SlideShare a Scribd company logo
1 of 2
Download to read offline
Top 5 Considerations for Design-Build Projects
07/10/19
SCHEME"F"
MUNICIPAL
SANITARY
SEWER
EASEMENT
MUNICIPAL
SANITARY
SEWER
EASEMENT
STAIR
#1
GYMNASIUM
BAND
GIRL'STOIL.
BOY'STOIL.
FACULTY
ROOM
CAFETERIA/
MULTI-PURPOSE
PLATFORM
ADMINISTRATION
OFFICE
PRINCIPAL
SERVING
SER
COURTYARD
M.
W.
STOR.
DATA/
ELEC.
MACH.
RM.
W.
M.
CORR.
CORRIDOR
CORR.
CORR.
A3
A3a
A5
A14
A12
A8
A6
A4
A7
A9
A13
A20
A10
A10b
A130
A140
A118
A116
A128
C100
B140
B110
B112
B104
B120b
B120a
A150
B150
B106
B124
B125
B125b
B125c
B126b
B126c
B126
CUST.
A111b
A111a
ELEC.
TOIL.
KILN
STOR.
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
T.
T.
CONF.
RM.
DRY
STORAGE
MECH.
UP UP
CL
DISHWASHING
MAINENTRANCE
CONTROLLEDACCESSFORVISITIORS
CHORAL
CORRIDOR
D
B161
B163
B165
B166
B167
B161
B166-1
B166-2
B165-1
B165-2
B165-3
B165-4
B164-1
B164-2
B164-3
B164-4
B16
B166-3
B166-5
D1-1
D1-2
B166-6
B166-7
EXIST.
T.R.
COMMUNITY
LIBRARY
BLUECENTER
EXISTINGDRIVE
MECH.
ENCLOSURE
4-1
4-2 4-3
4-4
4-5
4TH
ESL
4TH
4-7
4-8
4-9
4-10
4-11
4-12
4TH
5TH
6TH
4TH
5TH
6TH
4TH
6TH
6TH
MEC
C.E.
COLE
NEW
PAVING
4-6
RENOV.
AREA
NEW
NURSE
CAFETERIA
EXPANSION
NEW
AUX
GYM
LIFESKILLS
MUSIC
NEW
CORRIDOR
B100
LIBRARY
LGI
CU#4CU#5
ELEC.
GENERATOR
DRAIN
A:823sqft
PLAYGROUND
A:5,755sqft
PATIO
A:1,223sqft
ELEV
A:114sqft
A:820sqft
A:611sqft
SPED
A:742sqft
A:1,194sqft
ARTSTOR
ART
A:1,150sqft
ARTSTOR
ART
A:1,159sqft
ART
A:1,159sqft
ARTSTOR
CLASSROOM
A:923sqft
CLASSROOM
A:1,034sqft
STOR.
A:336sqft
CLASSROOM
A:922sqft
SCIENCE
A:991sqft
SCIENCE
A:991sqft
SCIENCE
A:971sqft
STOR.
A:352sqft
BOYST.R.
A:271sqft
GIRLST.R.
A:275sqft
ESL
A:737sqft
SP.ED.
A:800sqft
SPED
A:850sqft
STAFF
A:346sqft MECH
A:537sqft
MACH
A:2,140sqft
A:1,721sqft
CU#1
CU#2
ELEV.
LOCKER
ROOM
LOCKER
ROOM
CORR.
CORR.
STOR.
CU#3
A:1,273sqft
A:3,219sqft
COMMONUSE/SPECIALTYCLASSROOM
4THGRADE
5THGRADE
6THGRADE
STAFFANDADMINISTRATION
USELEGEND
NEWLANDSCAPE/PAVING
NEWPAVING
CIRCULATION
PROJECT
SCALE:1"=40'1FIRSTFLOORPLAN
Architectural project delivery methods include Design-Bid-Build,
Design-Build, Construction Management, and Partnering,
but which method is right for your project?
Before embarking on a Design-Build project, here are five key issues,
and the advantages and disadvantages, Owners should explore.
ACCOUNTABILITY
Design-Build projects have single-source accountability, meaning there is a
single point of contact for the Owner, and a concentration of responsibility.
The Owner deals with the Design-Builder entity (typically a contractor), instead
of separately hiring, and managing, Architects and Contractors. Because of
this, the Design-Builder assumes the risk, instead of the Owner.
In this type of contract, the Architect is no longer the Owner’s independent
consultant, and is now directly working for the Contractor. The loss of the
Architect’s input and judgment may expose the Owner to control problems. If
the Owner is used to having the Design Professional act as an agent, they will
have to employ another entity to take that responsibility.
In a traditional Design-Bid-Build contract, there are Checks and Balances inher-
ent. Both sides keep each other in-check and honest. With Design-Build, pe-
cially where the Design-Build team members are from one firm, there is no one
that the design-build entity is held accountable to, besides the Owner. This
gives the Owner a greater responsibility and management role in the contract.
BUDGET MANAGEMENT
Since all Design-Build team members are involved in the project from the
outset, the budget can be discussed through the design phase, instead of
waiting until bids come in. This helps to keep the project within a realistic
budget, and avoid surprises and unexpected value engineering.
A cost-effective design is easy to obtain because the Architect has access to
construction pricing and information throughout the design phase.
Communicating cost implications of design decisions ensures that the Owner
plays a key role in arriving at the final project price. Once the scope of work
has been finalized, the project costs are clearly defined and controlled by the
design-build team.
The cost control is shifted to the Design-Build entity, and frequently the project
design will gravitate towards the most profitable technologies for the Builder.
Naturally, if the Builder is leading the project, the design decisions will be
directed toward the most beneficial solutions for the Builder, instead of
focusing on the most beneficial solutions for the Owner.
Design-Build projects are not bid out to the lowest Contractor, and because of
