Farouk Alfisahar is a Lead Engineer with over 8 years of experience in construction projects for mechanical and piping works at power plants and industrial facilities. He is seeking new challenges and has experience managing teams, coordinating with departments, and meeting targets. He holds a degree in Shipbuilding Engineering from Diponegoro University and has worked on projects in Indonesia for companies including PT. Jurong Engineering Lestari and PT. Truba Jaya Engineering.
1. Farouk Alfisahar
Jl. Kromodiwiryo no.116 RT/RW 18/03 Purwogondo
Kalinyamatan Jepara 59467
Jawa tengah
E-mail : farouk.alfisahar@gmail.com
No Hp : 081228583569
08562683690
PERSONNAL DATA
I was born on October 31st
, 1985 at Jepara – Middle of Java, I am married. My
religion is islam.
CAREER OBJECTIVE
Offering 8 years’ experience in construction project of Mechanical and Piping works for
heavy project at Power Plant and Industrial Plan with latest position as Lead Engineer.
And one year in construction project of shipbuilding work for make new ship and repair.
Have ability to work independently or with a team, willing to work hard and seeking new
challenges.
SUMMARY OF QUALIFICATIONS
Managing man power in field, preparing planning schedule & control. Leading,
managing sub ordinate & coordinating with all department in the project execution for
reaching target from Management.
Make a quotation for propose new project assignment
EDUCATION
Diponegoro University, Semarang May 2007
Shipbuilding Engineering
GPA 3.30 of 4.00
Thesis: Design of Fishing Vessel “Tiger Shark” 133 BRT.
1
2. EXPERIENCE
PT. Jurong Engineering Lestari April 2012-Present
Job Description:
a. Coordinate with all department for reaching Management Target.
b. Making quotation for new project.
c. Understanding of specs and material for construction.
d. Prepare & Check Work Planning (Schedule, Progress, tools and consumables)
e. Make daily progress report to Chief Engineer or Site Manager
f. Managing Supervisor at field.
Responsibility:
a. Make sure that sub ordinates work safely and correctly as per JSA.
b. Make sure that tools and consumables properly to work.
c. Get target from Management.
d. Coordination with client on site and office
e. Give motivation to sub ordinates for increase their productivity.
f. Give daily progress report to Chief Engineer or Site Manager.
PROJECT ASSIGNMENT:
CAP ECCx Project
Position : Lead Engineer
(January, 2015 ~ Present)
Prepare WMS (Work Method Statement) for all activities at site
Planning man power, tools & consumables, equipment and arrange
area/workshop for piping fabrication and mechanical erection
Prepare daily report, daily progress and monitoring piping fabrication &
mechanical erection supervisor’s.
Planning for pipe and support erection completion for assist piping test
packaged and testing work.
Coordination meeting with client and owner to solve any problem.
Kaltim-5 Project
Position : Piping Engineer
(February, 2014 ~ December 2014)
The main responsibility is coordinating at site with all supervisor and
superintendent to reach target that already state by owner. Coordination meeting
with client and owner to solve any problem.
2
3. i-II Project Shutdown Piping Work for 2AA Chemical Plant Nippon Shokubai
Indonesia
Position : Site Manager
(November,2013 ~ December 2013)
The main responsibility is maintenance cost as per approval budget to run the
project to be on time for completion work. Coordination meeting with client and
owner to solve any problem at site.
EGRA (Export Grade React Alcohol) Project at PT. Indolampung Distillery
Position : Site Manager
(April, 2013 ~ September 2013)
The main responsibility is maintenance cost as per approval budget to run the
project to be on time for completion work. Coordination meeting with client and
owner to solve any problem.
i-II Project Piping Work for 2AA Chemical Plant Nippon Shokubai Indonesia
Position : Piping Engineer
(November, 2012 ~ March 2013)
The main responsibility is coordinating at site with all supervisor and
superintendent to reach target that already state by owner. Coordination meeting
with client and owner to solve any problem in site.
Ladle Furnace Project ANTAM FeNi 3 Plant Pomalaa, South East Sulawesi
Position : Mechanical and Piping Engineer
(April, 2012 ~ October 2012)
The main responsibility is coordinating at site with all sub contractor to reach target
that already state by owner. Coordination meeting with client and owner to solve
any problem in site.
