ARCHITECTURAL PROGRAMMING
ARCHITECTURAL PROGRAMMING
Program Spreadsheet – GSF, NSF, NOSF Calculation
Spatial Diagram for Schematic Design
Steps in Program Area Calculations
1. NSF : NSF for each space X #Units
2. NOSF : Total NSF + Circulation
3. Total NOSF with efficiency :Total NOSF / %Efficiency
4. Total with 10% for mechanical
Subtotal : 3 + 4
5. With 2% for exterior walls
Total GSF : Subtotal + 5
1. NSF – Net Square Footage
– Some circulation may be part of the unit sizes
(i.e. space to stand in front of counter or file cabinet)
– Some circulation is included in the NSF for work areas and cubicles
– Some circulation is included in the NSF for office spaces
• need space for layout and to move around
• NOTE: Since office spaces still need additional circulation to be
connected to the rest of the building the office is considered a NSF unit
(not NOSF)
2. NOSF - Net occupiable square footage
• Need additional sf for circulation between cubicles,
offices, aisles in an auditorium, etc.
• How much more? This is an estimate, based on:
• Experience doing these types of layouts
• Studying existing successful plans of similar projects (doing
area take-offs)
To get NOSF* - Guidelines for adding circulation
• % of space enclosed % Circulation added
(offices, closets, workrooms)
• More than 50% Add 30%
• Between 20 and 50% Between 15–25%
• Less than 20% Add 10%
• Note:
• Use your judgment – evaluate what activities are going on.
These are estimates.
• Sometimes programs just put 25% on top of total NSF.
However, tailoring to the specific areas gives you better
precision, especially if you want to revise
Calculating for NOSF
STAFF/SPACE PROGRAM CRITERIA STAFF UNITS NSF COMMENTS
TYPE NSF
Staff:
Manager PO 150 1 1 150
Counselors PO 150 3 3 450
Secretaries WS 80 2 2 160
Clerical WS 50 1 1 50
Support Areas:
Waiting/Reception O 15 0 10 150 Waiting for 10
Work Room/copier CR 100 0 1 100 Include copier @25sf
Coat closet CR 10 0 1 10
Toilets CR 50 0 2 100
TOTAL STAFF 7
TOTAL NSF 1,180
CIRCULATION @ 30% 354
TOTAL NET OCCUPIABLE SQUARE FOOTAGE – NOSF 1,534
Legend: PO – Private office; CR – closed room; WS – open workstation; C – cubicle; O – open area
1) NOSF With Efficiency – Total NOSF / Efficiency
2) Add 10% of NOSF with efficiency – Mechanical Space
3) Add 2% of Subtotal 1) + 2) - Exterior walls
• *If mechanical is programmed can skip this step
3. GSF: Gross Square Footage
Calculating for efficiency
• Total NOSF is divided by the % efficiency:
NOSF/ % Efficiency
4. GSF Calculation
EXAMPLE (with 75% Efficiency)
1. 1,534 NOSF/.75 = 2,045
2. Add 10% of #1 for Mechanical = 2,045 X 10% = 204.5
2,249.5
• 3. 2,249.5 X.02 (for exterior walls) = 44.99
TOTAL GSF 2,294.49
1) Total the NOSF
2) Estimate a building efficiency for the layout
(The higher the efficiency, the less room for additional circulation)
3) Estimate efficiency at 75% (for example)
4) Divide the NOSF by the % efficiency
5) Take 10% of SF with efficiency and add to the total
6) Take 2% of the total and add for the final GSF total
Calculating for total GSF
Example of Final GSF Summary Sheet
Bubble or Adjacency Diagrams
• The complete program has not yet been established - so not
designing final layout yet
• Easy to understand and helpful to both client and designer
• Client is confident important issues and possible solutions have
been determined and discussed before finalizing design
• Opportunity to rework the way things are done currently.
• Going through issues now and working things out abstractly
saves time, money, avoids miscommunication and, hopefully,
demands by client for additional unpaid work/changes later.
Diagrams discuss programmatic/planning ideas and options
• Copying services can be centralized or decentralized
Centralized Decentralized
Dept Dept Dept
Dept
Dept
Copy
services
Dept Dept
Dept
Dept
Dept
C
S
C
S
C
S
C
S
C
S
A few guidelines for better clarity of communication
• Diagrams are language - try to keep the symbols consistent
and distinct for different areas or ideas, i.e.
• Avoid any crossing lines
• Show relative sizes of spaces
• Indicating a front and back entry helps establish a context, a
relationship to areas outside the diagram.
• Try to distinguish closed and open areas through different
types of lines or colors.
• Abstractly indicate planning arrangement – avoid “daisy” diagrams
• Degree of adjacency:
– Can show the relationship of spaces by placing their symbols closer to
or further from one another
– If connecting space symbols (the bubbles) with lines – using different
line types/weights helps sort out areas into building blocks
• Use a key to explain all symbols
Diagram clarity
- Create some hierarchy – avoid daisy diagrams.
- Do not put spaces in the same shape as labels giving information about the
spaces. The center is the name of the overall space, yet all around it are in the
space (I assume)
- Lack of difference in the shapes (types and sizes) is also confusing.
kitchen
dishw
asher
clos
et
stor
age
table
stove
frig
Example of daisy diagram - little differentiation and indication of layout
Final Programming Pre-schematic phases
• During the programming phase, in addition to establishing the
staff space program and adjacency diagrams, need to explore
options for building layering; Layering diagrams - what goes
on what floor
• Discuss possible phasing of the project; degrees and ways to
address future expansion on the chosen site
• Explore building height and volume
• Present blocking diagrams – how does building occupy the
site? What is the footprint? What is the orientation of all
entries/exits in relationship to the site? Orientation of
departments/areas?
Blocking Diagrams
• Shows blocked out areas of the program, to scale
• Gives an idea of the building footprint, orientation, main
entries /exits
• Must be sited to be give whole picture
• Must have a North arrow showing orientation
• Several options should be considered before going into
schematic design
Blocking Diagram 1 – circle footprint
Blocking Diagram 2 – L-Shaped footprint
Blocking Diagram 3 – V-Shaped footprint
Blocking Diagram within Site
Blocking Diagram within Site

