SlideShare a Scribd company logo
1 of 13
Download to read offline
Farouk Alfisahar
Jl. Kromodiwiryo no.116 RT/RW 18/03 Purwogondo
Kalinyamatan Jepara 59467
Jawa tengah
E-mail : farouk.alfisahar@gmail.com
No Hp : 081228583569
08562683690
PERSONNAL DATA
I was born on October 31st
, 1985 at Jepara – Middle of Java, I am married. My
religion is islam.
CAREER OBJECTIVE
Offering 8 years’ experience in construction project of Mechanical and Piping works for
heavy project at Power Plant and Industrial Plan with latest position as Lead Engineer.
And one year in construction project of shipbuilding work for make new ship and repair.
Have ability to work independently or with a team, willing to work hard and seeking new
challenges.
SUMMARY OF QUALIFICATIONS
Managing man power in field, preparing planning schedule & control. Leading,
managing sub ordinate & coordinating with all department in the project execution for
reaching target from Management.
Make a quotation for propose new project assignment
EDUCATION
Diponegoro University, Semarang May 2007
Shipbuilding Engineering
GPA 3.30 of 4.00
Thesis: Design of Fishing Vessel “Tiger Shark” 133 BRT.
1
EXPERIENCE
PT. Jurong Engineering Lestari April 2012-Present
Job Description:
a. Coordinate with all department for reaching Management Target.
b. Making quotation for new project.
c. Understanding of specs and material for construction.
d. Prepare & Check Work Planning (Schedule, Progress, tools and consumables)
e. Make daily progress report to Chief Engineer or Site Manager
f. Managing Supervisor at field.
Responsibility:
a. Make sure that sub ordinates work safely and correctly as per JSA.
b. Make sure that tools and consumables properly to work.
c. Get target from Management.
d. Coordination with client on site and office
e. Give motivation to sub ordinates for increase their productivity.
f. Give daily progress report to Chief Engineer or Site Manager.
PROJECT ASSIGNMENT:
CAP ECCx Project
Position : Lead Engineer
(January, 2015 ~ Present)
 Prepare WMS (Work Method Statement) for all activities at site
 Planning man power, tools & consumables, equipment and arrange
area/workshop for piping fabrication and mechanical erection
 Prepare daily report, daily progress and monitoring piping fabrication &
mechanical erection supervisor’s.
 Planning for pipe and support erection completion for assist piping test
packaged and testing work.
 Coordination meeting with client and owner to solve any problem.
Kaltim-5 Project
Position : Piping Engineer
(February, 2014 ~ December 2014)
The main responsibility is coordinating at site with all supervisor and
superintendent to reach target that already state by owner. Coordination meeting
with client and owner to solve any problem.
2
i-II Project Shutdown Piping Work for 2AA Chemical Plant Nippon Shokubai
Indonesia
Position : Site Manager
(November,2013 ~ December 2013)
The main responsibility is maintenance cost as per approval budget to run the
project to be on time for completion work. Coordination meeting with client and
owner to solve any problem at site.
EGRA (Export Grade React Alcohol) Project at PT. Indolampung Distillery
Position : Site Manager
(April, 2013 ~ September 2013)
The main responsibility is maintenance cost as per approval budget to run the
project to be on time for completion work. Coordination meeting with client and
owner to solve any problem.
i-II Project Piping Work for 2AA Chemical Plant Nippon Shokubai Indonesia
Position : Piping Engineer
(November, 2012 ~ March 2013)
The main responsibility is coordinating at site with all supervisor and
superintendent to reach target that already state by owner. Coordination meeting
with client and owner to solve any problem in site.
Ladle Furnace Project ANTAM FeNi 3 Plant Pomalaa, South East Sulawesi
Position : Mechanical and Piping Engineer
(April, 2012 ~ October 2012)
The main responsibility is coordinating at site with all sub contractor to reach target
that already state by owner. Coordination meeting with client and owner to solve
any problem in site.
PT. Truba Jaya Engineering, Jakarta July 2008-July 2011
Job Description:
a. Coordinate with all department for reaching Management Target.
b. Understanding of specs and material for construction.
c. Prepare & Check Work Planning (Schedule, Progress, tools and consumables)