the lack of competition, can have higher construction costs. Bidding projects
can often keep construction costs competitive.
FIRM STATS
AT-A-GLANCE
11 PERSONNEL
6 LICENSED ARCHITECTS
3 LEED ACCREDITED PROS
+ CONSULTANT SERVICES
SUSTAINED RECORD
OF
EXCELLENCE
- AIA: Award of Special
Citation,
Institutional/Commercial;
Fostering Emerging
Profesionals Recognition;
Architectural Design Award
for Merit (Eastern chapter)
-Architects & Engineers:
Presidential Award of
Excellence, Innovative
Energy Efficient Design
- Associated Builders &
Contractors: Award of
Excellence
- Central PA: Forevergreen
Award, Suburban Renewal
School of the Year
- Masonry Contractors of
Central PA: Excellence in
Masonry Design; Judges
Award for Craftsmanship
T (610) 376-4927
MG-Architects.com
Muhlenberg Greene Architects Ltd.
955 Berkshire Blvd, Ste 101, Wyomissing, PA 19610-1278
COMMUNICATION
In a Design-Build project, relationships are built between the team members during the design phase, ensuring
that the stage is set for a successful construction project. All team members are involved from the beginning,
and communication between the Builders and Design Professionals ensures that potential problems are
discovered before construction starts.
In a successful Design-Build project, the relationship between the Design Professional and the Builder is an
alliance that fosters collaboration and teamwork. This relationship also benefits both the Builder and the Design
Professional, in that they support each other’s marketing and business efforts.
There is a risk for an unequal relationship between the Designer and the Builder, in which the project lead does
not understand, trust or value the role and expertise of the subcontractor(s).
SCHEDULING
Design-Build projects can usually be completed in a shorter timeframe because bid time is reduced, and
scheduling can begin before the design is finalized. Potential construction problems are usually uncovered
early and enhanced team communication can keep the project moving.
Traditional Design-Bid-Build projects must be phased so that each responsibility is completed before the next
can begin. Design-Build projects can potentially overlap these features; the subcontractor bidding period can
be simultaneous with the production of construction documents, and construction can even begin before the
drawings are complete. An experienced Design-Build team can save time with simpler construction
documents and a streamlined change order process.
QUALITY CONTROL
Team collaboration from the beginning of the project helps to remove ambiguity that may arise in construction
documents. Since the project team should be effectively communicating throughout the design process, the
construction documents are developed with input from all team members.
In a Design-Build contract, the Contractor is the Owner’s representative, and therefore the change order risk is
shifted to the party best able to control changes. The Builder is also able to correct the changes more quickly,
without first having to determine the responsible party.
Since the Owner does not have separate contracts with the Designer and the Builder, they also do not have a
system of checks and balances, as mentioned before. It may be necessary for the Owner to hire an
independent consultant to manage problems and hold all team members accountable.
T (610) 376-4927
MG-Architects.com
Muhlenberg Greene Architects Ltd.
955 Berkshire Blvd, Ste 101, Wyomissing, PA 19610-1278
ABOUT THE AUTHOR
Dennis W. Rex, AIA, NCARB, Principal, serves as the firm’s chief administrative
officer. He brings over thirty-five years of architectural experience in the planning,
design and rehabilitation of residential, commercial, institutional and industrial
buildings.
Project experience includes both foreign and domestic research laboratories,
transportation facilities, educational buildings, maintenance facilities,
manufacturing structures, office complexes, medical facilities, housing, and, most
recently, places of worship. Dennis is involved in all phases of projects from
programming through construction administration.
MUHLENBERG GREENE ARCHITECTS
Based in Berks County, Pennsylvania, our firm has been committed to a better built environment for over a
century. To review a sample portfolio of our completed projects, and rich history, please visit our website listed
below.
Have an upcoming project and need some advice?
We’d love to hear from you! Send an email to MGA@MG-Architects.com or give us a call to discuss your
upcoming project.
Dennis W. Rex, AIA, NCARB
Prinicpal

