for coordinating all water protection, sustainable uses and effective mitigation
measures
REGIONAL CAPACITY BUILDING
• Series of regional and sub-regional trainings and joint study tours, which build up a common technical
understanding of WFD/IWRM implementation and a more coordinated approximation of EU water policies from
the expert level up to decision-makers
REGIONAL RIVER BASIN MANAGEMENT
• Start of transboundary water management, including first monitorings at the BY-UA Pripyat river (groundwater)
and the AM-GE Khrami-Debed basin (surface water) as well as harmonised water body delineations (MD-RO)
• Better coordination with and more competent engagement in other regional initiatives, such as in EMBLAS
(monitoring at GE coastal waters)
RESULT 2
99
HARMONISED RBMP DEVELOPMENT IN TRANSBOUNDARY BASINS
• Harmonised process between the 6 countries (ToR, schedule, workshops
topics, etc)
• Regional workshops: economic analysis, programme of measures on-line
seminar
• Dnieper Basin Council in Belarus with Ukrainian delegation, cooperation for
Dnieper/Dnipro/Pripya RBMP
• Technical exchange for the harmonisation of the RBMP for the Prut basin
(delineation of the water bodies on the main river course, cross-reading of the
RBMP documents, etc)
DATA MANAGEMENT
• Promote common strategy: Apply the SEIS principles, supporting the
development of national data management strategies, develop data exchanges
• Target common regional objectives: improve access to the datasets, facilitate
SEIS and RBMP implementation indicators production, supporting the
dissemination of information to partners and to the public
RESULT 2
100
RESULT 3
STAKEHOLDER INVOLVEMENT FOR PARTICIPATIVE RBMP DEVELOPMENT
• Guidance document about participative RBMP is under preparation.
• Production of awareness-raising materials (factsheets, thematic summary, infographics,
cartoons)
• Professional consultant hired in every country (except Belarus): assistance to R3
activities at national scale:
• main consultations in river basins
• outreach events and awareness-raising campaigns
• ensuring EUWI+ and EU visibility in the country
COMMUNICATION AND AWARENESS RAISING (Sept 2018- Aug 2019)
• Increase of outreach activities: 21 in the 6 countries, 8 700 people reached
• Increase of EUWI+ website visits (+11 235) and EUWI+ FaceBook (+ 200 followers,
484 in total)
• Visibility of EUWI+ and EU action in progress
• Tools and organisation for regular monitoring and planning of upcoming events
(milestones for key EUWI+ results : Lab events and RBMP final document)
 More about communication and visibility in session 4 presentation
101
EUWI+ WEBSITE AND SOCIAL NETWORKS
EUWI+ website
https://www.euwipluseast.eu/en/
EUWI+ FaceBook page
https://www.facebook.com/euwiplus/
FaceBook Group The Dnipro Unites
https://www.facebook.com/groups/Dniprounites/?ref=br_rs
FaceBook Group Clean Rivers for a Healthy Future - Caucasus
https://www.facebook.com/groups/764028737267175/
102
PROJECT MANAGEMENT
REQUEST FOR 6 MONTHS PROJECT EXTENSION
• EUWI+ is currently scheduled to finish in August 2020. Various
delays during project execution have triggered a request for a 6
months cost-neutral extension to February 2021.
• DG Near was approached by the EUWI+ partners in October 2019
to request the extension and this is under consideration.
• This extra period will facilitate full use of available funds and to
complete capacity building activities (e.g. execution of offered
extra trainings, additional surveys, improvement of information in
the RBMPs).
103
Action to be taken
Link to ROM
recommendation
Status Remarks
Improve the Log-frame and
make it part of amended
contracts
R2 Addendum approval is
ongoing
 The Log-frame was completely revised based on EU best practice examples as provided by DG
Near.
 The new Log-frame is part of an addendum application which was sent to DG Near on 23 October
2019
Invite IPs to ensure a more
active participation of other
Member States in the
implementation and define
operational procedures that
would enhance the quality
of products and
contribution to key
products by all IPs
R3 Ongoing  A specific focus was set on the inclusion of additional EU MS experts. Active cooperation and
know-how transfer in the EaP Countries with Croatia on costal water management and Romania
for the cooperation with Moldova for the harmonisation of Prut RBMP has been developed.
Other actions led to planning for study tours to EU MS countries outside the IPs (to HR, PT, SP),
participation of selected EU MS experts in NPD meetings (from EST, BG, PL) and ensuring the
participation of the beneficiary to international meetings (e.g. INBO, Water Convention and
Protocol on Water and Health, Green Action TF, ICPDR) where they could exchange with
practitioners from EU Members States. Result 1 International Partners involved experts from EU
Member States/Western European Countries in activities on legislative, institutional and
normative support to partner countries (LIT, FR, EST, AT, CZ, NO).
 Coordination meetings between IPs have been organised including in early September 2018 and
in February 2019, and specifically on communication and visibility in June 2019, in order to
enhance the integration of inputs from the IP and the quality of products. Cooperation in areas
requiring inputs of all IPs enhanced (e.g. CEPA implementation roadmap (AM), SEA of Alazani-Iori
RBMP (GE), etc). Joint products of all IPs produced under visibility (NPD leaflet, Protocol on Water
and Health targets (UA), joint side-events, inputs to regional trainings, etc.
Address the issue of how
the programmes of
measures could be financed
as part of work on Water
Strategies and river basin
management plans
R5 Ongoing  Result 1 international partners (OECD and UNECE) continue supporting the development of
national Water Strategies and/or Water Laws, etc. which would contribute to sustainable
financing of the water sectors.
 2 regional trainings have been organised for Eastern Europe countries in Kyiv in March 2019 and
Caucasus countries in Tbilisi in April 2019 on economic analysis related to RBMP development
including IOW and OECD experts participation.
RESULT ORIENTED MONITORING
(ROM) REVIEW 2018
Current Status of Follow-up Plan ROM recommendations
104
STRONG COMMITMENT AND POLITICAL WILL REQUIRED TO
DEEPEN TRANSBOUNDARY COOPERATION
• e.g. for bilateral agreements
ONGOING ISSUE OF HARMONIZATION IN TRANSBOUNDARY
COORDINATION
• Technical issues, such as Typology, Delineation, Monitoring
systems, Status classification etc.)
• Political issues
DIFFERENT / COMMON (?) VOCABULARY,
DIFFERENT NATIONAL VISIONS AND STRATEGIES
CHALLENGES TO REGIONAL COOPERATION
105
www.euwipluseast.eu
www.facebook.com/euwiplus/
THANK YOU!
UNECE Alisher Mamadzhanov, Christine Kitzler
OECD Matthew Griffiths, Tatiana Efimova, Alexander
Martousevitch
EU Member State Consortium
Lead UBA (AT): Alexander Zinke
IOW (FR) : Stéphanie Laronde, Pierre Henry de
Villeneuve, Philippe Seguin
Any Questions?
please contact the responsible project leaders

More Related Content

What's hot

Item 1.2 - Upgrading the water monitoring capacities for SW and GW bodies
Item 1.2 -	Upgrading the water monitoring capacities for SW and GW bodiesItem 1.2 -	Upgrading the water monitoring capacities for SW and GW bodies
Item 1.2 - Upgrading the water monitoring capacities for SW and GW bodiesOECD Environment
 
2014-2016 work programmes thematic programmes and the knowledge chain_john me...
2014-2016 work programmes thematic programmes and the knowledge chain_john me...2014-2016 work programmes thematic programmes and the knowledge chain_john me...
2014-2016 work programmes thematic programmes and the knowledge chain_john me...Global Water Partnership
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoringhydrologyproject001
 
Legal and Institutional reforms in Water Management of Armenia
Legal and Institutional reforms in Water Management of ArmeniaLegal and Institutional reforms in Water Management of Armenia
Legal and Institutional reforms in Water Management of ArmeniaOECD Environment
 
Day1 2 nijsten_methodology
Day1 2 nijsten_methodologyDay1 2 nijsten_methodology
Day1 2 nijsten_methodologygroundwatercop
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiihydrologyproject001
 
Item 2.3 - Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...
Item 2.3 -	Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...Item 2.3 -	Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...
Item 2.3 - Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...OECD Environment
 
ITPS working group on Soil Organic Carbon
ITPS working group on Soil Organic CarbonITPS working group on Soil Organic Carbon
ITPS working group on Soil Organic CarbonSoils FAO-GSP
 
Mr. Bernado Mazzanti IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015
Mr. Bernado Mazzanti IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015Mr. Bernado Mazzanti IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015
Mr. Bernado Mazzanti IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015India-EU Water Partnership
 
Mh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtraMh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtrahydrologyproject0
 
Local Actions of the Guaraní Aquifer System Project - Elena Benitez - Guarani
Local Actions of the Guaraní Aquifer System Project - Elena Benitez - GuaraniLocal Actions of the Guaraní Aquifer System Project - Elena Benitez - Guarani
Local Actions of the Guaraní Aquifer System Project - Elena Benitez - GuaraniIwl Pcu
 
Developing a Regional WIP Response
Developing a Regional WIP ResponseDeveloping a Regional WIP Response
Developing a Regional WIP ResponseCleanH2O
 

What's hot (19)

Moldova
MoldovaMoldova
Moldova
 
Launching activities on participative River Basin Management Plans
Launching activities on participative  River Basin Management Plans Launching activities on participative  River Basin Management Plans
Launching activities on participative River Basin Management Plans
 
Item 1.2 - Upgrading the water monitoring capacities for SW and GW bodies
Item 1.2 -	Upgrading the water monitoring capacities for SW and GW bodiesItem 1.2 -	Upgrading the water monitoring capacities for SW and GW bodies
Item 1.2 - Upgrading the water monitoring capacities for SW and GW bodies
 
“EUWI+ Project Progress and changes occurred in previous period. Georgia” by ...
“EUWI+ Project Progress and changes occurred in previous period. Georgia” by ...“EUWI+ Project Progress and changes occurred in previous period. Georgia” by ...
“EUWI+ Project Progress and changes occurred in previous period. Georgia” by ...
 
Day1 1 ross_overview
Day1 1 ross_overviewDay1 1 ross_overview
Day1 1 ross_overview
 
2014-2016 work programmes thematic programmes and the knowledge chain_john me...
2014-2016 work programmes thematic programmes and the knowledge chain_john me...2014-2016 work programmes thematic programmes and the knowledge chain_john me...
2014-2016 work programmes thematic programmes and the knowledge chain_john me...
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoring
 
Legal and Institutional reforms in Water Management of Armenia
Legal and Institutional reforms in Water Management of ArmeniaLegal and Institutional reforms in Water Management of Armenia
Legal and Institutional reforms in Water Management of Armenia
 
5 guidelines fatulova
5 guidelines fatulova5 guidelines fatulova
5 guidelines fatulova
 
8. Flow and Form
8. Flow and Form8. Flow and Form
8. Flow and Form
 
Day1 2 nijsten_methodology
Day1 2 nijsten_methodologyDay1 2 nijsten_methodology
Day1 2 nijsten_methodology
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii
 
Economic Analysis for WRM
Economic Analysis for WRMEconomic Analysis for WRM
Economic Analysis for WRM
 
Item 2.3 - Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...
Item 2.3 -	Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...Item 2.3 -	Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...
Item 2.3 - Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...
 
