Consulting Engineer for Water Supply , Sewrege , Waste water , Solid waste , Storm water project etc
1. 1. CURRENT POSITION : TEAM LEADER cum Vice President
2. NAME OF FIRM : Choice Consultant Pvt Ltd
3. NAME OF EXPERT : N. RAVI
4. CURRENT RESIDENTIAL ADDRESS : Address: 146- Uranipatty Street -Srivilliputtur-626125-Virdhunagar Dist Tamilnadu
Telephone No: 8883792573
E-mail Address: ravijiju727@gmail.com
5. DATE OF BIRTH : 19th June 1969 CITIZENSHIP: Indian
Academic Qualification
: M. Tech Civil Engineering from Indian Institute of Integrated Science Technology and Research,
Chennai, 1995
B.E (Civil) (Specialization: Public Health & Environmental) from Indian Institute of Integrated
Science Technology and Research, Chennai, 1993
Diploma in Civil Engineering from State Board of Technical Education and Training, 1987
6. Percentage scored M.TECH III rd Sem - 85 % Final ( IV ) Sem- 98 %
B.TECH VII th Sem- 67.20 % Final (VIII) Sem- 86 %
7. EXPERIENCE 30 plus years of experience in Large-scale Water sector, Underground sewerage projects (UGD) ,
Storm water, Sludge disposal, wastewater management and all kind of civil infrastructure projects
including FIDIC contracts funded by various agencies like AFD, ADB, JICA, AMRUT, NABARD Bank,
World bank etc.
8. ROLES & RESPONSIBILITIES Project consultant, Design , Quality assurance, preparation of DPR, drawing, inception report, DMA
& reduction of NRW etc for 24x7 uninterrupted water supply & sewer project, Execution,
Implementation, Operation & Maintenance, PMC (Design, Operate & Build), Contract management
& Quality management , Detailed Engineering, scrutinizing in design & analysis of WTP, STP, ETP
pumping & lifting station, overhead service reservoir, sump & reservoir, collection well, Infiltration
well pumping & gravity main, distribution network, SCADA system & House service connection and
various structures etc
9. CONTACT : Mail - ravijiju727@gmail.com & Mobile 8883792573
10. EXPERTIZED : All kind of survey, Public health & Environmental Engineering and structural Engineering.
11. PASSPORT NO : M 9657158 Date of expiry- 01.06.2025
12. LANGUAGES : Read Write Speak
English Excellent Excellent Excellent
Hindi Fair Fair Excellent
Tamil Excellent Excellent Excellent
13. EMPLOYMENT RECORD :
S. No. From (Duration) To (Duration) Employer Position Held
(a) April -2023 Till Date M/s Choice Consultant Pvt Ltd Team Leader cum Vice President
(b) December 2022 March-2023 M/s Tractebel GKW Ltd Team Leader
(c) March 2022 November 2022 M/s Mars Planning & Engineering Service Pvt
Ltd
Team Leader
(d) September 2020 February 2022 WAPCOS Ltd (Third party : M/s Grow ever infrastructure
Pvt Ltd )
Team Leader cum Senior Public Health Engineer
(Project Head)
(e) July 2019 August 2020 M/s Sattva Engineering PVT Ltd Team Leader (Project Head)
(f) November 2017 June 2019 M/s Shriram EPC Co Ltd Team Leader (Project Head)
(g) February 2016 October 2017 M/s Keyem Engineering Team Leader (Project Head)
(h) November 2014 January 2016 M/s Lanarsy Infra Ltd Team Leader (Project Head)
(i) August 2012 October 2014 M/s Saisudhir Infrastructures Ltd Sr. Project Manager (Project Head)
(j) February 2010 July 2012 M/s IVRCL Infra Co Ltd and M/s NCC Co ltd Dy .Project Manager (Project Head)
2. (k) March 1989 February 2010 M/s IHP Co Ltd Project Manager (Project Head)
(l) June 1987 October 1989 M/s BALAJI & Co. Site Engineer
14. DETAILED TASKS ASSIGNED : As per RFP
15. WORKS UNDERTAKEN THAT BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASK ASSIGNED:
DETAILED TASKS ASSIGNED:
Responsible for overall Project Management, Contract Management & Administration, Quality Control & Assurance;
Establishment of Construction Management and Project Performance Monitoring and Reporting System in close coordination with the client
Quality assurance/ control and administration of multiple contracts.
