Outline of Presentation
• Introduction
•
• Team
• What's next
• Closing
Introduction
Construction planning and
scheduling refers to the process
through which a construction
business maps out exactly,
what will take place during a
project, what resources are
needed, when key activities will
take place, which personnel will
be involved, and anything else
pertinent to the project.
Objectives of the Study
To know the essential requirements of management skills and techniques
To identify the precedence relationships among project activities
To make better use of people, money, & material resources by identifying critical parts in
the project
To plan and schedule construction management techniques such as Bar Chart Method
and Critical Path Method
Project Planning & Scheduling
Project
planning
The process of identifying all the activities
necessary to successfully complete the project.
Project
Scheduling
The process of determining the sequential order of the
planned activities, assigning realistic durations to each
activity, and determining the start and finish dates for
each activity
Work
Breakdown
Structure
(WBS)
For any size project, large or small, it is
necessary to develop a well-defined Work
Breakdown Structure (WBS) that divides the
project into identifiable parts that can be
managed
• It defines the work to be performed, identifies the
needed expertise, assists in selection of the project
team, and establishes a base for project scheduling
and control.
• It is a graphical display of the project that shows
the division of work in a multi-level system.
• The number of levels in a WBS varies depending
upon the size and complexity of the project.
Work Breakdown Structure (WBS)
Project
Task 1 Task 2 Task 3
Sub Task 1.1
Sub Task 1.2 Sub Task 1.3
Work Package 1.1.1 Work Package 1.1.2 Work Package 1.1.3
PLANS OF PROPOSED BUILDING
• It is a three storey
Building planning to build
in the area of
Technological University
(Pang Long).
TECHNIQUES FOR PLANNING &
SCHEDULING
Methods of scheduling
Gantt chart or Bar Chart
Network Analysis Systems (NAS)
• Critical Path Method (CPM) – deterministic approach to scheduling
• Program Evaluation and Review Technique (PERT)
GANTT
CHART OR
BAR CHART
A programmed chart, a bar chart, a
graphical time-scale of the schedule,
developed by Henry L. Gantt.
Characteristics:
• Simple, easy to use/interpret, does not
require extensive interrelationships of
activities
• Difficult and require significant time to
update, does not show
interdependences of activities, does not
integrate costs or resources with the
schedule
• An effective technique for overall
project scheduling but has limited
application for detailed contraction
work.
CRITICAL PATH
METHOD (CPM)
Developed in 1956, now commonly used in
engineering and construction industry.
• The most used NAS for project
management.
• Characteristics:
• Simple concept, computations only require
basic arithmetic,
• The most difficult task is identifying and
interfacing the numerous activities that
are required to complete a project, i.e.,
development of the CPM network diagram.
• If a well-defined WBS is developed first,
the task of developing a CPM diagram is
greatly simplified.
Examples of Critical Path Method
Method I : Activity-On-Node (AON)
Method II : Activity-On-Arrow (AOA)
Scope of the thesis
Advantages and Disadvantages of
Bar Chart
A DVA NTAGES
- Simple graphical
- Easy for general comprehension
- Widespread used in industry
- Mostly used in small project
- Fairly broad planning and
scheduling tools, so they require
less revision and updating than
more sophisticated systems
DIS ADVANTAGES
- Very cumbersome as the number
of line activities, or bars increases
- Logical interconnections and
constraints of the various
activities is not expressed
- Difficult to use it for forecasting
the effects that changes in a
particular activity will have on the
overall schedule
Advantages and Disadvantages of
CPM Method
A DVA NTAGES
- Networks can much more
concisely represent large numbers
of activities
- Much more useful for forecasting
and control
- It identify the most critical
elements in the project schedule
- Easy to adjust if any delay is
happened in the project
DIS ADVANTAGES
- A little bit difficult to understand
the network system
B Y /
M R . P H YO K YAW

More Related Content

Similar to vnc.pptx

Control techniques
Control techniquesControl techniques
Control techniques
Adnan Shakir
 
Project management in general and some methods
Project management in general and some methodsProject management in general and some methods
Project management in general and some methods
ioan_dubar
 

Similar to vnc.pptx (20)

Control techniques
Control techniquesControl techniques
Control techniques
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt
 
