ROLES & RESPONSIBILTIES OF A QA/QC Manager as a QualityManagement system
PURPOSES
This, documentisto define QualityAssurance/QualityControl SectionOrganizationalstructure,
procedure,processesandresourcesneedtomeasuresthe effectivenessof servicesfor
GHANTOOT GroupBuildingDivisionAl- JazeeraTower / Residential TowerProjects,Abu Dhabi
Corniche,Moreoverto developandmaintainanorganizational systemwhichprovides quality
assurance and auditthrougheveryareaof the sectionwhile optimizingthe processof
production.
These processesbenefitthe organizationcommunityand leadtoQA/QCsatisfaction.
1.0: SCOPE
this,documentdescribesthe QA/QCProceduresand scope of work that are inthe line with
M/s: GHANTOOTN groupBuildingdivision objectivesof maintaininghighstandardqualityfor
Private andGovernmental Organization, Ministryof interior,Ministryof Justice & Peace Projects
inaccordance with Local regulations,Abu Dhabi municipality,ESTIDAMA, Ministryof Interior
Civil defense,Dubai Municipality,CED- TRAKHEES & International standards.
2.0: RESPONSIBILITY
Quality Assurance/ QualityControl Section
To, make sure that all constructionmaterialsandrelatedapplicationsconfirmstoapplicable
standards,code of engineeringpractice andLocal Regulations.
3.0: Sr. QA/QC MANAGER
1: Developoveralllongtermstrategicobjectivesand QA/QC plan.
2: Monitor the implementationof strategiestooptimizethe short,mediumalongerterm
performance of the Qualitycontrol section.
3: Developandupdate QA/QCControl Forms,systemsandproceduresbykeepingabreastof
international standardsandcodesspecificto the section
4: Reviewmaterial submissionsandchecktheircompliance withprojectspecification,approved
drawingsandrelevantstandards.
5: Reviewandapprove Methodstatements,ITP’Stechnical submissionsforconstruction
materials.
6: Manage a team of QualityinspectionsEngineersandoversee the inspectionprocessesfor
scheduledandunscheduledconstructionmaterial andtheircompliance usedinsites.
7: Conductlaboratorytestingof constructionmaterial andreview the reportsof the same.
8: Settle disputesbetweencontractors.
9: Participate andprovide inputstothe sectionheadforupdatingandupgradingthe applicable
technical manuals/guidelineswithrespecttoqualitycontrol
10: Arrange andparticipate inconductinginhouse andlocal seminars/Forums.
11: Reviewandanalyze testresultsof materials
12: Advise onimprovingqualitycontrol systemsinthe constructionfield
13: Ensure that all projectscomply withthe requirementsof the “Projectspecificationandlocal
Authorityregulation”
14: Randomlyselectspecimensfromsites fortestingatan independentthirdpartylaboratory
to checkcompliance of the materialswithspecifications
15: Witnesstrial mixesandtestingrequestedbyQA/QCManager
16: Leadingthe Qualityteamonsite and coordinatingQualitymatterswiththe contractors
17: Settingupof a QualityAssurance/Qualitycontrol Plan/Procedures
18: Enforcingthe QA systemonGhantoot / subcontractorsthrough Kick- off meetingandsub-
contractor coordinationmeetings
19: Conductingregularexternal andinternal auditsof stakeholders
20: Documentingeachconductedauditandensuringthatthe corrective andpreventiveactions
are implementedandiseffective inaddressingthe contractorsauditor’sfindingorobservations.
21: Contractor shall have todevelopplansandproceduresforvenderandmaterial inspections.
22: Reviewingmanufacturer’sproductsandprovidingrecommendationfor designand
specificationpurposes
23: Reviewingandapprovingof all associatedsupplier’s/manufacturer’sfor GhantootProjects
issuedqualityassurance,qualitycontrol documentations,problemsolvingof fieldinspection
non- conformancesanddeviations fromsupplier’s duringinspectionlifecycle.
24: Chairand documentweeklyqualitycontrol meetingsforcivil/architecture withthe project
control managerand provide writtenminutesasdescribedinprojectspecificationcontract
documents.
25: Coordinate anddocumentthe testing&commissioningof buildingsystemsaspartof site
closeoutprocedure.Coordinate withconstructionteamforfinal Commissioning&testactivities.
26: Advise onthe stoppage of workif necessarytoresolve mattersthataffectsafety,quality
and /or inhibit the logical progressof work.
27: Where appropriate,the qualitymanageradvisesonchangesandtheirimplementationand
providestraining,trainingtoolsandtechniquestoenableotherstoachieve quality.
28: Schedule Qualitycontrol auditsnotlessthanmonthlyanddocumentfindingsinareport.
29: Maintainrecordsof auditsof contractorsand subcontractorsas qualityrecordsandmake
themavailable tothe consultantuponrequest.
30: The monitoringsystemshall applytomaterial andequipmentaswell asdocumentation,
installationandconstructionwhichfail toconformtothe Contract Documents.
31: QA/QC Manager shall be informby Consultant's&Sub-Contractorswiththe followingfor
non-compliance:
32: Identificationof non-compliance
33: Descriptionof non-compliance
34: Evaluationof non-compliance
35: Recommendedcorrectiveaction
36: Date non-conformance wasidentified
37: date corrective actionwascompleted
38:Descriptionof final corrective action
39: Consultantapproval
40: QA/QC Manager shall have to provisionaconducta factory Inspectioninordertoverifythe
actual products,productconformity,Productioncapacity,Qualityintegratedmanagement
systeminorderto avoidany deviation&non-compliance toprojectspecification&Local
regulationbeforeanycommencementof activitiesatsites.
Eng. Mukhtar MuhammadJadoon
B.SC.CIVILENGINEERING
M.SC. GEOLOGY, MATERIALS SCIENCE.

