Group:4 Team: Path Finder
Roll:1717011;1717021; 1717024; 1717031;1717033
URP 2214:Site and Area Planning Studio
1
In this project, we have been given an area in Khulna for each group for studying
about the overall condition of that area including plots, building, vacant plots, open
space, recreational area, parks, vegetation, waterbody, connectivity, utilities, and
many more. We, Group 4 are given An Area Near Notun Rasta that covers the area
of Pabla Karigorpara in one side and some area of Goalkhali in others.
Now, This presentation will covers the Neighborhood layout of “Notun
Rasta.”
URP 2214:Site and Area Planning Studio 2
URP 2214:Site and Area Planning Studio 3
Khulna
Our Site
URP 2214:Site and Area Planning Studio 4
And Finally a Site Inventory
Analysis & SWOT analysis
 Objective of the project is to observe and note down the facilities over the area in a
good manure. A site suitability analysis and SWOT analysis was also done
 Findings:
URP 2214:Site and Area Planning Studio 5
Maximum area
is Gheer(Fish
Hatchery)
Poor Condition
of Drainage
Poor Condition
of Accessibility
URP 2214:Site and Area Planning Studio 6
URP 2214:Site and Area Planning Studio 7
Source: Contour map
creator
 Most of the area is undeveloped &
used as Fish Hatchery
 About 65 individual ponds are
used as hatchery.
 Most of the land is wetland and a
lest is cultivable land (About
10%).
URP 2214:Site and Area Planning Studio 8
Sun at
Noon
• Total Daylight 10 hrs.
to 13.32 hrs.(avg)
• The area is enriches
with proper daylight
• Wind Direction is on
Southern west having
a average speed of
22km/h.(source:https://satellites.pro
/#22.853898,89.524691,17 and
https://www.worldweatheronline.com/khu
lna-weather-averages/bd.aspx)
 As it varies a little in different corner of Khulna so the data for Khulna is used as
reference…
URP 2214:Site and Area Planning Studio 9
From the CHART
• Annual average temperature
of 26.3C (79.3 F) and monthly
means varying between 12.4 C
(54.3 F) in January and 34.3C
(93.7F) in May.
• Annual average rain fall
is1809.4 millimeters
• 87% of the annual rainfall
occurs in May and October.
The area contains three types of Road-
I. Primary Road(Outer Bypass Road &
Bastuhara Bypass)
II. Secondary Road like lemon city entrance
III. Tertiary road( Kacha road)
Actually there is no traditional road that
maintain the Criteria that fixed by law.
URP 2214:Site and Area Planning Studio 10
Fig: Primary road(Outer bypass road)
Roadways Length(m) Area covers
(approx.)
(%)
Primary 1263.06 .002
Secondary 1349.87 1.049
Tertiary 1771.08 1.32
Access 1650 1.22
URP 2214:Site and Area Planning Studio 11
Road-Length & Area Coverage
Road Map of the site
Vital Points of Khulna Distance from site
1. KUET 6.8km
1. KU 9.8km
1. Shibbari 5.6km
1. Ferighat Moore 6.5km
URP 2214:Site and Area Planning Studio 12
Surrounded by two
major roads, Outer
Bypass Road and
Bastuhara Bypass.
A secondary road is
connected with Khulna
city bypass road.
and there is a dead-end
road connected to
Khulna city bypass.
URP 2214:Site and Area Planning Studio 13
27%
40%
23%
10%
Land use percentage
Residential Water body
Vegetation Cultivable land
Total Area:
0.578𝑘𝑚2
(57.89 hectare)
Waterbody:0.231𝑘𝑚2
(23.1 hectare)
Residential:0.156𝑘𝑚2
(15.6 hectare)
Vegetation:0.132𝑘𝑚2
(13.2 hectare)
Cultivated Land:0.05𝑘𝑚2
(5 hectare)
URP 2214:Site and Area Planning Studio 14
• The area is full of waterbody. The
maximum area is Gheer (fish hatchery).
• There is a few man made drainage system
• A natural small cannel in west side exists.
But it is a dead-end cannel.
• The area contains almost 90+ ponds and
waterbody
• About 65 ponds are used as hatchery
Waterbody Condition
URP 2214:Site and Area Planning Studio 15
Dead end Canal on our site boundary
• A dead end canal exists on west
corner of our site
Dead end Canal on our site boundary
• Drainage ditch exists only on both
side of Outer bypass road and
Bastuhara bypass have the one
sided kacha ditch that’s condition is
severely poor.
Poor Drainage on Bastuhara Road
• Tertiary Roads have no drainage
line
• A road with no drainage
URP 2214:Site and Area Planning Studio 16
Fig: Vegetation map of that area
• About 23 % of our area is
covered with different type
of trees
Including Rice fields
URP 2214:Site and Area Planning Studio 17
Fig: Map showing Plot level or Building Level
(excluding tin made house)
Building
Constructed
Number of
Buildings
Tin 112
1 storied 50
2 storied 62
3 storied 33
4 storied & above 26
Under-
construction
8
Total 291
URP 2214:Site and Area Planning Studio 18
The area is categorized under three
boundaries like,
1. Highly Developed area
2. Moderately developed area
3. Undeveloped area
Maximum buildings are located on H.D.A.
Fig: Map showing different development condition
URP 2214:Site and Area Planning Studio 19
URP 2214:Site and Area Planning Studio 20
0
20
40
60
80
100
120
Scoreearned
Criteria
Ste analysis data for Different site
Teligati Golokdham Shiromoni Notun Rasta Arongghata
• The Site 2 of Golokdham is
the best suited site. As it
scored 655.
• Our site, Notun Rasta also
scored a moderate score of
644.
• From our analysis
Shiromoni is the third
suitable site.(Scoring 640)
Strength Weakness
1. Low development. So, there is enough opportunities for
development.
2. No political issue. Most of the lands are in privet ownership.
3. There is a market in Kabir Bat Tola and in Karigor Para in
the area which serves as a commercial zone for the site area.
4. There are several mosques in the area.
1. Access roads are in poor condition
2. Most of the lands are low land.
3. No gas, water supply facility. Poor community facility.
4. A few public amenities (like: shopping center, public gathering
place, recreation center etc.)
5. Flat land. So, most of the area goes under water during rainy
season.
6. There is a primary road that runs across the site area. Heavy
vehicles (like: bus, truck etc.) moves across the site. Due to
this there is noise pollution and safety issues in the site area.
7. The financial condition of the people is poor.
8. A little facility of city corporation.
Opportunity Threat
1. There is a primary school beside the site area.
2. There are no political issues in the surrounded areas.
1. The site area is away from the center of the Khulna city.
2. Transportation cost is huge for the commuters.
URP 2214:Site and Area Planning Studio 21
 After analyzing all the criteria and observe all the information it is clear to us that
our site is not the best but it can be turned to best by implementing some matter
that is come to limelight through our survey.
 We can recommend the proper utility services like sanitary and roadways with
some infrastructural development like proper planning of land use, enough
quantity of school etc.
 On comparison to other site, our site scores a moderately good score that means it
have mainly all kind of services(approx..) but not in proper amount.
 So if the governing authority take the necessary steps to upgrade the condition
then it would be the better residential cum commercial area.
URP 2214:Site and Area Planning Studio 22
URP 2282:Landscape Planning and Design 23