More Related Content

What's hot

Architect as a project manager
Architect as a project managerArchitect as a project manager
Architect as a project managerJackson Sampson
 
What, when, and why of commercial general contractors near me
What, when, and why of commercial general contractors near meWhat, when, and why of commercial general contractors near me
What, when, and why of commercial general contractors near memarwoodconstruction
 
Group 1 presentation intro to cpm
Group 1 presentation intro to cpmGroup 1 presentation intro to cpm
Group 1 presentation intro to cpmKaila Turla
 
The role of project management consultants
The role of project management consultantsThe role of project management consultants
The role of project management consultantsShah & Talati
 
The role of an Architect
The role of an ArchitectThe role of an Architect
The role of an ArchitectClara Lee
 
ConstructionFlow
ConstructionFlowConstructionFlow
ConstructionFlowJeff Dixon
 
Project Management Case Study .EC Harris International Ltd. (Al Wahda Mast...
Project Management Case Study .EC Harris International Ltd.   (Al Wahda Mast...Project Management Case Study .EC Harris International Ltd.   (Al Wahda Mast...
Project Management Case Study .EC Harris International Ltd. (Al Wahda Mast...Malik Liaqat Ali
 
AMTS Construction Management, Project Management, Facility Solutions Expertise
AMTS Construction Management, Project Management, Facility Solutions ExpertiseAMTS Construction Management, Project Management, Facility Solutions Expertise
AMTS Construction Management, Project Management, Facility Solutions ExpertiseAM Technical Solutions, Inc
 
1. introduction to construction technology by 15CRP46
1. introduction to construction technology by 15CRP461. introduction to construction technology by 15CRP46
1. introduction to construction technology by 15CRP46Noshad Ahmed Wahocho
 
Project management
Project managementProject management
Project managementBenjamin Tan
 
Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Constructionshillier38
 
Project Management
Project ManagementProject Management
Project ManagementDr K M SONI
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Juan Carlos Garcia Resume PM_16
Juan Carlos Garcia Resume PM_16Juan Carlos Garcia Resume PM_16
Juan Carlos Garcia Resume PM_16Juan Carlos Garcia
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.Hagi Sahib
 

What's hot (18)

Architect as a project manager
Architect as a project managerArchitect as a project manager
Architect as a project manager
 
What, when, and why of commercial general contractors near me
What, when, and why of commercial general contractors near meWhat, when, and why of commercial general contractors near me
What, when, and why of commercial general contractors near me
 
Group 1 presentation intro to cpm
Group 1 presentation intro to cpmGroup 1 presentation intro to cpm
Group 1 presentation intro to cpm
 
The role of project management consultants
The role of project management consultantsThe role of project management consultants
The role of project management consultants
 
The role of an Architect
The role of an ArchitectThe role of an Architect
The role of an Architect
 
ConstructionFlow
ConstructionFlowConstructionFlow
ConstructionFlow
 
Project Management Case Study .EC Harris International Ltd. (Al Wahda Mast...
Project Management Case Study .EC Harris International Ltd.   (Al Wahda Mast...Project Management Case Study .EC Harris International Ltd.   (Al Wahda Mast...
Project Management Case Study .EC Harris International Ltd. (Al Wahda Mast...
 
