1. C.VC.V
NAVEED ASIFNAVEED ASIF
Chief SurveyorChief Surveyor
Ph. #. +971503219097 / +971557175339
E-mail: naveed_nf2002@yahoo.com
Abu Dhabi, U.A.E
EXPERIENCE SUMMARYEXPERIENCE SUMMARY
Self-motivated fast learner and efficient worker with more than 12 years experience of Surveying in Civil Industry. Where
more than 11 years in the U.A.E, with proven endurance and determination to work long hours with less supervision.
Capable of working on Construction of infrastructure projects like Roads, and Bridges.
ACADEMIC QUALIFICATION.ACADEMIC QUALIFICATION.
Diploma in Land Surveying (Technical Board Peshawar)
Faculty of Science of Pakistan.
Secondary School Certificate: BISE, Abbott Abad Pakistan.
COMPUTER SKILLSCOMPUTER SKILLS
Windows XP , Vista , Widow 7, Auto Cad
MS Micro station office (word, Excel, Power Point) & internet browsing...
SURVEYING INSTRUMENTSSURVEYING INSTRUMENTS
Having a special command on Lieca GPS 1200 (Global Positioning System) and different kind of Total Stations like Lieca.
Sokkia & Topcon models & different kinds of Theodolites & Auto Levels and Laser Level.
KEY STRENGTHS DESCIPTIONKEY STRENGTHS DESCIPTION
♦ More than 12 years professional experience of Land Surveyor, & Senior Land Surveyor Working with Ghantoot
Transport & Gen Contracting (Road Section) as a Chief Surveyor since 2006.
♦ Establishment of control points, Bench Marks with Static Survey Local Survey.
♦ Ability to calculate close Traverse and Bench mark both by Manual and by instrument.
♦ Ability to calculate the coordinates of all kind of curves and super elevation by manual, by programmers & by
computer formulas.
♦ Ability to do the Topographical survey, all kind of setting out, horizontal & vertical alignments and contour survey
by GPS and by Total Station.
♦ Overseeing the collation of project survey services, meeting the design and construction requirements.
♦ Implementation of all surveying works at site according to the approved drawings, specifications and quality
management plan, ensuring all design coordinates are mapped accurately against the outlined specifications for
accuracy in measurement.
1
2. ♦ Coordinate and assist the survey and Drafting team to ensure timely completion of all work. Maintain, coach and
develop the survey team for the prompt, accurate and efficient survey services throughout the project.
♦ Ensure all survey instruments are calibrated and maintained in order to get high level of accuracy and survey
equipment & systems are upgraded and latest technology used to continually improve the survey standards.
♦ Coordinate with safety department for the implementation of safety policies and procedures related to surveying
works on site.
♦ Ability to quickly adapt complex corporate environments and to maintain high quality standards of performance in
time and cost constraints.
♦ Ability to establish and maintain professional relationships with clients, colleagues and external bodies.
♦ Well conversant with AutoCAD and ability to download & process the data from GPS/total station to PC.
♦ Committed to excellence.
PROFESSIONAL EXPERIENCE DETAILSPROFESSIONAL EXPERIENCE DETAILS
GHANTOOT TRANSPORT & GENERAL CONTRACTING
ESTABLISHMENT ABU DHABI since 2006 till Date
1)
Abu Dhabi Dubai Emirates road (E311 package A)
August 2014 till date
Client: Masanda
Consultant: AECOM
Sub Contractor:- CCECC(Chinese)
Project Cost: 2.1 Billion AED.
Nature of Duties:-
Position: - Chief Surveyor
Report: - Project Manager
Supervise: - Land Surveyors & Draughtsman.
Scope of work:
Project includes the construction of 37 kilometer of new 4 lane dual carriage way highway
with value of AED 2.1 Billion. (Included Interchange # J1 (with 1 bridge) J2,(with 1 bridge)
J3, (with 6 Bridges) including 6 culvert for Gas and Petroleum Pipe Lines Protection
Structure for Gasco & Dolphin Pipe Line and 5 camel Underpasses
Responsibilities:-
• Responsible for all kind of surveying work like topographical surveying, Establishment of Control points, Marking
of Center lines and monitoring of survey team and solving surveying issue at site, calculating coordinates and
levels of all kind curves, gridlines and any kind of structure work for the surveyors.
• Supervising project entire surveying team.
• Coordinating with the Sub-Contractor’s surveyor on work priorities and schedules.
• Marking of setting out line of Bridges with reference of construction drawings.
• Locating the pile location as per designed Co-ordinates.
• Locating the Retaining walls of the Bridge.
• Locating the MSE Walls near Bridges, Camel under Passes.
• Correspondence & Dealing with the AECOM Consult Engineers.
• Checking Shop drawings, Profile drawings preparing As Built Drawings.
