SlideShare a Scribd company logo
1 of 2
Download to read offline
Lou Houlemarde
Apple Valley, CA USA
CAREER OVERVIEW:
Forty-seven years experience in the many facets of construction within the bulk energy, commercial / retail, and housing industries.
Several of those years spent within the respective administrative and management structures. As a result, I have developed strong
project management, analytical, and organization skills which provide accurate assessment, appropriate staffing, support, and
contracting to process projects efficiently and to satisfactory conclusion.
WORK EXPERIENCE:
May 2012 throughCurrent: CB&C Corporation
Project Development – All Sectors
Key Responsibilities:
Review and consultation of proposed projects within various disciplines.
Project planning and estimating for initial phases.
Cost projections for long term / production phases.
Preparation of various Executive Summaries.
Achievements:
Several and various completed reviews and recommendations
May 2012 throughSeptember 2014: CB&C Corporation / Spirit Energy Inc
Project Consulting and Coordination – Oil Energy
Key Responsibilities:
Project coordination with Finance Manager and Project Geophysicist.
Project planning and estimating for initial exploration phases.
Cost projections for long term / production phases.
Contract Administration.
Consulting regarding government oil law and concession agreements.
Achievements:
Initial exploration plan completed.
Budget for initial exploration phase completed.
Contract negotiations in progress.
February 2009 through December 2011: CMS Inc
Principal
Key Responsibilities:
Providing various project management services for commercial / retail and senior care industries.
Providing management personnel for on-site management of various phases of projects.
Providing consultation and recommendations on project planning and problem remedy.
Achievements:
Generated project plans, developed budget, managed projects from design to completion.
Provide remedial action planning to avoid delay or stoppage.
Provided value engineering through constructability reviews.
September 2004 through December 2008: BAR-L Construction Company (Apple Valley, CA)
Vice President
Key Responsibilities:
Responsible for Estimating, Bid Proposals, Contract Administration, Project Management, and overall cost control including Accounts
receivable / payable.
Achievements:
Completed three new “Big Box” commercial / retail centers and substantial additions to another including civil elements, city street / road
improvements, and tenant improvements to leased suites.
Completed new construction of Choice Medical building and Meridian Urgent Care facility.
Completed renovations of existing medical facilities and urgent care unit for St. Joseph Health Care.
Page 1
Lou Houlemarde
Apple Valley, CA USA
1998 through 2004: Various Builders
Construction Manager
Key Responsibilities:
Construction management of various multi-family dwellings and senior living facilities.
Achievements:
Completed three multi-family complexes ranging from 200 to 400 units.
Completed a senior active living center of 240 units.
October 1970 through July 1996: Southern California Edison Co
Construction Manager – Hydro Generation and Substation Projects, Northern Division; 1989 - 1996
Construction Superintendent – EHV Transmission Lines and Substation Projects, Northern Division; 1988 - 1989
Supervisor – Engineering and Construction Support; 1986 - 1988
Supervisor – Engineering and Construction Vehicle and Equipment Fleet; 1984 - 1986
Supervisor – Construction Department Safety; 1982 - 1984
Trainer - Class A Truck Driver, Heavy Equipment Operator, and Crane Operator; 1980 - 1982
Heavy Equipment and Crane Operator; 1975 - 1980
Lineman – EHV Transmission Line Construction; 1970 - 1975
Achievements:
Bishop, CA Flow Lines Replacement Project; Replace wood pipe with steel ( approximately 12 miles total ).
Initial construction management of the Substation Automation Project; Prior to retirement, completed 67 of some 600 plus stations.
Various New Substation and Expansion Projects; Projects related to load growth in the Western and Northern Divisions.
Substation Equipment Replacement Project (SERP); Replacement of switching and breaker equipment to improve distribution efficiency.
Substation Seismic Upgrade Program; Seismic enhancements to key positions at key centers to maintain critical power need during and
following earthquake events.
Initial Tehachapi, CA, Wind Generation Projects; Install of new sub-station facilities and special equipment for interface with existing
electrical grid.
Vermillion Dam Tow Drain Repair; Performed emergency level repairs to prevent “blow-out”.
Powerhouse 3, Unit 5 Logistics and Crane Support; Coordinated rail and truck transport of various components and off-loading at site.
Powerhouse 8 Dam Repairs and Modifications; Repairs to face and install of debris screen.
Initial Draft of Construction Division Safety Program, Policy and Procedures.
Initial Draft of Modifications to Rigging Program related to Heavy Lift and Transmission Line Tower Erection.
Initial Draft of Division Driver and Equipment Operator Training Program.
Tower Line Tension Inspector (“Sagger”).
December 1968 through October 1970: Commercial / Retail and Housing Construction - Carpenter
October 1966 through October 1968: Active Military Service – US Marine Corps
August 1965 through September 1966: Santa Fe and Southern Pacific Railroads
EDUCATION:
Pasadena City College
Various Trade Schools
REFEREES:
Available upon request
Page 2