AMTS Construction Management, Project Management, Facility Solutions Expertise
AMTS Construction Management, Project Management, Facility Solutions ExpertiseAMTS Construction Management, Project Management, Facility Solutions Expertise
AMTS Construction Management, Project Management, Facility Solutions Expertise
 
Beckinson Ebrochure
Beckinson EbrochureBeckinson Ebrochure
Beckinson Ebrochure
 
1. introduction to construction technology by 15CRP46
1. introduction to construction technology by 15CRP461. introduction to construction technology by 15CRP46
1. introduction to construction technology by 15CRP46
 
Project management
Project managementProject management
Project management
 
Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Construction
 
Project Management
Project ManagementProject Management
Project Management
 
Resume Rev A 3-22-16
Resume Rev A 3-22-16Resume Rev A 3-22-16
Resume Rev A 3-22-16
 
Construction process
Construction processConstruction process
Construction process
 
Maulik_Mistri_1
Maulik_Mistri_1Maulik_Mistri_1
Maulik_Mistri_1
 
Juan Carlos Garcia Resume PM_16
Juan Carlos Garcia Resume PM_16Juan Carlos Garcia Resume PM_16
Juan Carlos Garcia Resume PM_16
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.
 

Similar to Five Key Considerations for Design Build Projects

[Report] Who's protecting your blindside? Construction Management: Protectin...
[Report] Who's protecting your blindside?  Construction Management: Protectin...[Report] Who's protecting your blindside?  Construction Management: Protectin...
[Report] Who's protecting your blindside? Construction Management: Protectin...JLL
 
Design-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesDesign-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesMcCarthy Holdings, Inc.
 
Bryan Butler Resume A1
Bryan Butler Resume A1Bryan Butler Resume A1
Bryan Butler Resume A1Bryan Butler
 
Bryan Butler Resume B
Bryan Butler Resume BBryan Butler Resume B
Bryan Butler Resume BBryan Butler
 
Residential Design Build Whitepaper
Residential Design Build WhitepaperResidential Design Build Whitepaper
Residential Design Build WhitepaperBethany Jenkins
 
T. Luoma_project_engineer_Instrumentation_Automation_controls
T. Luoma_project_engineer_Instrumentation_Automation_controlsT. Luoma_project_engineer_Instrumentation_Automation_controls
T. Luoma_project_engineer_Instrumentation_Automation_controlsTero Luoma
 
pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016Chris Nash
 
Ipd Convention 2009 Lessons Learned Presentation Final
Ipd Convention 2009 Lessons Learned Presentation FinalIpd Convention 2009 Lessons Learned Presentation Final
Ipd Convention 2009 Lessons Learned Presentation FinalAndrew Huseman
 
5 Secrets of Smarter, Faster, & Cheaper Construction In NYC
5 Secrets of Smarter, Faster, & Cheaper Construction In NYC5 Secrets of Smarter, Faster, & Cheaper Construction In NYC
5 Secrets of Smarter, Faster, & Cheaper Construction In NYCRahulJaykar21
 
03 CONSTRUCTION OWNERS REP INFORMATION
03 CONSTRUCTION OWNERS REP INFORMATION03 CONSTRUCTION OWNERS REP INFORMATION
03 CONSTRUCTION OWNERS REP INFORMATIONJoe Trujillo
 
DPS Hi End Manufacturing Brochure
DPS Hi End Manufacturing BrochureDPS Hi End Manufacturing Brochure
DPS Hi End Manufacturing Brochureannmarie1964
 
Construction economic
Construction economicConstruction economic
Construction economicfauziani
 
Project Charter Summery
Project Charter SummeryProject Charter Summery
Project Charter SummeryDerek Cooksey
 
Design Build Defined, and the Top 3 Team Structures
Design Build Defined, and the Top 3 Team StructuresDesign Build Defined, and the Top 3 Team Structures
Design Build Defined, and the Top 3 Team StructuresSuzanne Cody
 

Similar to Five Key Considerations for Design Build Projects (20)

[Report] Who's protecting your blindside? Construction Management: Protectin...
[Report] Who's protecting your blindside?  Construction Management: Protectin...[Report] Who's protecting your blindside?  Construction Management: Protectin...
[Report] Who's protecting your blindside? Construction Management: Protectin...
 
