2. PERSONAL INFORMATION
Name: B. Mohan Mahidhar
Name of the father: B. Sita Rama Rao
Date of Birth: 29th August, 1997
Languages Known: Telugu, Hindi and English
Permanent Address: Door No. 7/7/9, Balijepallivari Street, Srikakulam,
Andhra Pradesh, India. PIN: 532001.
Mobile No.: 7013490704, 9791487288
Mail ID: mahidhar.134@gmail.com
Profile Summary: Motivated professional aiming for challenging
assignments in Project Management to utilize my techno managerial
skills for the development of organization and self. Having 2+ years of
experience as Planning Engineer in Hindustan Construction Company
Limited.
3. PERSONAL INFORMATION
Academic Qualification & Certifications:
Studied Construction Project Management, an online course
authorized by Columbia University, New York through Coursera in
September 2020.
Completed training in Road Estimator software by Infycons Creative
Software Pvt Ltd in December 2019.
Studied B.Tech in Civil Engineering from SRM University and secured
9.1 CGPA, passed out in 2018.
Software Known: AutoCAD, Road Estimator, Microsoft Office Package,
Microsoft Project
Achievements: Awarded with 100% Attendance award for the
consecutive 2 years during 2nd & 3rd year of B.Tech at SRM University,
Chennai.
4. In August 2018, I have started my career as a Site Engineer at Munirka
Elevated Corridor Project, Delhi in Hindustan Construction Company
Limited. The main scope of Munirka Elevated Corridor Project is to
construct 2.9 Km flyover from IIT Delhi to NH98. The cost of this project
is 278 Cr. In this project, I have learnt several construction
methodologies such as Piles, Pile Caps, Piers, Pier Caps, Portal Beams,
Girders, Deck Slabs etc. My responsibilities in this project are given
below:
Studying and understanding the drawings and execution of
construction activities as per approved drawings
Implementing and ensuring all safety practice in order to protect
man, machinery and all other employed at site.
Coordinate with client and take approval by them prior to
shuttering and concrete for each part of structure.
Responsible for the physical delivery of project as per contractual
commitment with safety and quality standards.
Assisting Construction Manager in all project related issues.
Preparing Bar Bending Schedules
MUNIRKA FLYOVER, DELHI
5. Portal Beams: M45 Grade Concrete was used for Portal Beams
MUNIRKA FLYOVER, DELHI
7. Deck Sheeting for Slab: Due to heavy traffic and limited access space, it was
not possible to install shuttering for the deck slab. So, the team installed deck
sheet instead of shuttering which did not require support from below.
MUNIRKA FLYOVER, DELHI
8. REINFORCEMENT – DECK SLAB
Reinforcement for Deck Slab: I have prepared Bar Bending Schedule for the
deck slab and I am responsible for proper placing and fitting of Reinforcement
as per approved drawing.
MUNIRKA FLYOVER, DELHI
9. Casting of Deck Slab: M45 Grade concrete was used for deck slab. I was
responsible for the shuttering & proper compaction of concrete and curing.
MUNIRKA FLYOVER, DELHI
10. SMA (Stone Mastic Asphalt): SMA has been laid over the deck slab as a
wearing coarse
MUNIRKA FLYOVER, DELHI
17. 2.9 Km Munirka flyover was inaugurated by Shri Arvind Kejriwal, Chief Minister of
Delhi on 16th July, 2019.
MUNIRKA FLYOVER, DELHI
18. In August 2019, I got a transfer to Sone Bridge Project, Bihar and I was
promoted to Planning Engineer. The main scope of the Sone Bridge
Project is to construct 2.9 Km Main Bridge over the river Sone and 7.5
Km of approach roads which connects from Aurangabad and Rohtas
districts. This project consists of 1 Main Bridge, 5 Minor Bridges, 5
Vehicular Underpasses, 23 Hume Pipe Culverts and 7.5 km of approach
roads.
The cost of this project is 501.11 Crs. Client is Bihar Rajya Pul Nirman
Nigam Limited. I was responsible for both Planning and as well as
Quantity Surveyor activities.
SONE BRIDGE PROJECT, BIHAR
19. Roles & Responsibilities:
Preparation of Progress reports, Productivity analysis and all other
reports and presentations for senior management and client review
meetings.
Preparation and updating the project schedule and annual project
budget for time and cost controls and assisted in contractual time and
cost claims.
Preparation of Running Account Bills for the project on monthly basis
and getting certified from client.
Reconciliation of materials & DPR Vs Client Billing Vs Subcon/ PRW
Billings.
Calculation of materials required for Road works and Structure works
by studying and understanding the scope of work from drawings and
BOQ and giving requirement to store department for procurement.
Preparation of Turnover of the project and preparing cash flows.
Preparation of Subcon/ PRW bills on every month end.
Booking the DPR & Client, Subcontractor/ PRW bills in SAP Software
(System, Applications & Products in Data Processing.
SONE BRIDGE PROJECT, BIHAR
21. Main Bridge: Length of Main Bridge was 2.9 Km. Well Foundation for piers and
Abutments with Pier cap of sufficient width to accommodate the superstructure of 4
Lane. Segmental PSC Box Girders were used.
SONE BRIDGE PROJECT, BIHAR