Supervise the construction activity diligently during the implementation of the work.
Provide Training on best practices in construction management, Contract management.
Performance Monitoring of various contractors.
Support in preparing Project Completion Reports and progress reports.
Assist in resolving the contractual issue.
Ensure safety at work and compliance with ADB’s safeguard policies and procedures;
Lead a multi-disciplinary team of professional experts for design review and construction supervision;
Guide and oversee Planning, scheduling and monitoring of the project done through MS Project/Primavera;
Oversee Team to supervise the contractors in carrying out construction activities at the project site;
Monitor the construction method by assessing the adequacy of the contractor’s input materials, labour, equipment and construction
methods;
Capacity Building and Training of Corporation staff;
Assist in resolving contractual issues;
Guide and oversee Preparation of Progress and other Reports as required;
Analysis and design of various Industrial structures like RCC and Steel structural Plants including , pipe rack, platforms , Oil and Gas
industries, Foundations(raft, Piles, micro Piles, etc), Liquid retaining structures,
Hands on expertise in liquid retaining structures, design of dynamic foundations, Stack like Structures, Connection Design for Steel structure
Holds expertise in General Civil Engineering works, BOQ estimation , Design of Rigid and flexible pavements, Design of Storm water and
sanitary drains, etc
Preparation of specifications, tender document, BOQ, Cost Estimate along with technical & commercial bid evaluation and
recommendation and proficient in Civil and Structural.
Co-ordination with other disciplines, understanding the other discipline requirements, Architects and vendors. PMC design and Document
review and vendor drawing review
Shall be able to manage the project independently by planning and assigning the responsibilities to the team and handle face to face
conversation with client and contractors to resolve any design issues
Proficiency in various IS codes , American and British
A. Name of Assignment or project: Urban Water Supply Scheme Barmer , Jaisalmer, Paytu, Balotra, Pokran Project ( Total 5 separate project
Funded by: Jal Jeevan Mission
Year: April 2023 to Till date
Location: Rajasthan
Client: PHED Government of Rajasthan
Main project features: Earth work, Laying, jointing & Testing of and MS , DI pipes,HDPE pipes, pumping main and Gravity main, Construction of WTP, Construction
of collection well at Head works, ESR, GSR, House service connection, Domestic distribution network, Installation of SCADA, and allied infrastructural works, all kind
of EMI Length of MS, DI, HDPE pipe: 5723 Km.
Cost of Project: INR 953 Crores ( Inclusive of 5 project) Consultant cost @1.32%
Positions held: Team Leader cum Vice President (Project Head)
Activities Performed – Involve in Construction Supervision of 5 various WTP at Barmer ,Jaisalmer, Paytu, Balotra, Pokran, Construction of collection well at Head
works, ESR, GSR, House service connection, Domestic distribution network, Installation of SCADA, and allied infrastructural works.
Responsible for leading a team of multidisciplinary experts, Construction Supervision of Water Supply Network, Supervision stage: Review and approval of Working
/ Shop drawings, project management, day to day construction supervision, quality control, Material approval including electrical, Supervising structural, finishing
& piping works, etc., certifying contractor’s bills, conducting progress review meeting and take appropriate action for completion of various site activities as per
schedule, complying with contract conditions based on FIDIC, specification and liaison with Client and sub-contractors, The project including Planning and project
management of works using the latest version of Computerized Software applications like MS-Office/PERT and other related applied requirements independently.
A. Name of Assignment or project: Selection of consultant for long term Technical assistance for supporting the AFD project unit, PWD in charge -Augmentation of
water supply sources and rehabilitation system 24x7 water supply & Sewer Project- Pondicherry
Year: Dec 2022 to March 2023
Location: Pondicherry, India
Client: Public Works Department -Govt of Pondicherry
Main project features: Preparation of DPR, design & drawings & supervision of work for both Water Supply & Sewer Project like Earth work, Laying, jointing &
Testing of MS and DI pipes, HDPE, MDPE etc pumping main and Gravity main, Construction of WTP, Construction of collection well at Head works, ESR, GSR, House
service connection, Domestic distribution network, Installation of SCADA, and allied infrastructural works, all kind of EMI, Length of MS, DI, HDPE pipe: 946 Km etc.;
Funded by AFD
Cost of Project : INR 534 Crores. Consultant cost- 20 Crores
Positions held: Team Leader cum Senior Public Health Engineer
3. Activities Performed – Involve in Preparation of DPR, design & drawings and Implementation of Urban 24X7 continuous water supply zoning, DMA based DNI
project including leak detection monitoring and management, water metering; house service connections; assessment and implementation of Non-Revenue Water
reduction plan. Involve in Construction supervision of WTP, Construction of collection well at Head works, pumping station, ESR, GSR, House service connection,
Domestic distribution network, Installation of SCADA, and allied infrastructural works etc.