PT. Truba Jaya Engineering, Jakarta July 2008-July 2011
Job Description:
a. Coordinate with all department for reaching Management Target.
b. Understanding of specs and material for construction.
c. Prepare & Check Work Planning (Schedule, Progress, tools and consumables)
d. Make daily time sheet and daily progress report to Chief Engineer.
e. Managing man power at field.
Responsibility:
g. Make sure that sub ordinates work safely and correctly as per JSA.
h. Make sure that tools and consumables properly to work.
i. Get target from Management.
j. Give motivation to sub ordinates for increase their productivity.
k. Give daily progress report to Chief Engineer or Superintendent
3
4. PROJECT ASSIGNMENT:
Tanjung Jati “B” Unit 3 & 4 2x660MW CFSPP Project Jpr,TG/BOP Piping work
Position : Piping Supervisor
(Jan, 2011 ~ July 2011)
The main responsibility is coordinating all section especially Welding, Rigging,
Material Handling and QC for supporting my jobs. Coordinating with material
handling to make sure supply all source material & equipment as per specification
drawing. Coordinate with engineering department to make sure all design drawing
and detail drawing provided a head schedule with correct specification as owner
requirement.
Tanjung Jati “B” Unit 3 & 4 2 x 660MW CFSPP Project Jepara, Steel Structure
Erection work
Position : Painting Supervisor
(Oct, 2009 ~ Des, 2010)
The main responsibility is coordinating all section such as Rigging, Material
Handling and QC. Coordinating with material handling to make sure supply all
material paint as per requirement. Make sure for application painting as per
standard.
Job Achievement
o This project was profit 16.54% from company target 15%
o Appraisal from TMS (Truba Management System) Assessment Period
February 2010 ~ August 2010 for the best Performance of Project Planning
& Cost Control System & management
Labuan 2 x 330MW Coal Fire Steam Power Plant
Position : Jr. Boiler Supervisor
(Feb ’09 ~ September’09)
The main responsibility is coordinating all section especially Welding, Rigging,
Material Handling and QC for supporting my jobs. Coordinating with material
handling to make sure supply all source material & equipment as per specification
drawing. Coordinate with engineering department to make sure all design drawing
and detail drawing provided a head schedule with correct specification as owner
requirement.
4
5. CV. Wiyar Cahaya Samudera, Jakarta May 2008- July 2008
Position : Field assistance
(May ’08 ~ July’08)
The main responsibility is supporting site project leader to control and supervise
subcontractor. Support all consumables and materials for subcontractor.
Coordinating with shipyard owner to rent for a docking place . Coordinating with
Class such as BKI, LR, BV and the others to get certificate for a ship repair or new
building. Coordinate with engineering department to make sure all design drawing
and detail drawing provided a head schedule with correct specification as owner
requirement.
Lokal Contractor, Semarang March 2008- April 2008
Position : Helper
(March ’08 ~ Apr ’07)
The main responsibility is prepare tools and assist fitter to fit up repair work.
CV. Bina Lestari Bahari, Semarang June 2007- Des 2007
Position : Drafter and Fitter
(June ’07 ~ Des ’07)
The main responsibility is making drawing in moudloft (lantai kerja). Make design in
1:1 scale in moudlof. Marking drawing in plate for cutting. Install and make sure
that the materials plate install correctly by fitter and welder. Coordinating with
Material Handling section for supply the materials on time. Coordinate with
engineering department to make sure all design drawing and detail drawing
provided a head schedule with correct specification as owner requirement.
5
6. SKILLS
Capable to write and speak in English ( Passive & Active )
Capable to operate Microsoft project
Capable to operate Microsoft Office
Capable to operate Auto CAD
ACTIVITIES/TRAINING
• National Seminar Of Automatic Industry at Diponegoro University (2005)
• Core value Training – By PT. Truba Jaya Engineering (2008)
• PQM ( Productivity and Quality Management ) Supervisory Management by PT.
Truba Jaya Engineering ( 2008 )
• “Latihan Dasar Bela Negara” at RINDAM JAYA (2008)
• Leadership training by. PT. Truba Jaya Engineering ( 2008)
• Quality Awareness & Truba Management System for ISO training. By PT. Truba
Jaya Engineering (December 3, 2009 )
• Basic Painting application by PT. Truba Jaya Engineering (February 4, 2010)
HOBBIES
• Sport
• Football
• Reading
6