Time management pressent
Time management pressentTime management pressent
Time management pressent
 
Project Implementation.pdf
Project Implementation.pdfProject Implementation.pdf
Project Implementation.pdf
 
Network diagrams
Network diagramsNetwork diagrams
Network diagrams
 
programmed evaluation and review technique,
programmed evaluation and review technique,programmed evaluation and review technique,
programmed evaluation and review technique,
 
Unit II.pptx
Unit II.pptxUnit II.pptx
Unit II.pptx
 
Project Management.pptx
 Project  Management.pptx Project  Management.pptx
Project Management.pptx
 
Episode 23 : PROJECT TIME MANAGEMENT
Episode 23 : PROJECT TIME MANAGEMENTEpisode 23 : PROJECT TIME MANAGEMENT
Episode 23 : PROJECT TIME MANAGEMENT
 
OR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULINGOR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULING
 
Project scheduling and tracking
Project scheduling and  trackingProject scheduling and  tracking
Project scheduling and tracking
 
Gantt Charts.ppt
Gantt Charts.pptGantt Charts.ppt
Gantt Charts.ppt
 
PMP Exam Prep - Time Management
PMP Exam Prep - Time ManagementPMP Exam Prep - Time Management
PMP Exam Prep - Time Management
 
Project Planning | Accounting
Project Planning | AccountingProject Planning | Accounting
Project Planning | Accounting
 
PM-5 chapter project management (1).pptx
PM-5 chapter project management (1).pptxPM-5 chapter project management (1).pptx
PM-5 chapter project management (1).pptx
 
PM-chapter 00005 project management.pptx
PM-chapter 00005 project management.pptxPM-chapter 00005 project management.pptx
PM-chapter 00005 project management.pptx
 
project management -04.ppt
project management -04.pptproject management -04.ppt
project management -04.ppt
 
Project management in general and some methods
Project management in general and some methodsProject management in general and some methods
Project management in general and some methods
 
MIS Project management
MIS Project managementMIS Project management
MIS Project management
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniques
 

More from PigPug1

More from PigPug1 (16)

Group 3 Tablet 126.pdf
Group 3 Tablet 126.pdfGroup 3 Tablet 126.pdf
Group 3 Tablet 126.pdf
 
Group 3(2)_1-l.pdf
Group 3(2)_1-l.pdfGroup 3(2)_1-l.pdf
Group 3(2)_1-l.pdf
 
mg annt ppt.pptx
mg annt ppt.pptxmg annt ppt.pptx
mg annt ppt.pptx
 
ILE126 Group 5 Presentation.pdf
ILE126 Group 5 Presentation.pdfILE126 Group 5 Presentation.pdf
ILE126 Group 5 Presentation.pdf
 
SMARTPHONE.pdf
SMARTPHONE.pdfSMARTPHONE.pdf
SMARTPHONE.pdf
 
1657506996803913.pptx
1657506996803913.pptx1657506996803913.pptx
1657506996803913.pptx
 
VIC-4 Powerpoint.pptx
VIC-4 Powerpoint.pptxVIC-4 Powerpoint.pptx
VIC-4 Powerpoint.pptx
 
VIC-4 Powerpoint.pptx
VIC-4 Powerpoint.pptxVIC-4 Powerpoint.pptx
VIC-4 Powerpoint.pptx
 
vnc.pptx
vnc.pptxvnc.pptx
vnc.pptx
 
Chapter01_Python.ppt
Chapter01_Python.pptChapter01_Python.ppt
Chapter01_Python.ppt
 
minii.pptx
minii.pptxminii.pptx
minii.pptx
 
PPT3.pptx
PPT3.pptxPPT3.pptx
PPT3.pptx
 
IRS151 Group 3 Presentation (1).pdf
IRS151 Group 3 Presentation (1).pdfIRS151 Group 3 Presentation (1).pdf
IRS151 Group 3 Presentation (1).pdf
 
GROUP3.pptx
GROUP3.pptxGROUP3.pptx
GROUP3.pptx
 
Ethics (U Tun Kyi).pdf
Ethics (U Tun Kyi).pdfEthics (U Tun Kyi).pdf
Ethics (U Tun Kyi).pdf
 