Responsible to ensure organizational effectiveness by providing leadership for the organization’s functions, Work with the management team and also to contribute
to the development and implementation of project’s strategies, policies and practices, Improve the operational system, processes and policies in support of
organizations mission- specifically support better management reporting, information flow and management project processes and organizational planning,
Conduct office management tasks, Manage and increase the effectiveness and efficiency of support services (Human Resource, IT and Finance) through
improvement to each function as well as coordination and communication between support and project functions, Motivate team and employees, Support in
other relevant tasks as assigned by the Project Director.
B. Name of Assignment or project: GADAKOTA Rural Water supply project 82 MLD WTP Under Multi Village Scheme.
Funded by: Jal Jeevan mission and NDB (National development Bank)
Project Cost: INR 210 Crores Consultant cost - 9 Crores
Year: March 2022 to Nov 2022
Location: Madhya Pradesh India
Client: JAL Nigam under Public Health Engineering Organization Department Govt of MP
Main project features: Earth work, Laying, jointing & Testing of MS and DI pipes, HDPE, MDPE pipe etc pumping main and Gravity main, Construction of WTP,
Construction of collection well at Head works, ESR, GSR, House service connection, Domestic distribution network, Installation of SCADA, and allied infrastructural
works, all kind of EMI, Length of MS, DI, HDPE pipe: 2756 Km etc.
Positions held: Team Leader
Activities Performed – Involve in Construction Supervision of 82 MLD WTP, Construction of collection well at Head works, ESR, GSR, House service connection,
Domestic distribution network, Installation of SCADA, and allied infrastructural works.
Responsible to ensure organizational effectiveness by providing leadership for the organization’s functions, Work with the management team and also to contribute
to the development and implementation of project’s strategies, policies and practices, Improve the operational system, processes and policies in support of
organizations mission- specifically support better management reporting, information flow and management project processes and organizational planning,
Conduct office management tasks, Manage and increase the effectiveness and efficiency of support services (Human Resource, IT and Finance) through
improvement to each function as well as coordination and communication between support and project functions, Motivate team and employees, Support in
other relevant tasks as assigned by the Project Director.
C. Name of Assignment or project: Urban Water supply project 55 MLD, 51 MLD, 42 MLD & 59 MLD (4 Nos. in different location) WTP at 4 various locations inclusive
of Sambalpur, Rourkela, Jharsuguda, Baripada cities. Funded by AMRUT
Year: Sep 2020 to Feb 2022
Location: Odisha, India
Client: PHED, Govt of Odisha
Main project features: Earth work, Laying, jointing & Testing of MS and DI pipes, HDPE, MDPE etc. pumping main and Gravity main, Construction of WTP,
Construction of collection well at Head works, ESR, GSR, House service connection, Domestic distribution network, Installation of SCADA, and allied infrastructural
works, all kind of EMI, Length of MS, DI, HDPE pipe: 946 Km etc.
Cost of Project: INR 470 Crores) Consultant cost - 34 Crores
Positions held: Team Leader cum Senior Public Health Engineer
Activities Performed – Involve in design and Implementation of Urban 24X7 continuous water supply zoning, DMA based DNI project including leak detection
monitoring and management, water metering; house service connections; assessment and implementation of Non-Revenue Water reduction plan. Construction
Supervision of 55 MLD, 51 MLD, 42 MLD & 59 MLD WTP, Construction of collection well at Head works, pumping station, ESR, GSR, House service connection,
Domestic distribution network, Installation of SCADA, and allied infrastructural works etc.
Responsible to ensure organizational effectiveness by providing leadership for the organization’s functions, Work with the management team and also to contribute
to the development and implementation of project’s strategies, policies and practices, Improve the operational system, processes and policies in support of
organizations mission- specifically support better management reporting, information flow and management project processes and organizational planning,
Conduct office management tasks, Manage and increase the effectiveness and efficiency of support services (Human Resource, IT and Finance) through
improvement to each function as well as coordination and communication between support and project functions, Motivate team and employees, Support in
other relevant tasks as assigned by the Project Director.