More Related Content

What's hot

Indian Run Restoration Project
Indian Run Restoration ProjectIndian Run Restoration Project
Indian Run Restoration ProjectFairfax County
 
Richard Heggen - 1 Page CV
Richard Heggen - 1 Page CVRichard Heggen - 1 Page CV
Richard Heggen - 1 Page CVRichard Heggen
 
Jack Huth Resume
Jack Huth ResumeJack Huth Resume
Jack Huth ResumeJack Huth
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - February 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - February 2018Pharmacy to Kennedy Construction Liaison Committee Meeting - February 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - February 2018Crosstown TO
 
North Beauregard Street at North Chambliss Street Spot Improvement
North Beauregard Street at North Chambliss Street Spot ImprovementNorth Beauregard Street at North Chambliss Street Spot Improvement
North Beauregard Street at North Chambliss Street Spot ImprovementFairfax County
 
Actc ashby-i80-interchange-improvements
Actc ashby-i80-interchange-improvementsActc ashby-i80-interchange-improvements
Actc ashby-i80-interchange-improvementsE'ville Eye
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
N Miksic Resume 2016
N Miksic Resume 2016N Miksic Resume 2016
N Miksic Resume 2016Norm Miksic
 
Minteer Resume 4.7.16 - Linkedin
Minteer Resume 4.7.16 - LinkedinMinteer Resume 4.7.16 - Linkedin
Minteer Resume 4.7.16 - LinkedinZachary Minteer
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - April 2018
Pharmacy  to Kennedy Construction Liaison Committee Meeting - April 2018Pharmacy  to Kennedy Construction Liaison Committee Meeting - April 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - April 2018Crosstown TO
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2018
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2018Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2018
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2018Crosstown TO
 
Kirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationKirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationFairfax County
 

What's hot (20)

Esr 01 & esr-02 closing meeting
Esr 01 & esr-02 closing meetingEsr 01 & esr-02 closing meeting
Esr 01 & esr-02 closing meeting
 
Indian Run Restoration Project
Indian Run Restoration ProjectIndian Run Restoration Project
Indian Run Restoration Project
 
INL_Resume
INL_ResumeINL_Resume
INL_Resume
 
Richard Heggen - 1 Page CV
Richard Heggen - 1 Page CVRichard Heggen - 1 Page CV
Richard Heggen - 1 Page CV
 
Jack Huth Resume
Jack Huth ResumeJack Huth Resume
Jack Huth Resume
 
Saloman Garcia(1)
Saloman Garcia(1)Saloman Garcia(1)
Saloman Garcia(1)
 
Logan McDowell Resume
Logan McDowell ResumeLogan McDowell Resume
Logan McDowell Resume
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - February 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - February 2018Pharmacy to Kennedy Construction Liaison Committee Meeting - February 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - February 2018
 
North Beauregard Street at North Chambliss Street Spot Improvement
North Beauregard Street at North Chambliss Street Spot ImprovementNorth Beauregard Street at North Chambliss Street Spot Improvement
North Beauregard Street at North Chambliss Street Spot Improvement
 
Actc ashby-i80-interchange-improvements
Actc ashby-i80-interchange-improvementsActc ashby-i80-interchange-improvements
Actc ashby-i80-interchange-improvements
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
N Miksic Resume 2016
N Miksic Resume 2016N Miksic Resume 2016
N Miksic Resume 2016
 
Minteer Resume 4.7.16 - Linkedin
Minteer Resume 4.7.16 - LinkedinMinteer Resume 4.7.16 - Linkedin
Minteer Resume 4.7.16 - Linkedin
 
FAHEEM_Power Engineer
FAHEEM_Power EngineerFAHEEM_Power Engineer
FAHEEM_Power Engineer
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - April 2018
Pharmacy  to Kennedy Construction Liaison Committee Meeting - April 2018Pharmacy  to Kennedy Construction Liaison Committee Meeting - April 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - April 2018
 
