SlideShare a Scribd company logo
1 of 4
IMRAN SYED
Nationality: Indian.
Passport no: L38836656
Email ID: immuzdmbv@yahoo.co.in : +91 7760908181
Current Location: Karnataka, India
POSITION/POST APPLIED FOR:
Project Manager, Project Team Leader, Construction Manager, QA/QC Manager
SUMMARY:
A well presented and pro-active project manager who has a relentless drive to have a broad
impact rather than just deliver results. Possessing vast experience of coordinating and managing
all project activity, providing clear guidance and leadership to a team and ensuring that all
legislative requirements are fully met. Henry is a confident communicator with strong
interpersonal and analytical skills who thrives on social interaction and customer satisfaction. He
is presently looking to join a company where success is rewarded and internal succession is
always given priority.
TOTAL PROFESSIONAL EXPERIENCE: 12 years (Including Middle East Experience)
AREA OF EXPERTISE
• Highway Construction works
• Bridges, Retaining wall, pilling Construction works
• Slope protection, under pass Construction works
• Building Construction works
• Sewage and storm drainage pipeline construction works
• Preparation of BOQ and Tender documents
SKILLS
Project Management Professional Personal
1
Change management
Motivating staff
Infrastructure projects
Managing stakeholder
s Prince 2 Practitioner
IT projects Project
planning Contract
administration
Identifying key issues
Leadership skills
Estimating costs
Budgetary control
Technical support
Commercial experience
Information gathering
Coaching staff
Strategic thinking IT
skills Influencing skills
Conflict resolution
Problem solving
Analytical mind High
levels of integrity
Negotiating skills
EDUCATION QUALIFICATIONS
Master Highway Technology (82% complete), 2005
Visvesvaraya Technological University,
B.M.S.College of Engineering, Karnataka, India
Graduate Civil Engineering (73% complete), 2003
Visvesvaraya Technological University,
Malnad College of Engineering, Karnataka, India
PROFESSIONAL EXPERIENCE AND SIGNIFICANT ACHIEVEMENTS
Project Manager Jan 15-Till date
S.K. Construction Company, Pvt Hassan, INDIA.
Executing two 2 projects:
1. Construction of Civil court in Periyapatna, Mysore division.
2. Maintenance of roads package 12.
Responsibility:
Overal responsibility of project for arranging materials, manpower client discussions
approvals, quality control and assurance and safety.
Project Manager. June 11-Dec2014
Al Ayuni Investment and Contracting Company, Saudi Arabia.
project:
3. ISKAN PROJECT: Consists of interchange bridges and construction of highway (4th
ring road) works.
Client: AMANA.
Consultant: Abal Khail.
RESPONSIBILITY:
• Reporting to the project Management department.
• Review on work execution with work program on daily basis.
• Preparing and submissions of Internal Payment Certificates.
• Assembling project team,
• Assigning individual responsibilities,
• Identifying appropriate resources needed,
• Developing schedules to ensure timely completion of project,
• Coordination meetings with all utility departments to reduce damages.
• To ensure all work activities are as per approved methodology.
• Communicating project status and issues to team and management,
• Acting to reduce risk and resolve issues.
• Preparing/Scheduling weekly/monthly work activities,
• Reviewing Method statements, Drawing and technical specifications,
• Selecting appropriate materials as per BOQ, Specification and Drawings for construction.
• Supervising site Engineers, surveyors, planners, Quantity surveyors for ongoing works.
• Ensuring all resources (manpower and materials), are provided as per scheduled plan.
• Developing strong relationship with consultants.
• Reporting project status at progress meetings with consultants and client.
2
• Collecting all required permissions from concerned departments prior to execution of
work as per our drawings/contract.
• To Ensure HSE plan and distribute the same with project staff.