d. Make daily time sheet and daily progress report to Chief Engineer.
e. Managing man power at field.
Responsibility:
g. Make sure that sub ordinates work safely and correctly as per JSA.
h. Make sure that tools and consumables properly to work.
i. Get target from Management.
j. Give motivation to sub ordinates for increase their productivity.
k. Give daily progress report to Chief Engineer or Superintendent
3
PROJECT ASSIGNMENT:
Tanjung Jati “B” Unit 3 & 4 2x660MW CFSPP Project Jpr,TG/BOP Piping work
Position : Piping Supervisor
(Jan, 2011 ~ July 2011)
The main responsibility is coordinating all section especially Welding, Rigging,
Material Handling and QC for supporting my jobs. Coordinating with material
handling to make sure supply all source material & equipment as per specification
drawing. Coordinate with engineering department to make sure all design drawing
and detail drawing provided a head schedule with correct specification as owner
requirement.
Tanjung Jati “B” Unit 3 & 4 2 x 660MW CFSPP Project Jepara, Steel Structure
Erection work
Position : Painting Supervisor
(Oct, 2009 ~ Des, 2010)
The main responsibility is coordinating all section such as Rigging, Material
Handling and QC. Coordinating with material handling to make sure supply all
material paint as per requirement. Make sure for application painting as per
standard.
 Job Achievement
o This project was profit 16.54% from company target 15%
o Appraisal from TMS (Truba Management System) Assessment Period
February 2010 ~ August 2010 for the best Performance of Project Planning
& Cost Control System & management
Labuan 2 x 330MW Coal Fire Steam Power Plant
Position : Jr. Boiler Supervisor
(Feb ’09 ~ September’09)
The main responsibility is coordinating all section especially Welding, Rigging,
Material Handling and QC for supporting my jobs. Coordinating with material
handling to make sure supply all source material & equipment as per specification
drawing. Coordinate with engineering department to make sure all design drawing
and detail drawing provided a head schedule with correct specification as owner
requirement.
4
CV. Wiyar Cahaya Samudera, Jakarta May 2008- July 2008
Position : Field assistance
(May ’08 ~ July’08)
The main responsibility is supporting site project leader to control and supervise
subcontractor. Support all consumables and materials for subcontractor.
Coordinating with shipyard owner to rent for a docking place . Coordinating with
Class such as BKI, LR, BV and the others to get certificate for a ship repair or new
building. Coordinate with engineering department to make sure all design drawing
and detail drawing provided a head schedule with correct specification as owner
requirement.
Lokal Contractor, Semarang March 2008- April 2008
Position : Helper
(March ’08 ~ Apr ’07)
The main responsibility is prepare tools and assist fitter to fit up repair work.
CV. Bina Lestari Bahari, Semarang June 2007- Des 2007
Position : Drafter and Fitter
(June ’07 ~ Des ’07)
The main responsibility is making drawing in moudloft (lantai kerja). Make design in
1:1 scale in moudlof. Marking drawing in plate for cutting. Install and make sure
that the materials plate install correctly by fitter and welder. Coordinating with
Material Handling section for supply the materials on time. Coordinate with
engineering department to make sure all design drawing and detail drawing
provided a head schedule with correct specification as owner requirement.
5
SKILLS
 Capable to write and speak in English ( Passive & Active )
 Capable to operate Microsoft project
 Capable to operate Microsoft Office
 Capable to operate Auto CAD
ACTIVITIES/TRAINING
• National Seminar Of Automatic Industry at Diponegoro University (2005)
• Core value Training – By PT. Truba Jaya Engineering (2008)
• PQM ( Productivity and Quality Management ) Supervisory Management by PT.
Truba Jaya Engineering ( 2008 )
• “Latihan Dasar Bela Negara” at RINDAM JAYA (2008)
• Leadership training by. PT. Truba Jaya Engineering ( 2008)
• Quality Awareness & Truba Management System for ISO training. By PT. Truba
Jaya Engineering (December 3, 2009 )
• Basic Painting application by PT. Truba Jaya Engineering (February 4, 2010)
HOBBIES
• Sport
• Football
• Reading
6
7
8
9
10
11
12
13