• Daily reports of works to site Manager.
2
3. • Preparing drawings for Bridges, Camel under passes and MSE Walls & other documents for next day task in
advance.
• Handling of all kind of Quantities of Road including Structure Works.
• Expert in calculating quantities of Cut Fill Material & Structural Backfilling material by latest computer software
like AUTOCAD.
2)
Maintenance Rehabilitation Work for Abu Dhabi
Strategic Roads Zone 1 Abu Dhabi Region.
Contract No : DOT/C/HW/233/09.
Client : Department of Transport Abu Dhabi.
Consultant : Consult Parsons
: August 2012 to August 2014
Nature of Duties:-
Position: - Chief Surveyor
Report: - Project Manager
Supervise: - Land Surveyors & Draughtsman.
Scope of Work:
: Improving the Existing Conditions of Roads Bridges in Abu Dhabi Strategic
Roads Zone 1 Abu Dhabi Region.
Work includes the removal of existing pavement, Side Walks, Humps,
Paving, drainage, lighting, Signing, Pavement, Marking and Striping,
Utility. Relocation and Protection other Construction Topography, Setting
Out Lay Out and Leveling.
Responsibilities:-
• Reporting & advising on all matters relating to Survey Standards, Procedure’s, and Personnel & Equipment
Control.
• Supervising project entire surveying team.
• Checking Shop drawings, Profile drawings preparing As Built Drawings.
• Daily reports of works to site Manager.
• Preparing drawings & other documents for next day task in advance.
3)
Khalifa port & Industrial Zone (KPIZ) project (Taweelah)
Industrial Zone Area A-Secondary Infrastructure Phase-1
Packege-1 Contract no. 1001-291
Client: - ADPC (Abu Dhabi Port Company)
PMC: - Bechtel International
Project Cost 288 M AED
Nature of Duties:-
Position: - Chief Surveyor
Report: - Project Manager
Supervise: - Land Surveyors & Draughtsman.
Scope of Work:
3
4. Project Scope of Work includes the construction of permanent & Temporary Roads, Electrical
works, telecommunication network, Pumping Station, Combined Waste Water Network
including supply and installation of Pipelines, Storm Water & Ground Water Network,
Potable water & Firefighting network, Ducts, sleeves, protection, road signs and pavement
marking
Responsibilities:-
• Topographic Survey
• Setting Out of Central Line
• Triangulation Survey, Traversing
• Establishing of Bench Mark
• Supervising project entire surveying team.
• Marking of Center line and reference points for new road.
• Marking of central line for storm water, sewerage & Water lines.
• Mark out Round About at different Location.
4)
Mafraq-Ghuwaifat Border Post Highway Project at Al-Ruwais (UAE)
Oct, 2008 till Feb, 2012
Client: Department of Transport (DOT)
Consultant: Consult Maunsell AECOM
PMC: Mot Macdonald
Sub Contractor CCECC(Chinese)
Project Cost: 2.9 Billion AED.
Nature of Duties:-
Position: - Chief Surveyor
Report: - Project Manager
Supervise: - Land Surveyors & Draughtsman.
Scope of work:
Project includes the construction of 54 kilometer of new freeway at Ruwais to bypass the
existing Mafraq-Ghuwaifat Border Post highway and perform improvement of 20 km
existing Mafraq-Ghwaifat highway. Link Road from new Proposed Road to Jabel Al-Dhana
10 kilometer with value of AED 2.895 Billions. (Included Interchange # ENEC, 4B, 05, 06 &
07, Two Bridges (Bridge # 03 & Utility Bridge for Gas and Petroleum Pipe Lines), Protection
Structure for Gasco Pipe Line and Ten Military Underpasses
Responsibilities:-
• Establishing primary horizontal and vertical control points including reference ties for establishing the points in
the field.
• Coordinating with the Sub-Contractor’s surveyor on work priorities and schedules.
• Reporting discrepancies or technical problems to site manager.
• Correspondence & Dealing with the AECOM Consult Engineers.
• Marking of setting out line of Bridges with reference of construction drawings.
• Locating the pile location as per designed Co-ordinates.
• Locating the Retaining walls of the Bridge.
• Locating the MSE Walls near military under passes and Utility Bridge.
• Setting stakes for construction on the bases of plans prepared by designers and/or engineers.
4
5. • Marking of Center line and reference points for new road.
• Take off OGL (Original Ground Levels) of proposed Bridges.
• Taking off Co-ordinates of existing utilities like Electrical Cables, Fiber Optics Cables, Irrigation lines, water lines
and Existing Oil and Gas lines.
• Layout for Gayathi Link Road.
• Marking of setting out line of Bridges with reference of construction drawings.
• Locating the pile location as per designed Co-ordinates.