M Adel CV 2016
M Adel CV 2016M Adel CV 2016
M Adel CV 2016
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2018
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2018Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2018
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2018
 
Kirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationKirby Road Sidewalk Presentation
Kirby Road Sidewalk Presentation
 
Resume 2015
Resume 2015Resume 2015
Resume 2015
 
Resume (2)
Resume (2)Resume (2)
Resume (2)
 

Viewers also liked

Lovell, Christian Brief Writing Sample
Lovell, Christian Brief Writing SampleLovell, Christian Brief Writing Sample
Lovell, Christian Brief Writing SampleChristian Lovell
 
Jeff Brehmer Resume 2016
Jeff Brehmer Resume 2016Jeff Brehmer Resume 2016
Jeff Brehmer Resume 2016Jeff Brehmer
 
ELIZABETH LEATHERS_Resume_FILM
ELIZABETH LEATHERS_Resume_FILMELIZABETH LEATHERS_Resume_FILM
ELIZABETH LEATHERS_Resume_FILMElizabeth Leathers
 
Sawyer.CV.Oct.16_2
Sawyer.CV.Oct.16_2Sawyer.CV.Oct.16_2
Sawyer.CV.Oct.16_2Adam Sawyer
 
George Garcia Resume
George Garcia ResumeGeorge Garcia Resume
George Garcia ResumeGeorge Garcia
 
Katie Janiga Nurse Resume 2016 (1)
Katie Janiga Nurse Resume 2016 (1)Katie Janiga Nurse Resume 2016 (1)
Katie Janiga Nurse Resume 2016 (1)Katie Janiga
 
Performance and Cost Analysis of Modern Public Cloud Services
Performance and Cost Analysis of Modern Public Cloud ServicesPerformance and Cost Analysis of Modern Public Cloud Services
Performance and Cost Analysis of Modern Public Cloud ServicesMd.Saiedur Rahaman
 
borgen_CV_july2015
borgen_CV_july2015borgen_CV_july2015
borgen_CV_july2015Alex Borgen
 
Jiawen Wong Resume
Jiawen Wong ResumeJiawen Wong Resume
Jiawen Wong ResumeJia Wen Wong
 
Amy Wong Resume
Amy Wong ResumeAmy Wong Resume
Amy Wong ResumeAmy Wong
 

Viewers also liked (19)

Lovell, Christian Brief Writing Sample
Lovell, Christian Brief Writing SampleLovell, Christian Brief Writing Sample
Lovell, Christian Brief Writing Sample
 
Jeff Brehmer Resume 2016
Jeff Brehmer Resume 2016Jeff Brehmer Resume 2016
Jeff Brehmer Resume 2016
 
ELIZABETH LEATHERS_Resume_FILM
ELIZABETH LEATHERS_Resume_FILMELIZABETH LEATHERS_Resume_FILM
ELIZABETH LEATHERS_Resume_FILM
 
Sawyer.CV.Oct.16_2
Sawyer.CV.Oct.16_2Sawyer.CV.Oct.16_2
Sawyer.CV.Oct.16_2
 
CWong Resume
CWong ResumeCWong Resume
CWong Resume
 
George Garcia Resume
George Garcia ResumeGeorge Garcia Resume
George Garcia Resume
 
resume
resumeresume
resume
 
Katie Janiga Nurse Resume 2016 (1)
Katie Janiga Nurse Resume 2016 (1)Katie Janiga Nurse Resume 2016 (1)
Katie Janiga Nurse Resume 2016 (1)
 
Christian San Jose Resume
Christian San Jose ResumeChristian San Jose Resume
Christian San Jose Resume
 
Performance and Cost Analysis of Modern Public Cloud Services
Performance and Cost Analysis of Modern Public Cloud ServicesPerformance and Cost Analysis of Modern Public Cloud Services
Performance and Cost Analysis of Modern Public Cloud Services
 
borgen_CV_july2015
borgen_CV_july2015borgen_CV_july2015
borgen_CV_july2015
 
Vladimir_Ulogov_Resume
Vladimir_Ulogov_ResumeVladimir_Ulogov_Resume
Vladimir_Ulogov_Resume
 
nicolemalloyresume
nicolemalloyresumenicolemalloyresume
nicolemalloyresume
 
Ajaishni Resume
Ajaishni  ResumeAjaishni  Resume
Ajaishni Resume
 
Donald-Kuhlmann
Donald-KuhlmannDonald-Kuhlmann
Donald-Kuhlmann
 
Edward-Thompson-Matthews (2016 RESUME)
Edward-Thompson-Matthews (2016 RESUME)Edward-Thompson-Matthews (2016 RESUME)
Edward-Thompson-Matthews (2016 RESUME)
 
