1. Yuang Lee, REP, CEM, RA, DCEP
1662 Hillside Bend Crossing Lawrenceville, GA 30043
yuang55@gmail.com (404) 693-7782
Over 15 years combined experiences in Environmental and Energy Program Management, Policy alignment,
Sustainability Renewable Resources Preliminary Assessment,Analyze Industry Trends, Energy Market Policy
and regulations, proactively identify opportunities to achieve renewable energy targets ,conducted Energy
Project Financial Analysis, Utility Tariff Analysis,identify, develop, and monitor ESPC, UESC, PPA project
performance to achieve Corporation Sustainability Targets & Cost Reduction. Summarized below
• With Total portfolio over 1600 buildings, Large Portfolio Renewable Energy Management,
supported US Air force Reserve Command Headquarter (AFRC/HQ), and DHS/ CBP Portfolio
Energy Management and Over-sighted Real Estate Management, Renewable Technology and Best
Practices. ESPC, UESC, Power Purchase Agreement (PPA) Capital Projects Total over $60M
• Global & US Projects: Corporate Headquarters, Mixed-use Commercial & Residential buildings (10),
Educational (3), USPS Regional facility upgrades (4), Institutional Buildings (3), USPS Facility
Condition Assessment (200), and Data Centers/ Laboratory/ Healthcare (7)
• AEE Certified Renewable Energy Professional (REP), Certified Energy Manager(CEM), Registered
Architect (RA), Certified Demand Side Manager (CDSM), LEED GA, and a
Certified Data Center Energy Practitioner Specialist (DCEP).
• Headquarter/Air Force Reserve Command (HQ/AFRC), Warner Robins, GA
Portfolio over 900 Facilities in 10 major cities across USA. Assisted HQ/AFRC Facility Management
Chief Directors and HQ/Energy Managers, oversighted Facility Infrastructure Strategic Master
Planning, Energy Policy and Facility Management
Cost Saving Estimated Total $145 million Life Cycle, supported projects review for 9 Air
Force Bases,oversight development of New Construction,Retro-fits, NRG, SRM projects
• US Customs Border Patrol (CBP)/ Environmental and Energy Division, Indianapolis, IN
Portfolio over 700 Facilities throughout USA, Supporting Environmental and Energy Director, and
Facility Managers,identify, prioritize and develop Energy Capital Projects, HVAC, Lighting retrofits,
building envelope, Peak Demand Management and Review Energy & Water Audits ECMs, conducted
Portfolio Renewable Energy Preliminary Assessment in 2015.
Cost Saving Estimated $25M Identified and integrated Renewable Energy Resources tailored
for Data Center facility, recommended cutting edge Technologies and Industry Best Practices
• Gift Mart Expansion, Atlanta, GA One of the most Energy Efficient Convention Center …
Successfully designed and constructed one of the most Energy Efficient Technologies in Atlanta.
Served as an Architect/Facility Planner/ Construction Field Supervisor for a Design/ Built project,
Construction Cost $125 Million.
http://www.americasmart.com/ The Biggest Product Trade Show ATLANTA
• One Magnificent Mile, Chicago, IL
Gold Coast Chicago on Michigan Avenue,high rise Commercial/ Residential Development, served
as Technical Coordinator.
• John Hancock Building, Chicago, IL
95 stories High-end Commercial & Office Tower, Energy Efficiency HVAC System Upgrade, served
as a member in the Building Mechanical SystemDesign Team.
• Bishopgate Complex, London, U.K.
1,500,000square feet Multi-use development of Office Commercial High-end Residential. Functioned
as a technical coordinator in Infrastructure MasterPlanning Team.
SUMMARY
MAJOR ACCOMPLISHMENT & HIGHLIGHTS Click on Links Underlined
2. • Asian Development Bank - ADB, Manila, Philippines
New addition to ADB Headquarter– Manila banking facility, conducted Facility Energy Analysis.
• LG Corporation Headquarter, Seoul, South Korea
An innovative and Holistic Building System Technology approach, achieved Optimal Life Cycle Cost
Design and Best Practices. Functioned as a member of Facility Master Planning Team.
• Rowes Warf Waterfront , Boston, MA 650,000 square feet Multi-use high-end Commercial.
Five Star Boston Harbor Hotel, restaurants,high-end residential condominiums, offices and boat ferry
Facility. Led team of 6 engineers, responsible for whole building HVAC Systemdesign. Received The
“Distinguished Building Performance Award” from AIA Chicago link to Rowes Warf Waterfront
• HQ American United Life Insurance (AUL), Indianapolis, IN
Integrated Cutting Edge Renewable Energy Technology (GSHP) to achieve most energy efficient
System Design, Served as a team member, responsible for Facility HVAC design, planning, and plan
review for the 1st High-Rise Commercial Tower of its time; ASHRAE Awarded.