More Related Content

What's hot

Kochi city study(intro, history, demography, infrastructure, economy, tourism)
Kochi  city study(intro, history, demography, infrastructure, economy, tourism)Kochi  city study(intro, history, demography, infrastructure, economy, tourism)
Kochi city study(intro, history, demography, infrastructure, economy, tourism)Arun Chandra Babu
 
Urban Design SWOT Analysis, Doha, Qatar
Urban Design SWOT Analysis, Doha, QatarUrban Design SWOT Analysis, Doha, Qatar
Urban Design SWOT Analysis, Doha, QatarWalter Bone, RLA ASLA
 
CASE STUDY NEHRU PLACE,DELHI
CASE STUDY NEHRU PLACE,DELHICASE STUDY NEHRU PLACE,DELHI
CASE STUDY NEHRU PLACE,DELHIAashna Arora
 
RADIAL CITY PLANNING
RADIAL CITY PLANNINGRADIAL CITY PLANNING
RADIAL CITY PLANNINGTazim Asraf
 
TOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentTOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentShruthi Kshirasagar
 
Neighbourhood Concept
Neighbourhood ConceptNeighbourhood Concept
Neighbourhood ConceptAnshul Abbasi
 
Mix use building case Study
Mix use building case Study Mix use building case Study
Mix use building case Study Nitesh Parmar
 
Planning concept of Chandigarh city.
Planning concept of Chandigarh city.Planning concept of Chandigarh city.
Planning concept of Chandigarh city.Noshad Ahmed Wahocho
 
Doxiadis : Ekistics the science of human settlement
Doxiadis : Ekistics the science of human settlementDoxiadis : Ekistics the science of human settlement
Doxiadis : Ekistics the science of human settlementHemant Mishra
 
Urban planning concept,principles and elementes
Urban planning  concept,principles and elementes Urban planning  concept,principles and elementes
Urban planning concept,principles and elementes TeshagerMengesha
 
CLARENCE STEIN
CLARENCE STEINCLARENCE STEIN
CLARENCE STEINYamini K
 

What's hot (20)

Kochi city study(intro, history, demography, infrastructure, economy, tourism)
Kochi  city study(intro, history, demography, infrastructure, economy, tourism)Kochi  city study(intro, history, demography, infrastructure, economy, tourism)
Kochi city study(intro, history, demography, infrastructure, economy, tourism)
 
Urban Design SWOT Analysis, Doha, Qatar
Urban Design SWOT Analysis, Doha, QatarUrban Design SWOT Analysis, Doha, Qatar
Urban Design SWOT Analysis, Doha, Qatar
 
CASE STUDY NEHRU PLACE,DELHI
CASE STUDY NEHRU PLACE,DELHICASE STUDY NEHRU PLACE,DELHI
CASE STUDY NEHRU PLACE,DELHI
 
RADIAL CITY PLANNING
RADIAL CITY PLANNINGRADIAL CITY PLANNING
RADIAL CITY PLANNING
 
TOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentTOD - Transit Oriented Development
TOD - Transit Oriented Development
 
Neighbourhood Concept
Neighbourhood ConceptNeighbourhood Concept
Neighbourhood Concept
 
City forms
City formsCity forms
City forms
 
Mix use building case Study
Mix use building case Study Mix use building case Study
Mix use building case Study
 
Planning concept of Chandigarh city.
Planning concept of Chandigarh city.Planning concept of Chandigarh city.
Planning concept of Chandigarh city.
 
Doxiadis : Ekistics the science of human settlement
Doxiadis : Ekistics the science of human settlementDoxiadis : Ekistics the science of human settlement
Doxiadis : Ekistics the science of human settlement
 
Urban planning concept,principles and elementes
Urban planning  concept,principles and elementes Urban planning  concept,principles and elementes
Urban planning concept,principles and elementes
 
linear city settlement system
linear city settlement systemlinear city settlement system
linear city settlement system
 
GREEN NEIGHBOURHOOD DESIGN
GREEN NEIGHBOURHOOD DESIGNGREEN NEIGHBOURHOOD DESIGN
GREEN NEIGHBOURHOOD DESIGN
 
Radburn City
Radburn CityRadburn City
Radburn City
 
Neighbourhood Planning
Neighbourhood PlanningNeighbourhood Planning
Neighbourhood Planning
 
Ud ppt
Ud pptUd ppt
Ud ppt
 
MARINA BAY SINGAPORE - URBAN CASE STUDY
MARINA BAY SINGAPORE - URBAN CASE STUDYMARINA BAY SINGAPORE - URBAN CASE STUDY
MARINA BAY SINGAPORE - URBAN CASE STUDY
 
CLARENCE STEIN
CLARENCE STEINCLARENCE STEIN
CLARENCE STEIN
 
Copenhagen City, Denmark
Copenhagen City, DenmarkCopenhagen City, Denmark
Copenhagen City, Denmark
 
high rise buildings case study
high rise buildings case studyhigh rise buildings case study
high rise buildings case study
 

Similar to A presentation on Area Condition of a part of Khulna district

Group_3_Assignment-2 Seccondary plan.pdf
Group_3_Assignment-2 Seccondary plan.pdfGroup_3_Assignment-2 Seccondary plan.pdf
Group_3_Assignment-2 Seccondary plan.pdfAarthiR54
 
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]knelischer
 
Subdivision presentation.pdf
Subdivision presentation.pdfSubdivision presentation.pdf
Subdivision presentation.pdfSkFoishalAhmed
 
civil engineers project work .docx
civil engineers project work .docxcivil engineers project work .docx
civil engineers project work .docxVijay Kumar
 
Road development projects.
Road development projects.Road development projects.
Road development projects.Abhishek Rajput
 
From OpenStreetMap data to Land Use/Land Cover maps: experiments and first re...
From OpenStreetMap data to Land Use/Land Cover maps: experiments and first re...From OpenStreetMap data to Land Use/Land Cover maps: experiments and first re...
From OpenStreetMap data to Land Use/Land Cover maps: experiments and first re...Maria Antonia Brovelli
 
AAHDP_BOLE-SUMMIT Presentation Nove 5.pptx
AAHDP_BOLE-SUMMIT Presentation Nove 5.pptxAAHDP_BOLE-SUMMIT Presentation Nove 5.pptx
AAHDP_BOLE-SUMMIT Presentation Nove 5.pptxBossGold
 
Results part 1 summary slideshow
Results part 1 summary slideshowResults part 1 summary slideshow
Results part 1 summary slideshowTom McClelland
 
Final Report, Hi7
Final Report, Hi7Final Report, Hi7
Final Report, Hi7Mike White
 
Aranya low cost housing-BV Doshi
Aranya low cost housing-BV DoshiAranya low cost housing-BV Doshi
Aranya low cost housing-BV Doshikusha Ahmed
 
Urban Case study of Sector 3 Kurukshetra
Urban Case study of Sector 3 KurukshetraUrban Case study of Sector 3 Kurukshetra
Urban Case study of Sector 3 KurukshetraDhir Dhwaj
 
Georgetown Pike Walkway Phase III & Phase IV
Georgetown Pike Walkway Phase III & Phase IVGeorgetown Pike Walkway Phase III & Phase IV
Georgetown Pike Walkway Phase III & Phase IVFairfax County
 
New Rochelle TOD Study
New Rochelle TOD StudyNew Rochelle TOD Study
New Rochelle TOD Studyrcox1963
 
Critical analysis of planned residential area a study on khulshi
Critical analysis of planned residential area a study on khulshiCritical analysis of planned residential area a study on khulshi
Critical analysis of planned residential area a study on khulshiKazi Mahfuzur Rahman
 
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNINGUnit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNINGRNRANGANATH
 
Roadway condition survey
Roadway condition surveyRoadway condition survey
Roadway condition surveyapu roy
 

Similar to A presentation on Area Condition of a part of Khulna district (20)

Group_3_Assignment-2 Seccondary plan.pdf
Group_3_Assignment-2 Seccondary plan.pdfGroup_3_Assignment-2 Seccondary plan.pdf
Group_3_Assignment-2 Seccondary plan.pdf
 
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
 
Subdivision presentation.pdf
Subdivision presentation.pdfSubdivision presentation.pdf
Subdivision presentation.pdf
 
civil engineers project work .docx
civil engineers project work .docxcivil engineers project work .docx
civil engineers project work .docx
 
Road development projects.
Road development projects.Road development projects.
Road development projects.
 
East Don Trail - Design Concepts
East Don Trail - Design ConceptsEast Don Trail - Design Concepts
East Don Trail - Design Concepts
 
From OpenStreetMap data to Land Use/Land Cover maps: experiments and first re...
From OpenStreetMap data to Land Use/Land Cover maps: experiments and first re...From OpenStreetMap data to Land Use/Land Cover maps: experiments and first re...
From OpenStreetMap data to Land Use/Land Cover maps: experiments and first re...
 
AAHDP_BOLE-SUMMIT Presentation Nove 5.pptx
AAHDP_BOLE-SUMMIT Presentation Nove 5.pptxAAHDP_BOLE-SUMMIT Presentation Nove 5.pptx
AAHDP_BOLE-SUMMIT Presentation Nove 5.pptx
 
Results part 1 summary slideshow
Results part 1 summary slideshowResults part 1 summary slideshow
Results part 1 summary slideshow
 
Final Report, Hi7
Final Report, Hi7Final Report, Hi7
Final Report, Hi7
 
Aranya low cost housing-BV Doshi
Aranya low cost housing-BV DoshiAranya low cost housing-BV Doshi
Aranya low cost housing-BV Doshi
 
Urban Case study of Sector 3 Kurukshetra
Urban Case study of Sector 3 KurukshetraUrban Case study of Sector 3 Kurukshetra
Urban Case study of Sector 3 Kurukshetra
 
Georgetown Pike Walkway Phase III & Phase IV
Georgetown Pike Walkway Phase III & Phase IVGeorgetown Pike Walkway Phase III & Phase IV
Georgetown Pike Walkway Phase III & Phase IV
 
New Rochelle TOD Study
New Rochelle TOD StudyNew Rochelle TOD Study
New Rochelle TOD Study
 
2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final
 
Critical analysis of planned residential area a study on khulshi
Critical analysis of planned residential area a study on khulshiCritical analysis of planned residential area a study on khulshi
Critical analysis of planned residential area a study on khulshi
 
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNINGUnit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
 
Roadway condition survey
Roadway condition surveyRoadway condition survey
Roadway condition survey
 
Relief Line Project Assessment Phase 1A Consultation Presentation
Relief Line Project Assessment Phase 1A Consultation PresentationRelief Line Project Assessment Phase 1A Consultation Presentation
Relief Line Project Assessment Phase 1A Consultation Presentation
 
garaduation
garaduation garaduation
garaduation
 

Recently uploaded

Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Tina Ji
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130Suhani Kapoor
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...Call Girls in Nagpur High Profile
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...Cluster TWEED
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BHbill846304
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas💥Victoria K. Colangelo
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashikranjana rawat
 

Recently uploaded (20)

Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
 
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BH
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
 
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
 
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
 
Green Banking
Green Banking Green Banking
Green Banking
 
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort serviceyoung Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
 

A presentation on Area Condition of a part of Khulna district

  • 1. Group:4 Team: Path Finder Roll:1717011;1717021; 1717024; 1717031;1717033 URP 2214:Site and Area Planning Studio 1
  • 2. In this project, we have been given an area in Khulna for each group for studying about the overall condition of that area including plots, building, vacant plots, open space, recreational area, parks, vegetation, waterbody, connectivity, utilities, and many more. We, Group 4 are given An Area Near Notun Rasta that covers the area of Pabla Karigorpara in one side and some area of Goalkhali in others. Now, This presentation will covers the Neighborhood layout of “Notun Rasta.” URP 2214:Site and Area Planning Studio 2
  • 3. URP 2214:Site and Area Planning Studio 3 Khulna Our Site
  • 4. URP 2214:Site and Area Planning Studio 4 And Finally a Site Inventory Analysis & SWOT analysis
  • 5.  Objective of the project is to observe and note down the facilities over the area in a good manure. A site suitability analysis and SWOT analysis was also done  Findings: URP 2214:Site and Area Planning Studio 5 Maximum area is Gheer(Fish Hatchery) Poor Condition of Drainage Poor Condition of Accessibility
  • 6. URP 2214:Site and Area Planning Studio 6
  • 7. URP 2214:Site and Area Planning Studio 7 Source: Contour map creator  Most of the area is undeveloped & used as Fish Hatchery  About 65 individual ponds are used as hatchery.  Most of the land is wetland and a lest is cultivable land (About 10%).
  • 8. URP 2214:Site and Area Planning Studio 8 Sun at Noon • Total Daylight 10 hrs. to 13.32 hrs.(avg) • The area is enriches with proper daylight • Wind Direction is on Southern west having a average speed of 22km/h.(source:https://satellites.pro /#22.853898,89.524691,17 and https://www.worldweatheronline.com/khu lna-weather-averages/bd.aspx)
  • 9.  As it varies a little in different corner of Khulna so the data for Khulna is used as reference… URP 2214:Site and Area Planning Studio 9 From the CHART • Annual average temperature of 26.3C (79.3 F) and monthly means varying between 12.4 C (54.3 F) in January and 34.3C (93.7F) in May. • Annual average rain fall is1809.4 millimeters • 87% of the annual rainfall occurs in May and October.
  • 10. The area contains three types of Road- I. Primary Road(Outer Bypass Road & Bastuhara Bypass) II. Secondary Road like lemon city entrance III. Tertiary road( Kacha road) Actually there is no traditional road that maintain the Criteria that fixed by law. URP 2214:Site and Area Planning Studio 10 Fig: Primary road(Outer bypass road)
  • 11. Roadways Length(m) Area covers (approx.) (%) Primary 1263.06 .002 Secondary 1349.87 1.049 Tertiary 1771.08 1.32 Access 1650 1.22 URP 2214:Site and Area Planning Studio 11 Road-Length & Area Coverage Road Map of the site
  • 12. Vital Points of Khulna Distance from site 1. KUET 6.8km 1. KU 9.8km 1. Shibbari 5.6km 1. Ferighat Moore 6.5km URP 2214:Site and Area Planning Studio 12 Surrounded by two major roads, Outer Bypass Road and Bastuhara Bypass. A secondary road is connected with Khulna city bypass road. and there is a dead-end road connected to Khulna city bypass.
  • 13. URP 2214:Site and Area Planning Studio 13 27% 40% 23% 10% Land use percentage Residential Water body Vegetation Cultivable land Total Area: 0.578𝑘𝑚2 (57.89 hectare) Waterbody:0.231𝑘𝑚2 (23.1 hectare) Residential:0.156𝑘𝑚2 (15.6 hectare) Vegetation:0.132𝑘𝑚2 (13.2 hectare) Cultivated Land:0.05𝑘𝑚2 (5 hectare)
  • 14. URP 2214:Site and Area Planning Studio 14 • The area is full of waterbody. The maximum area is Gheer (fish hatchery). • There is a few man made drainage system • A natural small cannel in west side exists. But it is a dead-end cannel. • The area contains almost 90+ ponds and waterbody • About 65 ponds are used as hatchery Waterbody Condition
  • 15. URP 2214:Site and Area Planning Studio 15 Dead end Canal on our site boundary • A dead end canal exists on west corner of our site Dead end Canal on our site boundary • Drainage ditch exists only on both side of Outer bypass road and Bastuhara bypass have the one sided kacha ditch that’s condition is severely poor. Poor Drainage on Bastuhara Road • Tertiary Roads have no drainage line • A road with no drainage
  • 16. URP 2214:Site and Area Planning Studio 16 Fig: Vegetation map of that area • About 23 % of our area is covered with different type of trees Including Rice fields
  • 17. URP 2214:Site and Area Planning Studio 17 Fig: Map showing Plot level or Building Level (excluding tin made house) Building Constructed Number of Buildings Tin 112 1 storied 50 2 storied 62 3 storied 33 4 storied & above 26 Under- construction 8 Total 291
  • 18. URP 2214:Site and Area Planning Studio 18 The area is categorized under three boundaries like, 1. Highly Developed area 2. Moderately developed area 3. Undeveloped area Maximum buildings are located on H.D.A. Fig: Map showing different development condition
  • 19. URP 2214:Site and Area Planning Studio 19
  • 20. URP 2214:Site and Area Planning Studio 20 0 20 40 60 80 100 120 Scoreearned Criteria Ste analysis data for Different site Teligati Golokdham Shiromoni Notun Rasta Arongghata • The Site 2 of Golokdham is the best suited site. As it scored 655. • Our site, Notun Rasta also scored a moderate score of 644. • From our analysis Shiromoni is the third suitable site.(Scoring 640)
  • 21. Strength Weakness 1. Low development. So, there is enough opportunities for development. 2. No political issue. Most of the lands are in privet ownership. 3. There is a market in Kabir Bat Tola and in Karigor Para in the area which serves as a commercial zone for the site area. 4. There are several mosques in the area. 1. Access roads are in poor condition 2. Most of the lands are low land. 3. No gas, water supply facility. Poor community facility. 4. A few public amenities (like: shopping center, public gathering place, recreation center etc.) 5. Flat land. So, most of the area goes under water during rainy season. 6. There is a primary road that runs across the site area. Heavy vehicles (like: bus, truck etc.) moves across the site. Due to this there is noise pollution and safety issues in the site area. 7. The financial condition of the people is poor. 8. A little facility of city corporation. Opportunity Threat 1. There is a primary school beside the site area. 2. There are no political issues in the surrounded areas. 1. The site area is away from the center of the Khulna city. 2. Transportation cost is huge for the commuters. URP 2214:Site and Area Planning Studio 21
  • 22.  After analyzing all the criteria and observe all the information it is clear to us that our site is not the best but it can be turned to best by implementing some matter that is come to limelight through our survey.  We can recommend the proper utility services like sanitary and roadways with some infrastructural development like proper planning of land use, enough quantity of school etc.  On comparison to other site, our site scores a moderately good score that means it have mainly all kind of services(approx..) but not in proper amount.  So if the governing authority take the necessary steps to upgrade the condition then it would be the better residential cum commercial area. URP 2214:Site and Area Planning Studio 22