More Related Content

What's hot (20)

Mecosoft Product Development Lifecycle
Mecosoft Product Development LifecycleMecosoft Product Development Lifecycle
Mecosoft Product Development Lifecycle
 
CV Eng LTMuniz _QAQC Manager_ 11 Sep, 2016
CV Eng LTMuniz _QAQC Manager_ 11 Sep, 2016CV Eng LTMuniz _QAQC Manager_ 11 Sep, 2016
CV Eng LTMuniz _QAQC Manager_ 11 Sep, 2016
 
Sanjeev cv
Sanjeev   cvSanjeev   cv
Sanjeev cv
 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
 
Quality plan
Quality planQuality plan
Quality plan
 
CV Michael Geer1
CV Michael Geer1CV Michael Geer1
CV Michael Geer1
 
R. Cannell_July 2015
R. Cannell_July 2015R. Cannell_July 2015
R. Cannell_July 2015
 
Donald Wilkinson-Resume
Donald Wilkinson-ResumeDonald Wilkinson-Resume
Donald Wilkinson-Resume
 
Lead Regulatory Engineer
Lead Regulatory EngineerLead Regulatory Engineer
Lead Regulatory Engineer
 
106 quality assurance
106 quality assurance106 quality assurance
106 quality assurance
 
L9 quality assurance and documentation
L9 quality assurance and documentationL9 quality assurance and documentation
L9 quality assurance and documentation
 
Sanjeev - cv
Sanjeev - cvSanjeev - cv
Sanjeev - cv
 
CV_Goh Yeu Shan, Aaron
CV_Goh Yeu Shan, AaronCV_Goh Yeu Shan, Aaron
CV_Goh Yeu Shan, Aaron
 
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
 
Balaji CV - 2015
Balaji CV - 2015Balaji CV - 2015
Balaji CV - 2015
 
Quality assurance versus quality control
Quality assurance versus quality controlQuality assurance versus quality control
Quality assurance versus quality control
 
Qaqc in civil construction
Qaqc in civil constructionQaqc in civil construction
Qaqc in civil construction
 
Quality Assurance & Quality Control
Quality Assurance & Quality ControlQuality Assurance & Quality Control
Quality Assurance & Quality Control
 
Ramon Banaga's Resume
Ramon Banaga's ResumeRamon Banaga's Resume
Ramon Banaga's Resume
 
Sanjeev - cv
Sanjeev - cvSanjeev - cv
Sanjeev - cv
 

Viewers also liked

Los cuatro acuerdos - diapositiva - Jesús E. Camacho
Los cuatro acuerdos - diapositiva -  Jesús E. CamachoLos cuatro acuerdos - diapositiva -  Jesús E. Camacho
Los cuatro acuerdos - diapositiva - Jesús E. Camachokmacho94
 
RESEÑA "PENSAMIENTO Y LENGUAJE DE VYGOTSKI"
RESEÑA "PENSAMIENTO Y LENGUAJE DE VYGOTSKI"RESEÑA "PENSAMIENTO Y LENGUAJE DE VYGOTSKI"
RESEÑA "PENSAMIENTO Y LENGUAJE DE VYGOTSKI"Grecia Villegas
 