D. Name of Assignment or project: Water supply 152 MLD of WTP- Chennai Metro Water Supply Scheme (Pack 2 & 3) Funded by ADB
Year: Jul 2019 to Aug 2020
Location: Tamil Nadu, India
Client: Chennai Metro Corporation Chennai
Main project features: Earth work, Laying, jointing & Testing of MS and DI pipes, HDPE, MDPE etc pumping main and Gravity main, Construction of WTP,
Construction of collection well at Head works, ESR, GSR, House service connection, Domestic distribution network, Installation of SCADA, and allied infrastructural
works, all kind of EMI, Length of MS, DI, HDPE pipe: 1216 Km.
Cost of Project: INR 525 Crores). Consultant cost 26 Crores
Positions held: Team Leader (Project Head)
Activities Perform – Involve in Construction Supervision of 15 MLD WTP, Construction of collection well at Head works, pumping station, ESR, GSR, House service
connection, Domestic distribution network, Installation of SCADA, and allied infrastructural works etc.
Responsible for leading a team of multidisciplinary experts, Construction Supervision of Water Supply Network, Supervision stage: Review and approval of Working
/ Shop drawings, project management, day to day construction supervision, quality control, Material approval including electrical, Supervising structural, finishing
& piping works, etc., certifying contractor’s bills, conducting progress review meeting and take appropriate action for completion of various site activities as per
schedule, complying with contract conditions based on FIDIC, specification and liaison with Client and sub-contractors, The project including Planning and project
management of works using the latest version of Computerized Software applications like MS-Office/PERT and other related applied requirements independently.
E. Name of Assignment or project: Urban & Rural WSS -176 MLD WTP Chennai Metro Water Supply Scheme (Package -1). Funded by: ADB.
Year: Nov 2017 to Jun 2019
Location: Tamil Nadu, India
Client: Chennai Metro Corporation Chennai
4. Main project features: Earth work, Laying, jointing & Testing of MS and DI pipes, HDPE, MDPE etc pumping main and Gravity main, Construction of WTP,
Construction of collection well at Head works, ESR, GSR, House service connection, Domestic distribution network, Installation of SCADA, and allied infrastructural
works, all kind of EMI, Length of MS, DI, HDPE pipe: 1226 Km.
Cost of project: INR 438 Crores). Consultant cost – 23 Crores
Positions held: Team Leader (Project Head)
Activities Performed – Involve in Construction Supervision of 176 MLD WTP, Construction of collection well at Head works, ESR, GSR, House service connection,
Domestic distribution network, Installation of SCADA, and allied infrastructural works etc.
Responsible for supervising the execution and implementation of works at site, taking measurements including supervising preparing/checking and recommending
contractor’s bills/invoices and coordination with third party consultants, Carry out technical audit reports, drawing designs, estimates, BOQ, Site survey, evaluation
and analysis including soil investigation, sanitary, plumbing, drainage, water supply, and sewerage internal roads, electrification works etc., Day to day observations
of execution of construction works by contractors for the purpose of conformance with the detail engineering designs and drawings at site, Prepare detailed
PERT/CPM charts and simultaneously analyse/supervise contractors construction activities with reference to time frame, resource allocation and scheduling using
latest techniques, responsible to maintain complete documentation and render all technical services as may in any way relocate to construction and quality control
works at project site., etc.
F. Name of Assignment or project: Ulundurpet-UGD- 26 MLD of STP - Ulundurpettai UGD project. Funded by World Bank
Year: Feb 2016 to Oct 2017
Location: Tamil Nadu, India
Client: Government of Tamil Nadu - TWAD
Main project features: Earth work, Laying, jointing & Testing of DI, HDPE, PVC, Stoneware pipes, pumping main and Gravity main, Construction of 26 MLD STP,
Construction of Sewerage collection system including pumping station, House service connection, Domestic distribution network, Installation of SCADA, and allied
infrastructural works, all kind of EMI works Length of pipe lines: 256 Km.
Cost of Project: INR 102 Crores).
Positions held: Team Leader (Project Head)
Activities Performed - Responsible for Design and implementation of Earth work, Laying, jointing & Testing of DI, HDPE, PVC, Stoneware pipes, pumping main and
Gravity main, Construction of 26 MLD STP, Construction of Sewerage collection system including pumping station, House service connection, Domestic distribution
network, Installation of SCADA, and allied infrastructural works, all kind of EMI works Length of pipe lines: 256 Km.