2. ENTRIES/EXIT LEADIND TO KING SAUD HEALTH UNIVERSITY AT NATIONAL GUARD
AREA,RIYADH, (Project includes construction of 3 Bridges, 2 Flyovers, 2nd
ring road highway
construction, underpasses with retaining walls (525mts), and drainage system works) responsible
for overall construction of this project costing around SAR 621,864,500.00 , direct supervision of
onsite works, chairing meetings.
Client: Ministry of Road Transportation.
Consultant: Ital Consult Sab.
1. STROM DRAINAGE FOR RING ROAD IN RIYADH (PREVENTIVE MAINTENANCE PROJECT).
(Project consists of constructing drainage line of pipe (and box culverts) of 1 mtr dia, in different
locations completing length of 920 mts, with project cost around 211 million SAR
Client: Ministry of Road Transportation.
Consultant: SAUD Consult.
Project Engineer March 11-june 11
S.K. Construction Company, Pvt Hassan, INDIA.
Involved in 3 projects:
3. Construction of ITA College in Nagalpur, Hassan District,
4. Construction of Home science College, Hassan district,
5. Construction of Government first grade college,Hassan district.
• Assembling project team,
• Assigning individual responsibilities,
• Identifying appropriate resources needed,
Project Engineer Nov 10- Feb 11
Maldives Transport and Contracting Company Plc, Male, Maldives
For project H D C Road Development Project 2010, responsible for overall construction of project
costing around 3.23 million UD dollars, direct supervision of onsite contractors, chairing meetings.
• Reporting to the project management.
• Preparing/Reviewing Method statements, technical specifications, and overseeing shop
drawings, prior to start constructions.
• Closely reviewing work breakdown structure and general spec, milestone identification
and planning.
• Identifying ongoing project risks and assigning and mitigating risks.
Project Engineer June 10-Oct 10
S.K. Construction Company, Pvt Hassan, INDIA.
For project Construction of Police quarters (Govt. Projects), private construction covering all
activities involved in project execution.
3
Senior Quality Control and Quality Assurance Engineer Dec 08-May 10
Burhan International Construction Company, Doha, Qatar.
For project Construction of Pump Station 32A Main Forwarding from Doha to Rayyan
Sewerage Pipe Connection (ASHGHAL PROJECT), which includes construction of Pump
station, DI (1200mm dia) and GRP (1800mm dia) pipe laying works through which water will be
pumped to treatment plant, reinstatement works after pipe laying, micro tunneling works near road
intersections.
• Reporting to the project manager.
• Quality control and assurance of all permanent works.
• Quality inspection of Excavation, Laying, backfilling for 1800mm & 1200mm dia pipe.
• Preparing of Method statements, request forms and approval of same.
Assistant Highway Engineer May 08-Nov 08
SCOTT WILSON (consultancy) Pvt Ltd, Bangalore, INDIA.
For project Up Gradation Works at Cochin International Airport, Kerla State, and Karnataka
State Highway Improvement Projects (KSHIP-II Phase IB). Where involved in preparation of
Tender documents, BOQ, Detail project reports.
• Reporting to the Team Leader.
• Collecting soil samples from existing sub grade material from field for soil investigation.
• Preparing BOQ with senior engineers.
Material cum Highway Engineer Feb 03-Apr 08
PBI Construction Company, Mysore, INDIA.
For project Strengthening Existing Bilikere - Belur Road State Highway (SH-57), from km 0.00
to 38.60 km with associated link roads.
Responsibility:
Where involved in preparing method statements, mix design, checking asphalts temperatures and
reviewing shop drawings.
• Reporting project manager daily with task schedules,
• Routine checks for project specified test for each layers in highway includes all soil,
Aggregate and Asphalt tests.
• Execution with levels and thickness of each layer.
DECLARATION
I hereby declare that the above written particulars are true to the best of my knowledge and
belief.
Place: Karnataka,india.
Date: 05-05-2015 IMRAN. SYED
4