10 home remedies for asthma wheezing
10 home remedies for asthma wheezing10 home remedies for asthma wheezing
10 home remedies for asthma wheezingBuy Drug Pharmacy
 
Pitstop een wereld te winnen met lean
Pitstop een wereld te winnen met lean Pitstop een wereld te winnen met lean
Pitstop een wereld te winnen met lean vwiegel
 
The State of Corporate Social Media 2012
The State of Corporate Social Media 2012The State of Corporate Social Media 2012
The State of Corporate Social Media 2012Nick Johnson
 
10 home remedies for skin tags
10 home remedies for skin tags10 home remedies for skin tags
10 home remedies for skin tagsBuy Drug Pharmacy
 

Viewers also liked (12)

инглищ
инглищинглищ
инглищ
 
CV_BRIAN_2015
CV_BRIAN_2015CV_BRIAN_2015
CV_BRIAN_2015
 
Lean Kaizen and Kaizen Charters
Lean Kaizen and Kaizen ChartersLean Kaizen and Kaizen Charters
Lean Kaizen and Kaizen Charters
 
scan0310
scan0310scan0310
scan0310
 
Los cuatro acuerdos - diapositiva - Jesús E. Camacho
Los cuatro acuerdos - diapositiva -  Jesús E. CamachoLos cuatro acuerdos - diapositiva -  Jesús E. Camacho
Los cuatro acuerdos - diapositiva - Jesús E. Camacho
 
RESEÑA "PENSAMIENTO Y LENGUAJE DE VYGOTSKI"
RESEÑA "PENSAMIENTO Y LENGUAJE DE VYGOTSKI"RESEÑA "PENSAMIENTO Y LENGUAJE DE VYGOTSKI"
RESEÑA "PENSAMIENTO Y LENGUAJE DE VYGOTSKI"
 
10 home remedies for asthma wheezing
10 home remedies for asthma wheezing10 home remedies for asthma wheezing
10 home remedies for asthma wheezing
 
Pitstop een wereld te winnen met lean
Pitstop een wereld te winnen met lean Pitstop een wereld te winnen met lean
Pitstop een wereld te winnen met lean
 
Hoshin ISM 100615v7
Hoshin ISM 100615v7Hoshin ISM 100615v7
Hoshin ISM 100615v7
 
The State of Corporate Social Media 2012
The State of Corporate Social Media 2012The State of Corporate Social Media 2012
The State of Corporate Social Media 2012
 
10 home remedies for skin tags
10 home remedies for skin tags10 home remedies for skin tags
10 home remedies for skin tags
 
Lean Manga. Hoshin Kanri
Lean Manga. Hoshin KanriLean Manga. Hoshin Kanri
Lean Manga. Hoshin Kanri
 

Similar to JOB DESCRIPTION (1)

QA QC Overview CPOU_Final Rev 1
QA QC Overview CPOU_Final Rev 1QA QC Overview CPOU_Final Rev 1
QA QC Overview CPOU_Final Rev 1Thomas Wilson
 
INSPECTION COORDINATOR
INSPECTION COORDINATORINSPECTION COORDINATOR
INSPECTION COORDINATORJobby Abraham
 
Quality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementQuality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementEdwinJacob5
 
Quality assurance documentation
Quality assurance documentationQuality assurance documentation
Quality assurance documentationImran Jamil
 
Mitra matra iatf 16949 honda module 6
Mitra matra iatf 16949 honda module 6Mitra matra iatf 16949 honda module 6
Mitra matra iatf 16949 honda module 6DANANG WID
 
Quality Management System ISO 9001 Interpretation and Internal Audit
Quality Management System ISO 9001 Interpretation and Internal AuditQuality Management System ISO 9001 Interpretation and Internal Audit
Quality Management System ISO 9001 Interpretation and Internal AuditDinar Surtikarani
 
CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016Dayananda Hebbar
 
validation and verification of medical device.pptx
validation and verification of medical device.pptxvalidation and verification of medical device.pptx
validation and verification of medical device.pptxGargiVaghela
 
BIM quality-moser_Architectural_QA-QC_brief.r1
BIM quality-moser_Architectural_QA-QC_brief.r1BIM quality-moser_Architectural_QA-QC_brief.r1
BIM quality-moser_Architectural_QA-QC_brief.r1Cliff Moser
 
