SlideShare a Scribd company logo
1 of 1
AVIK SEN
Ramakrishnagarh, P.O. Italgacha, Kolkata-700079
Contact: +91 9546476834; Email: joyzen92@gmail.com DOB: 2nd
March, 1992
Assistant EngineerConstruction
Offering 3 years and 3 months of prolific experience; seeking challenging assignments across the industry
PROFESSIONAL EXPERIENCE
Mcnally Bharat Engineering Company Limited since August 2013
Assistant Engineer
Current CTC: 2.73 lakh p.a.
.
• Executing & monitoring the field works (Civil) for 2 years.
• Currently Preparing Client Invoices along with Measurement sheet (CHP/AHP/BOP Packages) since 1 yr 3 months.
• Coordinated with site manager for technical requirements, reporting requirements of management etc. Monitored
Physical progress as well as cost progress of the project on weekly basis.
• Skillfully prepared weekly and monthly progress reports for the management and also monitored Cash flow of the project
and fund requirements.
• Understood the Contracts and efficiently worked on ERP, MS Project.
• Preparation Subcontractor Invoices along with Measurement sheet.
Projects Undertaken
Title Civil, Structural and Architectural works of BOP and CHP/AHP package for 2X250 MW Thermal Power Plant for
BTPS ,Barauni (Since May’2014)
Cost Rs 243 Crores (Materials By Client)
Location Begusarai, Bihar
EDUCATIONAL CREDENTIALS
Degree/Course College/University Year Of Passing Marks Scored
Diploma (Civil Engineering) Ramakrishna Mission Shilpapitha,Belgharia 2013 82.0 %
Higher Secondary (12th
) W.B.C.H.S.E ,Patha Bhavan Ballygaunge 2010 71.5 %
Madhyamik (10th
) W.B.B.S.E ,R.K.M.V. Narendrapur 2008 89.5 %
Declaration
I hereby declare that all the above furnished information is true to the best of my knowledge
Date: Signature:

More Related Content

What's hot

Pre-Posting and Partial Energization
Pre-Posting and Partial EnergizationPre-Posting and Partial Energization
Pre-Posting and Partial EnergizationSSP Innovations
 
Lean Transformation Examples - Ed Cucinelli
Lean Transformation Examples - Ed CucinelliLean Transformation Examples - Ed Cucinelli
Lean Transformation Examples - Ed CucinelliEd Cucinelli
 
Content management – Strategy, process and tools in project life cycle and di...
Content management – Strategy, process and tools in project life cycle and di...Content management – Strategy, process and tools in project life cycle and di...
Content management – Strategy, process and tools in project life cycle and di...Viasys VDC
 
JOINING TO EXIT ALL PERFORMANCE REPORT IN AIRCEL
JOINING TO EXIT ALL PERFORMANCE REPORT IN AIRCELJOINING TO EXIT ALL PERFORMANCE REPORT IN AIRCEL
JOINING TO EXIT ALL PERFORMANCE REPORT IN AIRCELTanmoy Sarkar
 
Tammy Blunt Resume
Tammy Blunt ResumeTammy Blunt Resume
Tammy Blunt ResumeTamara Blunt
 
Resume-ParanthamanKrishnasamy
Resume-ParanthamanKrishnasamyResume-ParanthamanKrishnasamy
Resume-ParanthamanKrishnasamyParan K
 
Abdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrsAbdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrsAbdullah Jaber
 
Best practices for streamlining your project – A joint demo of Viasys VDC and...
Best practices for streamlining your project – A joint demo of Viasys VDC and...Best practices for streamlining your project – A joint demo of Viasys VDC and...
Best practices for streamlining your project – A joint demo of Viasys VDC and...Viasys VDC
 
20180223 project control loftvilles
20180223 project control loftvilles20180223 project control loftvilles
20180223 project control loftvillesSurya Budi
 

What's hot (18)

Pre-Posting and Partial Energization
Pre-Posting and Partial EnergizationPre-Posting and Partial Energization
Pre-Posting and Partial Energization
 
Lean Transformation Examples - Ed Cucinelli
Lean Transformation Examples - Ed CucinelliLean Transformation Examples - Ed Cucinelli
Lean Transformation Examples - Ed Cucinelli
 
[Belle] Resume
[Belle] Resume[Belle] Resume
[Belle] Resume
 
Ravi resume
Ravi resumeRavi resume
Ravi resume
 
Content management – Strategy, process and tools in project life cycle and di...
Content management – Strategy, process and tools in project life cycle and di...Content management – Strategy, process and tools in project life cycle and di...
Content management – Strategy, process and tools in project life cycle and di...
 