• Mark out Round About at different interchanges.
• Checking Shop drawings, Profile drawings preparing As Built Drawings.
5)
PROJECT: MAINTENANCE, IMPROVEMENT AND DUALIZATION OF
AL-MADAM SHWEIB ROAD (SHARJA, AL-AIN)
Sept 2006 to Sept 2008. (Completed)
Consultants Ital consult Pvt Ltd.
Clients Ministry of Public works Dubai
Sub Contractor CCECC(Chinese)
Project Cost: 110M AED
Nature of Duties:-
Position: - Senior Land Surveyor
Report: - Chief Surveyor & Site Manager
Supervise: - Land Surveyors & Draughtsman
Scope of Work:
Construction of 20 km four lane Road including Bridges, Camel Underpasses,
Street Light and Electrical Distribution works. Storm water and Irrigation,
Protection Dolphin Gas Pipe lines and Transco Water Pipe line
Responsibilities:-
• Worked as land surveyor Maintenance & Dualization of Al-Madam Shweib Road Checking of TBM with
reference to Municipality Bench Marks
• Marking of Center line and reference points for new road
• Take off OGL (Original Ground Levels) of proposed Bridge, utility & camel underpasses.
• Marking center line for storm water.
• Taking off Co-ordinates of existing utilities like Electrical Cables, Fiber Optics Cables, Irrigation lines, water lines
and Existing Oil and Gas lines.
• Layout for Madam Shweib Roads.
• Marking of setting out line of Bridge, utility bridge & camel under passes with reference of construction
drawings.
• Marking location of piles for utility bridge.
• Locating the Retaining walls of the Bridge & camel underpasses.
• Mark out Round About at madam shweib Road.
• Assist to Project Engineer to make shop drawings for Bridge, utility bridge & camel Underpasses.
6)
5
6. M/S AL-MUHAIRY GEN CONT. COMPANY ABU DHABI
June 2003 to Oct 2005
Consultants M/S Delew Cather
Clients Municipality of Abu Dhabi
Project Cost 1000M AED
Nature of Duties:-
Position: - Land Surveyor
Report: - Chief Surveyor
Scope of Work
Construction of 6 km Dual Carriage way, 3 Tunnels, 1 Bridge, 11 Pedestrians
Underpasses, 60 Water features, 75 Km of storm water drainage, including a
9000 m2 fresh water lake and 30 m high marine fountain, 600,000 m2 soft
landscaping, 75 Sun Shelters, 20 children play areas with 100 Pieces of
playground equipment, 34000 m2 of decorative stones and pavers for walk
ways.
Responsibilities:-
• Worked as land surveyor.
• Checking of TBM with reference to Municipality Bench Marks
• Marking of setting out line of whole project with reference of construction drawings.
• Marking of central line for storm water, sewerage & Water lines.
• Taking off Co-ordinates of existing utilities like Electrical Cables,
• Fiber Optics Cables, Irrigation lines & water lines
• Marking of Center line and reference points for new road
• Take off OGL (Original Ground Levels) of proposed Bridge, tunnels,
• pedestrian underpasses & fresh water lake
• Marking location of pedestrian underpasses, irrigation, reservation, tunnels & six lane roads.
• Setting out points for the Parking, Round about & Roads.
• Marking of points for the fresh water lake according to the prescribed design.
• Pile locating of Tunnels.
7)
GHAZI BROTHA CONSTRUCTION LTD (PAKISTAN)
June 2002 to May 2003
Consultants Pakistan Hydro Consultant
Client Municipality of Pakistan
Project Cost 2.20B US $
Scope of Work
6
7. Ghazi Barotha Hydropower project is a 1450 MW Hydropower project. Which
consist 52 KM long Concrete Lined Channel with a discharge Capacity of 56000
Cusecs Construction of four lane road, 52 km water Channel, 32 Bridges,
Spillways, 12 pedestrian crossings over the water channel & Drainage system. A
Barrage was constructed on Indus River at Ghazi for water Diversion into the
Channel. The Powerhouse was located at Barotha. The project had estimated
cost of 2.20 Billion $.
Responsibilities:-
• Worked as Asstt. Land surveyor.
• Checking of TBM with reference to Municipality Bench Marks
• Marking of Center line and reference points for new road.
• Take off OGL (Original Ground Levels).
• Setting out central line for drainage & Roads.
• Maintain the elevation for drainage system.
PERSONAL INFORMATIONPERSONAL INFORMATION
Name: Naveed Asif
Father Name: Sher Asif
Gender: Male
Marital Status: Married
Nationality: Pakistani
Religion: Islam
Driving License: Light Duty Driving License from U.A.E.
Languages: English, Arabic, Urdu/Hindi, Punjabi.
REFERENCEREFERENCE
Can be furnished upon request.
7