Advertising in Arab countries
The Coca Cola Poster
Communication Model
Communication channels
Communication technology
 How quickly must the information reach the
audience?
 Will there be feedback from the communication?
 What technology will the audience need to receive the
communication?
 Are there technical difficulties or learning curve issues
to address?
Communication technology
 Are there access or security issues with the
communications technology?
 Is the particular mode of technology likely to become
outdated?
 What is the relative cost of each technology?
Communication methods
Communication types
Communication Skills
Developing Great Communication
Skills
 Understand & follow the communication model (Sender,
 Receiver, Message, Noise)
 Take informal approach when communicating with
 stakeholders outside status meetings
 Develop effective listening skills
 appear interested
 make eye contacts
 put your speaker at ease
 recap what the speaker said in your words
 do not interrupt
Communication Management Plan
Main Contents
 Stakeholder communication requirements
 Information to be communicated
 Reason for distributing the information
 Time frame and frequency
 Responsible person/party to prepare and/or
communicate
 Responsible person/party for authorizing release of
confidential information
Communication Management
Plan Main Contents
 Persons who will receive the information (distribute to)
 Communication method, type and technology
 Allocated resources to perform communication, time and
budget
 Escalation process
 Updating & refining the communications management
plan
 Glossary of common terminology
 Project information flowcharts
 Communication constraints
Tips to Create a Communications
Management Plan
 Determine the communication needs of project
stakeholders.
 Evaluate any constraints and assumptions.
 Determine the appropriate communications
technologies.
 Distribute the communications management plan to
project stakeholders.
 Include activities for preparing project reports and
documentations
 Set enough time for meetings
Tips to Distribute Project
Information
 Distribute information in accordance with the
communications plan.
 Use effective communication skills to exchange
information.
 Monitor the communications system for feedback to
ensure messages are
 getting through as planned.
 Analyze effects on project execution and control when
unexpected
Tips to Distribute Project
Information
 information requests surface.
 Be prepared for the meetings, insist on the team to be
prepared
 Don’t count on verbal communication for approvals,
get it in writing
 SMART follow up is a key success for your project:
 Stakeholders receive your message
 Stakeholders understand what you mean
 Stakeholders take necessary actions
Tips to Report Project Performance
 Distribute information in accordance with the
communications plan.
 Use effective communication skills to exchange
information.
 Monitor the communications system for feedback to
ensure messages are
 getting through as planned.
 Analyze effects on project execution and control when
unexpected
Tips to Report Project
Performance
 information requests surface.
 Be prepared for the meetings, insist on the team to be
prepared
 Don’t count on verbal communication for approvals,
get it in writing
 SMART follow up is a key success for your project:
 Stakeholders receive your message
 Stakeholders understand what you mean
 Stakeholders take necessary actions
Tips to Report Project Performance
 Analyze work results against planned performance.
 Hold performance reviews.
 Determine the type of report needed for the
information being reported.
 Prepare professional performance reports.
 Balance the cost, time, and logistics of preparing
performance reports
 against the benefits gained.
 Measure and monitor performance consistently
throughout the project.
Tips to Manage Stakeholders
 Be flexible in communications with senior
management.
 Assign, track, and resolve open issues.
 Process change requests in order to update the
communications plan.
 Take corrective action to bring project performance in
line with stakeholder
 expectations.
 Document lessons learned.
Communication Activity
Group1 Develop a communication management plan (who will receive
what
information, when and how?)
Group2 In the middle of your project, one critical resource of the project team
big member resigned and wants to quit immediately. What is your
plan?,
and how you will communicate this information with the stakeholders?
Group3 The senior management asked you to hold on some activities which
definitely will delay the project. How are you going to deal with this
request?
Group4 In the middle of your project, the CEO informed that a VIP guest is
visiting the company and he wants you to prepare a 15 minutes
presentation about the project. What topics will you include in the
presentation?
Questions
1. Extensive use of - communication is most likely to aid
in solving complex problems.
A. verbal
B. written
C. formal
D. nonverbal
 Answer is (B)
2. The work breakdown structure can be an effective aid
for communication in which situation(s)?
A. Internal within the project team
B. Internal within the organization
C. External with the customer
D. Internal and external to the project
 Answer is (D)
3. The MOST likely result of communication blockers is
that:
A. the project is delayed.
B. trust level is enhanced.
C. conflict occurs.
D. senior management is displeased
 Answer is (C)
4. Communications are often enhanced when the sender
the receiver.
A. speaks up to
B. uses more physical movements when talking to
C. talks slowly to
D. shows concern for the perspective of
 Answer is (D)
5. Formal written correspondence with the customer is
required when:
A. defects are detected.
B. the customer requests additional work not covered under contract.
C. the project has a schedule slippage that includes changes to the critical
path.
D. the project has cost overruns.
 Answer is (B)
6. A project manager has a problem with a team
member's performance. What is BEST form of
communication for addressing this problem?
A. Formal written communication
B. Formal verbal communication
C. Informal written communication
D. Informal verbal communication
 Answer is (D)
7. Communications under a contract should tend
toward:
A. formal written communication.
B. formal verbal communication.
C. informal written communication.
D. informal verbal communication.
 Answer is (A)
8. The project status report is an example of which form
of communication?
A. Formal written communication
B. Formal verbal communication
C. Informal written communication
D. Informal verbal communication
 Answer is (A)
 9. When a project manager is engaged in negotiations,
nonverbal communication skills are of:
A. little importance.
B. major importance.
C. importance only when cost and schedule objectives are involved.
D. importance only to ensure you win the negotiation.
 Answer is (B)
 10. A large, one-year telecommunications project is
about halfway done when you take the place of the
previous project manager. The project involves three
different sellers and a project team of 30 people. You
would like to see the project's communications
requirements and what technology is being used to aid
in project communications. Where will you find this
information?
 A. The project management plan
 B. The information distribution plan
 C. The bar chart
 D. The communications management plan
 Answer is (D)
Thank you