More Related Content

What's hot

CV - AMIYA RANJAN HALDAR
CV - AMIYA RANJAN HALDARCV - AMIYA RANJAN HALDAR
CV - AMIYA RANJAN HALDARAmiya Halder
 
Rajinder kumar updated resume
Rajinder  kumar updated resumeRajinder  kumar updated resume
Rajinder kumar updated resumeRAJINDER KUMAR
 
civil engineer Cv
civil engineer Cvcivil engineer Cv
civil engineer CvRinu Chacko
 
Nawab civil supervisor cv
Nawab civil supervisor cvNawab civil supervisor cv
Nawab civil supervisor cvWasimIqbal28
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-NewManish Sabane
 
RANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLRANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLranganathan shankar
 
Basheer Ahmed Senior Infrastructure
Basheer Ahmed Senior InfrastructureBasheer Ahmed Senior Infrastructure
Basheer Ahmed Senior InfrastructureBasheer Nahiyoon
 
New updated CV ( Siddesha.Maidur)
New updated CV ( Siddesha.Maidur)New updated CV ( Siddesha.Maidur)
New updated CV ( Siddesha.Maidur)siddesh siddu
 
ANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEankush kumar
 
Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)RAJA KUMAR .R
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copyali haider
 
CV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERING
CV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERINGCV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERING
CV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERINGEngGalaydh Farah Axmed
 
Amer Zubair - QS
Amer Zubair - QSAmer Zubair - QS
Amer Zubair - QSAmer Zubair
 
Muhammad Aslam Bhutto Cv 2015
Muhammad Aslam Bhutto Cv 2015Muhammad Aslam Bhutto Cv 2015
Muhammad Aslam Bhutto Cv 2015muhammad aslam
 
Khan Sardar New C.V.DOC
Khan Sardar New C.V.DOCKhan Sardar New C.V.DOC
Khan Sardar New C.V.DOCKhan Sardar
 

What's hot (20)

CV - AMIYA RANJAN HALDAR
CV - AMIYA RANJAN HALDARCV - AMIYA RANJAN HALDAR
CV - AMIYA RANJAN HALDAR
 
Rajinder kumar updated resume
Rajinder  kumar updated resumeRajinder  kumar updated resume
Rajinder kumar updated resume
 
civil engineer Cv
civil engineer Cvcivil engineer Cv
civil engineer Cv
 
Civil engineer
Civil engineerCivil engineer
Civil engineer
 
Nawab civil supervisor cv
Nawab civil supervisor cvNawab civil supervisor cv
Nawab civil supervisor cv
 
Curriculum Vitae Of Khalid
Curriculum Vitae Of KhalidCurriculum Vitae Of Khalid
Curriculum Vitae Of Khalid
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
RANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLRANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CL
 
wilson cv
wilson cvwilson cv
wilson cv
 
CV-SITE SUPERVISOR
CV-SITE SUPERVISORCV-SITE SUPERVISOR
CV-SITE SUPERVISOR
 
Basheer Ahmed Senior Infrastructure
Basheer Ahmed Senior InfrastructureBasheer Ahmed Senior Infrastructure
Basheer Ahmed Senior Infrastructure
 
New updated CV ( Siddesha.Maidur)
New updated CV ( Siddesha.Maidur)New updated CV ( Siddesha.Maidur)
New updated CV ( Siddesha.Maidur)
 
ANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAE
 
Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)
 
Civil Engineer - CV
Civil Engineer - CVCivil Engineer - CV
Civil Engineer - CV
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
CV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERING
CV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERINGCV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERING
CV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERING
 
Amer Zubair - QS
Amer Zubair - QSAmer Zubair - QS
Amer Zubair - QS
 
Muhammad Aslam Bhutto Cv 2015
Muhammad Aslam Bhutto Cv 2015Muhammad Aslam Bhutto Cv 2015
Muhammad Aslam Bhutto Cv 2015
 
Khan Sardar New C.V.DOC
Khan Sardar New C.V.DOCKhan Sardar New C.V.DOC
Khan Sardar New C.V.DOC
 

Similar to Project Manager Imran Syed

Similar to Project Manager Imran Syed (20)

Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
MAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANEMAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANE
 
Amjad Bacha CV Apr 2014 (1)
Amjad Bacha CV Apr 2014 (1)Amjad Bacha CV Apr 2014 (1)
Amjad Bacha CV Apr 2014 (1)
 
My new resume- Copy (1) (3) - Copy
My new resume- Copy (1) (3) - CopyMy new resume- Copy (1) (3) - Copy
My new resume- Copy (1) (3) - Copy
 
Giri - CV
Giri - CVGiri - CV
Giri - CV
 
Jois Lakshmipathy - CV
Jois Lakshmipathy - CVJois Lakshmipathy - CV
Jois Lakshmipathy - CV
 
Curriculum Vitae-Zuber
Curriculum Vitae-ZuberCurriculum Vitae-Zuber
Curriculum Vitae-Zuber
 
