SlideShare a Scribd company logo
1 of 3
Yuang Lee, REP, CEM, RA, DCEP
1662 Hillside Bend Crossing Lawrenceville, GA 30043
yuang55@gmail.com (404) 693-7782
Over 15 years combined experiences in Environmental and Energy Program Management, Policy alignment,
Sustainability Renewable Resources Preliminary Assessment,Analyze Industry Trends, Energy Market Policy
and regulations, proactively identify opportunities to achieve renewable energy targets ,conducted Energy
Project Financial Analysis, Utility Tariff Analysis,identify, develop, and monitor ESPC, UESC, PPA project
performance to achieve Corporation Sustainability Targets & Cost Reduction. Summarized below
• With Total portfolio over 1600 buildings, Large Portfolio Renewable Energy Management,
supported US Air force Reserve Command Headquarter (AFRC/HQ), and DHS/ CBP Portfolio
Energy Management and Over-sighted Real Estate Management, Renewable Technology and Best
Practices. ESPC, UESC, Power Purchase Agreement (PPA) Capital Projects Total over $60M
• Global & US Projects: Corporate Headquarters, Mixed-use Commercial & Residential buildings (10),
Educational (3), USPS Regional facility upgrades (4), Institutional Buildings (3), USPS Facility
Condition Assessment (200), and Data Centers/ Laboratory/ Healthcare (7)
• AEE Certified Renewable Energy Professional (REP), Certified Energy Manager(CEM), Registered
Architect (RA), Certified Demand Side Manager (CDSM), LEED GA, and a
Certified Data Center Energy Practitioner Specialist (DCEP).
• Headquarter/Air Force Reserve Command (HQ/AFRC), Warner Robins, GA
Portfolio over 900 Facilities in 10 major cities across USA. Assisted HQ/AFRC Facility Management
Chief Directors and HQ/Energy Managers, oversighted Facility Infrastructure Strategic Master
Planning, Energy Policy and Facility Management
Cost Saving Estimated Total $145 million Life Cycle, supported projects review for 9 Air
Force Bases,oversight development of New Construction,Retro-fits, NRG, SRM projects
• US Customs Border Patrol (CBP)/ Environmental and Energy Division, Indianapolis, IN
Portfolio over 700 Facilities throughout USA, Supporting Environmental and Energy Director, and
Facility Managers,identify, prioritize and develop Energy Capital Projects, HVAC, Lighting retrofits,
building envelope, Peak Demand Management and Review Energy & Water Audits ECMs, conducted
Portfolio Renewable Energy Preliminary Assessment in 2015.
Cost Saving Estimated $25M Identified and integrated Renewable Energy Resources tailored
for Data Center facility, recommended cutting edge Technologies and Industry Best Practices
• Gift Mart Expansion, Atlanta, GA One of the most Energy Efficient Convention Center …
Successfully designed and constructed one of the most Energy Efficient Technologies in Atlanta.
Served as an Architect/Facility Planner/ Construction Field Supervisor for a Design/ Built project,
Construction Cost $125 Million.
http://www.americasmart.com/ The Biggest Product Trade Show ATLANTA
• One Magnificent Mile, Chicago, IL
Gold Coast Chicago on Michigan Avenue,high rise Commercial/ Residential Development, served
as Technical Coordinator.
• John Hancock Building, Chicago, IL
95 stories High-end Commercial & Office Tower, Energy Efficiency HVAC System Upgrade, served
as a member in the Building Mechanical SystemDesign Team.
• Bishopgate Complex, London, U.K.
1,500,000square feet Multi-use development of Office Commercial High-end Residential. Functioned
as a technical coordinator in Infrastructure MasterPlanning Team.
SUMMARY
MAJOR ACCOMPLISHMENT & HIGHLIGHTS Click on Links Underlined
• Asian Development Bank - ADB, Manila, Philippines
New addition to ADB Headquarter– Manila banking facility, conducted Facility Energy Analysis.
• LG Corporation Headquarter, Seoul, South Korea
An innovative and Holistic Building System Technology approach, achieved Optimal Life Cycle Cost
Design and Best Practices. Functioned as a member of Facility Master Planning Team.
• Rowes Warf Waterfront , Boston, MA 650,000 square feet Multi-use high-end Commercial.
Five Star Boston Harbor Hotel, restaurants,high-end residential condominiums, offices and boat ferry
Facility. Led team of 6 engineers, responsible for whole building HVAC Systemdesign. Received The
“Distinguished Building Performance Award” from AIA Chicago link to Rowes Warf Waterfront
• HQ American United Life Insurance (AUL), Indianapolis, IN
Integrated Cutting Edge Renewable Energy Technology (GSHP) to achieve most energy efficient
System Design, Served as a team member, responsible for Facility HVAC design, planning, and plan
review for the 1st High-Rise Commercial Tower of its time; ASHRAE Awarded.
 151 Incheon Tower, South Korea: The 151 Incheon Tower will be the tallest Twin Tower
in the world, if completed, proposed for construction in Songdo International City, Incheon, South