ITPS working group on Soil Organic Carbon
ITPS working group on Soil Organic CarbonITPS working group on Soil Organic Carbon
ITPS working group on Soil Organic Carbon
 
Mr. Bernado Mazzanti IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015
Mr. Bernado Mazzanti IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015Mr. Bernado Mazzanti IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015
Mr. Bernado Mazzanti IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015
 
Mh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtraMh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtra
 
Local Actions of the Guaraní Aquifer System Project - Elena Benitez - Guarani
Local Actions of the Guaraní Aquifer System Project - Elena Benitez - GuaraniLocal Actions of the Guaraní Aquifer System Project - Elena Benitez - Guarani
Local Actions of the Guaraní Aquifer System Project - Elena Benitez - Guarani
 
Developing a Regional WIP Response
Developing a Regional WIP ResponseDeveloping a Regional WIP Response
Developing a Regional WIP Response
 

Similar to Country Progress and Regional Cooperation 2018-2019

Master ppt whole project report 2021
Master ppt whole project report 2021Master ppt whole project report 2021
Master ppt whole project report 2021OECD Environment
 
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1OECD Environment
 
EU4Environment water and data regional launch event
EU4Environment water and data regional launch eventEU4Environment water and data regional launch event
EU4Environment water and data regional launch eventOECD Environment
 
EU4Env water and data regional launch event
EU4Env water and data regional launch eventEU4Env water and data regional launch event
EU4Env water and data regional launch eventOECD Environment
 
Item 6 b. euwi npd green_tf_ppt_final
Item 6 b. euwi npd green_tf_ppt_finalItem 6 b. euwi npd green_tf_ppt_final
Item 6 b. euwi npd green_tf_ppt_finalOECD Environment
 
Item 6b. Strategic planning for delivering water sector reform and SDGs
Item 6b. Strategic planning for delivering water sector reform and SDGsItem 6b. Strategic planning for delivering water sector reform and SDGs
Item 6b. Strategic planning for delivering water sector reform and SDGsOECD Environment
 
Information as a basis to establish transboundary cooperation: the experience...
Information as a basis to establish transboundary cooperation: the experience...Information as a basis to establish transboundary cooperation: the experience...
Information as a basis to establish transboundary cooperation: the experience...Iwl Pcu
 
Information as a basis to establish transboundary cooperation: the experience...
Information as a basis to establish transboundary cooperation: the experience...Information as a basis to establish transboundary cooperation: the experience...
Information as a basis to establish transboundary cooperation: the experience...Iwl Pcu
 
Communication and visibility
Communication and visibilityCommunication and visibility
Communication and visibilityOECD Environment
 
Mr. Carlos Benitez Sanz IEWP @ Workshop on Water allocation, water economics ...
Mr. Carlos Benitez Sanz IEWP @ Workshop on Water allocation, water economics ...Mr. Carlos Benitez Sanz IEWP @ Workshop on Water allocation, water economics ...
Mr. Carlos Benitez Sanz IEWP @ Workshop on Water allocation, water economics ...India-EU Water Partnership
 
Romania Agricultural Pollution Control (2) presentation
Romania Agricultural Pollution Control (2) presentationRomania Agricultural Pollution Control (2) presentation
Romania Agricultural Pollution Control (2) presentationIwl Pcu
 
Azerbaijan NPD 2023 Irina Belkahia EU4ENV ENG.pdf
Azerbaijan NPD 2023 Irina Belkahia EU4ENV ENG.pdfAzerbaijan NPD 2023 Irina Belkahia EU4ENV ENG.pdf
Azerbaijan NPD 2023 Irina Belkahia EU4ENV ENG.pdfOECD Environment
 
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...EU4Environment Water and Data - Implementing Partners' presentation atSecond ...
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...OECD Environment
 
Outcomes of cop22 safaa bahije, morocco
Outcomes of cop22   safaa bahije, moroccoOutcomes of cop22   safaa bahije, morocco
Outcomes of cop22 safaa bahije, moroccoOECD Governance
 
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...India UK Water Centre (IUKWC)
 

Similar to Country Progress and Regional Cooperation 2018-2019 (20)

Master ppt whole project report 2021
Master ppt whole project report 2021Master ppt whole project report 2021
Master ppt whole project report 2021
 
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1
 
EU4Environment water and data regional launch event
EU4Environment water and data regional launch eventEU4Environment water and data regional launch event
EU4Environment water and data regional launch event
 
EU4Env water and data regional launch event
EU4Env water and data regional launch eventEU4Env water and data regional launch event
EU4Env water and data regional launch event
 
“Progress since May 2017” by EUWI+ team
“Progress since May 2017” by EUWI+ team“Progress since May 2017” by EUWI+ team
“Progress since May 2017” by EUWI+ team
 
Item 6 b. euwi npd green_tf_ppt_final
Item 6 b. euwi npd green_tf_ppt_finalItem 6 b. euwi npd green_tf_ppt_final
Item 6 b. euwi npd green_tf_ppt_final
 
Item 6b. Strategic planning for delivering water sector reform and SDGs
Item 6b. Strategic planning for delivering water sector reform and SDGsItem 6b. Strategic planning for delivering water sector reform and SDGs
Item 6b. Strategic planning for delivering water sector reform and SDGs
 
Launching activities on RBMPs in Georgia and Azerbaijan
Launching activities on RBMPs in Georgia and AzerbaijanLaunching activities on RBMPs in Georgia and Azerbaijan
Launching activities on RBMPs in Georgia and Azerbaijan
 
Information as a basis to establish transboundary cooperation: the experience...
Information as a basis to establish transboundary cooperation: the experience...Information as a basis to establish transboundary cooperation: the experience...
Information as a basis to establish transboundary cooperation: the experience...
 
Information as a basis to establish transboundary cooperation: the experience...
Information as a basis to establish transboundary cooperation: the experience...Information as a basis to establish transboundary cooperation: the experience...
Information as a basis to establish transboundary cooperation: the experience...
 
Communication and visibility
Communication and visibilityCommunication and visibility
Communication and visibility
 
Mr. Carlos Benitez Sanz IEWP @ Workshop on Water allocation, water economics ...
Mr. Carlos Benitez Sanz IEWP @ Workshop on Water allocation, water economics ...Mr. Carlos Benitez Sanz IEWP @ Workshop on Water allocation, water economics ...
Mr. Carlos Benitez Sanz IEWP @ Workshop on Water allocation, water economics ...
 
Romania Agricultural Pollution Control (2) presentation
Romania Agricultural Pollution Control (2) presentationRomania Agricultural Pollution Control (2) presentation
Romania Agricultural Pollution Control (2) presentation
 
Azerbaijan NPD 2023 Irina Belkahia EU4ENV ENG.pdf
Azerbaijan NPD 2023 Irina Belkahia EU4ENV ENG.pdfAzerbaijan NPD 2023 Irina Belkahia EU4ENV ENG.pdf
Azerbaijan NPD 2023 Irina Belkahia EU4ENV ENG.pdf
 
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...EU4Environment Water and Data - Implementing Partners' presentation atSecond ...
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...
 
Outcomes of cop22 safaa bahije, morocco
Outcomes of cop22   safaa bahije, moroccoOutcomes of cop22   safaa bahije, morocco
Outcomes of cop22 safaa bahije, morocco
 
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
 
DWWP Parksville 2013
DWWP Parksville 2013DWWP Parksville 2013
DWWP Parksville 2013
 
Third IDMP CEE workshop: IDMP CEE progress and plans by Sabina Bokal
Third IDMP CEE workshop: IDMP CEE progress and plans by Sabina BokalThird IDMP CEE workshop: IDMP CEE progress and plans by Sabina Bokal
Third IDMP CEE workshop: IDMP CEE progress and plans by Sabina Bokal
 
11 kaliningard act.1.4_stonevicius
11 kaliningard act.1.4_stonevicius11 kaliningard act.1.4_stonevicius
11 kaliningard act.1.4_stonevicius
 

More from OECD Environment

Detlef Van Vuuren- Integrated modelling for interrelated crises.pdf
Detlef Van Vuuren- Integrated modelling for interrelated crises.pdfDetlef Van Vuuren- Integrated modelling for interrelated crises.pdf
Detlef Van Vuuren- Integrated modelling for interrelated crises.pdfOECD Environment
 
Thomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdf
Thomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdfThomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdf
Thomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdfOECD Environment
 
Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...
Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...
Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...OECD Environment
 
Astrid Bos - Identifying trade offs & searching for synergies.pdf
Astrid Bos - Identifying trade offs & searching for synergies.pdfAstrid Bos - Identifying trade offs & searching for synergies.pdf
Astrid Bos - Identifying trade offs & searching for synergies.pdfOECD Environment
 
Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...
Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...
Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...OECD Environment
 
Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...
Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...
Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...OECD Environment
 
Laurent Drouet - Physical and Economic Risks of Climate Change.pdf
Laurent Drouet - Physical and Economic Risks of Climate Change.pdfLaurent Drouet - Physical and Economic Risks of Climate Change.pdf
Laurent Drouet - Physical and Economic Risks of Climate Change.pdfOECD Environment
 
Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...
Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...
Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...OECD Environment
 
HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...
HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...
HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...OECD Environment
 
GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfOECD Environment
 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...OECD Environment
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...OECD Environment
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...OECD Environment
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...OECD Environment
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...OECD Environment
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...OECD Environment
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...OECD Environment
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESOECD Environment
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...OECD Environment
 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...OECD Environment
 

More from OECD Environment (20)

Detlef Van Vuuren- Integrated modelling for interrelated crises.pdf
Detlef Van Vuuren- Integrated modelling for interrelated crises.pdfDetlef Van Vuuren- Integrated modelling for interrelated crises.pdf
Detlef Van Vuuren- Integrated modelling for interrelated crises.pdf
 
Thomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdf
Thomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdfThomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdf
Thomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdf
 
Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...
Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...
Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...
 
Astrid Bos - Identifying trade offs & searching for synergies.pdf
Astrid Bos - Identifying trade offs & searching for synergies.pdfAstrid Bos - Identifying trade offs & searching for synergies.pdf
Astrid Bos - Identifying trade offs & searching for synergies.pdf
 
Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...
Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...
Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...
 
Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...
Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...
Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...
 
Laurent Drouet - Physical and Economic Risks of Climate Change.pdf
Laurent Drouet - Physical and Economic Risks of Climate Change.pdfLaurent Drouet - Physical and Economic Risks of Climate Change.pdf
Laurent Drouet - Physical and Economic Risks of Climate Change.pdf
 
Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...
Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...
Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...
 
HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...
HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...
HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...
 
GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdf
 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...
 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...
 

Recently uploaded

Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
Call Girls in Tiruppur  9332606886  ust Genuine Escort Model SeviceCall Girls in Tiruppur  9332606886  ust Genuine Escort Model Sevice
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevicekumargunjan9515
 
High Profile Call Girls Service in Udhampur 9332606886 High Profile Call G...
High Profile Call Girls Service in Udhampur   9332606886  High Profile Call G...High Profile Call Girls Service in Udhampur   9332606886  High Profile Call G...
High Profile Call Girls Service in Udhampur 9332606886 High Profile Call G...kumargunjan9515
 
Call girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlCall girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlMonica Sydney
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxEdgar Hertwich
 
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptxEnvironmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptxafzalulhoda98
 
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServiceMira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServicePriya Reddy
 
Top Call Girls in Bishnupur 9332606886 High Profile Call Girls You Can Get...
Top Call Girls in Bishnupur   9332606886  High Profile Call Girls You Can Get...Top Call Girls in Bishnupur   9332606886  High Profile Call Girls You Can Get...
Top Call Girls in Bishnupur 9332606886 High Profile Call Girls You Can Get...Sareena Khatun
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...HyderabadDolls
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxarnab132
 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...kumargunjan9515
 
Role of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease ManagementRole of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease ManagementRavikumar Vaniya
 
A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...Mark Jaeno P. Duyan
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxNazmusSakibNS
 
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...robinsonayot
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...Sareena Khatun
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.cojitesh
 
Russian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsRussian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsMonica Sydney
 
Call girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesCall girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesMonica Sydney
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...BrixsonLajara
 

Recently uploaded (20)

Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
Call Girls in Tiruppur  9332606886  ust Genuine Escort Model SeviceCall Girls in Tiruppur  9332606886  ust Genuine Escort Model Sevice
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
 
High Profile Call Girls Service in Udhampur 9332606886 High Profile Call G...
High Profile Call Girls Service in Udhampur   9332606886  High Profile Call G...High Profile Call Girls Service in Udhampur   9332606886  High Profile Call G...
High Profile Call Girls Service in Udhampur 9332606886 High Profile Call G...
 