Design-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesDesign-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful Outcomes
 
Bryan Butler Resume A1
Bryan Butler Resume A1Bryan Butler Resume A1
Bryan Butler Resume A1
 
Bryan Butler Resume B
Bryan Butler Resume BBryan Butler Resume B
Bryan Butler Resume B
 
ANASCV
ANASCVANASCV
ANASCV
 
Residential Design Build Whitepaper
Residential Design Build WhitepaperResidential Design Build Whitepaper
Residential Design Build Whitepaper
 
Beckinson E-brochure
Beckinson E-brochureBeckinson E-brochure
Beckinson E-brochure
 
Beckinson ebrochure
Beckinson ebrochureBeckinson ebrochure
Beckinson ebrochure
 
T. Luoma_project_engineer_Instrumentation_Automation_controls
T. Luoma_project_engineer_Instrumentation_Automation_controlsT. Luoma_project_engineer_Instrumentation_Automation_controls
T. Luoma_project_engineer_Instrumentation_Automation_controls
 
Nayer Resume March 2016
Nayer Resume March 2016Nayer Resume March 2016
Nayer Resume March 2016
 
pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016
 
Ipd Convention 2009 Lessons Learned Presentation Final
Ipd Convention 2009 Lessons Learned Presentation FinalIpd Convention 2009 Lessons Learned Presentation Final
Ipd Convention 2009 Lessons Learned Presentation Final
 
5 Secrets of Smarter, Faster, & Cheaper Construction In NYC
5 Secrets of Smarter, Faster, & Cheaper Construction In NYC5 Secrets of Smarter, Faster, & Cheaper Construction In NYC
5 Secrets of Smarter, Faster, & Cheaper Construction In NYC
 
PASBA 2010 presentation
PASBA 2010 presentationPASBA 2010 presentation
PASBA 2010 presentation
 
03 CONSTRUCTION OWNERS REP INFORMATION
03 CONSTRUCTION OWNERS REP INFORMATION03 CONSTRUCTION OWNERS REP INFORMATION
03 CONSTRUCTION OWNERS REP INFORMATION
 
DPS Hi End Manufacturing Brochure
DPS Hi End Manufacturing BrochureDPS Hi End Manufacturing Brochure
DPS Hi End Manufacturing Brochure
 
Construction economic
Construction economicConstruction economic
Construction economic
 
Project Charter Summery
Project Charter SummeryProject Charter Summery
Project Charter Summery
 
Design Build Defined, and the Top 3 Team Structures
Design Build Defined, and the Top 3 Team StructuresDesign Build Defined, and the Top 3 Team Structures
Design Build Defined, and the Top 3 Team Structures
 
ARTSCAPE_Introduction
ARTSCAPE_IntroductionARTSCAPE_Introduction
ARTSCAPE_Introduction
 

Recently uploaded

Iconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing servicesIconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing servicesIconic global solution
 
guest bathroom white and bluesssssssssss
guest bathroom white and bluesssssssssssguest bathroom white and bluesssssssssss
guest bathroom white and bluesssssssssssNadaMohammed714321
 
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...Rishabh Aryan
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 
Color Theory Explained for Noobs- Think360 Studio
Color Theory Explained for Noobs- Think360 StudioColor Theory Explained for Noobs- Think360 Studio
Color Theory Explained for Noobs- Think360 StudioThink360 Studio
 
Map of St. Louis Parks
Map of St. Louis Parks                              Map of St. Louis Parks
Map of St. Louis Parks CharlottePulte
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfneelspinoy
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.pptMaking and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.pptJIT KUMAR GUPTA
 
AI and Design Vol. 2: Navigating the New Frontier - Morgenbooster
AI and Design Vol. 2: Navigating the New Frontier - MorgenboosterAI and Design Vol. 2: Navigating the New Frontier - Morgenbooster
AI and Design Vol. 2: Navigating the New Frontier - Morgenbooster1508 A/S
 
10 must-have Chrome extensions for designers
10 must-have Chrome extensions for designers10 must-have Chrome extensions for designers
10 must-have Chrome extensions for designersPixeldarts
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIyuj
 
General Knowledge Quiz Game C++ CODE.pptx
General Knowledge Quiz Game C++ CODE.pptxGeneral Knowledge Quiz Game C++ CODE.pptx
General Knowledge Quiz Game C++ CODE.pptxmarckustrevion
 
simpson-lee_house_dt20ajshsjsjsjsjj15.pdf
simpson-lee_house_dt20ajshsjsjsjsjj15.pdfsimpson-lee_house_dt20ajshsjsjsjsjj15.pdf
simpson-lee_house_dt20ajshsjsjsjsjj15.pdfLucyBonelli
 
world health day 2024.pptxgbbvggvbhjjjbbbb
world health day 2024.pptxgbbvggvbhjjjbbbbworld health day 2024.pptxgbbvggvbhjjjbbbb
world health day 2024.pptxgbbvggvbhjjjbbbbpreetirao780
 