Korea. Served as a team member in Facility Infrastructure Master Planning Group. The design
consists oftwin 102-floor tower, Cost Estimated $15 Billion US Dollars
link to 151 Incheon Tower
PARSONS
Sr. Facility Assessor/ Custom Border Protection (DHS/CBP), Indianapolis 1/6/2014~11/25/2015
• With Real Estate portfolio over 700 Facilities across USA, assisted Director of Environment and
Energy Team in Infrastructure Strategic MasterPlanning and Progressive Renewable Energy Growth.
• Performed Portfolio Renewable Energy Resources Preliminary Assessment,identified Top 10 Targets
• Collaborated with Sustainability Team, align HPSB Data Centers and Lab renewable energy planning
to accelerate corporate sustainability objectives.
• Monitor Global Energy Market Trends, Evaluate Cutting Edge Renewable Technology and promoted
Best Practices, proactively lead “Energy Blimp” and pioneered “ Energy Lunch and Learn” Program
• Received DHS/CBP/ Environmental and Energy Director and FM&E Chief Director special mention,
also receive PARSONS Company Spot Bonus in 2015.
Booz Allen Hamilton
HQ/ AFRC Resource Efficiency Manager, Robins AFB, GA 1/30/2012~8/31/2013
• Provided support to Regional Director of FM Operation, assisted Facility & Management Team
oversighted over 900 facilities in 10 major cities across USA.
• Identified, Reviewed and Validated Renewable Energy Projects, analyzed utility Tariff and database,
and made recommendations at various States including GA. CA and FL.
• Developed, reviewed and implemented projects, budget proposal,Building Renovation, recommend
proven technology to improve building performances.
Energy Consultant 11/1/2009~1/15/2012
Consultation in Facility Condition Assessment and extended Training in Renewable Energy Assessment.
John Portman & Associates, Atlanta, GA
Facility Designer/ Construction Field Supervisor 9/6/2005-10/9/2009
• Proudly served as a team member in Facility Infrastructure Master Planning Group. The design
consists oftwin 102-floor tower, Cost Estimated $15 Billion US Dollars link to 151 Incheon Tower
• Successfully completed Gift Mart II project in Atlanta Down Town, a mixed-used commercial &
Convention Center; from facility Mater Planning to Construction, Total Construction Cost $125M
PROFESSIONAL EXPERIENCE HIGHLIGHTS
Yuang Lee, CEM, REP, RA
1662 Hillside Bend Crossing
Lawrenceville, GA 30043
YUANG55@GMAIL.COM (404) 693-7782
Facility Management /Real Estate Developer 10/16/2004~9/5/2005
• Unemployed, extended training in Facility Management and Real Estate Development
Globetrotters | Chicago Architectural Engineering Firm
Facility Designer 5/6/2002~10/15/2003
• Completed facility Retro-Commissioning, performance evaluations,energy audit, facilitated Retro-
Commissioning proposalof redevelopment for Chicago Housing Authority.
The Austin Company, Schaumburg, Illinois
Sr. Architect/ Facility Planner 8/5/2001~4/2002
• Facility planning, facility preliminary design and coordination of bid documents for Industrial
facilities, laboratories, hospital & office buildings.
Wold Architects and Engineers, Elgin, Illinois
Facility Designer 1999-2001
• Successfully performed facility assessment,assistant Project Manager with cost Estimation for light
commercial, schools,and various office projects.
Restrepo Group, Inc., Chicago, Illinois
Project Architect 4/1988-10/1995
• Maintain excellent client liaisons, major clientele included AT&T, USPS and Board of Education
Chicago Public School District.
• Completed Facility Retro-Fit, facility performance services, cost analyses,conducting code
compliances analysis, audit, developed strategies and implementation proposals.
Skidmore Owings & Merrill (SOM), Chicago, IL
Architect/ Mechanical Engineer 1/1980-3/1987
Led team of 6 Mechanical Engineers, HVAC systemdesign and Facility Energy Analysis.
• Energy Simulation utilizing DOE & TRACE, mechanical central plant design, HVAC equipment
specification, permits submission & shop drawings reviews for industrial and commercial facilities.
• Successfully designed and built projects and well recognized in USA and abroad, several project
received ASHRAE Energy Awards for high performance and one of the most Energy Efficient
buildings of its day. Including The First Tallest Commercial Tower in Down Town Indianapolis, IN
Masterof Science, Building Technology Major University of Illinois at Champaign Urbana, IL USA
Bachelor of Science, Building Technology Major, University of Chung-Yuan, Taiwan, R.O.C.
Certified Renewable Energy Professional (REP), Certified Energy Manager (CEM), Registered Architect
(RA), Certified Demand Side Manager (CDSM), Association of Energy Engineers (AEE),
Certified Data Center Energy Practitioner (DCEP), US Green Building Council (USGBC)
ASHRAE Energy Awards winner of various Industrial & Commercial Building Facilities
3
Education
Professional Certifications & Affiliation
Honors and Awards