Call girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlCall girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girl
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptxEnvironmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
 
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServiceMira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
 
Top Call Girls in Bishnupur 9332606886 High Profile Call Girls You Can Get...
Top Call Girls in Bishnupur   9332606886  High Profile Call Girls You Can Get...Top Call Girls in Bishnupur   9332606886  High Profile Call Girls You Can Get...
Top Call Girls in Bishnupur 9332606886 High Profile Call Girls You Can Get...
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
 
Jumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptxJumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptx
 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
 
Role of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease ManagementRole of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease Management
 
A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptx
 
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
Russian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsRussian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girls
 
Call girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesCall girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl services
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
 

Country Progress and Regional Cooperation 2018-2019

  • 1. 1 COUNTRY PROGRESS AND REGIONAL COOPERATION European Union Water Initiative Plus for the Eastern Partnership THIRD STEERING COMMITTEE MEETING UNECE / OECD / EU MS Consortium Prepared for the Regional Steering Committee Meeting, Paris, 26 November 2019
  • 2. 2 COUNTRY PROGRESS ARMENIA 1. Progress, Outputs and Outcomes since the second SCM in November 2018 2. Specific challenges / recommendations / solutions The EU-funded Action “European Union Water Initiative Plus for Eastern Partnership Countries (EUWI+ 4 EaP)” is implemented by the UNECE, OECD, responsible for the implementation of Result 1 and an EU member state consortium of Austria and France responsible for the implementation of Result 2 and 3. This document was produced by UNECE and/or OECD and/or the EU member state consortium with the financial assistance of the European Union. The views expressed herein can in no way be taken to reflect the official opinion of the European Union or the Governments of the Eastern Partnership Countries. This document and any map included herein are without prejudice to the status of, or sovereignty over, any territory, to the delimitation of international frontiers and boundaries, and to the name of any territory, city or area.
  • 3. 3 NATIONAL POLICY DIALOGUE • 18th Meeting of the Steering Committee of the National Policy Dialogue held on 15.10.2019 (54 participants, 19 female - 35 male) EU WATER ACQUIS APPROXIMATION • Draft roadmap for implementation of CEPA provisions (5 EU Water Directives) completed • Draft ministerial decrees for adoption of the roadmap were prepared LEGISLATIVE REFORM • Amendments to the Water Code, the Law on the National Water Program etc. in line with the CEPA implementation roadmap ongoing LEGISLATION POLICY & INSTITUTIONAL STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
  • 4. 4 MULTILATERAL ENVIRONMENTAL AGREEMENTS • Revised National Targets in the context of the Protocol on Water and Health (in Armenian and English) and analysis of legislative barriers to ensure equitable access to water and sanitation finalized SUPPORT IN DEVELOPING A WATER-FOOD SECURITY POLICY • An extended study on the irrigation sector reform is ongoing, scope was discussed at the 18th NPD SC meeting. LEGISLATION POLICY & INSTITUTIONAL STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
  • 5. 5 TRANSBOUNDARY COOPERATION • Support transboundary cooperation with Georgia on the Khrami-Debed and possible bi-lateral agreement – bilateral meeting held in Yerevan on 14 October 2019 CAPACITY DEVELOPMENT • Workshop/Consultation meeting organized on the revised targets in the context of the Protocol on Water and Health and equitable access (19.02.2019) LEGISLATION POLICY & INSTITUTIONAL STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
  • 6. 6 RELOCATION OF THE EMIC LAB PROCUREMENT • Renovation and relocation of laboratory almost completed and supply of laboratory furniture. Total contracted volume 123,000 € PROCUREMENT • Procurement of an ion chromatograph, water purification system, diverse chemical laboratory and field measurement equipment and spare parts for diverse laboratory devices. Total contracted volume 236,000 €. LAB OPENING • Under planning (early 2020) LABORATORY DEVELOPMENT
  • 7. 7 CAPACITY BUILDING • National and regional trainings o 2 methodological training workshops provided with existing equipment o 1 sub-regional methods training on “method validation, measurement uncertainty and metrological traceability in accordance with EN ISO 17025:2017” in Kyev in April 2019 o 1 regional methods training for determination of organochlorine compounds o 1 study visit to Austria in October 2019 to exchange experience on ways of implementing WFD in an EU member country o 1st round in participation in proficiency testing completed LABORATORY ACCREDITATION • focus on assistance in setting up the quality management system documentation, as a prerequisite for laboratory accreditation o 3 quality management missions to the EMIC laboratory in Yerevan between April 2018 and July 2019. LABORATORY DEVELOPMENT
  • 8. 8 CAPACITY BUILDING • 4 sub-regional training workshops provided / 10 trainees MONITORING AND BASIN PLANNING • Delineation report completed: 228 new surface water bodies in Sevan and Hrazdan RBDs identified, delineated and characterised. • 1 HYMO & 2 biological surveys conducted in 2 RBDs. 1 survey report. 1 report under review. 2 survey manuals. PROCUREMENT • Renovation of hydrological monitoring posts, supply of hydrological monitoring equipment and irrigation flow measurement equipment. Total contracted volume: 163,000 € SURFACE WATER MONITORING DEVELOPMENT
  • 9. 9 CAPACITY BUILDING • 2 national training events provided / 15 trainees MONITORING AND BASIN PLANNING • Delineation report completed: 18 new groundwater bodies in both RBDs identified, delineated and characterised. • Assessment of available groundwater resource incl. methodology ongoing. • Adaptation of monitoring network to WFD under preparation. • 2 groundwater surveys conducted in Sevan and Hrazdan RBDs, survey reports under development. 1 survey manual. PROCUREMENT • Purchase of an ultrasonic flow measurement device: contracted volume 8,600 € GROUNDWATER MONITORING DEVELOPMENT
  • 10. 10 LABORATORY • provision of 1 national training, 4 quality management missions and 2nd rounds of participation in proficiency testing SURFACE WATER • 2 sub-regional trainings and at least 1 biological and 1 investigative monitoring GROUNDWATER • at least 1 national training and 1 survey • Installation of new and rehabilitation of 18 existing monitoring GW sites FURTHER INVESTMENTS • Small laboratory equipment and SW monitoring equipment. OUTLOOK AND FURTHER PLANS FOR 2020
  • 11. 11 SIA: IMPLEMENTATION OF MEASURES FROM AKHURYAN RBMP • protected areas, environmental flow DEVELOPMENT OF RBMP IN SEVAN & HRAZDAN BASINS • Finalised chapters: water bodies delineation, characterisation, pressures, impacts, rick analysis, protected areas, main issues • Following chapters on-going (economic analysis, programme of measures) • First consultation on Significant Water Management Issues CAPACITY BUILDING/WORKSHOPS • RBMP Water bodies status & risk analysis (Dec 2018) with UBA • RBMP Environmental Flow Assessment (June 2019) • RBMP and economic analysis (regional, 11-12 April 2019 and 6-countries on-line webinar) PARTICIPATIVE RBM PLANNING
  • 12. 12 implementation of soft measure: estimation of ecological flow First new RBMP development
  • 13. 13 AGREEMENTS WITH HYDROMET, EMIC AND WATER COMMITTEE • Testing procedures of automatic data exchange through pilot actions • A provisional operational platform was implemented and is operational on the project server where o Previous EPIRB layers are available through web services o GIS layers from water cadaster are made available as web services FIRST METADATA AND DATASETS PRODUCED AND INTEGRATED INTO THE PLATFORM CAPACITY BUILDING • Online support on platform’s tools management o Metadata catalogue o Web services o Interactive maps SUPPORT ON DATA BASES STRUCTURING • Development of specifications for national databases development • Support to SWC information system update DEVELOPMENT OF THE DATA MANAGEMENT PLATFORM
  • 14. 14 PUBLIC CONSULTATIONS • 1st Public consultation on the first phase of the pilot RBMP development (main water issues) from 12 March to 12 April 2019 • 120 opinions collected for Hrazdan • 129 opinions for Sevan SUPPORT TO LOCAL CONSULTATION STRATEGY • Local consultant started in October 2018 (support to consultations and communication&visibility activities) • 1 Communication strategy and action plan for participative RBM Planning • 2 reports completed: o stakeholder analysis o on public consultation from March-April 2019 STAKEHOLDER INVOLVEMENT FOR PARTICIPATIVE RBMP DEVELOPMENT
  • 15. 15 COMMUNICATION MATERIALS DEVELOPMENT • 1 newsletter published in February 2019 • 1 EUWI+ leaflet & 1 banner in AM • 2 factsheets (Hrazdan and Sevan river basins) • 2 videos in AM and EN: World Environment Day, Sevan Day • 4 cartoons in AM: Public consultation, RBMP, EUWI+ project, Clean Beach (2018 edition) OUTREACH EVENTS (Sept 2018-August 2019) • 5 outreach events (World Water Day, World Environment Day, Lake Sevan Day an awareness-raising campaign on water quality ) • 452 people reached FOCUS • campaign on water quality knowledge to connect education on water to local water issues and water management projects (spring-autumn 2019) Campaign on water quality knowledge: trainings sessions for teachers in June 2019 COMMUNICATION AND AWARENESS RAISING Study tour and final presentation of the summer campaign’s results during World Water Monitoring Day on 18 September 2019
  • 16. 16 RBMP • Finalisation of the Sevan and Hrazdan RBMP and SIA DATA MANAGEMENT (IN COOPERATION WITH ENI-SEIS) • Tender and development of emic/hydromet national databases • Development of indicators databases • Valorization of available data through web services and visualization tools (interactive maps/ dashboards) • Transfer of database and tools for visualization on national platform STAKEHOLDER INVOLVEMENT/ COMMUNICATION AND VISIBILITY • Public consultation draft RBMP: first quarter 2020 • Lab event: early 2020 • Regional workshop on public consultation for Armenia, Azerbaijan and Georgia (first quarter 2020) OUTLOOK AND FURTHER PLANS FOR 2020
  • 17. 17 RECOMMENDATIONS • Need for adoption of the CEPA implementation roadmap to substantiate relevant legislative changes • Accession to the Protocol on Water and Health and formal adoption of targets CHALLENGES / RECOMMENDATIONS IN ARMENIA
  • 18. 18 COUNTRY PROGRESS AZERBAIJAN 1. Progress, Outputs and Outcomes since the second SCM in November 2018 2. Specific challenges / recommendations / solutions The EU-funded Action “European Union Water Initiative Plus for Eastern Partnership Countries (EUWI+ 4 EaP)” is implemented by the UNECE, OECD, responsible for the implementation of Result 1 and an EU member state consortium of Austria and France responsible for the implementation of Result 2 and 3. This document was produced by UNECE and/or OECD and/or the EU member state consortium with the financial assistance of the European Union. The views expressed herein can in no way be taken to reflect the official opinion of the European Union or the Governments of the Eastern Partnership Countries. This document and any map included herein are without prejudice to the status of, or sovereignty over, any territory, to the delimitation of international frontiers and boundaries, and to the name of any territory, city or area.