Jiawen Wong Resume
Jiawen Wong ResumeJiawen Wong Resume
Jiawen Wong Resume
 
Amy Wong Resume
Amy Wong ResumeAmy Wong Resume
Amy Wong Resume
 
JoseSorianoResume
JoseSorianoResumeJoseSorianoResume
JoseSorianoResume
 

Similar to Lou Houlemarde career overview construction management

Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016Sher Chuhan
 
Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2Rodney Taylor
 
Edward E calder CV 2014
Edward E calder CV 2014Edward E calder CV 2014
Edward E calder CV 2014Edward Calder
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager ResumeJack Dickerson
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resumeDerek Dhonau
 
Dale Riley - Resume2016
Dale Riley - Resume2016Dale Riley - Resume2016
Dale Riley - Resume2016Dale Riley
 
Ed resume 2017.docx current
Ed resume   2017.docx currentEd resume   2017.docx current
Ed resume 2017.docx currentEdward Budney
 
Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15 Mike Syslak
 
RICHARD REVILLE RESUME 9-28-15
RICHARD REVILLE RESUME 9-28-15RICHARD REVILLE RESUME 9-28-15
RICHARD REVILLE RESUME 9-28-15Richard Reville
 
Dave Goshorn - Resume
Dave Goshorn - ResumeDave Goshorn - Resume
Dave Goshorn - ResumeDave Goshorn
 
Dave Goshorn - Resume
Dave Goshorn - ResumeDave Goshorn - Resume
Dave Goshorn - ResumeDave Goshorn
 
Personal_Resume_11_2013
Personal_Resume_11_2013Personal_Resume_11_2013
Personal_Resume_11_2013Stephen Ciulla
 

Similar to Lou Houlemarde career overview construction management (20)

RE Resume YUANG LEE 2015 12 21
RE Resume YUANG LEE   2015 12 21RE Resume YUANG LEE   2015 12 21
RE Resume YUANG LEE 2015 12 21
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 
Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
chesbro resume
chesbro resumechesbro resume
chesbro resume
 
Resume.Brian Murphree
Resume.Brian MurphreeResume.Brian Murphree
Resume.Brian Murphree
 
Edward E calder CV 2014
Edward E calder CV 2014Edward E calder CV 2014
Edward E calder CV 2014
 
Resume
ResumeResume
Resume
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resume
 
Dale Riley - Resume2016
Dale Riley - Resume2016Dale Riley - Resume2016
Dale Riley - Resume2016
 
Ed resume 2017.docx current
Ed resume   2017.docx currentEd resume   2017.docx current
Ed resume 2017.docx current
 
Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15
 
RICHARD REVILLE RESUME 9-28-15
RICHARD REVILLE RESUME 9-28-15RICHARD REVILLE RESUME 9-28-15
RICHARD REVILLE RESUME 9-28-15
 
Erin Kingston - CV
Erin Kingston - CVErin Kingston - CV
Erin Kingston - CV
 
Caro, Jose J 11 9
Caro, Jose J 11 9Caro, Jose J 11 9
Caro, Jose J 11 9
 
Dave Goshorn - Resume
Dave Goshorn - ResumeDave Goshorn - Resume
Dave Goshorn - Resume
 
Dave Goshorn - Resume
Dave Goshorn - ResumeDave Goshorn - Resume
Dave Goshorn - Resume
 
Personal_Resume_11_2013
Personal_Resume_11_2013Personal_Resume_11_2013
Personal_Resume_11_2013
 
Stephen Vianelli CV 23 Dec 2016
Stephen Vianelli CV 23 Dec 2016Stephen Vianelli CV 23 Dec 2016
Stephen Vianelli CV 23 Dec 2016
 

