4. Enrolment Profile
As can be gleaned in the data, the enrolment in the past three (3) years shows a promising increase. From SY
2019 up to 2020, it gained a 8.26 % per cent increase. The following year gained 17.76 %. And presently, we
decrease into of 10.12 %. This means that we also gained the trust and confidence of our parents and the
community.
5. GRADE LEVEL MALE FEMALE TOTAL
GRADE 7 41 31 73
GRADE 8 35 29 64
GRADE 9 38 30 68
GRADE 10 31 41 72
TOTAL 256
JUNIOR HIGH SCHOOL
6. TRACK STRAND GRADE AND
SECTION
MALE FEMALE TOTAL
ACADEMIC TRACK
GENERAL
ACADEMIC
STRAND
GRADE 11 -
PATIENCE
2 8 10
GENERAL
ACADEMIC
STRAND
GRADE 12 - PEACE 16 9 25
TECHNICAL
LIVELIHOOD
TRACK
TECHNICALVOCATI
ONAL LIVELIHOOD
- AFA
GRADE 11 – HOPE 14 9 23
TECHNICALVOCATI
ONAL LIVELIHOOD
- AFA
GRADE 12–
HONESTY
8 18 26
84
SENIOR HIGH SCHOOL
7. In our school, we see to it that we will provide with utmost care the needs of the students such as the conducive
classrooms, interesting lessons, competent teachers and full support to encourage our learners to complete from
grade 7 to grade 12. These are few of the factor leading to an increase.
0%
20%
40%
60%
80%
100%
120%
1
2018-2019 2019-2020 2020-2021
8. NO. OF
TEACHERS
DESIGNATION No. of Teachers holding the position
Teacher I 13
Teacher II 1
Teacher III 0
Special Science Teacher I 1
Head Teacher I 1
Non- teaching Personnel 1
TOTAL 17
9. GOALS /OBJECTIVES/TARGETS OF
SCHOOL
• ZERO drop- out rate
• Implemented Project, Activities AND Programs
• Enhanced Reading Program
• Strengthened Linkages
• Reduced number of Non readers
• Continuous Professional Development for Teaching and Non teaching
Personnel of SAN ROQUE ANNEX.
• POSSIBLE SENIOR High School Exits
• Functional SGC, School PTA and Officials
• 100 percent Graduation Rate
• A literally safe, clean and healthy learning environment for learners.
10. PROJECTS/PROGRAMS/
ACTIVITIES
STATUS OF THE PROJECTS FUND SOURCE
1. CONSTRUCTION OF
MINI-STAGE
IMPLEMENTED LGU
2. TRIAGE IMPLEMENTED LGU
3. INSTALLATION OF GROUP
HAND WASHING
IMPLEMENTED MOOE,OWN PERSONAL POCKET
OF TEACHERS
4. I LOVE SAN ROQUE ANNEX IMPLEMENTED DONATIONS
5. MODIFICATION OF
CLASSROOM CR
PARTIALLY IMPLEMENTED GPTA,DONATIONS FROM
PERSONAL POCKETS OF
TEACHERS
6. SSG PARK IMPLEMENTED BRGY SAN ROQUE,
STAKEHOLDERS
11. PROJECTS/PROGRAMS/
ACTIVITIES
STATUS OF THE
PROJECTS
FUND SOURCE
7. LANDSCAPING OF EVERY
CLASSROOMS
IMPLEMENTED TEACHERS OWN POCKET
8. IMPROVEMENT OF GULAYAN SA
PAARALAN
IMPLEMENTED TEACHERS OWN POCKET
9. BENCHES MAKING IMPLEMENTED MOOE
10. PURCHASE OF THERMOMETER
SCANNER WITH STAND
IMPLEMENTED MOOE,TEACHERS OWN POCKET
11. ESTABLISHMENT OF READING
CORNER
IMPLEMENTED TEACHERS OWN POCKET
12. ESTABLISHMENT OF REST AREA
IN EVERY CLASSROOM
IMPLEMENTED TEACHERS OWN POCKET
12. PROJECTS/PROGRAMS/
ACTIVITIES
STATUS OF THE
PROJECTS
FUND SOURCE
13. Construction of Pedalized
Hand Washing
IMPLEMENTED TEACHERS OWN POCKET
14. Procurement f
tarpaulinated IEC ads on COVID
- 19 Protocol
IMPLEMENTED MOOE
15. Provision of Drinking water
in every classroom
IMPLEMENTED Teachers own pocket
16. Office Partition/
Modification
IMPLEMENTED MOOE
17. Construction of School Clinic IMPLEMENTED GPTA
18. PROVISION OF SOLAR
LIGHTS
IMPLEMENTED DILG CENTRAL OFFICE Through
BLGU
19. PROVISION OF GRASS
MOWER
IMPLEMENTED BLGU
13. PROJECTS/PROGRAMS/
ACTIVITIES
STATUS OF THE PROJECTS FUND SOURCE
20. 10 meter additional allocation
for the Perimeter Fence
IMPLEMENTED LGU MARAMAG
21. 1st PHASE of GAD Comfort
Room
IMPLEMETED MOOE
21. GAD Bulletin Board IMPLEMENTED MOOE
14. SCHOOL BASED PROGRAMS
• PROJECT H.E.L.L.O
• BASA SAN ROQUE ANNEX
• KUNG MAWAWALA KA, HAHANAPIN KITA
• MALINIS, LIGTAS AT MALUSOG NA
KAPALIGIRAN PARA SA MGA KABATAAN
15. SCHOOL AWARDS AND RECOGNITION YEAR TAKEN
1ST PLACER BRIGADA ESKWELA 2020
3rd PLACER BRIGADA ESKWELA 2021
STUDENTS AWARDS AND RECOGNITION YEAR TAKEN
2 students for DIVISION LEVEL
(ATHLETICS)
2023
SCHOOL AWARDS AND
RECOGNITION
16. TO STRENGTHEN THE GOALS DNHS-SAN ROQUE ANNEX looks
forward to …..
• Strengthen Collaboration linkages and Partnership
• Work with strong determination, commitment and dedication
• Encourage more Professional Development for Teachers
• Full implementation of the DEPED MANDATED Programs, Projects and Activities
• Mobilize and Capacitate work oriented, dedicated and talented group of Teachers
• Sincere implementation of Remediation and Enhancement Program
• TAP and EMPOWER student leaders in the Implementation of School based Programs
• Implementation of Enhance Career Guidance Program
• Intensive Conduct of Reading Sessions for NON- READERS
• Encourage all Project Coordinators, Subject Coordinators for an Output based effort
and Initiative of Every Ancillary and Coordinatorship
• Regular monitoring of Immersion and on Proper Guidance of the appropriate Exits.
17. FUTURE PROJECTS,ACTIVITIES,PROGRAMS
1. Perimeter Fence
2. Genderized Comfort Room
3. Modification of Wins Facility
4. Breast Feeding Section
5. Enhancement of Landscaping
6. Gulayan sa Paaralan
7. Mini-Covered Court
8. Reading Session Hall