SlideShare a Scribd company logo
1 of 2
1
Rena Cummings
www.linkedin.com/in/projectmanager3/
Telephone: 360-550-8216
rcummings43@gmail.com
Project Manager that is process focused and strategy driven. Trackingdata includes implementingcontinuous lean
process improvements, documentation which increases productivity and profitability by 25 percent. I am unique
because of my background in engineering and business systemanalysistheclients’needs are meet by initiatinga
valuestream approach by implementing business awareness,then solutions.
ED U C A TI ON
• MS in ProjectManager and Technology Management
• Improved SharePoint documentation process predicted costsavings of $75,000
• Achieved cost savings of $800,000 using six sigma and lean applications process
• Chaired multiple data review and change management “solution meetings”
• Project Analysis on Security feasibility of Sensor-Cloud Architect in Automobile
• Texas A&M Engineering Certification for Information Security
• Texas A&M Engineering Certification for Digital Forensics
• Scrum Project Manager co-manage 28 teams to update websites.
• Present Security presentation on “Building Security in software using agile application”
• BS in Mechanical and ManufacturingEngineer
PROJECT MANAG ER
 Me c h a n i c a l E n g i n e e r – T e c h n o l o g y Ma n a g e r 
AREA S O F EXP ERTISE
 Cisco IoT  Project Management  PowerShell
 Cloud Security  Project lifecycle  Cloud Data
 Azure IoT  Project Analysis  Cloud + Certification
 Sensor Cloud Design

 Linux /Perl script  Azure - Cloud
CL O UD EN THUSIA STIC
Project Manager, Product Design Engineer
Siemens Westinghouse; Fort Payne Al March 2002- March 2004
● Supervised Installation of Main & Neutral Leads in Stream Plant
● Chaired multiple data review and change management “solution meetings”
● 47% reduction of rework in corrosion of Main and Neutral Leads
● Achieved costsavings of $800,000 in rework of Main & Neutral Leads
P RO F ESSIO N A L EXP ERIEN C E
Busi ne ss Proce ss Syste m A nal yst November2013- August2014
JTS Manage Se rvi ce s
Se attl e , WA
O P ER A TI ON EF F I C EN C Y
JTS needed to update its document control operations to meet increased production demands and allowadditional
collaboration amongstemployees and contactors. New system had to be compatiblewith the needs of JTS various
clients.
 Use agilemethodology in preparations of contract setup, to assurecontinuous documentation flow
operation.
2
 Created and documented work flows usingVisio,and workflowprocess modelingdiagramto increase
operation effectively by 25 percent.
 Applying Enterprise Business Process methodology to identify inefficientprocess operations as well as
implementing improved process changemanagement procedures with a predicted cost savings by
$75,000.00
.
Senior Electronic Development Engineer
Daimler Trucks North America Portland Oregon January 2011 - January 2012
New Product Design: ProjectManaged
Linde Gas Gate-lift project required a special designed battery to accommodate their new design lift-gateto retrofit
300 trucks. As PM, I lead a cross-functional team,which included LindeGas, sales manager;plantmanager and
liaisonsto create a project plan to retrofit 300 trucks. My tasks included planning phrasefor pre-production builds
and program transition into production phrasedeliverable.
 Managed and monitor the Linde Gas- Gate lift new product line from production to delivery.
 Exceeded the project schedule deadline by 6 months reduce labor cost by $500,000
 Coordinated with Sales Manger to develop cost codes for Linde-Gas Gate Lift project.
 Applied Toyota Production Methodology and Gap Analysis; reduced truck deliverables by 2 months cost
savings of $ 80,000.00
Manufacturing Flight Test Operation & Validation Engineer
Boeing, Seattle Washington July 2008- June 2010
As PM, I lead a cross-functional teamof ground engineers, design engineers and production engineers to
manufacture 747,777 and 737 supportflighttest operation.As a liaison,I created test plans to be implemented by
aircraftmaintenancecrews for operational readiness of the plane.
Project Management –New Product Design- Support Smoke Detector Test Supports:
The 747 had a problem in acquiringa bracketto secure the smoke detectors. I encountered inconsistent
schedulingfor parts installation and a need to secure a suitablesupplier to supply smoke detectors accordingto
IMC - Infinite Minde Concepts, Seattle WA. January 2005-present
Project managed various projects frommodification of tamalemachine, to The Great African Cook-In
 Project Managed: Proposal to install solar panels --- Minister of Good Hope BaptistChurch, Seattle
 Created and managed a team of seven
 Submitted bid of $ 478,000 to install solar panelsand windmill
 Conducted SWOT analysis for solar panel installation
 Research and documented sustainability option
VOLUN TEER EXP ERIEN CE
Seattle Give Camp: MicrosoftCommons: Bellevue, WA October 2013 thru 2016
Scrum Project Manager, I managed 28 teams of software developers, Web develops, databaseAdministrators to
update or create web for 28 nonprofit organizations using Agileand Sprintapplication. As ScrumMaster, my
responsibility includes,staying within thescope of each project, create requirement analysis;keeping tasks moving
throughout the production pipeline. I engaged with the site-owners providing continuous feedback to the team.
EDUC A TIO N
2 0 1 4 MS TEC H N O L O G Y MAN AG EMEN T C I TY U N I V ER S I T Y
2 0 1 2 MS P R O J EC T MAN AG EMEN T C I TY U N I V ER S I T Y
1 9 9 7 BS MEC H AN I C AL EN G I N EER U N I V ER S I TY O F MEMP H I S
1 9 9 7 BS MAN U F AC TU R I N G EN G I N EER UN I V ER S I TY O F MEMP H I S