  • 19. 19 NATIONAL POLICY DIALOGUE • 8th Meeting of the Steering Committee of the National Policy Dialogue held on 12.7.2019 (45 participants, 13 female and 32 male) EU WATER ACQUIS APPROXIMATION • Approximation promoted through the policy dialogue LEGISLATIVE REFORM • Methodology for identification of water abstraction limits depending on ecological flow requirements developed MULTILATERAL ENVIRONMENTAL AGREEMENTS • National reporting exercise under the Protocol on Water and Health supported and the report submitted to the Protocol secretariat • Support to the Water Convention implementation and reporting provided LEGISLATION POLICY & INSTITUTIONAL STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
  • 20. 20 SUPPORTING A NATIONAL WATER STRATEGY & ACTION PROGRAMME • Consultation process on the national water strategy is completed and now the document has been submitted for adoption. A range of consultations with different Ministries and stakeholders was held in Q1/2 2019. Provisions of the new bilateral agreement between AZ and the EC were taken into consideration. Development of a National Water Action Programme launched. TRANSBOUNDARY COOPERATION • Support to consultations on the bilateral Kura agreement with Georgia provided. Note verbale to initiate formal negotiations sent by Azerbaijan. CAPACITY DEVELOPMENT • Provided through regional trainings/events and through support to reporting under MEAs. LEGISLATION POLICY & INSTITUTIONAL STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
  • 21. 21 REFURBISHMENT OF THE NATIONAL LABORATORY (MENR) • Renovation and supply of air condition and laboratory furniture almost completed. Total contracted volume 63,000 € • Additionally, EUWI+ support and contribution to relocation and refurbishment of provincial laboratory in Gazakh PROCUREMENT • Procurement of the Gas Chromatograph/MSMS, water purification system, atomic absorption spectrophotometer, microwave digestion for sample preparation. Total contracted volume 210,000 €. • Review of technical preparations: last week LAB OPENING • On 10 December 2019 in Baku LABORATORY DEVELOPMENT
  • 22. 22 CAPACITY BUILDING • National and regional trainings o 1 methodological training workshop provided with existing equipment o 1 sub-regional training on “method validation, measurement uncertainty and metrological traceability in accordance with EN ISO 17025:2017” in Kyev in April 2019 o 1 regional methods training for determination of organochlorine compounds o 1 study visit to Austria in October 2019 to exchange experience in ways of implementing WFD in an EU member country o 1st round in participation in proficiency testing completed LABORATORY ACCREDITATION • focuses on assistance in setting up the quality management system documentation, as a prerequisite for laboratory accreditation o 1 quality management mission to the MENR laboratory in Baku in April 2019. o 1 more quality management mission will take place in November 2019 LABORATORY DEVELOPMENT
  • 23. 23 SURFACE WATER AND COASTAL & TRANSITIONAL MONITORING DEVELOPMENT CAPACITY BUILDING • 4 sub-regional SW training workshops provided / 10 trainees & 2 national CTW training provided / 10 trainees MONITORING AND BASIN PLANNING • SW Delineation report completed: 108 new surface water bodies in the Upper Kura RBD identified, delineated and characterised. • 1 HYMO & 2 biological surveys conducted in 1 RBD; 1 survey report. 1 report under review. 2 survey manuals. PROCUREMENT • Supplying of equipment for coastal water monitoring. Total contracted volume 28,000 € • Supply of equipment for SW and GW upcoming
  • 24. 24 CAPACITY BUILDING • 2 national training workshops provided / 21 trainees MONITORING AND BASIN PLANNING • Delineation report completed: 9 new groundwater bodies in the Upper Kura RBD identified, delineated and characterized. • Adaptation of monitoring network to WFD under preparation. • 1 groundwater survey conducted in Upper Kura RBD. 1 survey report. 1 survey manual. GROUNDWATER MONITORING DEVELOPMENT
  • 25. 25 LABORATORY • provision of 7 national trainings, quality management missions and 2nd round of participation in proficiency testing SURFACE WATER & COASTAL & TRANSITIONAL WATER • SW: 2 sub-regional trainings and at least 1 biological and 1 investigative monitoring • CTW: provision of 2 national trainings and 2 surveys GROUNDWATER • at least 1 national training and 1 survey (1 in Decembe 2019?) FURTHER INVESTMENTS • Rehabilitation of groundwater monitoring sites • Purchase of planned SW and GW monitoring equipment • Reassessment of existing budget and further investments in works/supply/service. OUTLOOK AND FURTHER PLANS FOR 2020
  • 26. 26 DEVELOPMENT OF PILOT RBMP FOR THE KURA RIVER BASIN UPSTREAM MINGACHEVIR DAM • Finalised chapters: water bodies delineation, characterisation, pressures, impacts, protected areas • Following chapters on-going (economic analysis, programme of measures) • First consultation on Significant Water Management Issues SPECIFIC IMPLEMENTATION ACTIVITY IN THE SAME PILOT BASIN • Preparation of a water allocation strategy on going on the district CAPACITY BUILDING/WORKSHOPS • RBMP development launching workshop (3 July 2018) • RBMP integration, Pressures and impacts (October 25-26, 2018) • RBMP and economic analysis (regional, 11-12 April 2019 and 6-countries on-line webinar) • RBMP Programme of measures (Joint AZ, GE, 2-3 October 2019) PARTICIPATIVE RBM PLANNING
  • 27. 27 Kura upstream Mingachevir dam river basin district (pilot basin)
  • 28. 28 DEVELOPMENT OF THE WIS INFRASTRUCTURE • MoU for server acquisition signed (server purchased and hosted by MENR) • Installed server will be used as national WIS CAPACITY BUILDING • Online support on platform management o Metadata catalogue o Web services o Interactive maps AGREEMENTS WITH MENR/WATER QUALITY, MENR/HYDROLOGY • Testing procedures of automatic data exchange through pilot actions • A provisional operational platform was implemented and is operational on the project server where: o Previous EPIRB layers are available through web services DEVELOPMENT OF THE DATA MANAGEMENT PLATFORM
  • 29. 29 PUBLIC CONSULTATION • 1 stakeholder consultation period (January-May 2019) o Kura upstream Mingachevir dam Pilot Basin stakeholders meetings on RBMP work programme and main water related issues SUPPORT TO LOCAL CONSULTATION STRATEGY • Local consultant contracted on 7 March 2019. (support to consultations and communication&visibility activities) • 1 Communication strategy and action plan for participative RBM Planning • Questionnaires for future public consultations STAKEHOLDER INVOLVEMENT FOR PARTICIPATIVE RBMP DEVELOPMENT
  • 30. 30 COMMUNICATION MATERIAL DEVELOPMENT • 1 newsletter published in May 2019 • 1 EUWI+ leaflet & 1 banner in AZ • 4 cartoons in AZ: Public consultation, RBMP, EUWI+ project, Clean Beach (2018 edition) OUTREACH EVENTS (Sept 2018-Aug 2019) • 4 outreach events on the occasion of the EU days in May 2019: lectures and stand with practical sessions for schoolchildren and students to raise their awareness on water quality • 700 people reached COMMUNICATION AND AWARENESS RAISING EUWI+ stand at EU Days in Mingachevir, May 2019
  • 31. 31 RBMP • Finalisation of the Kura upstream Mingachevir dam RBMP and SIA DATA MANAGEMENT (IN COOPERATION WITH ENI-SEIS) • Tender and development of quality national databases • Development of indicators databases • Valorization of available data through web services and visualization tools (interactive maps/ dashboards) • Transfer of database/tools used for visualization on national platform STAKEHOLDER INVOLVEMENT/ COMMUNICATION AND VISIBILITY • Public consultation draft RBMP: first quarter 2020 • Lab event: 10 December • Regional workshop on public consultation for Armenia, Azerbaijan and Georgia (first quarter 2020) OUTLOOK AND FURTHER PLANS FOR 2020
  • 32. 32 RECOMMENDATIONS • Expedite adoption of national water strategy COUNTRY INVESTMENT BUDGET • Substantial budget volumes are currently unallocated. Effort will be needed to add eligible and WFD-compliant investments. The MS Consortium started in the summer to facilitate selection, preparation and implementation within the remaining EUWI+ project period. CHALLENGES / RECOMMENDATIONS IN AZERBAIJAN
  • 33. 33 COUNTRY PROGRESS BELARUS 1. Progress, Outputs and Outcomes since the second SCM in November 2018 2. Specific challenges / recommendations / solutions The EU-funded Action “European Union Water Initiative Plus for Eastern Partnership Countries (EUWI+ 4 EaP)” is implemented by the UNECE, OECD, responsible for the implementation of Result 1 and an EU member state consortium of Austria and France responsible for the implementation of Result 2 and 3. This document was produced by UNECE and/or OECD and/or the EU member state consortium with the financial assistance of the European Union. The views expressed herein can in no way be taken to reflect the official opinion of the European Union or the Governments of the Eastern Partnership Countries. This document and any map included herein are without prejudice to the status of, or sovereignty over, any territory, to the delimitation of international frontiers and boundaries, and to the name of any territory, city or area.
  • 34. 34 NATIONAL POLICY DIALOGUE • 1st meeting of the Inter-agency committee managing the implementation of the EUWI+ project in Belarus held on 5 December 2018. EU WATER ACQUIS APPROXIMATION AND LEGISLATIVE REFORM • in progress SUPPORT IN DEVELOPING A NATIONAL WATER STRATEGY • Assistance to developing new Water Strategy to 2030, in the context of Climate Change o Draft new Water Strategy passed public hearings; o Strategic Environmental Assessment of the Water Strategy ongoing; Kick-off meeting and training held in July 2019 LEGISLATION POLICY & INSTITUTIONAL STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
  • 35. 35 PILOT ACTIONS AT LOCAL LEVEL TO SUPPORT IMPLEMENTATION OF THE WATER STRATEGY AND RESPECTIVE RBMP • On-going pilot actions in Kopyl Rayon of Minsk Oblast: priority activities identified through an Express survey of water resources and infrastructure in the rayon: o New water consumption and wastewater discharge norms developed and approved by 4 most water intensive enterprises in the rayon, with immediate effect; and o Recommendations on the future Master plan for portable water supply developed and generally approved by the public administration of the rayon. MULTILATERAL ENVIRONMENTAL AGREEMENTS/COMMITMENTS • Methodology to monitor nationalised SDGs 6.3-6-5 developed, approved by BelStat and integrated in the computed based State Water Cadaster data- base allowing an automated calculation of time-series for reporting purposes • Baseline study for updating the targets set under the Protocol on Water and Health drafted and the revised targets are being discussed • Reporting under the Water Convention and SDG 6.5.2. supported LEGISLATION POLICY & INSTITUTIONAL STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