Supervising the execution and implementation of works at site, taking measurements including supervising preparing/checking and recommending contractor’s
bills/invoices and coordination with third party consultants, Carry out technical audit reports, drawing designs, estimates, BOQ, Site survey, evaluation and analysis
including soil investigation, sanitary, plumbing, drainage, water supply, and sewerage internal roads, electrification works etc., Day to day observations of execution
of construction works by contractors for the purpose of conformance with the detail engineering designs and drawings at site, Prepare detailed PERT/CPM charts
and simultaneously analyse/supervise contractors construction activities with reference to time frame, resource allocation and scheduling using latest techniques,
responsible to maintain complete documentation and render all technical services as may in any way relocate to construction and quality control works at project
site., etc.
G. Name of Assignment or project: ERODE - UGD project - 78 MLD of STP. Funded by: ADB.
Year: Nov 2014 to Jan 2016
Location: Tamil Nadu, India
Client: ERODE Corporation
Main project features: Earth work, Laying, jointing & Testing of DI, HDPE, PVC, Stoneware pipes, pumping main and Gravity main, Construction of 78 MLD STP,
Construction of Sewerage collection system including pumping station, House service connection, Domestic distribution network, Installation of SCADA, and allied
infrastructural works, all kind of EMI works Length of pipe line: 659 Km.
Cost of Project: INR 186 Crores).
Positions held: Team Leader (Project Head)
Activities Performed - Responsible for Design and implementation of Earth work, Laying, jointing & Testing of DI, HDPE, PVC, Stoneware pipes, pumping main and
Gravity main, Construction of 78 MLD STP, Construction of Sewerage collection system including pumping station, House service connection, Domestic distribution
network, Installation of SCADA, and allied infrastructural works, all kind of EMI works Length of pipe line: 659 Km.
Involve in review designs and drawings, methodologies of various contracts, responsible for overall coordination and monitoring of all stages of the assignment by
providing strategic and technical advice, preparation of execution drawings and service drawings for construction, preparation of bill of quantities, estimates and
rate analysis based on market rates, Schedule of Rates etc. for civil, plumbing and water supply, reviewing of design basis drawings of the Contractor for Lay out
Plans, Estimates, Technical Specifications, Construction Methodology and Erection scheme, involved in Checking RCC and finishing activities on daily basis and
conducting technical and quality audits at project sites. Inspecting slabs, post-concreting and during concreting, materials received at site, maintaining
Measurement Book, Checking the measurements and prepare bills, check and approve interim payment of sub-contractors, lead and manage the team consisting
of Civil Engineers and guide in construction supervision and quality auditing, involved in project management including supervision and quality control of
construction of internal roads, water supply, drainage, sanitation etc.
H. Name of Assignment or project: Urban & RWS- HOKENAKKAL Water Supply Scheme (Package 4) Capacity of 161 MLD WTP. Funded by: JICA.
Year: Aug 2012 to Oct 2014
Location: Hosur (Tamil Nadu)
Client: Government of Tamil Nadu – TWAD
Main project features: Earth work, Laying, jointing & Testing of MS and DI pipes, pumping main and Gravity main, Construction of WTP, Construction of collection
well at Head works, ESR, GSR, House service connection, Domestic distribution network, Installation of SCADA, and allied infrastructural works, all kind of EMI
Length of MS, DI, HDPE pipe: 2723 Km. (Cost of Project: INR 453 Crores).
Positions held: Team Leader (Project Head)
Activities Performed – Involve in Construction Supervision of 161 MLD WTP, Construction of collection well at Head works, ESR, GSR, House service connection,
Domestic distribution network, Installation of SCADA, and allied infrastructural works.
Responsible for leading a team of multidisciplinary experts, Construction Supervision of Water Supply Network, Supervision stage: Review and approval of Working
/ Shop drawings, project management, day to day construction supervision, quality control, Material approval including electrical, Supervising structural, finishing
& piping works, etc., certifying contractor’s bills, conducting progress review meeting and take appropriate action for completion of various site activities as per
schedule, complying with contract conditions based on FIDIC, specification and liaison with Client and sub-contractors, The project including Planning and project
management of works using the latest version of Computerized Software applications like MS-Office/PERT and other related applied requirements independently.
5. I. Name of Assignment or project: Urban & RWS - HOKENAKKAL Water Supply Scheme (Package-1 & 2) 161 MLD of WTP. Funded by: JICA.
Year: Feb 2010 to Jul 2012
Location: Dharmapuri (Tamil Nadu)
Client: TWAD Board Government of Tamil Nadu
Main project features: Earth work, Laying, jointing & Testing of MS and DI pipes, HDPE, MDPE etc pumping main and Gravity main, Construction of WTP,
Construction of collection well at Head works, ESR, GSR, House service connection, Domestic distribution network, Installation of SCADA, and allied infrastructural
works, all kind of EMI works -Length of MS, DI, HDPE pipe: 2602 Km.
(Cost of Project: INR 552 Crores).
Positions held: Team Leader (Project Head)
Activities Performed – Involve in Construction Supervision of 161 MLD WTP, Construction of collection well at Head works, ESR, GSR, House service connection,
Domestic distribution network, Installation of SCADA, and allied infrastructural works, all kind of EMI works etc.
Responsible for leading a team of multidisciplinary experts, Construction Supervision of Water Supply Network, Supervision stage: Review and approval of Working
/ Shop drawings, project management, day to day construction supervision, quality control, Material approval including electrical, Supervising structural, finishing
& piping works, etc., certifying contractor’s bills, conducting progress review meeting and take appropriate action for completion of various site activities as per
schedule, complying with contract conditions based on FIDIC, specification and liaison with Client and sub-contractors, The project including Planning and project
management of works using the latest version of Computerized Software applications like MS-Office/PERT and other related applied requirements independently.
J. Name of Assignment or project: 79 MLD of WTP – Rural Water Supply - Namakkal Water Supply project. Funded by: World Bank.
Year: May 2004 to Feb 2010
Location: Tamil Nadu, India
Client: TWAD Board Government of Tamil Nadu
Main project features: Earth work, Laying, jointing & Testing of MS and DI pipes, PVC & GI pipe etc pumping main and Gravity main, Construction of WTP,
Construction of collection well at Head works, ESR, GSR, House service connection, Domestic distribution network, Installation of SCADA, and allied infrastructural
works, all kind of EMI Length of MS, DI, HDPE pipe: 2899 Km. (Cost of Project: INR 523 Crores).
Positions held: Project Manager (Team Leader) (Project Head)
Activities Performed – Involve in Construction Supervision of 79 MLD WTP, Construction of collection well at Head works, ESR, GSR, House service connection,
Domestic distribution network, Installation of SCADA, and allied infrastructural works etc.
Responsible for leading a team of multidisciplinary experts, Construction Supervision of Water Supply Network, Supervision stage: Review and approval of Working
/ Shop drawings, project management, day to day construction supervision, quality control, Material approval including electrical, Supervising structural, finishing
& piping works, etc., certifying contractor’s bills, conducting progress review meeting and take appropriate action for completion of various site activities as per
schedule, complying with contract conditions based on FIDIC, specification and liaison with Client and sub-contractors, The project including Planning and project
management of works using the latest version of Computerized Software applications like MS-Office/PERT and other related applied requirements independently.
K. Name of Assignment or project: 31 MLD WTP at Perundurai Urban - Water Supply project. Funded by: World Bank.
Year: Mar 1998 to Apr 2004
Location: Tamil Nadu, India
Client: TWAD Board, Tamil Nadu
Main project features: Earth work, Laying, jointing & Testing of MS and DI pipes, PVC & GI pipe etc pumping main and Gravity main, Construction of WTP,
Construction of collection well at Head works, ESR, GSR, House service connection, Domestic distribution network, Installation of SCADA, and allied infrastructural
works, all kind of EMI Length of MS, DI, PVC pipe: 323 Km. (Cost of Project: INR 89 Crores).
Positions held: Dy. Project Manager (Team Leader) (Project Head)
Activities Performed – Involve in Construction Supervision of 31 MLD WTP, Construction of collection well at Head works, ESR, GSR, House service connection,
Domestic distribution network, Installation of SCADA, and allied infrastructural works etc.
Responsible for assisting the Project Manager in Planning of works using Project Management Techniques, quantity measurements for all items of works executed
at different stages for calculations required for payment purposes throughout the duration of the project; Check cost estimates of works as required; Preparation
of Cash Flow Projections, preparation of progress reports of the project, Preparation of Bill, Earthwork Calculations, Extra items, Substitute items, Variation orders,
Indents, Escalation bill, Rate analysis, Handling of Contract Agreement, Scrutiny of Bills, Measurement Book record entry and Procurement of materials.
