SlideShare a Scribd company logo
1 of 2
Download to read offline
Page 1
CURRICULUM VITAE
Muhammad Taufiq Edy Prayoga
Place/Date of Birth : Gresik, 6 October 1988
Age : 28 Years Old
Phone : +6281232233237
Education : Degree on Physics Engineering, Institute of
Technology Sepuluh November Surabaya (ITS)
Current Address : JL. Asahan 28, Randuagung Gresik - East Java
Language Spoken : English / Bahasa
Language Written : English / Bahasa
Experience : 5 Years
Mail to: taufiqedy07@gmail.com
PROFESSIONAL/WORK EXPERIENCE
Having more than 5 years’ of work experience, on EPC and Petrochemical Company as Instrument and
electrical engineer. And the last position as Project Control Engineer on Sabah Ammonia Urea
(SAMUR) Project, Malaysia
Responsibility:
Interface of Work, Consist of:
• Develop Document for Instrument such as Hook up Drawing using AutoCAD, Datasheet For field
Instrument, Instrument Index and Cable schedule.
• Installation of Field Instrument Such as Coriolis Flow Meter, Level Transmitter, On/Off Valve,
Control Valve, RTD, Magnetic Flow Meter, Temperature Transmitter.
• Interface to Vendor Package or Mechanical Engineer and Package Instrument Engineer.
• Loop Test Work Using HART Comm 475
• To Operate PLC Using Siemens S7-200 and Allen Bradley 5/40
• To Operate 3D Viewer Using Naviswork
• Trouble Shooting Field Instrument
• Develop Document for Electrical such as Single Line Diagram Drawing using AutoCAD,
Datasheet for Electrical Equipment, Load list And Cable schedule.
• Monitoring of Packages Installation Such as HRSG, Boiler, Demin Water, Raw Water Treatment,
Air Compressor Package, Sulphure Pelletizer and Custody Meter Package.
• Making a Mitigation and Action Plan If Have Bottle Neck Between Construction with
Engineering, Engineering With Vendor or Other Discipline.
• To Make Sure The Installation of Instrument, Mechanical, Building, Civil and Structure in Field
Accordance with Latest Drawing by Engineering,
• Controlling progress of Work in Ammonia Area, Urea Area and Utility Area.
• Scheduling of Work is Make a Spend of Time with Calculate between Quantity Manpower with
Quantity of Remaining Work.
• To Make a schedule using primavera P6 Proffesional R8.1 and Microsoft project.
• Produce Weekly and Monthly Report of Instrument, Mechanical, Building, Structure, Civil and
Pre-commissioning work.
• Produce The Package Presentation for Weekly Report Meeting with Owner Or Internal.
• Monitoring of Mechanical Completion, Punch List and ITP All discipline.
• Develop Close-Out Report Such as Project Lessons Learned, Project Schedule, Man Power
Histogram and EPC (Engineering, Procurement and Construction) status.
Page 2
Work Experience :
1. Field Work
Position : Project Control Engineer
Industry : Rekayasa Industri Malaysia SDN BHD
Joined : June 2015 – Dec 2016
Project : Sabah Ammonia Urea (SAMUR) in Petronas Chemical Fertilizer SDN BHD.
Sabah-Malaysia
2. Field Work
Position : Instrument and Electrical Engineer
Industry : PT. Sukses Mulia Indonesia (EPC)
Joined : March 2015 – May 2015
Project : Corn Dryer & Processing Facilities in PT. Hextar Seed Indonesia, Ngadiluwih,
Kediri, East Java, Indonesia
3. Field Work
Position : Instrument Construction Engineer
Industry : PT. Tripatra Engineering and Construction (EPC)
Joined : October 2013 – February 2015
Project : Banyu Urip Central Processing Facility Project, EPC1East Java Indonesia For
180.000 BPD (Barrel Per Day) of Crude Oil Production
4. Field Work
Position : Instrument Construction Engineer
Industry : PT. Sukses Mulia Indonesia (EPC)
Joined : March 2013 – October 2013
Project : Bioethanol 100KL/Day in PT. Perkebunan Nusantara, Gempolkrep Mojokerto
5. Field Work
Position : Student trainee
Industry : PT. Petrokimia Gresik
Joined : December 2011 – January 2012
6. Field Work
Position : Student trainee
Industry : PT. Petrokimia Gresik
Joined : July 2008 – August 2009
COURSE ATTENDING
1. Trainee “ Working At High” Organized By PT. Tripatra
2. Trainee “ Confine Space” Organized By PT. Tripatra
3. Trainee “ Safety Leader” Organized By PT. Tripatra
4. Trainee “ H2S Level 1” Organized By PT. Tripatra
5. Trainee “ H2S Level 2” Organized By PT. Tripatra
Surabaya, 05 Feb 2017
Muhammad Taufiq Edy Prayoga