Interior Design for Office a cura di RMG Project Studio
Interior Design for Office a cura di RMG Project StudioInterior Design for Office a cura di RMG Project Studio
Interior Design for Office a cura di RMG Project StudioRMG Project Studio
 
The spirit of digital place - game worlds and architectural phenomenology
The spirit of digital place - game worlds and architectural phenomenologyThe spirit of digital place - game worlds and architectural phenomenology
The spirit of digital place - game worlds and architectural phenomenologyChristopher Totten
 
guest bathroom white and blue ssssssssss
guest bathroom white and blue ssssssssssguest bathroom white and blue ssssssssss
guest bathroom white and blue ssssssssssNadaMohammed714321
 
Karim apartment ideas 02 ppppppppppppppp
Karim apartment ideas 02 pppppppppppppppKarim apartment ideas 02 ppppppppppppppp
Karim apartment ideas 02 pppppppppppppppNadaMohammed714321
 
Karim apartment ideas 01 ppppppppppppppp
Karim apartment ideas 01 pppppppppppppppKarim apartment ideas 01 ppppppppppppppp
Karim apartment ideas 01 pppppppppppppppNadaMohammed714321
 

Recently uploaded (20)

Iconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing servicesIconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing services
 
guest bathroom white and bluesssssssssss
guest bathroom white and bluesssssssssssguest bathroom white and bluesssssssssss
guest bathroom white and bluesssssssssss
 
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
 
Color Theory Explained for Noobs- Think360 Studio
Color Theory Explained for Noobs- Think360 StudioColor Theory Explained for Noobs- Think360 Studio
Color Theory Explained for Noobs- Think360 Studio
 
Map of St. Louis Parks
Map of St. Louis Parks                              Map of St. Louis Parks
Map of St. Louis Parks
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdf
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.pptMaking and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
 
AI and Design Vol. 2: Navigating the New Frontier - Morgenbooster
AI and Design Vol. 2: Navigating the New Frontier - MorgenboosterAI and Design Vol. 2: Navigating the New Frontier - Morgenbooster
AI and Design Vol. 2: Navigating the New Frontier - Morgenbooster
 
10 must-have Chrome extensions for designers
10 must-have Chrome extensions for designers10 must-have Chrome extensions for designers
10 must-have Chrome extensions for designers
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AI
 
General Knowledge Quiz Game C++ CODE.pptx
General Knowledge Quiz Game C++ CODE.pptxGeneral Knowledge Quiz Game C++ CODE.pptx
General Knowledge Quiz Game C++ CODE.pptx
 
simpson-lee_house_dt20ajshsjsjsjsjj15.pdf
simpson-lee_house_dt20ajshsjsjsjsjj15.pdfsimpson-lee_house_dt20ajshsjsjsjsjj15.pdf
simpson-lee_house_dt20ajshsjsjsjsjj15.pdf
 
world health day 2024.pptxgbbvggvbhjjjbbbb
world health day 2024.pptxgbbvggvbhjjjbbbbworld health day 2024.pptxgbbvggvbhjjjbbbb
world health day 2024.pptxgbbvggvbhjjjbbbb
 
Interior Design for Office a cura di RMG Project Studio
Interior Design for Office a cura di RMG Project StudioInterior Design for Office a cura di RMG Project Studio
Interior Design for Office a cura di RMG Project Studio
 
The spirit of digital place - game worlds and architectural phenomenology
The spirit of digital place - game worlds and architectural phenomenologyThe spirit of digital place - game worlds and architectural phenomenology
The spirit of digital place - game worlds and architectural phenomenology
 
guest bathroom white and blue ssssssssss
guest bathroom white and blue ssssssssssguest bathroom white and blue ssssssssss
guest bathroom white and blue ssssssssss
 
Karim apartment ideas 02 ppppppppppppppp
Karim apartment ideas 02 pppppppppppppppKarim apartment ideas 02 ppppppppppppppp
Karim apartment ideas 02 ppppppppppppppp
 
Karim apartment ideas 01 ppppppppppppppp
Karim apartment ideas 01 pppppppppppppppKarim apartment ideas 01 ppppppppppppppp
Karim apartment ideas 01 ppppppppppppppp
 