MDSAP Certification: Success and Failures
MDSAP Certification: Success and FailuresMDSAP Certification: Success and Failures
MDSAP Certification: Success and FailuresGreenlight Guru
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality ManagementSAJJAD KHUDHUR ABBAS
 
Lab&production quality control manual
Lab&production quality control manualLab&production quality control manual
Lab&production quality control manualHumphrey muiruri
 
Lab&production quality controll manual
Lab&production quality controll manualLab&production quality controll manual
Lab&production quality controll manualHumphrey muiruri
 
Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...IRJET Journal
 

Similar to JOB DESCRIPTION (1) (20)

QA QC Overview CPOU_Final Rev 1
QA QC Overview CPOU_Final Rev 1QA QC Overview CPOU_Final Rev 1
QA QC Overview CPOU_Final Rev 1
 
INSPECTION COORDINATOR
INSPECTION COORDINATORINSPECTION COORDINATOR
INSPECTION COORDINATOR
 
CV_QC_Mahaboob khan (2)
CV_QC_Mahaboob khan (2)CV_QC_Mahaboob khan (2)
CV_QC_Mahaboob khan (2)
 
Quality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementQuality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract management
 
Quality assurance documentation
Quality assurance documentationQuality assurance documentation
Quality assurance documentation
 
Chirag's CV as on 13-05-2015
Chirag's CV  as on 13-05-2015Chirag's CV  as on 13-05-2015
Chirag's CV as on 13-05-2015
 
Mitra matra iatf 16949 honda module 6
Mitra matra iatf 16949 honda module 6Mitra matra iatf 16949 honda module 6
Mitra matra iatf 16949 honda module 6
 
Quality Management System ISO 9001 Interpretation and Internal Audit
Quality Management System ISO 9001 Interpretation and Internal AuditQuality Management System ISO 9001 Interpretation and Internal Audit
Quality Management System ISO 9001 Interpretation and Internal Audit
 
CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016
 
validation and verification of medical device.pptx
validation and verification of medical device.pptxvalidation and verification of medical device.pptx
validation and verification of medical device.pptx
 
UPDATED RESUME 2016
UPDATED RESUME 2016UPDATED RESUME 2016
UPDATED RESUME 2016
 
BIM quality-moser_Architectural_QA-QC_brief.r1
BIM quality-moser_Architectural_QA-QC_brief.r1BIM quality-moser_Architectural_QA-QC_brief.r1
BIM quality-moser_Architectural_QA-QC_brief.r1
 
MDSAP Certification: Success and Failures
MDSAP Certification: Success and FailuresMDSAP Certification: Success and Failures
MDSAP Certification: Success and Failures
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality Management
 
57086 15 quality
57086 15 quality57086 15 quality
57086 15 quality
 
Quality manual
Quality manualQuality manual
Quality manual
 
Lab&production quality control manual
Lab&production quality control manualLab&production quality control manual
Lab&production quality control manual
 
Lab&production quality controll manual
Lab&production quality controll manualLab&production quality controll manual
Lab&production quality controll manual
 
RESUME QA QC ENGG
RESUME  QA  QC ENGGRESUME  QA  QC ENGG
RESUME QA QC ENGG
 
Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...
 

JOB DESCRIPTION (1)