Anand ponnaiah
Anand ponnaiahAnand ponnaiah
Anand ponnaiah
 
cv.dchand copy
cv.dchand copycv.dchand copy
cv.dchand copy
 
Sudhakar Vordhi 27012016
Sudhakar Vordhi 27012016Sudhakar Vordhi 27012016
Sudhakar Vordhi 27012016
 
K. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QSK. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QS
 
CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)
 
CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)
 
CV (2)
CV (2)CV (2)
CV (2)
 
CV- bala qa
CV- bala qaCV- bala qa
CV- bala qa
 
B_Naik-CV1
B_Naik-CV1B_Naik-CV1
B_Naik-CV1
 
Manoj cv
Manoj cv Manoj cv
Manoj cv
 
CV of Mohammad Khalid Perwez.
CV of Mohammad Khalid Perwez.CV of Mohammad Khalid Perwez.
CV of Mohammad Khalid Perwez.
 
Civil engineer strategic
Civil engineer strategicCivil engineer strategic
Civil engineer strategic
 

Project Manager Imran Syed

  • 1. IMRAN SYED Nationality: Indian. Passport no: L38836656 Email ID: immuzdmbv@yahoo.co.in : +91 7760908181 Current Location: Karnataka, India POSITION/POST APPLIED FOR: Project Manager, Project Team Leader, Construction Manager, QA/QC Manager SUMMARY: A well presented and pro-active project manager who has a relentless drive to have a broad impact rather than just deliver results. Possessing vast experience of coordinating and managing all project activity, providing clear guidance and leadership to a team and ensuring that all legislative requirements are fully met. Henry is a confident communicator with strong interpersonal and analytical skills who thrives on social interaction and customer satisfaction. He is presently looking to join a company where success is rewarded and internal succession is always given priority. TOTAL PROFESSIONAL EXPERIENCE: 12 years (Including Middle East Experience) AREA OF EXPERTISE • Highway Construction works • Bridges, Retaining wall, pilling Construction works • Slope protection, under pass Construction works • Building Construction works • Sewage and storm drainage pipeline construction works • Preparation of BOQ and Tender documents SKILLS Project Management Professional Personal 1 Change management Motivating staff Infrastructure projects Managing stakeholder s Prince 2 Practitioner IT projects Project planning Contract administration Identifying key issues Leadership skills Estimating costs Budgetary control Technical support Commercial experience Information gathering Coaching staff Strategic thinking IT skills Influencing skills Conflict resolution Problem solving Analytical mind High levels of integrity Negotiating skills
  • 2. EDUCATION QUALIFICATIONS Master Highway Technology (82% complete), 2005 Visvesvaraya Technological University, B.M.S.College of Engineering, Karnataka, India Graduate Civil Engineering (73% complete), 2003 Visvesvaraya Technological University, Malnad College of Engineering, Karnataka, India PROFESSIONAL EXPERIENCE AND SIGNIFICANT ACHIEVEMENTS Project Manager Jan 15-Till date S.K. Construction Company, Pvt Hassan, INDIA. Executing two 2 projects: 1. Construction of Civil court in Periyapatna, Mysore division. 2. Maintenance of roads package 12. Responsibility: Overal responsibility of project for arranging materials, manpower client discussions approvals, quality control and assurance and safety. Project Manager. June 11-Dec2014 Al Ayuni Investment and Contracting Company, Saudi Arabia. project: 3. ISKAN PROJECT: Consists of interchange bridges and construction of highway (4th ring road) works. Client: AMANA. Consultant: Abal Khail. RESPONSIBILITY: • Reporting to the project Management department. • Review on work execution with work program on daily basis. • Preparing and submissions of Internal Payment Certificates. • Assembling project team, • Assigning individual responsibilities, • Identifying appropriate resources needed, • Developing schedules to ensure timely completion of project, • Coordination meetings with all utility departments to reduce damages. • To ensure all work activities are as per approved methodology. • Communicating project status and issues to team and management, • Acting to reduce risk and resolve issues. • Preparing/Scheduling weekly/monthly work activities, • Reviewing Method statements, Drawing and technical specifications, • Selecting appropriate materials as per BOQ, Specification and Drawings for construction. • Supervising site Engineers, surveyors, planners, Quantity surveyors for ongoing works. • Ensuring all resources (manpower and materials), are provided as per scheduled plan. • Developing strong relationship with consultants. • Reporting project status at progress meetings with consultants and client. 2
