2. Air to water heat pumps
Heat pump installed capacity: 350kw
Underfloor heating cooling area: 3.560 sq.m.
Year of construction: 2008
Commercial building “Silver”, Thessaloniki Greece – Air to water heat pumps
4. Industrial building, Thessaloniki Greece - Air to water heat pump
Air to water heat pump
Heat pump installed capacity: 70kw
Underfloor heating cooling area: 690 sq.m.
Year of construction: 2009
5. Industrial building “Biston”, Thessaloniki Greece – Hybrid heating and cooling system
Air-to-water heat pumps, solar thermal and a
net-metering PV system
Distribution systems: Fancoil units
Year of construction: 2013
6. Hybrid heating and cooling system, combining
geothermal with air-to-water heat pumps, solar
heating and a net-metering PV system
Distribution systems: Underfloor heating -
cooling 3.500 sq.m. and
fancoil units
Year of construction: 2014-2015
Nursing Home, Serres Greece – Zero CO2 emissions building
7. Miraggio Hotel, Chalkidiki Greece - All mechanical aspects
Installation of all equipment, mechanical, piping,
plumbing, fire protection, HVAC, for a total
covering area of 35.000 sq.m.
Year of construction: 2015-2016