  • 1. ROLES & RESPONSIBILTIES OF A QA/QC Manager as a QualityManagement system PURPOSES This, documentisto define QualityAssurance/QualityControl SectionOrganizationalstructure, procedure,processesandresourcesneedtomeasuresthe effectivenessof servicesfor GHANTOOT GroupBuildingDivisionAl- JazeeraTower / Residential TowerProjects,Abu Dhabi Corniche,Moreoverto developandmaintainanorganizational systemwhichprovides quality assurance and auditthrougheveryareaof the sectionwhile optimizingthe processof production. These processesbenefitthe organizationcommunityand leadtoQA/QCsatisfaction. 1.0: SCOPE this,documentdescribesthe QA/QCProceduresand scope of work that are inthe line with M/s: GHANTOOTN groupBuildingdivision objectivesof maintaininghighstandardqualityfor Private andGovernmental Organization, Ministryof interior,Ministryof Justice & Peace Projects inaccordance with Local regulations,Abu Dhabi municipality,ESTIDAMA, Ministryof Interior Civil defense,Dubai Municipality,CED- TRAKHEES & International standards. 2.0: RESPONSIBILITY Quality Assurance/ QualityControl Section To, make sure that all constructionmaterialsandrelatedapplicationsconfirmstoapplicable standards,code of engineeringpractice andLocal Regulations. 3.0: Sr. QA/QC MANAGER 1: Developoveralllongtermstrategicobjectivesand QA/QC plan. 2: Monitor the implementationof strategiestooptimizethe short,mediumalongerterm performance of the Qualitycontrol section. 3: Developandupdate QA/QCControl Forms,systemsandproceduresbykeepingabreastof international standardsandcodesspecificto the section 4: Reviewmaterial submissionsandchecktheircompliance withprojectspecification,approved drawingsandrelevantstandards. 5: Reviewandapprove Methodstatements,ITP’Stechnical submissionsforconstruction materials. 6: Manage a team of QualityinspectionsEngineersandoversee the inspectionprocessesfor scheduledandunscheduledconstructionmaterial andtheircompliance usedinsites. 7: Conductlaboratorytestingof constructionmaterial andreview the reportsof the same. 8: Settle disputesbetweencontractors. 9: Participate andprovide inputstothe sectionheadforupdatingandupgradingthe applicable technical manuals/guidelineswithrespecttoqualitycontrol 10: Arrange andparticipate inconductinginhouse andlocal seminars/Forums. 11: Reviewandanalyze testresultsof materials 12: Advise onimprovingqualitycontrol systemsinthe constructionfield 13: Ensure that all projectscomply withthe requirementsof the “Projectspecificationandlocal Authorityregulation” 14: Randomlyselectspecimensfromsites fortestingatan independentthirdpartylaboratory
  • 2. to checkcompliance of the materialswithspecifications 15: Witnesstrial mixesandtestingrequestedbyQA/QCManager 16: Leadingthe Qualityteamonsite and coordinatingQualitymatterswiththe contractors 17: Settingupof a QualityAssurance/Qualitycontrol Plan/Procedures 18: Enforcingthe QA systemonGhantoot / subcontractorsthrough Kick- off meetingandsub- contractor coordinationmeetings 19: Conductingregularexternal andinternal auditsof stakeholders 20: Documentingeachconductedauditandensuringthatthe corrective andpreventiveactions are implementedandiseffective inaddressingthe contractorsauditor’sfindingorobservations. 21: Contractor shall have todevelopplansandproceduresforvenderandmaterial inspections. 22: Reviewingmanufacturer’sproductsandprovidingrecommendationfor designand specificationpurposes 23: Reviewingandapprovingof all associatedsupplier’s/manufacturer’sfor GhantootProjects issuedqualityassurance,qualitycontrol documentations,problemsolvingof fieldinspection non- conformancesanddeviations fromsupplier’s duringinspectionlifecycle. 24: Chairand documentweeklyqualitycontrol meetingsforcivil/architecture withthe project control managerand provide writtenminutesasdescribedinprojectspecificationcontract documents. 25: Coordinate anddocumentthe testing&commissioningof buildingsystemsaspartof site closeoutprocedure.Coordinate withconstructionteamforfinal Commissioning&testactivities. 26: Advise onthe stoppage of workif necessarytoresolve mattersthataffectsafety,quality and /or inhibit the logical progressof work. 27: Where appropriate,the qualitymanageradvisesonchangesandtheirimplementationand providestraining,trainingtoolsandtechniquestoenableotherstoachieve quality. 28: Schedule Qualitycontrol auditsnotlessthanmonthlyanddocumentfindingsinareport. 29: Maintainrecordsof auditsof contractorsand subcontractorsas qualityrecordsandmake themavailable tothe consultantuponrequest. 30: The monitoringsystemshall applytomaterial andequipmentaswell asdocumentation, installationandconstructionwhichfail toconformtothe Contract Documents. 31: QA/QC Manager shall be informby Consultant's&Sub-Contractorswiththe followingfor non-compliance: 32: Identificationof non-compliance 33: Descriptionof non-compliance 34: Evaluationof non-compliance 35: Recommendedcorrectiveaction 36: Date non-conformance wasidentified 37: date corrective actionwascompleted 38:Descriptionof final corrective action 39: Consultantapproval 40: QA/QC Manager shall have to provisionaconducta factory Inspectioninordertoverifythe actual products,productconformity,Productioncapacity,Qualityintegratedmanagement systeminorderto avoidany deviation&non-compliance toprojectspecification&Local
  • 3. regulationbeforeanycommencementof activitiesatsites. Eng. Mukhtar MuhammadJadoon B.SC.CIVILENGINEERING M.SC. GEOLOGY, MATERIALS SCIENCE.