More Related Content

What's hot

Kino Codner - Engineering Resume
Kino Codner - Engineering ResumeKino Codner - Engineering Resume
Kino Codner - Engineering ResumeKino Codner
 
Independent Autodesk Building Performance Analysis Certificate 2014_arcbenson
Independent Autodesk Building Performance Analysis Certificate 2014_arcbensonIndependent Autodesk Building Performance Analysis Certificate 2014_arcbenson
Independent Autodesk Building Performance Analysis Certificate 2014_arcbensonBenson C. Chen
 
Gary Newell Resume GN
Gary Newell Resume GNGary Newell Resume GN
Gary Newell Resume GNGary Newell
 
Autodesk Building Performance Analysis Certificate 2014_tony.zekry
Autodesk Building Performance Analysis Certificate 2014_tony.zekryAutodesk Building Performance Analysis Certificate 2014_tony.zekry
Autodesk Building Performance Analysis Certificate 2014_tony.zekryTony Michel Zekry
 
Building Science Certificate _
Building Science Certificate _Building Science Certificate _
Building Science Certificate _Abiola Adeseko
 
Independent Autodesk Building Performance Analysis Certificate_kurps
Independent Autodesk Building Performance Analysis Certificate_kurpsIndependent Autodesk Building Performance Analysis Certificate_kurps
Independent Autodesk Building Performance Analysis Certificate_kurpsArtis Kurps
 
Samuel M Lewis Resume 2016
Samuel M Lewis Resume 2016Samuel M Lewis Resume 2016
Samuel M Lewis Resume 2016Sam Lewis
 
Briana Owens Resume
Briana Owens ResumeBriana Owens Resume
Briana Owens ResumeBriana Owens
 
Tyler Letter of Recommendation
Tyler Letter of RecommendationTyler Letter of Recommendation
Tyler Letter of RecommendationTyler Minnis
 
GoogleApps_SalesEngineer_Certification
GoogleApps_SalesEngineer_CertificationGoogleApps_SalesEngineer_Certification
GoogleApps_SalesEngineer_CertificationSavio Gonsalves
 
Aaron Goldenberg's most current Resume
Aaron Goldenberg's most current ResumeAaron Goldenberg's most current Resume
Aaron Goldenberg's most current ResumeAaron Goldenberg
 

What's hot (20)

Kino Codner - Engineering Resume
Kino Codner - Engineering ResumeKino Codner - Engineering Resume
Kino Codner - Engineering Resume
 
Independent Autodesk Building Performance Analysis Certificate 2014_arcbenson
Independent Autodesk Building Performance Analysis Certificate 2014_arcbensonIndependent Autodesk Building Performance Analysis Certificate 2014_arcbenson
Independent Autodesk Building Performance Analysis Certificate 2014_arcbenson
 