More Related Content

Viewers also liked

تويتر في التعليم
تويتر في التعليمتويتر في التعليم
تويتر في التعليمessa14
 
Introduction aux leçons
Introduction aux leçonsIntroduction aux leçons
Introduction aux leçonsPierrot Caron
 
Online Influence Conference '15
Online Influence Conference '15Online Influence Conference '15
Online Influence Conference '15Jeremy Waite
 
Les Français et les propositions de François Hollande pour l'emploi / Sondage...
Les Français et les propositions de François Hollande pour l'emploi / Sondage...Les Français et les propositions de François Hollande pour l'emploi / Sondage...
Les Français et les propositions de François Hollande pour l'emploi / Sondage...contact Elabe
 
Citations UCEM (Texte 7.VII.1.12)
Citations UCEM (Texte 7.VII.1.12)Citations UCEM (Texte 7.VII.1.12)
Citations UCEM (Texte 7.VII.1.12)Pierrot Caron
 
Citations UCEM (Leçon 64.3.4)
Citations UCEM (Leçon 64.3.4)Citations UCEM (Leçon 64.3.4)
Citations UCEM (Leçon 64.3.4)Pierrot Caron
 
28 Quotes from Dreamforce 2015
28 Quotes from Dreamforce 201528 Quotes from Dreamforce 2015
28 Quotes from Dreamforce 2015Jeremy Waite
 
Cyber crime and security
Cyber crime and securityCyber crime and security
Cyber crime and securitySharath Raj
 
الانفوجرافيك
الانفوجرافيكالانفوجرافيك
الانفوجرافيكRawanAlturki
 

Viewers also liked (12)

تويتر في التعليم
تويتر في التعليمتويتر في التعليم
تويتر في التعليم
 
Introduction aux leçons
Introduction aux leçonsIntroduction aux leçons
Introduction aux leçons
 
Online Influence Conference '15
Online Influence Conference '15Online Influence Conference '15
Online Influence Conference '15
 
Caracterización del grupo 5 1
Caracterización del grupo 5 1Caracterización del grupo 5 1
Caracterización del grupo 5 1
 
Les Français et les propositions de François Hollande pour l'emploi / Sondage...
Les Français et les propositions de François Hollande pour l'emploi / Sondage...Les Français et les propositions de François Hollande pour l'emploi / Sondage...
Les Français et les propositions de François Hollande pour l'emploi / Sondage...
 