More Related Content

Similar to arch_programming.pdf

ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdfctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdfGagandeepKaur617299
 
Schedule Development
Schedule DevelopmentSchedule Development
Schedule DevelopmentChris Carson
 
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation models
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation modelsSe 381 - lec 25 - 32 - 12 may29 - program size and cost estimation models
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation modelsbabak danyal
 
Project management
Project managementProject management
Project managementervinod
 
Week 2 Individual Assignment Project Plan Part 1 Purpose .docx
Week 2 Individual Assignment Project Plan Part 1 Purpose .docxWeek 2 Individual Assignment Project Plan Part 1 Purpose .docx
Week 2 Individual Assignment Project Plan Part 1 Purpose .docxmelbruce90096
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..pptPedadaSaikumar
 
CMSC 335 FINAL PROJECT
CMSC 335 FINAL PROJECTCMSC 335 FINAL PROJECT
CMSC 335 FINAL PROJECTHamesKellor
 
NCV 4 Project Management Hands-On Support Slide Show - Module 3
NCV 4 Project Management Hands-On Support Slide Show - Module 3NCV 4 Project Management Hands-On Support Slide Show - Module 3
NCV 4 Project Management Hands-On Support Slide Show - Module 3Future Managers
 
Operations scheduling
Operations schedulingOperations scheduling
Operations schedulingRajThakuri
 
PDC project guidelines
PDC project guidelinesPDC project guidelines
PDC project guidelinesDoug Crouch
 
Bolton college presentation
Bolton college presentationBolton college presentation
Bolton college presentationDynistics
 
Physical Design overview
Physical Design overviewPhysical Design overview
Physical Design overviewMarcus Wei
 
BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together? BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together? CCT International
 
C03.05-Scheduling.key.pdf
C03.05-Scheduling.key.pdfC03.05-Scheduling.key.pdf
C03.05-Scheduling.key.pdfssuser8babb7
 
itec513 fall20172018 COCOMO model estimation.ppt
itec513 fall20172018 COCOMO model estimation.pptitec513 fall20172018 COCOMO model estimation.ppt
itec513 fall20172018 COCOMO model estimation.pptinaamulh77
 

Similar to arch_programming.pdf (20)

ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdfctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
 