151 Incheon Tower, South Korea: The 151 Incheon Tower will be the tallest Twin Tower
in the world, if completed, proposed for construction in Songdo International City, Incheon, South
Korea. Served as a team member in Facility Infrastructure Master Planning Group. The design
consists oftwin 102-floor tower, Cost Estimated $15 Billion US Dollars
link to 151 Incheon Tower
PARSONS
Sr. Facility Assessor/ Custom Border Protection (DHS/CBP), Indianapolis 1/6/2014~11/25/2015
• With Real Estate portfolio over 700 Facilities across USA, assisted Director of Environment and
Energy Team in Infrastructure Strategic MasterPlanning and Progressive Renewable Energy Growth.
• Performed Portfolio Renewable Energy Resources Preliminary Assessment,identified Top 10 Targets
• Collaborated with Sustainability Team, align HPSB Data Centers and Lab renewable energy planning
to accelerate corporate sustainability objectives.
• Monitor Global Energy Market Trends, Evaluate Cutting Edge Renewable Technology and promoted
Best Practices, proactively lead “Energy Blimp” and pioneered “ Energy Lunch and Learn” Program
• Received DHS/CBP/ Environmental and Energy Director and FM&E Chief Director special mention,
also receive PARSONS Company Spot Bonus in 2015.
Booz Allen Hamilton
HQ/ AFRC Resource Efficiency Manager, Robins AFB, GA 1/30/2012~8/31/2013
• Provided support to Regional Director of FM Operation, assisted Facility & Management Team
oversighted over 900 facilities in 10 major cities across USA.
• Identified, Reviewed and Validated Renewable Energy Projects, analyzed utility Tariff and database,
and made recommendations at various States including GA. CA and FL.
• Developed, reviewed and implemented projects, budget proposal,Building Renovation, recommend
proven technology to improve building performances.
Energy Consultant 11/1/2009~1/15/2012
Consultation in Facility Condition Assessment and extended Training in Renewable Energy Assessment.
John Portman & Associates, Atlanta, GA
Facility Designer/ Construction Field Supervisor 9/6/2005-10/9/2009
• Proudly served as a team member in Facility Infrastructure Master Planning Group. The design
consists oftwin 102-floor tower, Cost Estimated $15 Billion US Dollars link to 151 Incheon Tower
• Successfully completed Gift Mart II project in Atlanta Down Town, a mixed-used commercial &
Convention Center; from facility Mater Planning to Construction, Total Construction Cost $125M
PROFESSIONAL EXPERIENCE HIGHLIGHTS
3. Yuang Lee, CEM, REP, RA
1662 Hillside Bend Crossing
Lawrenceville, GA 30043
YUANG55@GMAIL.COM (404) 693-7782
Facility Management /Real Estate Developer 10/16/2004~9/5/2005
• Unemployed, extended training in Facility Management and Real Estate Development
Globetrotters | Chicago Architectural Engineering Firm
Facility Designer 5/6/2002~10/15/2003
• Completed facility Retro-Commissioning, performance evaluations,energy audit, facilitated Retro-
Commissioning proposalof redevelopment for Chicago Housing Authority.
The Austin Company, Schaumburg, Illinois
Sr. Architect/ Facility Planner 8/5/2001~4/2002
• Facility planning, facility preliminary design and coordination of bid documents for Industrial
facilities, laboratories, hospital & office buildings.
Wold Architects and Engineers, Elgin, Illinois
Facility Designer 1999-2001
• Successfully performed facility assessment,assistant Project Manager with cost Estimation for light
commercial, schools,and various office projects.
Restrepo Group, Inc., Chicago, Illinois
Project Architect 4/1988-10/1995
• Maintain excellent client liaisons, major clientele included AT&T, USPS and Board of Education
Chicago Public School District.
• Completed Facility Retro-Fit, facility performance services, cost analyses,conducting code
compliances analysis, audit, developed strategies and implementation proposals.
Skidmore Owings & Merrill (SOM), Chicago, IL
Architect/ Mechanical Engineer 1/1980-3/1987
Led team of 6 Mechanical Engineers, HVAC systemdesign and Facility Energy Analysis.
• Energy Simulation utilizing DOE & TRACE, mechanical central plant design, HVAC equipment
specification, permits submission & shop drawings reviews for industrial and commercial facilities.
• Successfully designed and built projects and well recognized in USA and abroad, several project
received ASHRAE Energy Awards for high performance and one of the most Energy Efficient
buildings of its day. Including The First Tallest Commercial Tower in Down Town Indianapolis, IN
Masterof Science, Building Technology Major University of Illinois at Champaign Urbana, IL USA
Bachelor of Science, Building Technology Major, University of Chung-Yuan, Taiwan, R.O.C.
Certified Renewable Energy Professional (REP), Certified Energy Manager (CEM), Registered Architect
(RA), Certified Demand Side Manager (CDSM), Association of Energy Engineers (AEE),
Certified Data Center Energy Practitioner (DCEP), US Green Building Council (USGBC)
ASHRAE Energy Awards winner of various Industrial & Commercial Building Facilities
3
Education
Professional Certifications & Affiliation
Honors and Awards