Lou Houlemarde career overview construction management

  • 1. Lou Houlemarde Apple Valley, CA USA CAREER OVERVIEW: Forty-seven years experience in the many facets of construction within the bulk energy, commercial / retail, and housing industries. Several of those years spent within the respective administrative and management structures. As a result, I have developed strong project management, analytical, and organization skills which provide accurate assessment, appropriate staffing, support, and contracting to process projects efficiently and to satisfactory conclusion. WORK EXPERIENCE: May 2012 throughCurrent: CB&C Corporation Project Development – All Sectors Key Responsibilities: Review and consultation of proposed projects within various disciplines. Project planning and estimating for initial phases. Cost projections for long term / production phases. Preparation of various Executive Summaries. Achievements: Several and various completed reviews and recommendations May 2012 throughSeptember 2014: CB&C Corporation / Spirit Energy Inc Project Consulting and Coordination – Oil Energy Key Responsibilities: Project coordination with Finance Manager and Project Geophysicist. Project planning and estimating for initial exploration phases. Cost projections for long term / production phases. Contract Administration. Consulting regarding government oil law and concession agreements. Achievements: Initial exploration plan completed. Budget for initial exploration phase completed. Contract negotiations in progress. February 2009 through December 2011: CMS Inc Principal Key Responsibilities: Providing various project management services for commercial / retail and senior care industries. Providing management personnel for on-site management of various phases of projects. Providing consultation and recommendations on project planning and problem remedy. Achievements: Generated project plans, developed budget, managed projects from design to completion. Provide remedial action planning to avoid delay or stoppage. Provided value engineering through constructability reviews. September 2004 through December 2008: BAR-L Construction Company (Apple Valley, CA) Vice President Key Responsibilities: Responsible for Estimating, Bid Proposals, Contract Administration, Project Management, and overall cost control including Accounts receivable / payable. Achievements: Completed three new “Big Box” commercial / retail centers and substantial additions to another including civil elements, city street / road improvements, and tenant improvements to leased suites. Completed new construction of Choice Medical building and Meridian Urgent Care facility. Completed renovations of existing medical facilities and urgent care unit for St. Joseph Health Care. Page 1
  • 2. Lou Houlemarde Apple Valley, CA USA 1998 through 2004: Various Builders Construction Manager Key Responsibilities: Construction management of various multi-family dwellings and senior living facilities. Achievements: Completed three multi-family complexes ranging from 200 to 400 units. Completed a senior active living center of 240 units. October 1970 through July 1996: Southern California Edison Co Construction Manager – Hydro Generation and Substation Projects, Northern Division; 1989 - 1996 Construction Superintendent – EHV Transmission Lines and Substation Projects, Northern Division; 1988 - 1989 Supervisor – Engineering and Construction Support; 1986 - 1988 Supervisor – Engineering and Construction Vehicle and Equipment Fleet; 1984 - 1986 Supervisor – Construction Department Safety; 1982 - 1984 Trainer - Class A Truck Driver, Heavy Equipment Operator, and Crane Operator; 1980 - 1982 Heavy Equipment and Crane Operator; 1975 - 1980 Lineman – EHV Transmission Line Construction; 1970 - 1975 Achievements: Bishop, CA Flow Lines Replacement Project; Replace wood pipe with steel ( approximately 12 miles total ). Initial construction management of the Substation Automation Project; Prior to retirement, completed 67 of some 600 plus stations. Various New Substation and Expansion Projects; Projects related to load growth in the Western and Northern Divisions. Substation Equipment Replacement Project (SERP); Replacement of switching and breaker equipment to improve distribution efficiency. Substation Seismic Upgrade Program; Seismic enhancements to key positions at key centers to maintain critical power need during and following earthquake events. Initial Tehachapi, CA, Wind Generation Projects; Install of new sub-station facilities and special equipment for interface with existing electrical grid. Vermillion Dam Tow Drain Repair; Performed emergency level repairs to prevent “blow-out”. Powerhouse 3, Unit 5 Logistics and Crane Support; Coordinated rail and truck transport of various components and off-loading at site. Powerhouse 8 Dam Repairs and Modifications; Repairs to face and install of debris screen. Initial Draft of Construction Division Safety Program, Policy and Procedures. Initial Draft of Modifications to Rigging Program related to Heavy Lift and Transmission Line Tower Erection. Initial Draft of Division Driver and Equipment Operator Training Program. Tower Line Tension Inspector (“Sagger”). December 1968 through October 1970: Commercial / Retail and Housing Construction - Carpenter October 1966 through October 1968: Active Military Service – US Marine Corps August 1965 through September 1966: Santa Fe and Southern Pacific Railroads EDUCATION: Pasadena City College Various Trade Schools REFEREES: Available upon request Page 2