More Related Content

What's hot (18)

Rizwan Javed Mech_Engr_Cv
Rizwan Javed Mech_Engr_CvRizwan Javed Mech_Engr_Cv
Rizwan Javed Mech_Engr_Cv
 
Frzan ali cv reservoir engineer
Frzan ali cv   reservoir engineerFrzan ali cv   reservoir engineer
Frzan ali cv reservoir engineer
 
Andy Kuss - Resume
Andy Kuss - ResumeAndy Kuss - Resume
Andy Kuss - Resume
 
Assistant Manager - Mechanical
Assistant Manager - MechanicalAssistant Manager - Mechanical
Assistant Manager - Mechanical
 
Koti (assistant manager mech)
Koti (assistant manager mech)Koti (assistant manager mech)
Koti (assistant manager mech)
 
[Belle] Resume
[Belle] Resume[Belle] Resume
[Belle] Resume
 
Henry Cornell Brewer Resume Fall 2015
Henry Cornell Brewer Resume Fall 2015Henry Cornell Brewer Resume Fall 2015
Henry Cornell Brewer Resume Fall 2015
 
Julian_Carroll resume 2015 link
Julian_Carroll resume 2015 linkJulian_Carroll resume 2015 link
Julian_Carroll resume 2015 link
 
SR Johnson Resume
SR Johnson ResumeSR Johnson Resume
SR Johnson Resume
 
tamuthu
tamuthutamuthu
tamuthu
 
Sap calculations & epc's
Sap calculations & epc'sSap calculations & epc's
Sap calculations & epc's
 
venky CV( solar )
venky CV( solar )venky CV( solar )
venky CV( solar )
 
Rudra CV
Rudra CVRudra CV
Rudra CV
 
Colin_Roderick_Resume
Colin_Roderick_ResumeColin_Roderick_Resume
Colin_Roderick_Resume
 
CV.aries.joseph.salabsab
CV.aries.joseph.salabsabCV.aries.joseph.salabsab
CV.aries.joseph.salabsab
 
Resume 2016 updated
Resume 2016 updatedResume 2016 updated
Resume 2016 updated
 
Hariprasad K V R
Hariprasad K V RHariprasad K V R
Hariprasad K V R
 
My Resume
My ResumeMy Resume
My Resume
 

Similar to Curriculum Vitae Muhammad Taufiq (20)

resume paramatt
resume paramattresume paramatt
resume paramatt
 
New CV Donny Baru
New CV Donny BaruNew CV Donny Baru
New CV Donny Baru
 
resume paramatt1
resume paramatt1resume paramatt1
resume paramatt1
 
AMT CV (3)
AMT CV (3)AMT CV (3)
AMT CV (3)
 
CV Farouk Alfisahar 2015
CV Farouk Alfisahar 2015CV Farouk Alfisahar 2015
CV Farouk Alfisahar 2015
 
Curriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project ManagerCurriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project Manager
 
Ahmad Ridwan - Updated CV.
Ahmad Ridwan - Updated CV.Ahmad Ridwan - Updated CV.
Ahmad Ridwan - Updated CV.
 
EPLopez RESUME
EPLopez RESUMEEPLopez RESUME
EPLopez RESUME
 
CV-Gusryan Zari Khamsya
CV-Gusryan Zari KhamsyaCV-Gusryan Zari Khamsya
CV-Gusryan Zari Khamsya
 
CV Bambang Eko Hermawan
CV Bambang Eko HermawanCV Bambang Eko Hermawan
CV Bambang Eko Hermawan
 
CURRICULUM VITAE UPDATE OM
CURRICULUM VITAE UPDATE OMCURRICULUM VITAE UPDATE OM
CURRICULUM VITAE UPDATE OM
 
Christoph Sinaga_CV 2015
Christoph Sinaga_CV 2015Christoph Sinaga_CV 2015
Christoph Sinaga_CV 2015
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
 
Ukeje CV
Ukeje CVUkeje CV
Ukeje CV
 
ASHWIN A_Senior planning Engineer_
ASHWIN A_Senior planning Engineer_ASHWIN A_Senior planning Engineer_
ASHWIN A_Senior planning Engineer_
 
Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
 
Ramajitti P_Resume 14 Jan 16 (1)
Ramajitti P_Resume 14 Jan 16 (1)Ramajitti P_Resume 14 Jan 16 (1)
Ramajitti P_Resume 14 Jan 16 (1)
 
kolligars-I-1
kolligars-I-1kolligars-I-1
kolligars-I-1
 
CV New 2016
CV New 2016CV New 2016
CV New 2016
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 