Citations UCEM (Texte 7.VII.1.12)
Citations UCEM (Texte 7.VII.1.12)Citations UCEM (Texte 7.VII.1.12)
Citations UCEM (Texte 7.VII.1.12)
 
Citations UCEM (Leçon 64.3.4)
Citations UCEM (Leçon 64.3.4)Citations UCEM (Leçon 64.3.4)
Citations UCEM (Leçon 64.3.4)
 
Les attaques MITM
Les attaques MITMLes attaques MITM
Les attaques MITM
 
28 Quotes from Dreamforce 2015
28 Quotes from Dreamforce 201528 Quotes from Dreamforce 2015
28 Quotes from Dreamforce 2015
 
Cyber crime and security
Cyber crime and securityCyber crime and security
Cyber crime and security
 
الانفوجرافيك
الانفوجرافيكالانفوجرافيك
الانفوجرافيك
 
¿Quieres conocernos? ENTRA
¿Quieres conocernos? ENTRA¿Quieres conocernos? ENTRA
¿Quieres conocernos? ENTRA
 

Similar to RE Resume YUANG LEE 2015 12 21

Ronald J Kunz Resume C
Ronald J Kunz Resume CRonald J Kunz Resume C
Ronald J Kunz Resume CRon Kunz
 
Phil Staib's Resume 2016
Phil Staib's Resume 2016Phil Staib's Resume 2016
Phil Staib's Resume 2016Phil Staib
 
Stan Shipley Resume, Projects 11mr18
Stan Shipley   Resume, Projects 11mr18Stan Shipley   Resume, Projects 11mr18
Stan Shipley Resume, Projects 11mr18stan_shipley
 
Facilities 8-4-15
Facilities 8-4-15Facilities 8-4-15
Facilities 8-4-15Larry Jones
 
Keller, Keith EXPANDED RESUME
Keller, Keith EXPANDED RESUMEKeller, Keith EXPANDED RESUME
Keller, Keith EXPANDED RESUMEKeith H. Keller
 
Personal_Resume_11_2013
Personal_Resume_11_2013Personal_Resume_11_2013
Personal_Resume_11_2013Stephen Ciulla
 
Heyer Professional Profile
Heyer Professional ProfileHeyer Professional Profile
Heyer Professional Profilepheyer351
 
D Ford Resume 3 14 10
D Ford Resume 3 14 10D Ford Resume 3 14 10
D Ford Resume 3 14 10gueste65323
 
Forrest Suehs Resume 2016 - Prof Advan Rev 0
Forrest Suehs Resume 2016 - Prof Advan Rev 0Forrest Suehs Resume 2016 - Prof Advan Rev 0
Forrest Suehs Resume 2016 - Prof Advan Rev 0Forrest Suehs
 
Kevin szymanski resume
Kevin szymanski   resumeKevin szymanski   resume
Kevin szymanski resumekasst110
 
Creating a High-Performance and Environmentally Sustainable Building
Creating a High-Performance and Environmentally Sustainable BuildingCreating a High-Performance and Environmentally Sustainable Building
Creating a High-Performance and Environmentally Sustainable BuildingIllinois ASHRAE
 
Dale Riley - Resume2016
Dale Riley - Resume2016Dale Riley - Resume2016
Dale Riley - Resume2016Dale Riley
 
Facilities Manager Resume 3 2015 (1)
Facilities Manager Resume 3 2015 (1)Facilities Manager Resume 3 2015 (1)
Facilities Manager Resume 3 2015 (1)Don DeSanti
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalSam DiPasquale
 

Similar to RE Resume YUANG LEE 2015 12 21 (20)

Lou Houlemarde
Lou HoulemardeLou Houlemarde
Lou Houlemarde
 
Ronald J Kunz Resume C
Ronald J Kunz Resume CRonald J Kunz Resume C
Ronald J Kunz Resume C
 