More Related Content

What's hot

MURALI CV-LATEST-10-04-13
MURALI CV-LATEST-10-04-13 MURALI CV-LATEST-10-04-13
MURALI CV-LATEST-10-04-13 murali durairaj
 
Resume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D KulkarniResume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D KulkarniPrasad Kulkarni
 
New updated CV ( Siddesha.Maidur)
New updated CV ( Siddesha.Maidur)New updated CV ( Siddesha.Maidur)
New updated CV ( Siddesha.Maidur)siddesh siddu
 
Civil Engineer Resume
 Civil Engineer Resume Civil Engineer Resume
Civil Engineer ResumeRavi Kumar
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorabdul shukoor
 
Resume_HVAC Engineer
Resume_HVAC EngineerResume_HVAC Engineer
Resume_HVAC EngineerSushil Patel
 
narasimha gupta updated cv
narasimha gupta updated cvnarasimha gupta updated cv
narasimha gupta updated cvNarasimha Gupta
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007sajid hasan
 
Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)RAJA KUMAR .R
 
asthasinghResume-1
asthasinghResume-1asthasinghResume-1
asthasinghResume-1Astha Sachan
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 

What's hot (20)

update cv
update cvupdate cv
update cv
 
MURALI CV-LATEST-10-04-13
MURALI CV-LATEST-10-04-13 MURALI CV-LATEST-10-04-13
MURALI CV-LATEST-10-04-13
 
niladri-2014
niladri-2014niladri-2014
niladri-2014
 
Debraj resume 1
Debraj resume 1Debraj resume 1
Debraj resume 1
 
Resume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D KulkarniResume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D Kulkarni
 
Pandiarajan CV 2015.1
Pandiarajan CV 2015.1Pandiarajan CV 2015.1
Pandiarajan CV 2015.1
 
New updated CV ( Siddesha.Maidur)
New updated CV ( Siddesha.Maidur)New updated CV ( Siddesha.Maidur)
New updated CV ( Siddesha.Maidur)
 
Civil Engineer Resume
 Civil Engineer Resume Civil Engineer Resume
Civil Engineer Resume
 
NAVEEN CV
NAVEEN CV NAVEEN CV
NAVEEN CV
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoor
 
Resume_HVAC Engineer
Resume_HVAC EngineerResume_HVAC Engineer
Resume_HVAC Engineer
 
narasimha gupta updated cv
narasimha gupta updated cvnarasimha gupta updated cv
narasimha gupta updated cv
 
Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007
 
Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)
 
asthasinghResume-1
asthasinghResume-1asthasinghResume-1
asthasinghResume-1
 
cv andriyansysh
cv andriyansyshcv andriyansysh
cv andriyansysh
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Nitin Patekar Rsume
Nitin Patekar RsumeNitin Patekar Rsume
Nitin Patekar Rsume
 
2 btech civil engineer resume
2 btech civil engineer resume2 btech civil engineer resume
2 btech civil engineer resume
 

Similar to CV Farouk Alfisahar 2015

BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)Aravind Sadasivan
 
CV Arun_30-Jun-16
CV Arun_30-Jun-16CV Arun_30-Jun-16
CV Arun_30-Jun-16Arun R
 
raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghushashi tr
 
Irene Lim (Resume)
Irene Lim (Resume)Irene Lim (Resume)
Irene Lim (Resume)Irene Lim
 
Resume renjith sap _pm
Resume renjith sap _pmResume renjith sap _pm
Resume renjith sap _pmRenjith N K
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515newaffendy ali
 
Ariel Almes -CV_update
Ariel Almes -CV_updateAriel Almes -CV_update
Ariel Almes -CV_updateAriel Almes
 
latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)murali perianan
 
latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)murali perianan
 

Similar to CV Farouk Alfisahar 2015 (20)

Curriculum Vitae Muhammad Taufiq
Curriculum Vitae Muhammad TaufiqCurriculum Vitae Muhammad Taufiq
Curriculum Vitae Muhammad Taufiq
 
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
 
Rozlan Ramli 2015
Rozlan Ramli 2015Rozlan Ramli 2015
Rozlan Ramli 2015
 
my resume sankar 3
my resume sankar 3my resume sankar 3
my resume sankar 3
 
Wp 241016
Wp 241016Wp 241016
Wp 241016
 
CV A SAMUEL N
CV A SAMUEL NCV A SAMUEL N
CV A SAMUEL N
 
Rezume ongky
Rezume ongkyRezume ongky
Rezume ongky
 
CV-CE-0516
CV-CE-0516CV-CE-0516
CV-CE-0516
 
CV Arun_30-Jun-16
CV Arun_30-Jun-16CV Arun_30-Jun-16
CV Arun_30-Jun-16
 
raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)
 
TAWANDA MAHLANGU CV.
TAWANDA MAHLANGU CV.TAWANDA MAHLANGU CV.
TAWANDA MAHLANGU CV.
 