Curriculum Vitae Muhammad Taufiq

  • 1. Page 1 CURRICULUM VITAE Muhammad Taufiq Edy Prayoga Place/Date of Birth : Gresik, 6 October 1988 Age : 28 Years Old Phone : +6281232233237 Education : Degree on Physics Engineering, Institute of Technology Sepuluh November Surabaya (ITS) Current Address : JL. Asahan 28, Randuagung Gresik - East Java Language Spoken : English / Bahasa Language Written : English / Bahasa Experience : 5 Years Mail to: taufiqedy07@gmail.com PROFESSIONAL/WORK EXPERIENCE Having more than 5 years’ of work experience, on EPC and Petrochemical Company as Instrument and electrical engineer. And the last position as Project Control Engineer on Sabah Ammonia Urea (SAMUR) Project, Malaysia Responsibility: Interface of Work, Consist of: • Develop Document for Instrument such as Hook up Drawing using AutoCAD, Datasheet For field Instrument, Instrument Index and Cable schedule. • Installation of Field Instrument Such as Coriolis Flow Meter, Level Transmitter, On/Off Valve, Control Valve, RTD, Magnetic Flow Meter, Temperature Transmitter. • Interface to Vendor Package or Mechanical Engineer and Package Instrument Engineer. • Loop Test Work Using HART Comm 475 • To Operate PLC Using Siemens S7-200 and Allen Bradley 5/40 • To Operate 3D Viewer Using Naviswork • Trouble Shooting Field Instrument • Develop Document for Electrical such as Single Line Diagram Drawing using AutoCAD, Datasheet for Electrical Equipment, Load list And Cable schedule. • Monitoring of Packages Installation Such as HRSG, Boiler, Demin Water, Raw Water Treatment, Air Compressor Package, Sulphure Pelletizer and Custody Meter Package. • Making a Mitigation and Action Plan If Have Bottle Neck Between Construction with Engineering, Engineering With Vendor or Other Discipline. • To Make Sure The Installation of Instrument, Mechanical, Building, Civil and Structure in Field Accordance with Latest Drawing by Engineering, • Controlling progress of Work in Ammonia Area, Urea Area and Utility Area. • Scheduling of Work is Make a Spend of Time with Calculate between Quantity Manpower with Quantity of Remaining Work. • To Make a schedule using primavera P6 Proffesional R8.1 and Microsoft project. • Produce Weekly and Monthly Report of Instrument, Mechanical, Building, Structure, Civil and Pre-commissioning work. • Produce The Package Presentation for Weekly Report Meeting with Owner Or Internal. • Monitoring of Mechanical Completion, Punch List and ITP All discipline. • Develop Close-Out Report Such as Project Lessons Learned, Project Schedule, Man Power Histogram and EPC (Engineering, Procurement and Construction) status.
  • 2. Page 2 Work Experience : 1. Field Work Position : Project Control Engineer Industry : Rekayasa Industri Malaysia SDN BHD Joined : June 2015 – Dec 2016 Project : Sabah Ammonia Urea (SAMUR) in Petronas Chemical Fertilizer SDN BHD. Sabah-Malaysia 2. Field Work Position : Instrument and Electrical Engineer Industry : PT. Sukses Mulia Indonesia (EPC) Joined : March 2015 – May 2015 Project : Corn Dryer & Processing Facilities in PT. Hextar Seed Indonesia, Ngadiluwih, Kediri, East Java, Indonesia 3. Field Work Position : Instrument Construction Engineer Industry : PT. Tripatra Engineering and Construction (EPC) Joined : October 2013 – February 2015 Project : Banyu Urip Central Processing Facility Project, EPC1East Java Indonesia For 180.000 BPD (Barrel Per Day) of Crude Oil Production 4. Field Work Position : Instrument Construction Engineer Industry : PT. Sukses Mulia Indonesia (EPC) Joined : March 2013 – October 2013 Project : Bioethanol 100KL/Day in PT. Perkebunan Nusantara, Gempolkrep Mojokerto 5. Field Work Position : Student trainee Industry : PT. Petrokimia Gresik Joined : December 2011 – January 2012 6. Field Work Position : Student trainee Industry : PT. Petrokimia Gresik Joined : July 2008 – August 2009 COURSE ATTENDING 1. Trainee “ Working At High” Organized By PT. Tripatra 2. Trainee “ Confine Space” Organized By PT. Tripatra 3. Trainee “ Safety Leader” Organized By PT. Tripatra 4. Trainee “ H2S Level 1” Organized By PT. Tripatra 5. Trainee “ H2S Level 2” Organized By PT. Tripatra Surabaya, 05 Feb 2017 Muhammad Taufiq Edy Prayoga