Phil Staib's Resume 2016
Phil Staib's Resume 2016Phil Staib's Resume 2016
Phil Staib's Resume 2016
 
Stan Shipley Resume, Projects 11mr18
Stan Shipley   Resume, Projects 11mr18Stan Shipley   Resume, Projects 11mr18
Stan Shipley Resume, Projects 11mr18
 
WE Firm Profile
WE Firm ProfileWE Firm Profile
WE Firm Profile
 
Facilities 8-4-15
Facilities 8-4-15Facilities 8-4-15
Facilities 8-4-15
 
Keller, Keith EXPANDED RESUME
Keller, Keith EXPANDED RESUMEKeller, Keith EXPANDED RESUME
Keller, Keith EXPANDED RESUME
 
Personal_Resume_11_2013
Personal_Resume_11_2013Personal_Resume_11_2013
Personal_Resume_11_2013
 
Heyer Professional Profile
Heyer Professional ProfileHeyer Professional Profile
Heyer Professional Profile
 
Rudy CV2-1
Rudy CV2-1Rudy CV2-1
Rudy CV2-1
 
D Ford Resume 3 14 10
D Ford Resume 3 14 10D Ford Resume 3 14 10
D Ford Resume 3 14 10
 
Resume
ResumeResume
Resume
 
Forrest Suehs Resume 2016 - Prof Advan Rev 0
Forrest Suehs Resume 2016 - Prof Advan Rev 0Forrest Suehs Resume 2016 - Prof Advan Rev 0
Forrest Suehs Resume 2016 - Prof Advan Rev 0
 
Kevin szymanski resume
Kevin szymanski   resumeKevin szymanski   resume
Kevin szymanski resume
 
Resume
ResumeResume
Resume
 
Creating a High-Performance and Environmentally Sustainable Building
Creating a High-Performance and Environmentally Sustainable BuildingCreating a High-Performance and Environmentally Sustainable Building
Creating a High-Performance and Environmentally Sustainable Building
 
Dale Riley - Resume2016
Dale Riley - Resume2016Dale Riley - Resume2016
Dale Riley - Resume2016
 
Facilities Manager Resume 3 2015 (1)
Facilities Manager Resume 3 2015 (1)Facilities Manager Resume 3 2015 (1)
Facilities Manager Resume 3 2015 (1)
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - Electrical
 
Res414
Res414Res414
Res414
 

RE Resume YUANG LEE 2015 12 21

  • 1. Yuang Lee, REP, CEM, RA, DCEP 1662 Hillside Bend Crossing Lawrenceville, GA 30043 yuang55@gmail.com (404) 693-7782 Over 15 years combined experiences in Environmental and Energy Program Management, Policy alignment, Sustainability Renewable Resources Preliminary Assessment,Analyze Industry Trends, Energy Market Policy and regulations, proactively identify opportunities to achieve renewable energy targets ,conducted Energy Project Financial Analysis, Utility Tariff Analysis,identify, develop, and monitor ESPC, UESC, PPA project performance to achieve Corporation Sustainability Targets & Cost Reduction. Summarized below • With Total portfolio over 1600 buildings, Large Portfolio Renewable Energy Management, supported US Air force Reserve Command Headquarter (AFRC/HQ), and DHS/ CBP Portfolio Energy Management and Over-sighted Real Estate Management, Renewable Technology and Best Practices. ESPC, UESC, Power Purchase Agreement (PPA) Capital Projects Total over $60M • Global & US Projects: Corporate Headquarters, Mixed-use Commercial & Residential buildings (10), Educational (3), USPS Regional facility upgrades (4), Institutional Buildings (3), USPS Facility Condition Assessment (200), and Data Centers/ Laboratory/ Healthcare (7) • AEE Certified Renewable Energy Professional (REP), Certified Energy Manager(CEM), Registered Architect (RA), Certified Demand Side Manager (CDSM), LEED GA, and a Certified Data Center Energy Practitioner Specialist (DCEP). • Headquarter/Air Force Reserve Command (HQ/AFRC), Warner Robins, GA Portfolio over 900 Facilities in 10 major cities across USA. Assisted HQ/AFRC Facility Management Chief Directors and HQ/Energy Managers, oversighted Facility Infrastructure Strategic Master Planning, Energy Policy and Facility Management Cost Saving Estimated Total $145 million Life Cycle, supported projects review for 9 Air Force Bases,oversight development of New Construction,Retro-fits, NRG, SRM projects • US Customs Border Patrol (CBP)/ Environmental and Energy Division, Indianapolis, IN Portfolio over 700 Facilities throughout USA, Supporting Environmental and Energy Director, and Facility Managers,identify, prioritize and develop Energy Capital Projects, HVAC, Lighting retrofits, building envelope, Peak Demand Management and Review Energy & Water Audits ECMs, conducted Portfolio Renewable Energy Preliminary Assessment in 2015. Cost Saving Estimated $25M Identified and integrated Renewable Energy Resources tailored for Data Center facility, recommended cutting edge Technologies and Industry Best Practices • Gift Mart Expansion, Atlanta, GA One of the most Energy Efficient Convention Center … Successfully designed and constructed one of the most Energy Efficient Technologies in Atlanta. Served as an Architect/Facility Planner/ Construction Field Supervisor for a Design/ Built project, Construction Cost $125 Million. http://www.americasmart.com/ The Biggest Product Trade Show ATLANTA • One Magnificent Mile, Chicago, IL Gold Coast Chicago on Michigan Avenue,high rise Commercial/ Residential Development, served as Technical Coordinator. • John Hancock Building, Chicago, IL 95 stories High-end Commercial & Office Tower, Energy Efficiency HVAC System Upgrade, served as a member in the Building Mechanical SystemDesign Team. • Bishopgate Complex, London, U.K. 1,500,000square feet Multi-use development of Office Commercial High-end Residential. Functioned as a technical coordinator in Infrastructure MasterPlanning Team. SUMMARY MAJOR ACCOMPLISHMENT & HIGHLIGHTS Click on Links Underlined
  • 2. • Asian Development Bank - ADB, Manila, Philippines New addition to ADB Headquarter– Manila banking facility, conducted Facility Energy Analysis. • LG Corporation Headquarter, Seoul, South Korea An innovative and Holistic Building System Technology approach, achieved Optimal Life Cycle Cost Design and Best Practices. Functioned as a member of Facility Master Planning Team. • Rowes Warf Waterfront , Boston, MA 650,000 square feet Multi-use high-end Commercial. Five Star Boston Harbor Hotel, restaurants,high-end residential condominiums, offices and boat ferry Facility. Led team of 6 engineers, responsible for whole building HVAC Systemdesign. Received The “Distinguished Building Performance Award” from AIA Chicago link to Rowes Warf Waterfront • HQ American United Life Insurance (AUL), Indianapolis, IN Integrated Cutting Edge Renewable Energy Technology (GSHP) to achieve most energy efficient System Design, Served as a team member, responsible for Facility HVAC design, planning, and plan review for the 1st High-Rise Commercial Tower of its time; ASHRAE Awarded.  151 Incheon Tower, South Korea: The 151 Incheon Tower will be the tallest Twin Tower in the world, if completed, proposed for construction in Songdo International City, Incheon, South Korea. Served as a team member in Facility Infrastructure Master Planning Group. The design consists oftwin 102-floor tower, Cost Estimated $15 Billion US Dollars link to 151 Incheon Tower PARSONS Sr. Facility Assessor/ Custom Border Protection (DHS/CBP), Indianapolis 1/6/2014~11/25/2015 • With Real Estate portfolio over 700 Facilities across USA, assisted Director of Environment and Energy Team in Infrastructure Strategic MasterPlanning and Progressive Renewable Energy Growth. • Performed Portfolio Renewable Energy Resources Preliminary Assessment,identified Top 10 Targets • Collaborated with Sustainability Team, align HPSB Data Centers and Lab renewable energy planning to accelerate corporate sustainability objectives. • Monitor Global Energy Market Trends, Evaluate Cutting Edge Renewable Technology and promoted Best Practices, proactively lead “Energy Blimp” and pioneered “ Energy Lunch and Learn” Program • Received DHS/CBP/ Environmental and Energy Director and FM&E Chief Director special mention, also receive PARSONS Company Spot Bonus in 2015. Booz Allen Hamilton HQ/ AFRC Resource Efficiency Manager, Robins AFB, GA 1/30/2012~8/31/2013 • Provided support to Regional Director of FM Operation, assisted Facility & Management Team oversighted over 900 facilities in 10 major cities across USA. • Identified, Reviewed and Validated Renewable Energy Projects, analyzed utility Tariff and database, and made recommendations at various States including GA. CA and FL. • Developed, reviewed and implemented projects, budget proposal,Building Renovation, recommend proven technology to improve building performances. Energy Consultant 11/1/2009~1/15/2012 Consultation in Facility Condition Assessment and extended Training in Renewable Energy Assessment. John Portman & Associates, Atlanta, GA Facility Designer/ Construction Field Supervisor 9/6/2005-10/9/2009 • Proudly served as a team member in Facility Infrastructure Master Planning Group. The design consists oftwin 102-floor tower, Cost Estimated $15 Billion US Dollars link to 151 Incheon Tower • Successfully completed Gift Mart II project in Atlanta Down Town, a mixed-used commercial & Convention Center; from facility Mater Planning to Construction, Total Construction Cost $125M PROFESSIONAL EXPERIENCE HIGHLIGHTS
  • 3. Yuang Lee, CEM, REP, RA 1662 Hillside Bend Crossing Lawrenceville, GA 30043 YUANG55@GMAIL.COM (404) 693-7782 Facility Management /Real Estate Developer 10/16/2004~9/5/2005 • Unemployed, extended training in Facility Management and Real Estate Development Globetrotters | Chicago Architectural Engineering Firm Facility Designer 5/6/2002~10/15/2003 • Completed facility Retro-Commissioning, performance evaluations,energy audit, facilitated Retro- Commissioning proposalof redevelopment for Chicago Housing Authority. The Austin Company, Schaumburg, Illinois Sr. Architect/ Facility Planner 8/5/2001~4/2002 • Facility planning, facility preliminary design and coordination of bid documents for Industrial facilities, laboratories, hospital & office buildings. Wold Architects and Engineers, Elgin, Illinois Facility Designer 1999-2001 • Successfully performed facility assessment,assistant Project Manager with cost Estimation for light commercial, schools,and various office projects. Restrepo Group, Inc., Chicago, Illinois Project Architect 4/1988-10/1995 • Maintain excellent client liaisons, major clientele included AT&T, USPS and Board of Education Chicago Public School District. • Completed Facility Retro-Fit, facility performance services, cost analyses,conducting code compliances analysis, audit, developed strategies and implementation proposals. Skidmore Owings & Merrill (SOM), Chicago, IL Architect/ Mechanical Engineer 1/1980-3/1987 Led team of 6 Mechanical Engineers, HVAC systemdesign and Facility Energy Analysis. • Energy Simulation utilizing DOE & TRACE, mechanical central plant design, HVAC equipment specification, permits submission & shop drawings reviews for industrial and commercial facilities. • Successfully designed and built projects and well recognized in USA and abroad, several project received ASHRAE Energy Awards for high performance and one of the most Energy Efficient buildings of its day. Including The First Tallest Commercial Tower in Down Town Indianapolis, IN Masterof Science, Building Technology Major University of Illinois at Champaign Urbana, IL USA Bachelor of Science, Building Technology Major, University of Chung-Yuan, Taiwan, R.O.C. Certified Renewable Energy Professional (REP), Certified Energy Manager (CEM), Registered Architect (RA), Certified Demand Side Manager (CDSM), Association of Energy Engineers (AEE), Certified Data Center Energy Practitioner (DCEP), US Green Building Council (USGBC) ASHRAE Energy Awards winner of various Industrial & Commercial Building Facilities 3 Education Professional Certifications & Affiliation Honors and Awards