Schedule Training
Schedule TrainingSchedule Training
Schedule Training
 
Tn6 facility layout
Tn6 facility layoutTn6 facility layout
Tn6 facility layout
 
Tn6 facility+layout
Tn6 facility+layoutTn6 facility+layout
Tn6 facility+layout
 
Schedule Development
Schedule DevelopmentSchedule Development
Schedule Development
 
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation models
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation modelsSe 381 - lec 25 - 32 - 12 may29 - program size and cost estimation models
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation models
 
Design and Space Efficiency for Workspaces
Design and Space Efficiency for WorkspacesDesign and Space Efficiency for Workspaces
Design and Space Efficiency for Workspaces
 
Project management
Project managementProject management
Project management
 
Week 2 Individual Assignment Project Plan Part 1 Purpose .docx
Week 2 Individual Assignment Project Plan Part 1 Purpose .docxWeek 2 Individual Assignment Project Plan Part 1 Purpose .docx
Week 2 Individual Assignment Project Plan Part 1 Purpose .docx
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt
 
CMSC 335 FINAL PROJECT
CMSC 335 FINAL PROJECTCMSC 335 FINAL PROJECT
CMSC 335 FINAL PROJECT
 
pm--basic.pptx
pm--basic.pptxpm--basic.pptx
pm--basic.pptx
 
NCV 4 Project Management Hands-On Support Slide Show - Module 3
NCV 4 Project Management Hands-On Support Slide Show - Module 3NCV 4 Project Management Hands-On Support Slide Show - Module 3
NCV 4 Project Management Hands-On Support Slide Show - Module 3
 
Operations scheduling
Operations schedulingOperations scheduling
Operations scheduling
 
PDC project guidelines
PDC project guidelinesPDC project guidelines
PDC project guidelines
 
Bolton college presentation
Bolton college presentationBolton college presentation
Bolton college presentation
 
Physical Design overview
Physical Design overviewPhysical Design overview
Physical Design overview
 
BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together? BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together?
 
C03.05-Scheduling.key.pdf
C03.05-Scheduling.key.pdfC03.05-Scheduling.key.pdf
C03.05-Scheduling.key.pdf
 
itec513 fall20172018 COCOMO model estimation.ppt
itec513 fall20172018 COCOMO model estimation.pptitec513 fall20172018 COCOMO model estimation.ppt
itec513 fall20172018 COCOMO model estimation.ppt
 

Recently uploaded

Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 

Recently uploaded (20)

Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 

arch_programming.pdf

  • 1. ARCHITECTURAL PROGRAMMING ARCHITECTURAL PROGRAMMING Program Spreadsheet – GSF, NSF, NOSF Calculation Spatial Diagram for Schematic Design
  • 2.
  • 3. Steps in Program Area Calculations 1. NSF : NSF for each space X #Units 2. NOSF : Total NSF + Circulation 3. Total NOSF with efficiency :Total NOSF / %Efficiency 4. Total with 10% for mechanical Subtotal : 3 + 4 5. With 2% for exterior walls Total GSF : Subtotal + 5
  • 4. 1. NSF – Net Square Footage – Some circulation may be part of the unit sizes (i.e. space to stand in front of counter or file cabinet) – Some circulation is included in the NSF for work areas and cubicles – Some circulation is included in the NSF for office spaces • need space for layout and to move around • NOTE: Since office spaces still need additional circulation to be connected to the rest of the building the office is considered a NSF unit (not NOSF)
  • 5. 2. NOSF - Net occupiable square footage • Need additional sf for circulation between cubicles, offices, aisles in an auditorium, etc. • How much more? This is an estimate, based on: • Experience doing these types of layouts • Studying existing successful plans of similar projects (doing area take-offs)
  • 6. To get NOSF* - Guidelines for adding circulation • % of space enclosed % Circulation added (offices, closets, workrooms) • More than 50% Add 30% • Between 20 and 50% Between 15–25% • Less than 20% Add 10% • Note: • Use your judgment – evaluate what activities are going on. These are estimates. • Sometimes programs just put 25% on top of total NSF. However, tailoring to the specific areas gives you better precision, especially if you want to revise
  • 7. Calculating for NOSF STAFF/SPACE PROGRAM CRITERIA STAFF UNITS NSF COMMENTS TYPE NSF Staff: Manager PO 150 1 1 150 Counselors PO 150 3 3 450 Secretaries WS 80 2 2 160 Clerical WS 50 1 1 50 Support Areas: Waiting/Reception O 15 0 10 150 Waiting for 10 Work Room/copier CR 100 0 1 100 Include copier @25sf Coat closet CR 10 0 1 10 Toilets CR 50 0 2 100 TOTAL STAFF 7 TOTAL NSF 1,180 CIRCULATION @ 30% 354 TOTAL NET OCCUPIABLE SQUARE FOOTAGE – NOSF 1,534 Legend: PO – Private office; CR – closed room; WS – open workstation; C – cubicle; O – open area
  • 8. 1) NOSF With Efficiency – Total NOSF / Efficiency 2) Add 10% of NOSF with efficiency – Mechanical Space 3) Add 2% of Subtotal 1) + 2) - Exterior walls • *If mechanical is programmed can skip this step 3. GSF: Gross Square Footage
  • 9. Calculating for efficiency • Total NOSF is divided by the % efficiency: NOSF/ % Efficiency
  • 10. 4. GSF Calculation EXAMPLE (with 75% Efficiency) 1. 1,534 NOSF/.75 = 2,045 2. Add 10% of #1 for Mechanical = 2,045 X 10% = 204.5 2,249.5 • 3. 2,249.5 X.02 (for exterior walls) = 44.99 TOTAL GSF 2,294.49
  • 11. 1) Total the NOSF 2) Estimate a building efficiency for the layout (The higher the efficiency, the less room for additional circulation) 3) Estimate efficiency at 75% (for example) 4) Divide the NOSF by the % efficiency 5) Take 10% of SF with efficiency and add to the total 6) Take 2% of the total and add for the final GSF total Calculating for total GSF
  • 12. Example of Final GSF Summary Sheet
  • 13. Bubble or Adjacency Diagrams • The complete program has not yet been established - so not designing final layout yet • Easy to understand and helpful to both client and designer • Client is confident important issues and possible solutions have been determined and discussed before finalizing design • Opportunity to rework the way things are done currently. • Going through issues now and working things out abstractly saves time, money, avoids miscommunication and, hopefully, demands by client for additional unpaid work/changes later.
  • 14. Diagrams discuss programmatic/planning ideas and options • Copying services can be centralized or decentralized Centralized Decentralized Dept Dept Dept Dept Dept Copy services Dept Dept Dept Dept Dept C S C S C S C S C S
  • 15. A few guidelines for better clarity of communication • Diagrams are language - try to keep the symbols consistent and distinct for different areas or ideas, i.e. • Avoid any crossing lines • Show relative sizes of spaces • Indicating a front and back entry helps establish a context, a relationship to areas outside the diagram. • Try to distinguish closed and open areas through different types of lines or colors.
  • 16. • Abstractly indicate planning arrangement – avoid “daisy” diagrams • Degree of adjacency: – Can show the relationship of spaces by placing their symbols closer to or further from one another – If connecting space symbols (the bubbles) with lines – using different line types/weights helps sort out areas into building blocks • Use a key to explain all symbols
  • 17.
  • 18.
  • 19.
  • 20. Diagram clarity - Create some hierarchy – avoid daisy diagrams. - Do not put spaces in the same shape as labels giving information about the spaces. The center is the name of the overall space, yet all around it are in the space (I assume) - Lack of difference in the shapes (types and sizes) is also confusing. kitchen dishw asher clos et stor age table stove frig
  • 21. Example of daisy diagram - little differentiation and indication of layout
  • 22. Final Programming Pre-schematic phases • During the programming phase, in addition to establishing the staff space program and adjacency diagrams, need to explore options for building layering; Layering diagrams - what goes on what floor • Discuss possible phasing of the project; degrees and ways to address future expansion on the chosen site • Explore building height and volume • Present blocking diagrams – how does building occupy the site? What is the footprint? What is the orientation of all entries/exits in relationship to the site? Orientation of departments/areas?
  • 23.
  • 24.
  • 25. Blocking Diagrams • Shows blocked out areas of the program, to scale • Gives an idea of the building footprint, orientation, main entries /exits • Must be sited to be give whole picture • Must have a North arrow showing orientation • Several options should be considered before going into schematic design
  • 26. Blocking Diagram 1 – circle footprint
  • 27. Blocking Diagram 2 – L-Shaped footprint
  • 28. Blocking Diagram 3 – V-Shaped footprint