Gary Newell Resume GN
Gary Newell Resume GNGary Newell Resume GN
Gary Newell Resume GN
 
Autodesk Building Performance Analysis Certificate 2014_tony.zekry
Autodesk Building Performance Analysis Certificate 2014_tony.zekryAutodesk Building Performance Analysis Certificate 2014_tony.zekry
Autodesk Building Performance Analysis Certificate 2014_tony.zekry
 
Building Science Certificate _
Building Science Certificate _Building Science Certificate _
Building Science Certificate _
 
STEPHEN HESKETH
STEPHEN HESKETHSTEPHEN HESKETH
STEPHEN HESKETH
 
Independent Autodesk Building Performance Analysis Certificate_kurps
Independent Autodesk Building Performance Analysis Certificate_kurpsIndependent Autodesk Building Performance Analysis Certificate_kurps
Independent Autodesk Building Performance Analysis Certificate_kurps
 
Samuel M Lewis Resume 2016
Samuel M Lewis Resume 2016Samuel M Lewis Resume 2016
Samuel M Lewis Resume 2016
 
Briana Owens Resume
Briana Owens ResumeBriana Owens Resume
Briana Owens Resume
 
coursecompletion (1)
coursecompletion (1)coursecompletion (1)
coursecompletion (1)
 
Resume
ResumeResume
Resume
 
Tyler Letter of Recommendation
Tyler Letter of RecommendationTyler Letter of Recommendation
Tyler Letter of Recommendation
 
varun resume..
varun resume..varun resume..
varun resume..
 
Project Management Specialist
Project Management SpecialistProject Management Specialist
Project Management Specialist
 
Resume 5-5-16
Resume 5-5-16Resume 5-5-16
Resume 5-5-16
 
SamarKantiBarua
SamarKantiBaruaSamarKantiBarua
SamarKantiBarua
 
GoogleApps_SalesEngineer_Certification
GoogleApps_SalesEngineer_CertificationGoogleApps_SalesEngineer_Certification
GoogleApps_SalesEngineer_Certification
 
Perdziola Resume Final
Perdziola Resume FinalPerdziola Resume Final
Perdziola Resume Final
 
CV
CVCV
CV
 
Aaron Goldenberg's most current Resume
Aaron Goldenberg's most current ResumeAaron Goldenberg's most current Resume
Aaron Goldenberg's most current Resume
 

Similar to Experienced Project Manager with Expertise in Cloud, IoT, and Process Improvement

Seanresume3-15.docx-2
Seanresume3-15.docx-2Seanresume3-15.docx-2
Seanresume3-15.docx-2Sean Hedden
 
Michael_L_Jones_resume_1_27_15New
Michael_L_Jones_resume_1_27_15NewMichael_L_Jones_resume_1_27_15New
Michael_L_Jones_resume_1_27_15NewMichael Jones
 
RAB resume 09 01 2016
RAB resume    09 01 2016RAB resume    09 01 2016
RAB resume 09 01 2016Rich Bellino
 
Carl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens
 
Chris S. Schaeuble Resume
Chris S. Schaeuble ResumeChris S. Schaeuble Resume
Chris S. Schaeuble ResumeChris Schaeuble
 
Resume of Eric Stohlquist
Resume of Eric StohlquistResume of Eric Stohlquist
Resume of Eric StohlquistEricStohlquist1
 
Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16Gyasi Brown
 
Sandra.Schneider(PM) Resume 11-15
Sandra.Schneider(PM) Resume 11-15Sandra.Schneider(PM) Resume 11-15
Sandra.Schneider(PM) Resume 11-15Sandy Schneider
 
Jack Holcombe
Jack HolcombeJack Holcombe
Jack Holcombejack0352
 
Resume__GARY_SHELTON
Resume__GARY_SHELTONResume__GARY_SHELTON
Resume__GARY_SHELTONGary Shelton
 
JubrilOgunbunmiC2017WF
JubrilOgunbunmiC2017WFJubrilOgunbunmiC2017WF
JubrilOgunbunmiC2017WFJus September
 
Ray Yelle Profile 2016-01
Ray Yelle Profile 2016-01Ray Yelle Profile 2016-01
Ray Yelle Profile 2016-01Raymond Yelle
 