Sachin Mohelay
Sachin MohelaySachin Mohelay
Sachin Mohelay
 
WH Integration
WH IntegrationWH Integration
WH Integration
 
JOINING TO EXIT ALL PERFORMANCE REPORT IN AIRCEL
JOINING TO EXIT ALL PERFORMANCE REPORT IN AIRCELJOINING TO EXIT ALL PERFORMANCE REPORT IN AIRCEL
JOINING TO EXIT ALL PERFORMANCE REPORT IN AIRCEL
 
Tammy Blunt Resume
Tammy Blunt ResumeTammy Blunt Resume
Tammy Blunt Resume
 
Resume-ParanthamanKrishnasamy
Resume-ParanthamanKrishnasamyResume-ParanthamanKrishnasamy
Resume-ParanthamanKrishnasamy
 
Amarnath RESUME
Amarnath RESUMEAmarnath RESUME
Amarnath RESUME
 
Abdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrsAbdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrs
 
ChrisNiehoffResume 11-12-15
ChrisNiehoffResume 11-12-15ChrisNiehoffResume 11-12-15
ChrisNiehoffResume 11-12-15
 
Resume PCL
Resume PCLResume PCL
Resume PCL
 
Best practices for streamlining your project – A joint demo of Viasys VDC and...
Best practices for streamlining your project – A joint demo of Viasys VDC and...Best practices for streamlining your project – A joint demo of Viasys VDC and...
Best practices for streamlining your project – A joint demo of Viasys VDC and...
 
20180223 project control loftvilles
20180223 project control loftvilles20180223 project control loftvilles
20180223 project control loftvilles
 
june'15
june'15june'15
june'15
 
100715resume (1)
100715resume (1)100715resume (1)
100715resume (1)
 

Similar to cv avik (20)

Harsh
HarshHarsh
Harsh
 
Resume
ResumeResume
Resume
 
Anil Resume
Anil ResumeAnil Resume
Anil Resume
 
CV Shreenivash Chandra
CV Shreenivash ChandraCV Shreenivash Chandra
CV Shreenivash Chandra
 
GMR
GMRGMR
GMR
 
Abhishek Resume
Abhishek ResumeAbhishek Resume
Abhishek Resume
 
Safnas_QS_Resume
Safnas_QS_ResumeSafnas_QS_Resume
Safnas_QS_Resume
 
Resume updated
Resume updatedResume updated
Resume updated
 
Resume_Chethan 2016
Resume_Chethan 2016Resume_Chethan 2016
Resume_Chethan 2016
 
Waqar Azeem -QS
Waqar Azeem -QSWaqar Azeem -QS
Waqar Azeem -QS
 
Prabakaran CV
Prabakaran CVPrabakaran CV
Prabakaran CV
 
Cherukuri
CherukuriCherukuri
Cherukuri
 
CV Planning Manager (Sundeep Khare)
CV Planning Manager (Sundeep Khare)CV Planning Manager (Sundeep Khare)
CV Planning Manager (Sundeep Khare)
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Manish kumar project planning & control with 3.7 years of experience
Manish kumar project planning & control with 3.7 years of experienceManish kumar project planning & control with 3.7 years of experience
Manish kumar project planning & control with 3.7 years of experience
 
2016 - Balaji Manivel - CV
2016 - Balaji Manivel - CV2016 - Balaji Manivel - CV
2016 - Balaji Manivel - CV
 
Mujtaba Ahmed Khan Resume (2)
Mujtaba Ahmed Khan Resume (2)Mujtaba Ahmed Khan Resume (2)
Mujtaba Ahmed Khan Resume (2)
 
raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)
 
Resume
ResumeResume
Resume
 
Mohammad_Yassen_Social_Media_Profile
Mohammad_Yassen_Social_Media_ProfileMohammad_Yassen_Social_Media_Profile
Mohammad_Yassen_Social_Media_Profile
 

cv avik

  • 1. AVIK SEN Ramakrishnagarh, P.O. Italgacha, Kolkata-700079 Contact: +91 9546476834; Email: joyzen92@gmail.com DOB: 2nd March, 1992 Assistant EngineerConstruction Offering 3 years and 3 months of prolific experience; seeking challenging assignments across the industry PROFESSIONAL EXPERIENCE Mcnally Bharat Engineering Company Limited since August 2013 Assistant Engineer Current CTC: 2.73 lakh p.a. . • Executing & monitoring the field works (Civil) for 2 years. • Currently Preparing Client Invoices along with Measurement sheet (CHP/AHP/BOP Packages) since 1 yr 3 months. • Coordinated with site manager for technical requirements, reporting requirements of management etc. Monitored Physical progress as well as cost progress of the project on weekly basis. • Skillfully prepared weekly and monthly progress reports for the management and also monitored Cash flow of the project and fund requirements. • Understood the Contracts and efficiently worked on ERP, MS Project. • Preparation Subcontractor Invoices along with Measurement sheet. Projects Undertaken Title Civil, Structural and Architectural works of BOP and CHP/AHP package for 2X250 MW Thermal Power Plant for BTPS ,Barauni (Since May’2014) Cost Rs 243 Crores (Materials By Client) Location Begusarai, Bihar EDUCATIONAL CREDENTIALS Degree/Course College/University Year Of Passing Marks Scored Diploma (Civil Engineering) Ramakrishna Mission Shilpapitha,Belgharia 2013 82.0 % Higher Secondary (12th ) W.B.C.H.S.E ,Patha Bhavan Ballygaunge 2010 71.5 % Madhyamik (10th ) W.B.B.S.E ,R.K.M.V. Narendrapur 2008 89.5 % Declaration I hereby declare that all the above furnished information is true to the best of my knowledge Date: Signature: