2. MINJERRIBA
C U LT U R A L C E N T R E
NORTH STRADBROKE IS.
DWELLING AND DENSITY
This project was broken into two key elements,
development of a master-plan for Dunwich on
North Stradbroke Island and the design of a
cultural and community centre which lends itself to
the community.
The centre provides a cultural heritage museum
and exhibition space, a variety of meeting rooms,
community spaces, visitors centre as well as a
restaurant and cafe. The building responds to the
immediate context of the site littered with large
Moreton Bay Figs and on a broader scale, the
building encapsulates the idea of movement and
explores it on a variety of levels.
P | 2 Lyle Mitrovich P | 587 936 1984 E | lyle.mitrovich@hotmail.com Design Portfolio
3. DESTINATION
B R I S B A N E
CASINO DEVELOPMENT
ARCHITECTURE AND COMMERCE
The Destination Brisbane project took on the
Queen’s Wharf Casino development in Brisbane’s
CBD, as an opportunity to take on the complex
dilemmas in imagining alternative configurations.
The project aimed to develop a landscape within
the city that was easily accessible and acted as
the podium for 2 residential towers and a hotel.
The green roof consisted of a variety of sloped
terraces perforated with atriums that connected
major program elements. This included the casino
floor as well as lyric theatre as well as numerous
levels of retail and hospitality.
P | 3 Lyle Mitrovich P | 587 936 1984 E | lyle.mitrovich@hotmail.com Design Portfolio
4. CABIN FEVER
U Q R E S E A R C H
BUILD STUDIO
ECO CABIN
The Eco Cabin project investigated how various
research methods and non-conventional
approaches to testing and prototyping can start
to inform the design and construction of a primary
structural system in the form of a self-contained
cabin. The task involved a concept design and
competition submission for the cabin (as pictured),
as well as prototyping and construction, which
took place at a three-day construction workshop.
This project lead the research team down the path
of non-conventional architectural construction
techniques as we explored ways of prototyping
and development outside the typical 3D modelling
environment.
P | 4 Lyle Mitrovich P | 587 936 1984 E | lyle.mitrovich@hotmail.com Design Portfolio
5. ARTWORX
C R E AT I V E A R T S
C A M P U S
MARYBOUROUGH
INSTITUTIONS AND IDEOLOGIES
The Artworx Creative Arts Campus, Maryborough,
investigated the intricacies of designing and
thinking about an institution where a community’s
cultural and material values are given physical
expression. This project brief includes a black
box theatre and variety of teaching, learning and
administrative spaces.
The task was to develop key design manifestos,
which responded to the context of Maryborough
as a rural township and recognise the potential of
an institution and its community for a transactional
relationship.
Ground Plan
Level One
Level Two
P | 5 Lyle Mitrovich P | 587 936 1984 E | lyle.mitrovich@hotmail.com Design Portfolio
6. GUGGENHEIM
M U S E U M
HELSINKI, FINLAND
DESIGN COMPETITION
Entry Axonometric
The Guggenheim Helsinki Design Competition
was used as a basis for this project and provided
the opportunity to develop individual designs that
ran in tandem with the competition. This project
employed the same brief, design constraints and
submission requirements.
The design focused on the idea of organised
pavilions, both open and closed, to encourage
movement towards the waters edge and
throughout the exhibition spaces.
P | 6 Lyle Mitrovich P | 587 936 1984 E | lyle.mitrovich@hotmail.com Design Portfolio
7. Between BArch and MArch I worked for a
construction company before gaining experience
in an architectural practice. CGH Constructions
is a Brisbane based construction company that
prides itself on client involvement and establishing
strong working relationships with architects,
tradesmen and subcontractors. During my
employment at CGH Constructions I was primarily
involved in construction planning and tendering
which contributed to achieving efficient and
budget-controlled solutions.
The unique skill set and knowledge gained from
this role will continue to influence my architectural
career and future prospects.
The projects shown on the right are a sample of
the projects I was involved with during my time at
CGH Constructions.
Responsibilities include:
-- Tendering on residential projects
-- Assisting Director throughout planning and
construction phases
-- Attending site meetings with architects and
sub contractors
P | 7 Lyle Mitrovich P | 587 936 1984 E | lyle.mitrovich@hotmail.com Design Portfolio
8. Between BArch and MArch I also worked for ABM
Architects as an Architectural Assistant. Ainsley
Bell and Murchison Architects Australia are a
Brisbane based architecture firm that has been
operating since 1969 and specialise in areas
such as government, aged care, residential and
education.
During my employment with AB+M I worked on
a variety of project types and scales including,
education, aged care, residential, commercial and
public projects.
The projects shown on the right are a sample of
the projects I was involved with during my time at
ABM Architects.
Responsibilities include:
-- Digital modelling
-- Contract documentation
-- Graphic design, visualisation and presentation
P | 8 Lyle Mitrovich P | 587 936 1984 E | lyle.mitrovich@hotmail.com Design Portfolio
9. UP
2.20
4
2.20
3
2.10
2
2.10 1
90102090 4070 90 2530 90
430
90 2340 90
1000
90
3140 90 4570 90 2860 90100090
VERANDAH
BEDROOM 1 BEDROOM 2
90 7800 90 2860 90100090
90307090258090346090
90307090613090
90102090 2030 90 4570 90 2860 90
1000
90
BATH
KITCHEN
DINING
LOUNGE
WC
1
3.10
2
3.10
FOCHSTREET
HAIG STREET
Boundary Line
13821500
90
720
90140090277090413090
9029301200901500903480
90346090574090
W
1
DATE Prepared for
Drawing Scale Drawing no. Issue
NORTH
GENERAL NOTES
DO NOT SCALE FROM DRAWINGS, USE FIGURED DIMENSIONS ONLY.
CONFIRM ALL DIMENSIONS ON SITE PRIOR TO COMMENCING ANY
FABRICATION, WORK OR SETOUT. VERIFY LOCATION OF EXISTING
SERVICES BEFORE COMMENCEMENT OF WORK. ALL CONSTRUCTION TO
BE IN ACCORDANCE WITH THE BCA AND RELEVANT AUSTRALIAN
STANDARDS. FULL STRUCTURAL CERTIFCATION REQUIRED.
1 : 100LEVEL 1 FLOOR PLAN 1.20
04/07/14
32 FOCH ST ASHGROVE
DENNIS SCOTT
No. Description Date
B REVISED BA SUBMISSION 16/01/2015
C LOUNGE ROOM WALL
REVISION
30/01/2015
3100
7500
BoundaryLine
FOCHSTREET
3000
30.820
30.370
PROPOSED LOWER PLAN
PROPOSED UPPER PLAN
LEVELS TO BE SET ON SITE BY REGISTERED
SURVEYOR. DWELLING NOT TO EXCEED 9.5M ABOVE
NATURAL GROUND LINE AS DEFINED IN BRISBANE
CITY PLAN 2014.
EXISTING
BALUSTRADE
EXISTING ROOF
EXISTING WINDOWS
STAIRS DETERMINED BY NGL
HORIZONTAL TIMBER CLADDING
NATURAL
GROUND LINE
WINDOW BAY (REFER
WINDOW SCHEDULE)
WINDOWS (REFER WINDOW SCHEDULE)
UPPER CEILING
3100
1382 9470 1500
BoundaryLine
BoundaryLine
HAIGSTREET
3000
30.820
30.370
PROPOSED GARAGE PLAN
PROPOSED LOWER PLAN
LEVELS TO BE SET ON SITE BY REGISTERED
SURVEYOR. DWELLING NOT TO EXCEED 9.5M ABOVE
NATURAL GROUND LINE AS DEFINED IN BRISBANE
CITY PLAN 2014.
EXISTING ROOF
EXISTING WINDOWS
GARAGE DOOR
HORIZONTAL TIMBER CLADDING
EXISTING BALUSTRADE
NATURAL GROUND LINE
PROPOSED UPPER PLAN
UPPER CEILING
WINDOWS (REFER WINDOW
SCHEDULE)
DATE Prepared for
Drawing Scale Drawing no. Issue.
NORTH
GENERAL NOTES
DO NOT SCALE FROM DRAWINGS, USE FIGURED DIMENSIONS ONLY.
CONFIRM ALL DIMENSIONS ON SITE PRIOR TO COMMENCING ANY
FABRICATION, WORK OR SETOUT. VERIFY LOCATION OF EXISTING
SERVICES BEFORE COMMENCEMENT OF WORK. ALL CONSTRUCTION TO
BE IN ACCORDANCE WITH THE BCA AND RELEVANT AUSTRALIAN
STANDARDS. FULL STRUCTURAL CERTIFCATION REQUIRED.
1 : 100 CELEVATIONS 2.10
04/07/14
32 FOCH ST ASHGROVE
DENNIS SCOTT
Scale: 1 : 100
2
WEST ELEVATION
Scale: 1 : 100
1
NORTH ELEVATION
No. Description Date
B REVISED BA SUBMISSION 16/01/2015
C LOUNGE ROOM WALL
REVISION
30/01/2015
DATE Prepared for
Drawing Scale Drawing no.
NORTH
GENERAL NOTES
DO NOT SCALE FROM DRAWINGS, USE FIGURED DIMENSIONS ONLY.
CONFIRM ALL DIMENSIONS ON SITE PRIOR TO COMMENCING ANY
FABRICATION, WORK OR SETOUT. VERIFY LOCATION OF EXISTING
SERVICES BEFORE COMMENCEMENT OF WORK. ALL CONSTRUCTION TO
BE IN ACCORDANCE WITH THE BCA AND RELEVANT AUSTRALIAN
STANDARDS. FULL STRUCTURAL CERTIFCATION REQUIRED.
PERSPECTIVE 1.00
01/31/15
32 FOCH ST ASHGROVE
DENNIS SCOTT
No. Description Date
Cube Studio is a small business venture that
started in 2012. It is a partnership between Marcus
Leask, a colleague and fellow graduate from
the University of Queensland and myself. The
business not only sought to explore architectural
design, but investigate design as a whole. The
projects undertaken over the last three years by
Cube Studio include; web design, graphic design,
drafting and photography.
This collaboration has enabled Marcus and I to
further understand and experience the relationship
involved in client and consultant communications,
and gain experience in a variety of business
practices.
Clients we have worked with are shown on the
right.
Responsibilities include:
-- Managing and liaising with clients and
stakeholders
-- Digital production across multiple platforms
-- Business management and strategic
development
-- Project scoping, quoting and service delivery
-- Invoicing, cash flow management and taxation
compliance
P | 9 Lyle Mitrovich P | 587 936 1984 E | lyle.mitrovich@hotmail.com Design Portfolio