Gusyahri hidayat (cm)
Gusyahri hidayat (cm)Gusyahri hidayat (cm)
Gusyahri hidayat (cm)
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
Irene Lim (Resume)
Irene Lim (Resume)Irene Lim (Resume)
Irene Lim (Resume)
 
Resume renjith sap _pm
Resume renjith sap _pmResume renjith sap _pm
Resume renjith sap _pm
 
HM SIAL
HM SIALHM SIAL
HM SIAL
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515new
 
Ariel Almes -CV_update
Ariel Almes -CV_updateAriel Almes -CV_update
Ariel Almes -CV_update
 
latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)
 
latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)
 

CV Farouk Alfisahar 2015

  • 1. Farouk Alfisahar Jl. Kromodiwiryo no.116 RT/RW 18/03 Purwogondo Kalinyamatan Jepara 59467 Jawa tengah E-mail : farouk.alfisahar@gmail.com No Hp : 081228583569 08562683690 PERSONNAL DATA I was born on October 31st , 1985 at Jepara – Middle of Java, I am married. My religion is islam. CAREER OBJECTIVE Offering 8 years’ experience in construction project of Mechanical and Piping works for heavy project at Power Plant and Industrial Plan with latest position as Lead Engineer. And one year in construction project of shipbuilding work for make new ship and repair. Have ability to work independently or with a team, willing to work hard and seeking new challenges. SUMMARY OF QUALIFICATIONS Managing man power in field, preparing planning schedule & control. Leading, managing sub ordinate & coordinating with all department in the project execution for reaching target from Management. Make a quotation for propose new project assignment EDUCATION Diponegoro University, Semarang May 2007 Shipbuilding Engineering GPA 3.30 of 4.00 Thesis: Design of Fishing Vessel “Tiger Shark” 133 BRT. 1
  • 2. EXPERIENCE PT. Jurong Engineering Lestari April 2012-Present Job Description: a. Coordinate with all department for reaching Management Target. b. Making quotation for new project. c. Understanding of specs and material for construction. d. Prepare & Check Work Planning (Schedule, Progress, tools and consumables) e. Make daily progress report to Chief Engineer or Site Manager f. Managing Supervisor at field. Responsibility: a. Make sure that sub ordinates work safely and correctly as per JSA. b. Make sure that tools and consumables properly to work. c. Get target from Management. d. Coordination with client on site and office e. Give motivation to sub ordinates for increase their productivity. f. Give daily progress report to Chief Engineer or Site Manager. PROJECT ASSIGNMENT: CAP ECCx Project Position : Lead Engineer (January, 2015 ~ Present)  Prepare WMS (Work Method Statement) for all activities at site  Planning man power, tools & consumables, equipment and arrange area/workshop for piping fabrication and mechanical erection  Prepare daily report, daily progress and monitoring piping fabrication & mechanical erection supervisor’s.  Planning for pipe and support erection completion for assist piping test packaged and testing work.  Coordination meeting with client and owner to solve any problem. Kaltim-5 Project Position : Piping Engineer (February, 2014 ~ December 2014) The main responsibility is coordinating at site with all supervisor and superintendent to reach target that already state by owner. Coordination meeting with client and owner to solve any problem. 2
  • 3. i-II Project Shutdown Piping Work for 2AA Chemical Plant Nippon Shokubai Indonesia Position : Site Manager (November,2013 ~ December 2013) The main responsibility is maintenance cost as per approval budget to run the project to be on time for completion work. Coordination meeting with client and owner to solve any problem at site. EGRA (Export Grade React Alcohol) Project at PT. Indolampung Distillery Position : Site Manager (April, 2013 ~ September 2013) The main responsibility is maintenance cost as per approval budget to run the project to be on time for completion work. Coordination meeting with client and owner to solve any problem. i-II Project Piping Work for 2AA Chemical Plant Nippon Shokubai Indonesia Position : Piping Engineer (November, 2012 ~ March 2013) The main responsibility is coordinating at site with all supervisor and superintendent to reach target that already state by owner. Coordination meeting with client and owner to solve any problem in site. Ladle Furnace Project ANTAM FeNi 3 Plant Pomalaa, South East Sulawesi Position : Mechanical and Piping Engineer (April, 2012 ~ October 2012) The main responsibility is coordinating at site with all sub contractor to reach target that already state by owner. Coordination meeting with client and owner to