  • 36. 36 TRANSBOUNDARY COOPERATION • Support to transboundary cooperation in the Western Dvina-Daugava basin provided by facilitating consultations on an inter-ministerial agreement with Latvia CAPACITY DEVELOPMENT • Trainees from Belarus attended a regional capacity development event on strategic planning under high risks and uncertainty (October 2018) held jointly with IIASA under another regional project funded by Norway (synergy) • EUWI+ side event on reform of rural WSS, at an International Water conference in Minsk in February 2019 • Training materials on economic instruments for WRM in RB developed and printed; integration thereof in the curricular of recipient training institutions in Belarus started. • Based on request from the EUWI+ Interagency SC, training on methodology for reporting under 6.5.2 provided through regional and global workshops • Training on scoping study for SEA procedure, Minsk, 12 July 2019 LEGISLATION POLICY & INSTITUTIONAL STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
  • 37. 37 PROCUREMENT • Procurement of the Liquid chromatography–mass spectrometry (LC-MS) and Atomic Fluorescence Spectroscopy (AFS). Total contracted volume 267,000 €. LAB OPENING • 5 December NPD with lab agenda item • Main visibility event in spring 2020 LABORATORY DEVELOPMENT
  • 38. 38 CAPACITY BUILDING • National and regional trainings o 1 methodological training provided with existing equipment o 2 sub-regional trainings: 1 on the new version of the international standard EN ISO/IEC 17025:2017 in Tbilisi and 1 for internal auditors acc. to ISO 19011 guideline and EN ISO 17025:2017 in Chisinau o 1 regional methods training for determination of organochlorine compounds o 1 study visit to Austria in October 2019 to exchange experience in ways of implementing WFD in an EU member state o 1st round in participation in proficiency testing completed LABORATORY ACCREDITATION • Partner laboratory already accredited o Re-accreditation and transposing their existing quality management system into the new edition of the international standard EN ISO 17025:2017 is ongoing LABORATORY DEVELOPMENT
  • 39. 39 SURFACE WATER MONITORING DEVELOPMENT CAPACITY BUILDING • 4 sub-regional SW trainings provided / 11 trainees MONITORING AND BASIN PLANNING • SW Delineation report completed: 715 new surface water bodies in 1 RBD identified, delineated and characterised. • 1 HYMO & 2 biological surveys conducted in 1 RBDs. 1 survey report. 1 report under review. 2 survey manuals. PROCUREMENT • Purchase of SW monitoring equipment upcoming
  • 40. 40 CAPACITY BUILDING • 2 national training workshop provided / 15 trainees MONITORING AND BASIN PLANNING • Delineation report completed: 11 new groundwater bodies in Pripyat RB identified, delineated and characterised. • Adaptation of monitoring network to WFD ongoing • Transboundary coordination of GWBs with UA ongoing • Pollution investigation (pesticides) ongoing. • 2 groundwater surveys conducted in Pripyat RB. 1 survey report + 1 under preparation. 2 survey manuals. GROUNDWATER MONITORING DEVELOPMENT
  • 41. 41 LABORATORY • provision of 8 national trainings and 2nd round of participation in proficiency testing SURFACE WATER • 2 sub-regional trainings and at least 1 biological and 1 investigative monitoring GROUNDWATER • at least 1 national training and 1 survey FURTHER INVESTMENTS • Purchase of planned SW and GW monitoring equipment • Re-assessment of existing budget and further investments in works/supply/service. OUTLOOK AND FURTHER PLANS FOR 2020
  • 42. 42 PRIPYAT RBMP DEVELOPMENT • Finalised chapters: Draft basin characterisation submitted at 1st consultation on 1st Nov. 2019 (20 participants) DNIEPER RBMP REFINEMENT • Documents available on EUWI+ website (1 report, 3 annexes) • In the process of final approval DNIEPER RBMP IMPLEMENTATION • Sub-Basin Management Plan of Uza River Basin on-going • Sub-Basin Management Plan of Mogilev urban watercourses on-going SECONDARY LEGISLATION TECHNICAL GUIDES FOR NATIONAL USE ON-GOING • Estimation of diffuse pollution • Convergence of RBMPs content with WFD requirements WORKSHOPS • RBMP and economic analysis (regional, 27-28 March 2019 and 6-countries on-line webinar) PARTICIPATIVE RBMP
  • 43. 43 SUPORT ON DATA BASES STRUCTURING • Interest for data sharing formulated by main data producers but without any engagements CAPACITY BUILDING • Online support on platform management o Metadata catalogue o Web services o Interactive maps DEVELOPMENT OF THE WIS INFRASTRUCTURE • Tender for server acquisition was launched • A provisional operational platform was implemented and is operational on project server with previous EPIRB layers available through web services DEVELOPMENT OF THE DATA MANAGEMENT PLATFORM
  • 44. 44 PUBLIC CONSULTATION • 2 Basin Council meetings • Dnieper- 25 October 2018 • Western Bug- December 2018 • 1 Public consultation meeting on Pripyat RBMP (from 1 November 2019) SUPPORT TO LOCAL CONSULTATION STRATEGY • Draft Participative RBMP Communication Strategy & Action plan STAKEHOLDER INVOLVEMENT FOR PARTICIPATIVE RBMP DEVELOPMENT
  • 45. 45 COMMUNICATION MATERIALS o 1 newsletter published in June 2019 o 1 EUWI+ leaflet & 1 banner in BY o 3 cartoons in BY: Public consultation, RBMP, EUWI+ project o 2 Factsheets in English (Dnieper and Pripyat River Basin) OUTREACH EVENTS (Sept 2018-Aug 2019) o 1 outreach event: Minsk Festival "the EU and Belarus, Creating Opportunities for Youth", EUWI+ stand, June 2019 o 300 people reached COMMUNICATION AND AWARENESS RAISING EUWI+ stand at Minsk Festival " the EU and Belarus, Creating Opportunities for Youth “ June 2019
  • 46. 46 RBMP • Finalisation of the Pripyat RBMP and SIAs DATA MANAGEMENT • Finalizing server acquisition/ configuration • Development of indicators databases • Valorization of available data through web services and visualization tools (interactive maps/ dashboards) • Transfer of database/tools used for visualization on national platform STAKEHOLDER INVOLVEMENT COMMUNICATION AND VISIBILITY • Public consultation on Pripyat RBMP • Lab event splited in two: 5 Dec 2019 back to back with NPD, students visit in Spring 2020 OUTLOOK AND FURTHER PLANS FOR 2020
  • 47. 47 COUNTRY INVESTMENT BUDGET • Substantial budget volumes are currently unallocated. Effort will be needed to add eligible and WFD-compliant investments. The MS Consortium started in the summer to facilitate selection, preparation and implementation within the remaining EUWI+ project period. CHALLENGES / RECOMMENDATIONS IN BELARUS
  • 48. 48 COUNTRY PROGRESS GEORGIA 1. Progress, Outputs and Outcomes since the second SCM in November 2018 2. Specific challenges / recommendations / solutions The EU-funded Action “European Union Water Initiative Plus for Eastern Partnership Countries (EUWI+ 4 EaP)” is implemented by the UNECE, OECD, responsible for the implementation of Result 1 and an EU member state consortium of Austria and France responsible for the implementation of Result 2 and 3. This document was produced by UNECE and/or OECD and/or the EU member state consortium with the financial assistance of the European Union. The views expressed herein can in no way be taken to reflect the official opinion of the European Union or the Governments of the Eastern Partnership Countries. This document and any map included herein are without prejudice to the status of, or sovereignty over, any territory, to the delimitation of international frontiers and boundaries, and to the name of any territory, city or area.
  • 49. 49 NATIONAL POLICY DIALOGUE • 6th Meeting of the Steering Committee of the National Policy Dialogue held on 2.10.2018 (46 participants, 23 female and 23 male) EU WATER ACQUIS APPROXIMATION: • Approximation promoted through the policy dialogue LEGISLATIVE REFORM: • Support to the organization of a high-level consultation workshop on the draft law on water resources management on 9-11 February 2019 in Borjomi, Georgia provided. • Final draft law uploaded to the electronic inter-ministerial platform for final comments and later submission to the parliament for adoption • Secondary legislation “Review of the existing draft decree on monitoring of water resources to ensure its compliance with the draft law on water resources management and the EU WFD finalised • Review of the existing draft of the normative act on Water Quality Ecological Standards to ensure its compliance with the draft law on water resources management and the EU Water Framework Directive WFD completed • Support in the reform of water abstraction charges initiated LEGISLATION POLICY & INSTITUTIONAL STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
  • 50. 50 MULTILATERAL ENVIRONMENTAL AGREEMENTS • Preparations conducted for the SEA for the Alazani-Iori RBMP SUPPORT IN DEVELOPING A NATIONAL WATER STRATEGY • Work is underway. Finalization of a policy (concept) paper providing a long-term vision for further policy developments in the water sector of Georgia will serve as a conceptual framework for the National Water Strategy. • Work on the reform of water abstraction charges: scoping and review of international experience launched TRANSBOUNDARY COOPERATION • Support transboundary cooperation with Georgia on the Khrami-Debed and possible bi-lateral agreement – bilateral meeting held in Yerevan on 14 October 2019 • Support to consultations on the bilateral Kura agreement with Azerbaijan provided. CAPACITY DEVELOPMENT • Workshop on the draft law on water resources management on 9-11 February 2019 in Borjomi • Provided through regional trainings/events and through support to reporting under MEAs. LEGISLATION POLICY & INSTITUTIONAL STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
  • 51. 51 CAPACITY BUILDING • National and regional trainings o 2 methodological trainings provided with existing equipment o 1 training for internal auditors acc. to ISO 19011 guideline and EN ISO 17025:2017 in Tbilisi and 1 workshop on QM principles o 1 regional methods training for determination of organochlorine compounds o 2 sub-regional trainings for internal auditors acc. to ISO 19011 and on the new version of the international standard EN ISO/IEC 17025:2017 o 1 study visit to Austria in October 2019 to exchange experience in ways of implementing WFD in an EU member state o 1st round in participation in proficiency testing completed LABORATORY ACCREDITATION • Partner laboratory already accredited o Re-accreditation and transposing their existing quality management system into the new edition of the international standard EN ISO 17025:2017 is ongoing LABORATORY DEVELOPMENT
  • 52. 52 PROCUREMENT • Procurement of the Gas Chromatograph/MSMS, Microwave Digestion for sample preparation and Water Purification System. Total contracted volume 187,000 €. LAB OPENING • Successfully realized on 30th October 2019 in Tbilisi. LABORATORY DEVELOPMENT
  • 53. 53 SURFACE WATER AND COASTAL & TRANSITIONAL MONITORING DEVELOPMENT CAPACITY BUILDING • 4 sub-regional SW trainings provided / 17 trainees & 3 national CTW trainings provided / 19 trainees MONITORING AND BASIN PLANNING • SW Delineation report completed: 818 new surface water bodies in 2 RBD identified, delineated and characterised. • 1 HYMO & 2 biological surveys conducted in 1 RBDs. 1 survey report. 1 report under review. 2 survey manuals. • 2 surveys of coastal & transitional waters PROCUREMENT • Supplying of equipment for coastal water monitoring. Total contracted volume 37,000 €.
  • 54. 54 CAPACITY BUILDING • 2 national trainings provided / 23 trainees MONITORING AND BASIN PLANNING • Delineation report completed: 35 new groundwater bodies in the 2 RBDs identified, delineated and characterised. • Geophysical logging of wells ongoing, as part of adaptation of monitoring network to WFD. • 2 groundwater surveys conducted in the 2 RBDs. 1 survey report + 1 under preparation. 1 survey manual. GROUNDWATER MONITORING DEVELOPMENT