DESIGN OF MIXED MODE SOLAR CROP DRYER (_103848.pptx
DESIGN OF MIXED MODE SOLAR CROP DRYER (_103848.pptxDESIGN OF MIXED MODE SOLAR CROP DRYER (_103848.pptx
DESIGN OF MIXED MODE SOLAR CROP DRYER (_103848.pptx
 

Recently uploaded

Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
Nimot Muili
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
AllTops
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
SandaliGurusinghe2
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 

Recently uploaded (14)

Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docx
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 

vnc.pptx

  • 1.
  • 2. Outline of Presentation • Introduction • • Team • What's next • Closing
  • 3. Introduction Construction planning and scheduling refers to the process through which a construction business maps out exactly, what will take place during a project, what resources are needed, when key activities will take place, which personnel will be involved, and anything else pertinent to the project.
  • 4. Objectives of the Study To know the essential requirements of management skills and techniques To identify the precedence relationships among project activities To make better use of people, money, & material resources by identifying critical parts in the project To plan and schedule construction management techniques such as Bar Chart Method and Critical Path Method
  • 5. Project Planning & Scheduling Project planning The process of identifying all the activities necessary to successfully complete the project. Project Scheduling The process of determining the sequential order of the planned activities, assigning realistic durations to each activity, and determining the start and finish dates for each activity
  • 6. Work Breakdown Structure (WBS) For any size project, large or small, it is necessary to develop a well-defined Work Breakdown Structure (WBS) that divides the project into identifiable parts that can be managed • It defines the work to be performed, identifies the needed expertise, assists in selection of the project team, and establishes a base for project scheduling and control. • It is a graphical display of the project that shows the division of work in a multi-level system. • The number of levels in a WBS varies depending upon the size and complexity of the project.
  • 7. Work Breakdown Structure (WBS) Project Task 1 Task 2 Task 3 Sub Task 1.1 Sub Task 1.2 Sub Task 1.3 Work Package 1.1.1 Work Package 1.1.2 Work Package 1.1.3
  • 8. PLANS OF PROPOSED BUILDING • It is a three storey Building planning to build in the area of Technological University (Pang Long).
  • 9. TECHNIQUES FOR PLANNING & SCHEDULING Methods of scheduling Gantt chart or Bar Chart Network Analysis Systems (NAS) • Critical Path Method (CPM) – deterministic approach to scheduling • Program Evaluation and Review Technique (PERT)
  • 10. GANTT CHART OR BAR CHART A programmed chart, a bar chart, a graphical time-scale of the schedule, developed by Henry L. Gantt. Characteristics: • Simple, easy to use/interpret, does not require extensive interrelationships of activities • Difficult and require significant time to update, does not show interdependences of activities, does not integrate costs or resources with the schedule • An effective technique for overall project scheduling but has limited application for detailed contraction work.
  • 11. CRITICAL PATH METHOD (CPM) Developed in 1956, now commonly used in engineering and construction industry. • The most used NAS for project management. • Characteristics: • Simple concept, computations only require basic arithmetic, • The most difficult task is identifying and interfacing the numerous activities that are required to complete a project, i.e., development of the CPM network diagram. • If a well-defined WBS is developed first, the task of developing a CPM diagram is greatly simplified.
  • 12. Examples of Critical Path Method
  • 13. Method I : Activity-On-Node (AON)
  • 14. Method II : Activity-On-Arrow (AOA)
  • 15. Scope of the thesis
  • 16. Advantages and Disadvantages of Bar Chart A DVA NTAGES - Simple graphical - Easy for general comprehension - Widespread used in industry - Mostly used in small project - Fairly broad planning and scheduling tools, so they require less revision and updating than more sophisticated systems DIS ADVANTAGES - Very cumbersome as the number of line activities, or bars increases - Logical interconnections and constraints of the various activities is not expressed - Difficult to use it for forecasting the effects that changes in a particular activity will have on the overall schedule
  • 17. Advantages and Disadvantages of CPM Method A DVA NTAGES - Networks can much more concisely represent large numbers of activities - Much more useful for forecasting and control - It identify the most critical elements in the project schedule - Easy to adjust if any delay is happened in the project DIS ADVANTAGES - A little bit difficult to understand the network system
  • 18. B Y / M R . P H YO K YAW