solve any problem in site. PT. Truba Jaya Engineering, Jakarta July 2008-July 2011 Job Description: a. Coordinate with all department for reaching Management Target. b. Understanding of specs and material for construction. c. Prepare & Check Work Planning (Schedule, Progress, tools and consumables) d. Make daily time sheet and daily progress report to Chief Engineer. e. Managing man power at field. Responsibility: g. Make sure that sub ordinates work safely and correctly as per JSA. h. Make sure that tools and consumables properly to work. i. Get target from Management. j. Give motivation to sub ordinates for increase their productivity. k. Give daily progress report to Chief Engineer or Superintendent 3
  • 4. PROJECT ASSIGNMENT: Tanjung Jati “B” Unit 3 & 4 2x660MW CFSPP Project Jpr,TG/BOP Piping work Position : Piping Supervisor (Jan, 2011 ~ July 2011) The main responsibility is coordinating all section especially Welding, Rigging, Material Handling and QC for supporting my jobs. Coordinating with material handling to make sure supply all source material & equipment as per specification drawing. Coordinate with engineering department to make sure all design drawing and detail drawing provided a head schedule with correct specification as owner requirement. Tanjung Jati “B” Unit 3 & 4 2 x 660MW CFSPP Project Jepara, Steel Structure Erection work Position : Painting Supervisor (Oct, 2009 ~ Des, 2010) The main responsibility is coordinating all section such as Rigging, Material Handling and QC. Coordinating with material handling to make sure supply all material paint as per requirement. Make sure for application painting as per standard.  Job Achievement o This project was profit 16.54% from company target 15% o Appraisal from TMS (Truba Management System) Assessment Period February 2010 ~ August 2010 for the best Performance of Project Planning & Cost Control System & management Labuan 2 x 330MW Coal Fire Steam Power Plant Position : Jr. Boiler Supervisor (Feb ’09 ~ September’09) The main responsibility is coordinating all section especially Welding, Rigging, Material Handling and QC for supporting my jobs. Coordinating with material handling to make sure supply all source material & equipment as per specification drawing. Coordinate with engineering department to make sure all design drawing and detail drawing provided a head schedule with correct specification as owner requirement. 4
  • 5. CV. Wiyar Cahaya Samudera, Jakarta May 2008- July 2008 Position : Field assistance (May ’08 ~ July’08) The main responsibility is supporting site project leader to control and supervise subcontractor. Support all consumables and materials for subcontractor. Coordinating with shipyard owner to rent for a docking place . Coordinating with Class such as BKI, LR, BV and the others to get certificate for a ship repair or new building. Coordinate with engineering department to make sure all design drawing and detail drawing provided a head schedule with correct specification as owner requirement. Lokal Contractor, Semarang March 2008- April 2008 Position : Helper (March ’08 ~ Apr ’07) The main responsibility is prepare tools and assist fitter to fit up repair work. CV. Bina Lestari Bahari, Semarang June 2007- Des 2007 Position : Drafter and Fitter (June ’07 ~ Des ’07) The main responsibility is making drawing in moudloft (lantai kerja). Make design in 1:1 scale in moudlof. Marking drawing in plate for cutting. Install and make sure that the materials plate install correctly by fitter and welder. Coordinating with Material Handling section for supply the materials on time. Coordinate with engineering department to make sure all design drawing and detail drawing provided a head schedule with correct specification as owner requirement. 5
  • 6. SKILLS  Capable to write and speak in English ( Passive & Active )  Capable to operate Microsoft project  Capable to operate Microsoft Office  Capable to operate Auto CAD ACTIVITIES/TRAINING • National Seminar Of Automatic Industry at Diponegoro University (2005) • Core value Training – By PT. Truba Jaya Engineering (2008) • PQM ( Productivity and Quality Management ) Supervisory Management by PT. Truba Jaya Engineering ( 2008 ) • “Latihan Dasar Bela Negara” at RINDAM JAYA (2008) • Leadership training by. PT. Truba Jaya Engineering ( 2008) • Quality Awareness & Truba Management System for ISO training. By PT. Truba Jaya Engineering (December 3, 2009 ) • Basic Painting application by PT. Truba Jaya Engineering (February 4, 2010) HOBBIES • Sport • Football • Reading 6
  • 7. 7
  • 8. 8
  • 9. 9
  • 10. 10
  • 11. 11
  • 12. 12
  • 13. 13