Five Key Considerations for Design Build Projects

  • 1. Top 5 Considerations for Design-Build Projects 07/10/19 SCHEME"F" MUNICIPAL SANITARY SEWER EASEMENT MUNICIPAL SANITARY SEWER EASEMENT STAIR #1 GYMNASIUM BAND GIRL'STOIL. BOY'STOIL. FACULTY ROOM CAFETERIA/ MULTI-PURPOSE PLATFORM ADMINISTRATION OFFICE PRINCIPAL SERVING SER COURTYARD M. W. STOR. DATA/ ELEC. MACH. RM. W. M. CORR. CORRIDOR CORR. CORR. A3 A3a A5 A14 A12 A8 A6 A4 A7 A9 A13 A20 A10 A10b A130 A140 A118 A116 A128 C100 B140 B110 B112 B104 B120b B120a A150 B150 B106 B124 B125 B125b B125c B126b B126c B126 CUST. A111b A111a ELEC. TOIL. KILN STOR. OFFICE OFFICE OFFICE OFFICE OFFICE T. T. CONF. RM. DRY STORAGE MECH. UP UP CL DISHWASHING MAINENTRANCE CONTROLLEDACCESSFORVISITIORS CHORAL CORRIDOR D B161 B163 B165 B166 B167 B161 B166-1 B166-2 B165-1 B165-2 B165-3 B165-4 B164-1 B164-2 B164-3 B164-4 B16 B166-3 B166-5 D1-1 D1-2 B166-6 B166-7 EXIST. T.R. COMMUNITY LIBRARY BLUECENTER EXISTINGDRIVE MECH. ENCLOSURE 4-1 4-2 4-3 4-4 4-5 4TH ESL 4TH 4-7 4-8 4-9 4-10 4-11 4-12 4TH 5TH 6TH 4TH 5TH 6TH 4TH 6TH 6TH MEC C.E. COLE NEW PAVING 4-6 RENOV. AREA NEW NURSE CAFETERIA EXPANSION NEW AUX GYM LIFESKILLS MUSIC NEW CORRIDOR B100 LIBRARY LGI CU#4CU#5 ELEC. GENERATOR DRAIN A:823sqft PLAYGROUND A:5,755sqft PATIO A:1,223sqft ELEV A:114sqft A:820sqft A:611sqft SPED A:742sqft A:1,194sqft ARTSTOR ART A:1,150sqft ARTSTOR ART A:1,159sqft ART A:1,159sqft ARTSTOR CLASSROOM A:923sqft CLASSROOM A:1,034sqft STOR. A:336sqft CLASSROOM A:922sqft SCIENCE A:991sqft SCIENCE A:991sqft SCIENCE A:971sqft STOR. A:352sqft BOYST.R. A:271sqft GIRLST.R. A:275sqft ESL A:737sqft SP.ED. A:800sqft SPED A:850sqft STAFF A:346sqft MECH A:537sqft MACH A:2,140sqft A:1,721sqft CU#1 CU#2 ELEV. LOCKER ROOM LOCKER ROOM CORR. CORR. STOR. CU#3 A:1,273sqft A:3,219sqft COMMONUSE/SPECIALTYCLASSROOM 4THGRADE 5THGRADE 6THGRADE STAFFANDADMINISTRATION USELEGEND NEWLANDSCAPE/PAVING NEWPAVING CIRCULATION PROJECT SCALE:1"=40'1FIRSTFLOORPLAN Architectural project delivery methods include Design-Bid-Build, Design-Build, Construction Management, and Partnering, but which method is right for your project? Before embarking on a Design-Build project, here are five key issues, and the advantages and disadvantages, Owners should explore. ACCOUNTABILITY Design-Build projects have single-source accountability, meaning there is a single point of contact for the Owner, and a concentration of responsibility. The Owner deals with the Design-Builder entity (typically a contractor), instead of separately hiring, and managing, Architects and Contractors. Because of this, the Design-Builder assumes the risk, instead of the Owner. In this type of contract, the Architect is no longer the Owner’s independent consultant, and is now directly working for the Contractor. The loss of the Architect’s input and judgment may expose the Owner to control problems. If the Owner is used to having the Design Professional act as an agent, they will have to employ another entity to take that responsibility. In a traditional Design-Bid-Build contract, there are Checks and Balances inher- ent. Both sides keep each other in-check and honest. With Design-Build, pe- cially where the Design-Build team members are from one firm, there is no one that the design-build entity is held accountable to, besides the Owner. This gives the Owner a greater responsibility and management role in the contract. BUDGET MANAGEMENT Since all Design-Build team members are involved in the project from the outset, the budget can be discussed through the design phase, instead of waiting until bids come in. This helps to keep the project within a realistic budget, and avoid surprises and unexpected value engineering. A cost-effective design is easy to obtain because the Architect has access to construction pricing and information throughout the design phase. Communicating cost implications of design decisions ensures that the Owner plays a key role in arriving at the final project price. Once the scope of work has been finalized, the project costs are clearly defined and controlled by the design-build team. The cost control is shifted to the Design-Build entity, and frequently the project design will gravitate towards the most profitable technologies for the Builder. Naturally, if the Builder is leading the project, the design decisions will be directed toward the most beneficial solutions for the Builder, instead of focusing on the most beneficial solutions for the Owner. Design-Build projects are not bid out to the lowest Contractor, and because of the lack of