Miller dwayne-resume08132013
Miller dwayne-resume08132013Miller dwayne-resume08132013
Miller dwayne-resume08132013Dwayne Miller
 
Resume-DanTruaxWeston
Resume-DanTruaxWestonResume-DanTruaxWeston
Resume-DanTruaxWestondajomatruax
 

Similar to Experienced Project Manager with Expertise in Cloud, IoT, and Process Improvement (20)

Technology project manager
Technology project managerTechnology project manager
Technology project manager
 
Business analysis project management
Business analysis project managementBusiness analysis project management
Business analysis project management
 
Seanresume3-15.docx-2
Seanresume3-15.docx-2Seanresume3-15.docx-2
Seanresume3-15.docx-2
 
Michael_L_Jones_resume_1_27_15New
Michael_L_Jones_resume_1_27_15NewMichael_L_Jones_resume_1_27_15New
Michael_L_Jones_resume_1_27_15New
 
Tomi resume
Tomi resumeTomi resume
Tomi resume
 
Profile_Dhananjay_Bhave
Profile_Dhananjay_BhaveProfile_Dhananjay_Bhave
Profile_Dhananjay_Bhave
 
RAB resume 09 01 2016
RAB resume    09 01 2016RAB resume    09 01 2016
RAB resume 09 01 2016
 
Carl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 Revised
 
Chris S. Schaeuble Resume
Chris S. Schaeuble ResumeChris S. Schaeuble Resume
Chris S. Schaeuble Resume
 
Resume of Eric Stohlquist
Resume of Eric StohlquistResume of Eric Stohlquist
Resume of Eric Stohlquist
 
Resume_Dhananjay_Bhave
Resume_Dhananjay_BhaveResume_Dhananjay_Bhave
Resume_Dhananjay_Bhave
 
Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16
 
Sandra.Schneider(PM) Resume 11-15
Sandra.Schneider(PM) Resume 11-15Sandra.Schneider(PM) Resume 11-15
Sandra.Schneider(PM) Resume 11-15
 
Jack Holcombe
Jack HolcombeJack Holcombe
Jack Holcombe
 
Resume__GARY_SHELTON
Resume__GARY_SHELTONResume__GARY_SHELTON
Resume__GARY_SHELTON
 
JubrilOgunbunmiC2017WF
JubrilOgunbunmiC2017WFJubrilOgunbunmiC2017WF
JubrilOgunbunmiC2017WF
 
Ray Yelle Profile 2016-01
Ray Yelle Profile 2016-01Ray Yelle Profile 2016-01
Ray Yelle Profile 2016-01
 
Cms solution 08072010
Cms solution 08072010Cms solution 08072010
Cms solution 08072010
 
Miller dwayne-resume08132013
Miller dwayne-resume08132013Miller dwayne-resume08132013
Miller dwayne-resume08132013
 
Resume-DanTruaxWeston
Resume-DanTruaxWestonResume-DanTruaxWeston
Resume-DanTruaxWeston
 

Experienced Project Manager with Expertise in Cloud, IoT, and Process Improvement