  • 55. 55 LABORATORY • provision of 4 national trainings and 2nd rounds of participation in proficiency testing SURFACE AND COASTAL & TRANSITIONAL WATER • SW: 2 sub-regional trainings and at least 1 biological and 1 investigative monitoring • CTW: 3 national trainings and 1 survey GROUNDWATER • at least 1 national training and 1 survey FURTHER INVESTMENTS • Rehabilitation of GW monitoring sites and furnishing with logging equipment • Purchase of planned SW, GW and CTW monitoring equipment • Re-assessment of existing budget and further investments in service/supply/works. OUTLOOK AND FURTHER PLANS FOR 2020
  • 56. 56 DEVELOPMENT OF ALAZANI AND IORI RBMP • Finalised chapters: water bodies delineation, characterisation, pressures, impacts, protected areas + Thematic summary of the basin characterisation • Following chapters on-going • First consultation on Significant Water Management Issues DEVELOPMENT OF KHRAMI AND DEBED RBMP • Finalised chapters: water bodies delineation, characterisation, pressures, impacts, protected areas + Thematic summary of the basin characterisation • Following chapters on-going • First consultation on Significant Water Management Issues WORKSHOPS: • RBMP development launching, 5 June 2018 • RBMP Characterisation, pressures, impact, 22-23 October 2018 • RBMP and economic analysis (regional, 11-12 April 2019 and 6-countries on-line webinar) • RBMP Programme of measures (Joint AZ, GE, 2-3 October 2019) PARTICIPATIVE RBM PLANNING
  • 57. 57 Need for harmonisation at the border for a continuity in the share vision of water body status Need to experience the adoption process and implementation monitoring
  • 58. 58 AGREEMENTS WITH NEA WATER QUALITY AND MEPA WATER USE • Testing procedures of automatic data exchange through pilot actions CAPACITY BUILDING • Online support on platform management o Metadata catalogue o Web services o Interactive maps DEVELOPMENT OF THE WIS INFRASTRUCTURE • A provisional operational platform was implemented and is operational on project server where: o Previous EPIRB layers are available through web services. o GIS layers from Water Cadaster were made available as web services • Letter of Agreement was signed and tender launched for server strengthening DEVELOPMENT OF THE DATA MANAGEMENT PLATFORM
  • 59. 59 PUBLIC CONSULTATION o 2 Basin council meetings (Alazani-Iori and Khrami-Debed river basins) o 1 Public consultation for Alazani-Iori and Khrami-Debed River Basins(13-16 May) o 7 meetings at Tianeti, Telavi, Kvareli, Signagi, Sagarejo, Bolnisi and Tetritskaro. o 140 opinions gathered SUPPORT TO LOCAL CONSULTATION STRATEGY o 1 Participative RBMP Communication strategy & action plan o 1 Public consultation report STAKEHOLDER INVOLVEMENT FOR PARTICIPATIVE RBMP DEVELOPMENT
  • 60. 60 COMMUNICATION MATERIALS DEVELOPMENT • 1 newsletter published in June 2019 • 2 factsheets (Khrami Debed, Alazani-Iori) • 1 EUWI+ leaflet & 1 banner in GE • 3 cartoons in GE: Public consultation, RBMP, EUWI+ project • 2 videos: coastal water monitoring (published on FB), Water Law • 4 infographics in EN and GE about Khrami Debed and Alasani-Iori main issues • OUTREACH EVENTS (SEPT 2018-AUG 2019) o 1 outreach event: o March 2019 World Water Day (Open Space for schoolchildren in Bolsini + campaign “Don’t leave anyone behind”) o 40 people reached COMMUNICATION AND AWARENESS RAISING Tbilisi Water Laboratory Day on 30 October 2019 FOCUS: Water Laboratory Day (30.10.2019) • 44 news items in: • 6 project partners media • 15 Georgian media • 3 European union media • 1 express campaign on EUWI+ FB page: • 5 FB publications • More than 3600 organic reaches
  • 61. 61 RBMP • Finalisation of the Alazani-Iori & Kharmi-Debed RBMPs DATA MANAGEMENT(IN COOPERATION WITH ENI-SEIS) • Development of indicators databases • Valorization of available data through web services and visualization tools (interactive maps/ dashboards) • Transfer of database/tools used for visualization on national platform STAKEHOLDER INVOLVEMENT COMMUNICATION AND VISIBILITY • Public consultation on draft RBMP: first quarter 2020 • Regional workshop on public consultation for Armenia, Azerbaijan and Georgia (first quarter 2020) OUTLOOK AND FURTHER PLANS FOR 2020
  • 62. 62 RECOMMENDATION • Expedite adoption of the New Water Law to serve as foundation for reforms in the Water Sector COUNTRY INVESTMENT BUDGET • Substantial budget volumes are currently unallocated. Effort will be needed to add eligible and WFD-compliant investments. The MS Consortium started in the summer to facilitate selection, preparation and implementation within the remaining EUWI+ project period. CHALLENGES / RECOMMENDATIONS IN GEORGIA
  • 63. 63 COUNTRY PROGRESS MOLDOVA 1. Progress, Outputs and Outcomes since the second SCM in November 2018 2. Specific challenges / recommendations / solutions The EU-funded Action “European Union Water Initiative Plus for Eastern Partnership Countries (EUWI+ 4 EaP)” is implemented by the UNECE, OECD, responsible for the implementation of Result 1 and an EU member state consortium of Austria and France responsible for the implementation of Result 2 and 3. This document was produced by UNECE and/or OECD and/or the EU member state consortium with the financial assistance of the European Union. The views expressed herein can in no way be taken to reflect the official opinion of the European Union or the Governments of the Eastern Partnership Countries. This document and any map included herein are without prejudice to the status of, or sovereignty over, any territory, to the delimitation of international frontiers and boundaries, and to the name of any territory, city or area.
  • 64. 64 NATIONAL POLICY DIALOGUE • 5th Meeting of the Steering Committee of the National Policy Dialogue held on 25.10.2019 (73 participants, 37 female and 36 male) EU WATER ACQUIS APPROXIMATION • Approximation promoted through the policy dialogue LEGISLATIVE REFORM • Draft Law on the amendments to the Water Law No.272 prepared, and adopted by the Parliament in November 2018 as Law No.249/2018 • Work started on transforming the new temporary design and construction norms for small-scale drinking water supply systems in Moldova approved in April 2018 into permanent ones; and on drafting similar new norms for small-scale sanitation systems • A study started on the use of Economic instruments for WRM in Moldova, incl. monetary evaluation of damage to water resources and bodies; and identifying and assessing options for establishing a dedicated Water Solidarity Fund. LEGISLATION POLICY & INSTITUTIONAL STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
  • 65. 65 MULTILATERAL ENVIRONMENTAL AGREEMENTS • Methodological support for monitoring and reporting on SDG 6.5.2 indicator provided and report submitted to the Convention secretariat • An expert group is working on draft revisions to the National Programme for the Protocol on Water and Health implementation and proposals for legislative changes to ensure equitable access to water and sanitation to be presented at the Stakeholder Consultation Meeting in early 2020. SUPPORT IN DEVELOPING A NATIONAL WATER STRATEGY / MID-TERM PLANS • Support to drafting a Government Resolution on updating the national WSS Strategy and approving new mid-term action plan for 2019-23 to support implementation of the Strategy (submitted to the Government, comments collected and are being addressed) TRANSBOUNDARY COOPERATION • General support provided through the Water Convention activities LEGISLATION POLICY & INSTITUTIONAL STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
  • 66. 66 CAPACITY DEVELOPMENT • Trainees from Moldova attended the regional capacity development event on strategic planning under high risks and uncertainty (October 2018) • Capacity development event on applying the new norms and sustainable business models in rural WSS (March 2019) • Work started on developing training materials on EIs for WRM in Moldova • Provided through regional trainings/events and through support to reporting under MEAs. LEGISLATION POLICY & INSTITUTIONAL STRENGTHENING PROGRESS / OUTPUTS / OUTCOMES
  • 67. 67 CAPACITY BUILDING • National and regional trainings o 2 methodological trainings provided with existing equipment o 1 sub-regional training event for internal auditors acc. to ISO 19011 guideline and EN ISO 17025:2017 in Chisinau o 1 regional methods training for determination of organochlorine compounds o 1 sub-regional training on the new version of the international standard EN ISO/IEC 17025:2017 o 1 study visit to Austria in October 2019 to exchange experience in ways of implementing WFD in an EU member state o 1st round in participation in proficiency testing completed LABORATORY ACCREDITATION • Partner laboratory was already accredited o Re-accreditation and transposing their existing quality management system into the new edition of the international standard EN ISO 17025:2017 is outstanding o However, after institutional changes from SHS to EAM, the accreditation status of the partner laboratory was temporarily suspended until the end of 2019 and may be lost. LABORATORY DEVELOPMENT
  • 68. 68 PROCUREMENT • Procurement of the Gas Chromatograph/MSMS, Microwave Digestion for sample preparation, Water Purification System, Atomic Absorption Spectrophotometer, DOC/TOC and bench freeze dryer .Total contracted volume 270,000 €. LAB OPENING • Early 2020 (tbd) LABORATORY DEVELOPMENT
  • 69. 69 SURFACE WATER MONITORING DEVELOPMENT CAPACITY BUILDING • 4 sub-regional SW trainings provided / 7 trainees + 2 national trainings provided with 19 trainees MONITORING AND BASIN PLANNING • SW Delineation report completed: Existing surface water bodies in DPBS RBD reviewed and revised, 96 new delineated. • 1 HYMO & 1 biological survey conducted in DPBS RBD. 1 survey report, 1 report under review. 2 survey manuals. • Participation at ICPDR Joint Danube Survey 4 PROCUREMENT • Purchase of SW monitoring equipment upcoming
  • 70. 70 CAPACITY BUILDING • 2 national training workshops provided / 13 trainees MONITORING AND BASIN PLANNING • Delineation report completed: 13 existing groundwater bodies in DPBS RBD reviewed, 8 revised, 1 new delineated. • Adaptation of monitoring network to WFD ongoing. • 2 groundwater surveys conducted in DPBS RBD. 1 survey report + 1 in preparation. 2 survey manuals. GROUNDWATER MONITORING DEVELOPMENT
  • 71. 71 LABORATORY • provision of 9 national trainings and 2nd round of participation in proficiency testing SURFACE WATER • 2 sub-regional trainings and at least 1 biological and 1 investigative monitoring GROUNDWATER • at least 1 national training and 1 survey FURTHER INVESTMENTS • Rehabilitation and installation of new monitoring sites • Purchase of planned SW and GW monitoring equipment • Re-assessment of existing budget and further investments in works/supply/service. OUTLOOK AND FURTHER PLANS FOR 2020
  • 72. 72 DANUBE-PRUT AND BACK SEA DISTRICT RBMP 1ST CYCLE IMPLEMENTATION • RBMP approved in Oct. 2018 • Program of measures implementation can be completed earlier by end of 2021 DANUBE-PRUT AND BACK SEA DISTRICT RBMP DEVELOPMENT, 2ND CYCLE • Finalised chapters: Draft Thematic Summary of the basin characterization finalized in June 2019 • New contract on Programme of Measures on-going (contract signed on 7 June 2019) SPECIFIC IMPLEMENTATION ACTIONS (under activity 2.3.2) • Development of a Water Sanitation System (WSS) master plan for the Nirnova sub-basin within the context of the inter-municipality pilot governance scheme development • Supporting the development and adoption of a code of good agricultural practices in Moldova CAPACITY BUILDING/WORKSHOPS • First steps of RBMP 2nd cycle II on 17 September • Cross-road workshop on RBMP development: Pressures-impact analysis, held on 13 November 2018, 25 participants including a Romanian expert from Prut branch of Apele Romane for transboundary coordination • Participative river basin management planning on 31 January to prepare the consultation process including a Romanian expert from Prut branch of Apele Romane • RBMP and economic analysis (regional, 27-28 March 2019 and 6-countries on-line webinar) • Continuous exchange with the selected contractor: 6 Skype meeting (2.3.2) with the service provider including the involvement of the beneficiary PARTICIPATIVE RBM PLANNING
