1.
Address: 4_EL takafol st_EL haram_GIZA_EGYPT.
Tel: 00201008287222
Mob: 00966551703681 /0096654415947
.saTAMER.ALI@NOUR.commail:-E
An Electric Engineer, Has a Good Experience in maintenance, Installation, testing and
commissioning for Switchgear & protection facilities. Able to work on own initiative and
as part of a team. Proven leadership skills involving managing, developing and
motivating team to achieve their objectives. Reliable, trustworthy and meticulous.
Gained a good understanding of what is required of an electric engineer.
University certificate: B.Sc. Degree in Electrical Engineering
Faculty of Engineering – Cairo University.
Major: Electric Power and machines.
Graduation Project: Microcontroller Operated Solar System.
Graduation Year: 2003.
Grade: Fair.
Project grade: Good
Secondary certificate: El-Orman secondary school.
Birth Date : SEP 27 , 1979
Place of Birth: Giza – Egypt.
Religion: Muslim.
Nationality: Egyptian.
Marital: Married.
Military Status: Permanent exemption
Arabic: Mother language
English: Very Good spoken and written.
Tamer Ahmed Ali Hussien
Contact
Profile
Education
Personal Information
Language
2. present----SEP 2015Dates:
Engineer.ProtectionSeniorTitle:
Responsibilities:
( ALAFLAJ Area ) &8765offor the Protection & Control CoordinationResponsible-
Substation.THAQEEF
of Main One Line Diagram as per Project Technical SpecificationReviewing-
Relaying & Metering One Line Diagram as per Project TechnicalReviewing-
Specification.
of 132/33/13.8KV CT/VT sizing calculation.Reviewing-
of interface drawing.Preparation and reviewing-
of control and power cable schedule.Reviewing-
design drawing submitted by vendor.& Detailsof different baseReviewing-
,protectionTransformer,protectionscheme drawing like LineprotectionofReviewing-
etc.protectionand BFRprotectionBus bar
of different point list like SAS,SCADA, TFR, SOE etc.Reviewing-
with supplier and project execution team.Coordination-
of base & detail design drawing to client for review and approval.Submission-
technical meeting with client & suppliers.Attending-
NOUR ENERGY CompanyName of employer:
Saudi ArabiaWork Location:
JUN 2015----NOV 2010Dates:
EngineerProtectionTitle:
Responsibilities:
CT & VT Sizing Calculations.Preparing-
the Proposed Relay Setting.Preparing-
the Protection Requirement Regarding to SEC Standards.Preparing-
coordination with higher management and motivation with proper guidance & withGood-
technical staff for achievements of the projects in minimum time.
the project scope of work, supervise installation and handle theReview-
and acceptance of the sites .commissioningsite
built drawings at the construction site,-& Compliance of correct asChecking-
reflecting all changes and modifications
supervisions and solving problems with team.Site-
- Modification and upgrading for protection schemes in (MV & HV)
substations (13.8, 33 &132KV).
Career Experience
3. - Installation and commissioning For Protection Schemes (stuck breaker.bus bar
protection, Over current, Earth Fault, Under voltage, Fault Recorder ,Distance, Cable
differential and Differential).
- Testing of ABB (REF 610,REF 615, RED 615, RED 670,RET 615)
Siemens (7Sj61, 7Sj64, 7Sj801, 7SA522, 7SD522, 7UT 612)
SEL (311, 411L, 351A, 421) and
MICOM (P122, P127, P139, P543, P633, P443).
ZIV (7IRV, 6RTV)
- Familiar with Many Testing Instrument (Freja300, Sverker, CPC 100,CT analyzer,
Delta 2000 ).
- Familiar with Most of the relays Software (DIGSI, S1 Studio, SEl Accelerator,
PCM600, CAP505, ZIVercompluse).
- Appling all tests needed for (CTs, VTs, Power cable).
- Installation & Testing for Digital Millimeters.
E.R.Co (Electrical Relays Company)Name of employer:
Saudi ArabiaWork Location:
Sep 2010----Sep 2009Dates:
Engineer& CommissioningingTestTitle:
Responsibilities:
progress reports for higher managementMaking-
schedules of worksMaking-
supervisions and solving problems with teamSite-
ordination.-co-ith properwresponsibility-selfthe project withHandle-
and supervising, handing over of approved spare parts.Verifying,Checking-
-Modification and upgrading for protection schemes in medium voltage
substations (11, 33 & 66KV).
-Installation and commissioning of Protection Schemes ( Over current, Earth Fault
,Distance and Differential).
- Testing for Siemens digital protective relays
(7SJ63, 7SJ64, 7SJ8011, 7SA522, 7SD522 and 7UT612).
- Testing of Siemens protective relays using OMICRON device.
Works.Madeena Company for Public Contracting-Bab ALName of employer:
Libya.Work Location:
4. 2009sep----Jan 2004Dates:
anHead of Repairing Department, Cairo 500 kV substation, EgyptiTitle:
Electricity Transmission Company.
Responsibilities:
- Repairing and provide maintenance programs for H.V Switchgears (power
Transformers, C.B’s, Isolators)
- Installation H.V Switchgears (500, 220, 11 kV)
- Making electric test for H.V Switchgears (Timing, Contact resistance)
- Testing of SF6 Gas state (acidity, moisture, gas percentage)
- Transformers testing (DC Resistance, Meager, Turns ratio, Tan δ)
E.E.T.C (Egyptian Electricity Transmission Company).Name of employer:
Egypt.Work Location:
Jan 2006------Jan 2004Dates:
(Part Time)Site Engineer.Title:
Responsibilities:
supervisions and solving problems with teamSite-
built drawings at the construction site-& Compliance of correct asChecking-
- Supervise Installation of LV & MV Networks.
- Supervise Construction of Transformers Rooms.
- Supervise Installation of Distribution Transformers.
progress reports for higher managementMaking-
Abna'a Company.-ALName of employer:
EgyptWork Location:
* PMP Preparing .
* MS Project.
* AUX1 (Automatic control circuits).
* CCS (Electrical control circuits and Diagrams for substations).
* Safety in Substations & Switchyards Programs.
* Office package (Word, Excel, and Power Point).
Ability to Learn New Technologies and Sciences.
Ability to Work Under Pressure and Within Team Work.
Ability to Work Individually according to Work Requirements.
Good Planning Abilitie
Courses & Computer skills
Soft skills