  • 3. • Collecting all required permissions from concerned departments prior to execution of work as per our drawings/contract. • To Ensure HSE plan and distribute the same with project staff. 2. ENTRIES/EXIT LEADIND TO KING SAUD HEALTH UNIVERSITY AT NATIONAL GUARD AREA,RIYADH, (Project includes construction of 3 Bridges, 2 Flyovers, 2nd ring road highway construction, underpasses with retaining walls (525mts), and drainage system works) responsible for overall construction of this project costing around SAR 621,864,500.00 , direct supervision of onsite works, chairing meetings. Client: Ministry of Road Transportation. Consultant: Ital Consult Sab. 1. STROM DRAINAGE FOR RING ROAD IN RIYADH (PREVENTIVE MAINTENANCE PROJECT). (Project consists of constructing drainage line of pipe (and box culverts) of 1 mtr dia, in different locations completing length of 920 mts, with project cost around 211 million SAR Client: Ministry of Road Transportation. Consultant: SAUD Consult. Project Engineer March 11-june 11 S.K. Construction Company, Pvt Hassan, INDIA. Involved in 3 projects: 3. Construction of ITA College in Nagalpur, Hassan District, 4. Construction of Home science College, Hassan district, 5. Construction of Government first grade college,Hassan district. • Assembling project team, • Assigning individual responsibilities, • Identifying appropriate resources needed, Project Engineer Nov 10- Feb 11 Maldives Transport and Contracting Company Plc, Male, Maldives For project H D C Road Development Project 2010, responsible for overall construction of project costing around 3.23 million UD dollars, direct supervision of onsite contractors, chairing meetings. • Reporting to the project management. • Preparing/Reviewing Method statements, technical specifications, and overseeing shop drawings, prior to start constructions. • Closely reviewing work breakdown structure and general spec, milestone identification and planning. • Identifying ongoing project risks and assigning and mitigating risks. Project Engineer June 10-Oct 10 S.K. Construction Company, Pvt Hassan, INDIA. For project Construction of Police quarters (Govt. Projects), private construction covering all activities involved in project execution. 3
  • 4. Senior Quality Control and Quality Assurance Engineer Dec 08-May 10 Burhan International Construction Company, Doha, Qatar. For project Construction of Pump Station 32A Main Forwarding from Doha to Rayyan Sewerage Pipe Connection (ASHGHAL PROJECT), which includes construction of Pump station, DI (1200mm dia) and GRP (1800mm dia) pipe laying works through which water will be pumped to treatment plant, reinstatement works after pipe laying, micro tunneling works near road intersections. • Reporting to the project manager. • Quality control and assurance of all permanent works. • Quality inspection of Excavation, Laying, backfilling for 1800mm & 1200mm dia pipe. • Preparing of Method statements, request forms and approval of same. Assistant Highway Engineer May 08-Nov 08 SCOTT WILSON (consultancy) Pvt Ltd, Bangalore, INDIA. For project Up Gradation Works at Cochin International Airport, Kerla State, and Karnataka State Highway Improvement Projects (KSHIP-II Phase IB). Where involved in preparation of Tender documents, BOQ, Detail project reports. • Reporting to the Team Leader. • Collecting soil samples from existing sub grade material from field for soil investigation. • Preparing BOQ with senior engineers. Material cum Highway Engineer Feb 03-Apr 08 PBI Construction Company, Mysore, INDIA. For project Strengthening Existing Bilikere - Belur Road State Highway (SH-57), from km 0.00 to 38.60 km with associated link roads. Responsibility: Where involved in preparing method statements, mix design, checking asphalts temperatures and reviewing shop drawings. • Reporting project manager daily with task schedules, • Routine checks for project specified test for each layers in highway includes all soil, Aggregate and Asphalt tests. • Execution with levels and thickness of each layer. DECLARATION I hereby declare that the above written particulars are true to the best of my knowledge and belief. Place: Karnataka,india. Date: 05-05-2015 IMRAN. SYED 4