  • 73. 73 First interim RBMP adopted in October 2018 Development of the 2nd generation of Danube-Prut and back sea RBMP 12/2021-12/2027 synchronised with EU MS and with further transboundary harmonisation with Romania
  • 74. 74 DEVELOPMENT OF THE WIS INFRASTRUCTURE • A provisional operational platform was implemented and is operational on project server where: o Previous EPIRB layers are available through web services. o GIS layers from water cadaster were made available as web services CAPACITY BUILDING • Online support on platform management o Metadata catalogue o Web services o Interactive maps SUPORT ON DATA BASES STRUCTURING • Technical analysis of some existing databases was done in order to analyze conditions for updating • A database of RBMP implementation indicators was created and can be visualized on line (graphs, maps and interactive dashboard) DEVELOPMENT OF THE DATA MANAGEMENT PLATFORM
  • 75. 75 • First PUBLIC CONSULTATION ON RBMP CYCLE II o from June to September 2019 o 5 public consultation meeting in sub-districts (picture): o 1 Basin Council meeting (20 September 2019) o 170 opinions collected • SUPPORT TO LOCAL CONSULTATION STRATEGY o Updated communication strategy and plan for the DPBS river district o 1 Public Consultation report STAKEHOLDER INVOLVEMENT FOR PARTICIPATIVE RBMP DEVELOPMENT
  • 76. 76 • COMMUNICATION MATERIALS o 1 newsletter published in May 2019 o 1 EUWI+ leaflet & 1 banner in MD o 4 cartoons in MD: Public consultation, RBMP, EUWI+ project, Clean Beach (2018) o 1 factsheet (Danube-Prut and Black Sea river basin) • OUTREACH EVENTS (Sept 2018-Aug 2019) o 6 outreach events: International Clean Beach Day 2018, EU days in Chisinau and Cahul, Danube Day (cycling tour and D-Day), International Clean Beach Day 2019 edition o 730 people reached COMMUNICATION AND AWARENESS RAISING Danube Day 2019: Cycling tour from Nemteni to Giurgiulesti
  • 77. 77 RBMP • Finalisation of Draft Danube-Prut and Black Sea RBMP cycle II and SIAs DATA MANAGEMENT • Acquisition or rehabilitation of a specific server for Apele Moldovei? • Supporting development of water use database and/or Water quality database and/or hydrographic network standardize information layer? • Development of indicators databases • Valorization of available data through web services and visualization tools (interactive maps/ dashboards) • Transfer of database/tools used for visualization on Apele Moldovei server? STAKEHOLDER INVOLVEMENT COMMUNICATION AND VISIBILITY • Public consultation draft RBMP: second quarter 2020 • Lab event: Early 2020 OUTLOOK AND FURTHER PLANS FOR 2020
  • 78. 78 THE CHANGE OF THE GOVERNMENT JUNE AND NOVEMBER 2019: • Repeated uncertainty of sustained commitment for EUWI+ and of Ministerial guidance to the MD water management institutions. SURFACE WATER • Insufficient capacity of the laboratory at the new National Environment Agency of Moldova on the level of staff and operational budget allowing to deliver regular and, extended (WFD-compliant) monitoring. In 2019, upon the move of the lab from SHS to the new EAM, there was a lack of regular SW monitoring, a loss of EUWI+ trained staff and there is partly too few staff to operate certain equipment, including new deliveries. Contracting delays are still affecting the EUWI+ work schedule (i.e. regarding data collection and analysis, ESCS development). LABORATORY • In spite of excellent pre-conditions during the EUWI+ assessment and of various EUWI+ support (trainings, study tour, road map and additional expert support), the new and upgraded accreditation standard (ISO 10025- 2017) of the EAM lab will not be achieved. Also, the existing accreditation was suspended in early 2019 due to the change of the accredited lab (from SHS to EAM). COUNTRY INVESTMENT BUDGET • Substantial budget volumes are currently unallocated. Effort will be needed to add eligible and WFD-compliant investments. The MS Consortium started in the summer to facilitate selection, preparation and implementation within the remaining EUWI+ project period. CHALLENGES / RECOMMENDATIONS IN MOLDOVA
  • 79. 79 COUNTRY PROGRESS UKRAINE 1. Progress, Outputs and Outcomes since the second SCM in November 2018 2. Specific challenges / recommendations / solutions The EU-funded Action “European Union Water Initiative Plus for Eastern Partnership Countries (EUWI+ 4 EaP)” is implemented by the UNECE, OECD, responsible for the implementation of Result 1 and an EU member state consortium of Austria and France responsible for the implementation of Result 2 and 3. This document was produced by UNECE and/or OECD and/or the EU member state consortium with the financial assistance of the European Union. The views expressed herein can in no way be taken to reflect the official opinion of the European Union or the Governments of the Eastern Partnership Countries. This document and any map included herein are without prejudice to the status of, or sovereignty over, any territory, to the delimitation of international frontiers and boundaries, and to the name of any territory, city or area.
  • 80. 80 NATIONAL POLICY DIALOGUE • Last Meeting of the National Policy Dialogue took place on 5-6 Nov 2019 (89 participants, 40 female and 49 male) LEGISLATION POLICY & INSTITUTIONAL STRENGTHENING
  • 81. 81 MULTILATERAL ENVIRONMENTAL AGREEMENTS NATIONAL POLICY DIALOGUE • Revision of the national targets under the Protocol on Water and Health finalized and recommended by the Interagency WG for approval at appropriate government level • Public consultations on the revision of targets held in Kyiv on 19-20 December 2018 • Support was provided to reporting under the Protocol on Water and Health and the report submitted to the Protocol secretariat
  • 82. 82 SUPPORT IN DEVELOPING A NATIONAL WATER STRATEGY • A series of roundtable workshops were held with different focus groups (regional WRM authorities, municipalities, water utilities) to discuss setting national water targets and indicators to be included in the water strategy. TRANSBOUNDARY COOPERATION • General support provided under the Water Convention activities • Support provided to Ukraine to meet commitments under the ICPDR through participation in relevant ICPDR meetings and capacity development activities LEGISLATION POLICY & INSTITUTIONAL STRENGTHENING
  • 83. 83 PROCUREMENT • Procurement of the Gas Chromatograph/MSMS, water purification system, atomic absorption spectrophotometer, microwave digestion for sample preparation and Atomic Fluorescence Spectroscopy. Total contracted volume 263,000 €. LAB OPENING • Expected for the end of January 2020. LABORATORY DEVELOPMENT
  • 84. 84 CAPACITY BUILDING • National and regional trainings o 3 methodological trainings provided with existing equipment o 1 sub-regional methods training on “method validation, measurement uncertainty and metrological traceability in accordance with EN ISO 17025:2017” in Kyev in April 2019 o 1 regional methods training for determination of organochlorine compounds o 1 study visit to Austria inOctober 2019 to exchange experience in ways of implementing WFD in an EU member state o 1st round in participation in proficiency testing completed LABORATORY ACCREDITATION • focuses on assistance in setting up the quality management system documentation, as a prerequisite for laboratory accreditation o 4 quality management missions were conducted to support the Basin Laboratory in Vyshghorod between June 2018 and August 2019. o 2 more quality management missions are planned for 2020. LABORATORY DEVELOPMENT
  • 85. 85 SURFACE WATER MONITORING DEVELOPMENT CAPACITY BUILDING • 4 sub-regional SW trainings provided / 7 trainees + 2 national training workshops provided with 19 trainees MONITORING AND BASIN PLANNING • SW Delineation report completed: 3811 new surface water bodies in Dnipro RB identified, delineated and characterised. • 1 HYMO & 1 biological survey conducted in Dnipro RB. 1 survey report. 1 report under review. 2 survey manuals. PROCUREMENT • Purchase of SW monitoring equipment upcoming
  • 86. 86 CAPACITY BUILDING • 1 national training workshop provided / 8 trainees MONITORING AND BASIN PLANNING • Delineation report completed: 26 new groundwater bodies in Dnipro RBD identified, delineated and characterised. • 1 groundwater survey conducted in Dnipro RBD. 1 survey report in preparation. 1 survey manuals. • Transboundary coordination with BY at Pripyat ongoing GROUNDWATER DEVELOPMENT PROGRESS / OUTPUTS / OUTCOMES
  • 87. 87 LABORATORY • provision of 3 national trainings and 2nd round of participation in proficiency testing SURFACE WATER • 2 sub-regional trainings and at least 1 biological and 1 investigative monitoring GROUNDWATER • at least 1 national training and 1 survey FURTHER INVESTMENTS • Purchase of planned SW and GW monitoring equipment • Re-assessment of existing budget and further investments in works/supply/service. OUTLOOK AND FURTHER PLANS FOR 2020
  • 88. 88 DNIPER RBMP DEVELOPMENT • Chapter characterisation and summary available on EUWI+ website • Chapter protected areas in the process of technical validation • Chapters pressures impact, risk analysis, environmental objectives for surface water and groundwater, economic analysis part 1 on going TECHNICAL GUIDELINES • 3 secondary legislation technical guides for national use on-going: pressures and risk assessment for groundwater; protected areas delineation and objectives definition; improvement of National methodology for pressures and risk assessment for surface water CAPACITY BUILDING • Technical workshop about RBMP characterisation, water bodies, delineation, risk analysis held on 11-12 Dec. 2018, 70 participants incl. experts from Belarus and Georgia • RBMP and economic analysis regional workshop, 27-28 March 2019 in Kiev and 6- countries on-line webinar) • 5 lectures at State Agency of Water Resources Training Centre for 100 representatives of water management each time • 7 lectures in Dnipro BUVR for local water representatives PARTICIPATIVE RBMP
  • 89. 89 DEVELOPMENT OF THE WIS INFRASTRUCTURE • Letter of Agreement was signed and tender launched for server acquisition for SAWR • A provisional operational platform was implemented and is operational on project server where: o Previous EPIRB layers are available through web services o GIS layers from Water Cadaster were made available as web services • LoA under preparation for acquisition of a server for Hydromet CAPACITY BUILDING • Online support on platform management o Metadata catalogue o Web services o Interactive maps SUPORT ON DATA BASES STRUCTURING • Technical analysis of some existing databases was done in order to analyze conditions for updating DEVELOPMENT OF THE DATA MANAGEMENT PLATFORM
  • 90. 90 PUBLIC CONSULTATION o 3 Basin Council meetings o Lower Dnipro in Kherson, o Middle Dnipro in Cherkasy o Desna in Chernihiv o 4 stakeholder meetings SUPPORT TO LOCAL CONSULTATION STRATEGY o 1 Updated participative RBM Planning Communication strategy for the Dnieper (Dnipro) river district o Event reports CAPACITY BUILDING o 5 conferences STAKEHOLDER INVOLVEMENT FOR PARTICIPATIVE RBMP DEVELOPMENT