  • 1. 1 Rena Cummings www.linkedin.com/in/projectmanager3/ Telephone: 360-550-8216 rcummings43@gmail.com Project Manager that is process focused and strategy driven. Trackingdata includes implementingcontinuous lean process improvements, documentation which increases productivity and profitability by 25 percent. I am unique because of my background in engineering and business systemanalysistheclients’needs are meet by initiatinga valuestream approach by implementing business awareness,then solutions. ED U C A TI ON • MS in ProjectManager and Technology Management • Improved SharePoint documentation process predicted costsavings of $75,000 • Achieved cost savings of $800,000 using six sigma and lean applications process • Chaired multiple data review and change management “solution meetings” • Project Analysis on Security feasibility of Sensor-Cloud Architect in Automobile • Texas A&M Engineering Certification for Information Security • Texas A&M Engineering Certification for Digital Forensics • Scrum Project Manager co-manage 28 teams to update websites. • Present Security presentation on “Building Security in software using agile application” • BS in Mechanical and ManufacturingEngineer PROJECT MANAG ER  Me c h a n i c a l E n g i n e e r – T e c h n o l o g y Ma n a g e r  AREA S O F EXP ERTISE  Cisco IoT  Project Management  PowerShell  Cloud Security  Project lifecycle  Cloud Data  Azure IoT  Project Analysis  Cloud + Certification  Sensor Cloud Design   Linux /Perl script  Azure - Cloud CL O UD EN THUSIA STIC Project Manager, Product Design Engineer Siemens Westinghouse; Fort Payne Al March 2002- March 2004 ● Supervised Installation of Main & Neutral Leads in Stream Plant ● Chaired multiple data review and change management “solution meetings” ● 47% reduction of rework in corrosion of Main and Neutral Leads ● Achieved costsavings of $800,000 in rework of Main & Neutral Leads P RO F ESSIO N A L EXP ERIEN C E Busi ne ss Proce ss Syste m A nal yst November2013- August2014 JTS Manage Se rvi ce s Se attl e , WA O P ER A TI ON EF F I C EN C Y JTS needed to update its document control operations to meet increased production demands and allowadditional collaboration amongstemployees and contactors. New system had to be compatiblewith the needs of JTS various clients.  Use agilemethodology in preparations of contract setup, to assurecontinuous documentation flow operation.
  • 2. 2  Created and documented work flows usingVisio,and workflowprocess modelingdiagramto increase operation effectively by 25 percent.  Applying Enterprise Business Process methodology to identify inefficientprocess operations as well as implementing improved process changemanagement procedures with a predicted cost savings by $75,000.00 . Senior Electronic Development Engineer Daimler Trucks North America Portland Oregon January 2011 - January 2012 New Product Design: ProjectManaged Linde Gas Gate-lift project required a special designed battery to accommodate their new design lift-gateto retrofit 300 trucks. As PM, I lead a cross-functional team,which included LindeGas, sales manager;plantmanager and liaisonsto create a project plan to retrofit 300 trucks. My tasks included planning phrasefor pre-production builds and program transition into production phrasedeliverable.  Managed and monitor the Linde Gas- Gate lift new product line from production to delivery.  Exceeded the project schedule deadline by 6 months reduce labor cost by $500,000  Coordinated with Sales Manger to develop cost codes for Linde-Gas Gate Lift project.  Applied Toyota Production Methodology and Gap Analysis; reduced truck deliverables by 2 months cost savings of $ 80,000.00 Manufacturing Flight Test Operation & Validation Engineer Boeing, Seattle Washington July 2008- June 2010 As PM, I lead a cross-functional teamof ground engineers, design engineers and production engineers to manufacture 747,777 and 737 supportflighttest operation.As a liaison,I created test plans to be implemented by aircraftmaintenancecrews for operational readiness of the plane. Project Management –New Product Design- Support Smoke Detector Test Supports: The 747 had a problem in acquiringa bracketto secure the smoke detectors. I encountered inconsistent schedulingfor parts installation and a need to secure a suitablesupplier to supply smoke detectors accordingto IMC - Infinite Minde Concepts, Seattle WA. January 2005-present Project managed various projects frommodification of tamalemachine, to The Great African Cook-In  Project Managed: Proposal to install solar panels --- Minister of Good Hope BaptistChurch, Seattle  Created and managed a team of seven  Submitted bid of $ 478,000 to install solar panelsand windmill  Conducted SWOT analysis for solar panel installation  Research and documented sustainability option VOLUN TEER EXP ERIEN CE Seattle Give Camp: MicrosoftCommons: Bellevue, WA October 2013 thru 2016 Scrum Project Manager, I managed 28 teams of software developers, Web develops, databaseAdministrators to update or create web for 28 nonprofit organizations using Agileand Sprintapplication. As ScrumMaster, my responsibility includes,staying within thescope of each project, create requirement analysis;keeping tasks moving throughout the production pipeline. I engaged with the site-owners providing continuous feedback to the team. EDUC A TIO N 2 0 1 4 MS TEC H N O L O G Y MAN AG EMEN T C I TY U N I V ER S I T Y 2 0 1 2 MS P R O J EC T MAN AG EMEN T C I TY U N I V ER S I T Y 1 9 9 7 BS MEC H AN I C AL EN G I N EER U N I V ER S I TY O F MEMP H I S 1 9 9 7 BS MAN U F AC TU R I N G EN G I N EER UN I V ER S I TY O F MEMP H I S