L. Name of Assignment or project: Urban & Rural Water Supply - Chennai Metro, Chengalpattu WSS (55 MLD) , Sriperumbathur WSS (42 MLD), Thiruvannamalai
WSS ( 33 MLD) , Salem WSS 59 MLD) . (Total 5 project) Funded by: World Bank & NABARD Bank
Year: Nov 1989 to Feb 1998
Location: Chennai, Tamil Nadu
Client: M/s The Indian Hume Pipe Co, Ltd
Main project features: Earth work, Laying, jointing & Testing of MS and DI pipes, PVC, HDPE, MDPE etc pumping main and Gravity main, Construction of WTP,
Construction of collection well at Head works, ESR, GSR, House service connection, Domestic distribution network, Installation of SCADA, and allied infrastructural
works, all kind of EMI Length of MS, DI, PVC pipe: 823 Km.
Cost of Project: INR 253 Crores. (Cost of 5 project)
Positions held: Site-in-charge (Team Leader) (Project Head)
Activities Performed- Involve in Construction Supervision of laying of pipeline, WTP, Construction of collection well at Head works, ESR, GSR, House service
connection, Domestic distribution network, Installation of SCADA, and allied infrastructural works etc.
Responsible for assisting the Project Manager in Planning of works using Project Management Techniques, quantity measurements for all items of works executed
at different stages for calculations required for payment purposes throughout the duration of the project; Check cost estimates of works as required; Preparation
of Cash Flow Projections, preparation of progress reports of the project, Preparation of Bill, Earthwork Calculations, Extra items, Substitute items, Variation orders,
Indents, Escalation bill, Rate analysis, Handling of Contract Agreement, Scrutiny of Bills, Measurement Book record entry and Procurement of materials.
M. Name of Assignment or project: Urban Water supply scheme – WTP of 52 MLD Coimbatore Water Supply Scheme project. Funded by World Bank
Year: Jun 1987 to Oct 1989
Location: Tamil Nadu, India
Client: TWAD Board, Tamil Nadu
Main project features: Earth work, Laying, jointing & Testing of MS and DI pipes, pumping main and Gravity main, Construction of WTP, Construction of collection
well at Head works, ESR, GSR, House service connection, Domestic distribution network, Installation of SCADA, and allied infrastructural works, all kind of EMI
Length of MS, DI, PVC pipe: 325 Km.
Cost of Project: INR 48 Crores).
6. Positions held: Site-in-charge
Activities Performed – Involve in Construction Supervision of 52 MLD WTP, Construction of collection well at Head works, ESR, GSR, House service connection,
Domestic distribution network, Installation of SCADA, and allied infrastructural works etc.
Responsible for assisting the Project Manager in Planning of works using Project Management Techniques, quantity measurements for all items of works executed
at different stages for calculations required for payment purposes throughout the duration of the project; Check cost estimates of works as required; Preparation
of Cash Flow Projections, preparation of progress reports of the project, Preparation of Bill, Earthwork Calculations, Extra items, Substitute items, Variation orders,
Indents, Escalation bill, Rate analysis, Handling of Contract Agreement, Scrutiny of Bills, Measurement Book record entry and Procurement of materials.
14. CERTIFICATION
I, the undersigned, certify to the best of my knowledge and belief that:
(i) This CV correctly describes my qualifications and experience
(ii) I am not a current employee of the Executing or the Implementing Agency
(iii) In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of the inputs specified for me in Form TECH 6 provided
team mobilization takes place within the validity of this proposal.
(iv) I was not part of the team who wrote the terms of reference for this consulting services assignment
(v) I am not currently debarred by a multilateral development bank or temporarily suspended by funding agent.
(vi) I confirm that I will be available to carry out the assignment for which my CV has been submitted in accordance with the implementation arrangements and
schedule set out in the Proposal.
(vii) certify that I have obtained the consent of the named expert to submit his/her CV, and that she/he will be available to carry out the assignment in accordance
with the implementation arrangements and schedule set out in the Proposal, and confirm his/her compliance with paras (i) to (v) above.
I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.
_________________________________________________________________________Date: 10/12/2023
[Signature of expert] Day/Month/Year