  • 91. 91 • COMMUNICATION MATERIAL DEVELOPMENT o 1 newsletter published in April 2019 o 1 EUWI+ leaflet & 1 banner in UA o 6 cartoons in UA: Public consultation, RBMP, EUWI+ project, Clean Beach (2018, 2019), EU compliant monitoring in UA o 1 Infographics on the Protocol Water & Health o Active Facebook group https://www.facebook.com/groups/Dniprounites/: 559 members • OUTREACH EVENTS (Sept 2018-Aug 2019) o 5 outreach events: International Clean Beach Day 2018 edition, World Water Day, Danube Day, Dnipro Day o 6410 people reached • FOCUS: Clean Beach Day (Sept 2019) o 7000 participants o 234 river bank clean-ups o 1 public media challenge #I clean- your turn 2” o 1 campaign on plastic pollution prevention o 1 cartoon: plastic pollution (EUWI+ and EMBLAS-Plus) o 1 video: Clean Beach Day at Dnipro riverbanks o 1 Infographics on Clean Beach Day results COMMUNICATION AND AWARENESS RAISING
  • 92. 92 Video on media challenge #I clean- your turn 2” Large-scale public awareness rising event: “Dnipro Day” 2019 Clean Beach Day (Sept 2019): 234 clean ups. almost 3 times more than the 2018 edition (around 2700 participants) infographics on Clean Beach Day results (2019 edition) Cartoon on Plastic-pollution prevention
  • 93. 93 RBMP • Finalisation of the main characterization for the whole Dnieper DATA MANAGEMENT • Support acquisition of a server for Hydromet (LoA, tender, installation) • Support update of the State Water Monitoring Information System ? • Support development of Hydromet hydro biological database? • Support develop of interoperability between Hydromet database and State Water Monitoring Information System? • Development of indicators databases • Valorization of available data through web services and visualization tools (interactive maps/ dashboards) • Transfer of database/tools used for visualization on national platform STAKEHOLDER INVOLVEMENT COMMUNICATION AND VISIBILITY • Public consultation RBMP main issues: first quarter 2020 • Lab event: early 2020 OUTLOOK AND FURTHER PLANS FOR 2020
  • 94. 94 MEAS IMPLEMENTATION • Formal adoption of the revised targets under the Protocol on Water and Health COUNTRY INVESTMENT BUDGET • Substantial budget volumes are currently unallocated. Effort will be needed to add eligible and WFD-compliant investments. The MS Consortium started in the summer to facilitate selection, preparation and implementation within the remaining EUWI+ project period. CHALLENGES / RECOMMENDATIONS IN UKRAINE
  • 95. 95 REGIONAL COOPERATION The EU-funded Action “European Union Water Initiative Plus for Eastern Partnership Countries (EUWI+ 4 EaP)” is implemented by the UNECE, OECD, responsible for the implementation of Result 1 and an EU member state consortium of Austria and France responsible for the implementation of Result 2 and 3. This document was produced by UNECE and/or OECD and/or the EU member state consortium with the financial assistance of the European Union. The views expressed herein can in no way be taken to reflect the official opinion of the European Union or the Governments of the Eastern Partnership Countries. This document and any map included herein are without prejudice to the status of, or sovereignty over, any territory, to the delimitation of international frontiers and boundaries, and to the name of any territory, city or area.
  • 96. 96 • Transboundary cooperation supported in the Kura, Neman, Dniester, Western Dvina/Daugava, Khrami-Debed, Danube (ICPDR) basins • Capacity development event on Water Strategy preparation under high risks and uncertainty (synergy with another regional project funded by Norway) • Exchange of experience in reform of rural WSS at the EUWI+ side-event at the International water forum in Minsk • Special session, organised by EUWI+ on 7 June 2019 at the 15th Environmental Forum in Novogrudok, Belarus RESULT 1
  • 97. 97 • Training opportunities provided at the regional trainings/events under the Water Convention and the Protocol on Water and Health (reporting on SDG 6.5.2, reporting under the Protocol and the Water Convention, WG on IWRM, etc.) • A regional training on Synergies and joint implementation of the Protocol on Water and Health, related EU Directives and SDGs in the Eastern Partnership countries was held in Geneva on 2 April 2019 • Special session on EUWI+ at the Working Group on IWRM (Geneva, 23 October 2019) • Side-event and special session at the Water Convention MOP (October 2018) • Side-event and special session at the Protocol on Water and Health MOP (19-20 November 2019) RESULT 1
  • 98. 98 LABORATORY DEVELOPMENT • Joint participation in laboratory proficiency testing • Harmonised high-level laboratory quality management system • Coordinated steps towards international EN ISO 17025:2017 laboratory standard MONITORING OF SURFACE AND GROUNDWATER AND COASTAL & TRANSITIONAL WATERS • Building up of an updated comprehensive knowledge base about the ecological status of international River Basin Districts as a starting point for coordinating all water protection, sustainable uses and effective mitigation measures REGIONAL CAPACITY BUILDING • Series of regional and sub-regional trainings and joint study tours, which build up a common technical understanding of WFD/IWRM implementation and a more coordinated approximation of EU water policies from the expert level up to decision-makers REGIONAL RIVER BASIN MANAGEMENT • Start of transboundary water management, including first monitorings at the BY-UA Pripyat river (groundwater) and the AM-GE Khrami-Debed basin (surface water) as well as harmonised water body delineations (MD-RO) • Better coordination with and more competent engagement in other regional initiatives, such as in EMBLAS (monitoring at GE coastal waters) RESULT 2
  • 99. 99 HARMONISED RBMP DEVELOPMENT IN TRANSBOUNDARY BASINS • Harmonised process between the 6 countries (ToR, schedule, workshops topics, etc) • Regional workshops: economic analysis, programme of measures on-line seminar • Dnieper Basin Council in Belarus with Ukrainian delegation, cooperation for Dnieper/Dnipro/Pripya RBMP • Technical exchange for the harmonisation of the RBMP for the Prut basin (delineation of the water bodies on the main river course, cross-reading of the RBMP documents, etc) DATA MANAGEMENT • Promote common strategy: Apply the SEIS principles, supporting the development of national data management strategies, develop data exchanges • Target common regional objectives: improve access to the datasets, facilitate SEIS and RBMP implementation indicators production, supporting the dissemination of information to partners and to the public RESULT 2
  • 100. 100 RESULT 3 STAKEHOLDER INVOLVEMENT FOR PARTICIPATIVE RBMP DEVELOPMENT • Guidance document about participative RBMP is under preparation. • Production of awareness-raising materials (factsheets, thematic summary, infographics, cartoons) • Professional consultant hired in every country (except Belarus): assistance to R3 activities at national scale: • main consultations in river basins • outreach events and awareness-raising campaigns • ensuring EUWI+ and EU visibility in the country COMMUNICATION AND AWARENESS RAISING (Sept 2018- Aug 2019) • Increase of outreach activities: 21 in the 6 countries, 8 700 people reached • Increase of EUWI+ website visits (+11 235) and EUWI+ FaceBook (+ 200 followers, 484 in total) • Visibility of EUWI+ and EU action in progress • Tools and organisation for regular monitoring and planning of upcoming events (milestones for key EUWI+ results : Lab events and RBMP final document)  More about communication and visibility in session 4 presentation
  • 101. 101 EUWI+ WEBSITE AND SOCIAL NETWORKS EUWI+ website https://www.euwipluseast.eu/en/ EUWI+ FaceBook page https://www.facebook.com/euwiplus/ FaceBook Group The Dnipro Unites https://www.facebook.com/groups/Dniprounites/?ref=br_rs FaceBook Group Clean Rivers for a Healthy Future - Caucasus https://www.facebook.com/groups/764028737267175/
  • 102. 102 PROJECT MANAGEMENT REQUEST FOR 6 MONTHS PROJECT EXTENSION • EUWI+ is currently scheduled to finish in August 2020. Various delays during project execution have triggered a request for a 6 months cost-neutral extension to February 2021. • DG Near was approached by the EUWI+ partners in October 2019 to request the extension and this is under consideration. • This extra period will facilitate full use of available funds and to complete capacity building activities (e.g. execution of offered extra trainings, additional surveys, improvement of information in the RBMPs).
  • 103. 103 Action to be taken Link to ROM recommendation Status Remarks Improve the Log-frame and make it part of amended contracts R2 Addendum approval is ongoing  The Log-frame was completely revised based on EU best practice examples as provided by DG Near.  The new Log-frame is part of an addendum application which was sent to DG Near on 23 October 2019 Invite IPs to ensure a more active participation of other Member States in the implementation and define operational procedures that would enhance the quality of products and contribution to key products by all IPs R3 Ongoing  A specific focus was set on the inclusion of additional EU MS experts. Active cooperation and know-how transfer in the EaP Countries with Croatia on costal water management and Romania for the cooperation with Moldova for the harmonisation of Prut RBMP has been developed. Other actions led to planning for study tours to EU MS countries outside the IPs (to HR, PT, SP), participation of selected EU MS experts in NPD meetings (from EST, BG, PL) and ensuring the participation of the beneficiary to international meetings (e.g. INBO, Water Convention and Protocol on Water and Health, Green Action TF, ICPDR) where they could exchange with practitioners from EU Members States. Result 1 International Partners involved experts from EU Member States/Western European Countries in activities on legislative, institutional and normative support to partner countries (LIT, FR, EST, AT, CZ, NO).  Coordination meetings between IPs have been organised including in early September 2018 and in February 2019, and specifically on communication and visibility in June 2019, in order to enhance the integration of inputs from the IP and the quality of products. Cooperation in areas requiring inputs of all IPs enhanced (e.g. CEPA implementation roadmap (AM), SEA of Alazani-Iori RBMP (GE), etc). Joint products of all IPs produced under visibility (NPD leaflet, Protocol on Water and Health targets (UA), joint side-events, inputs to regional trainings, etc. Address the issue of how the programmes of measures could be financed as part of work on Water Strategies and river basin management plans R5 Ongoing  Result 1 international partners (OECD and UNECE) continue supporting the development of national Water Strategies and/or Water Laws, etc. which would contribute to sustainable financing of the water sectors.  2 regional trainings have been organised for Eastern Europe countries in Kyiv in March 2019 and Caucasus countries in Tbilisi in April 2019 on economic analysis related to RBMP development including IOW and OECD experts participation. RESULT ORIENTED MONITORING (ROM) REVIEW 2018 Current Status of Follow-up Plan ROM recommendations
  • 104. 104 STRONG COMMITMENT AND POLITICAL WILL REQUIRED TO DEEPEN TRANSBOUNDARY COOPERATION • e.g. for bilateral agreements ONGOING ISSUE OF HARMONIZATION IN TRANSBOUNDARY COORDINATION • Technical issues, such as Typology, Delineation, Monitoring systems, Status classification etc.) • Political issues DIFFERENT / COMMON (?) VOCABULARY, DIFFERENT NATIONAL VISIONS AND STRATEGIES CHALLENGES TO REGIONAL COOPERATION
  • 105. 105 www.euwipluseast.eu www.facebook.com/euwiplus/ THANK YOU! UNECE Alisher Mamadzhanov, Christine Kitzler OECD Matthew Griffiths, Tatiana Efimova, Alexander Martousevitch EU Member State Consortium Lead UBA (AT): Alexander Zinke IOW (FR) : Stéphanie Laronde, Pierre Henry de Villeneuve, Philippe Seguin Any Questions? please contact the responsible project leaders