competition, can have higher construction costs. Bidding projects can often keep construction costs competitive. FIRM STATS AT-A-GLANCE 11 PERSONNEL 6 LICENSED ARCHITECTS 3 LEED ACCREDITED PROS + CONSULTANT SERVICES SUSTAINED RECORD OF EXCELLENCE - AIA: Award of Special Citation, Institutional/Commercial; Fostering Emerging Profesionals Recognition; Architectural Design Award for Merit (Eastern chapter) -Architects & Engineers: Presidential Award of Excellence, Innovative Energy Efficient Design - Associated Builders & Contractors: Award of Excellence - Central PA: Forevergreen Award, Suburban Renewal School of the Year - Masonry Contractors of Central PA: Excellence in Masonry Design; Judges Award for Craftsmanship T (610) 376-4927 MG-Architects.com Muhlenberg Greene Architects Ltd. 955 Berkshire Blvd, Ste 101, Wyomissing, PA 19610-1278
  • 2. COMMUNICATION In a Design-Build project, relationships are built between the team members during the design phase, ensuring that the stage is set for a successful construction project. All team members are involved from the beginning, and communication between the Builders and Design Professionals ensures that potential problems are discovered before construction starts. In a successful Design-Build project, the relationship between the Design Professional and the Builder is an alliance that fosters collaboration and teamwork. This relationship also benefits both the Builder and the Design Professional, in that they support each other’s marketing and business efforts. There is a risk for an unequal relationship between the Designer and the Builder, in which the project lead does not understand, trust or value the role and expertise of the subcontractor(s). SCHEDULING Design-Build projects can usually be completed in a shorter timeframe because bid time is reduced, and scheduling can begin before the design is finalized. Potential construction problems are usually uncovered early and enhanced team communication can keep the project moving. Traditional Design-Bid-Build projects must be phased so that each responsibility is completed before the next can begin. Design-Build projects can potentially overlap these features; the subcontractor bidding period can be simultaneous with the production of construction documents, and construction can even begin before the drawings are complete. An experienced Design-Build team can save time with simpler construction documents and a streamlined change order process. QUALITY CONTROL Team collaboration from the beginning of the project helps to remove ambiguity that may arise in construction documents. Since the project team should be effectively communicating throughout the design process, the construction documents are developed with input from all team members. In a Design-Build contract, the Contractor is the Owner’s representative, and therefore the change order risk is shifted to the party best able to control changes. The Builder is also able to correct the changes more quickly, without first having to determine the responsible party. Since the Owner does not have separate contracts with the Designer and the Builder, they also do not have a system of checks and balances, as mentioned before. It may be necessary for the Owner to hire an independent consultant to manage problems and hold all team members accountable. T (610) 376-4927 MG-Architects.com Muhlenberg Greene Architects Ltd. 955 Berkshire Blvd, Ste 101, Wyomissing, PA 19610-1278 ABOUT THE AUTHOR Dennis W. Rex, AIA, NCARB, Principal, serves as the firm’s chief administrative officer. He brings over thirty-five years of architectural experience in the planning, design and rehabilitation of residential, commercial, institutional and industrial buildings. Project experience includes both foreign and domestic research laboratories, transportation facilities, educational buildings, maintenance facilities, manufacturing structures, office complexes, medical facilities, housing, and, most recently, places of worship. Dennis is involved in all phases of projects from programming through construction administration. MUHLENBERG GREENE ARCHITECTS Based in Berks County, Pennsylvania, our firm has been committed to a better built environment for over a century. To review a sample portfolio of our completed projects, and rich history, please visit our website listed below. Have an upcoming project and need some advice? We’d love to hear from you! Send an email to MGA@MG-Architects.com or give us a call to discuss your upcoming project. Dennis W. Rex, AIA, NCARB Prinicpal