More Related Content

Similar to PROJECT COMMUNICATION MANAGEMENT Ch9.ppt

Running Head STRATEGIC COMMUNICATIONS PLAN 1 .docx
Running Head STRATEGIC COMMUNICATIONS PLAN 1 .docxRunning Head STRATEGIC COMMUNICATIONS PLAN 1 .docx
Running Head STRATEGIC COMMUNICATIONS PLAN 1 .docxjeanettehully
 
samrus 1.docx
samrus 1.docxsamrus 1.docx
samrus 1.docxKiyaMama
 
10 pmp communication management exam
10 pmp communication  management exam10 pmp communication  management exam
10 pmp communication management examJamil Faraj , PMP
 
Communication planning
Communication planningCommunication planning
Communication planningSomashekar S.M
 
Communication management
Communication management Communication management
Communication management ammara2010
 
PMP Training - 10 project communication management
PMP Training - 10 project communication managementPMP Training - 10 project communication management
PMP Training - 10 project communication managementejlp12
 
IT 520 Final Project Guidelines and Rubric Overview .docx
IT 520 Final Project Guidelines and Rubric  Overview .docxIT 520 Final Project Guidelines and Rubric  Overview .docx
IT 520 Final Project Guidelines and Rubric Overview .docxchristiandean12115
 
PMP Certification Training Course Part-64
PMP Certification Training Course Part-64PMP Certification Training Course Part-64
PMP Certification Training Course Part-64Skillogic Solutions
 
Project Management as an Art Form
Project Management as an Art FormProject Management as an Art Form
Project Management as an Art FormTreehouse Agency
 
Free PMP Exam Sample Question of the week
Free PMP Exam Sample Question of the weekFree PMP Exam Sample Question of the week
Free PMP Exam Sample Question of the weekOSP International LLC
 
10.0 Project Communications Management Overview
10.0 Project Communications Management Overview10.0 Project Communications Management Overview
10.0 Project Communications Management OverviewDavidMcLachlan1
 

Similar to PROJECT COMMUNICATION MANAGEMENT Ch9.ppt (20)

Running Head STRATEGIC COMMUNICATIONS PLAN 1 .docx
Running Head STRATEGIC COMMUNICATIONS PLAN 1 .docxRunning Head STRATEGIC COMMUNICATIONS PLAN 1 .docx
Running Head STRATEGIC COMMUNICATIONS PLAN 1 .docx
 
samrus 1.docx
samrus 1.docxsamrus 1.docx
samrus 1.docx
 
10 pmp communication management exam
10 pmp communication  management exam10 pmp communication  management exam
10 pmp communication management exam
 
Communication planning
Communication planningCommunication planning
Communication planning
 
Chapter 10
Chapter 10Chapter 10
Chapter 10
 
Communication management
Communication management Communication management
Communication management
 
PMP Training - 10 project communication management
PMP Training - 10 project communication managementPMP Training - 10 project communication management
PMP Training - 10 project communication management
 
IT 520 Final Project Guidelines and Rubric Overview .docx
IT 520 Final Project Guidelines and Rubric  Overview .docxIT 520 Final Project Guidelines and Rubric  Overview .docx
IT 520 Final Project Guidelines and Rubric Overview .docx
 
Free PMP Exam Q & A
Free PMP Exam Q & AFree PMP Exam Q & A
Free PMP Exam Q & A
 
PMP Certification Training Course Part-64
PMP Certification Training Course Part-64PMP Certification Training Course Part-64
PMP Certification Training Course Part-64
 
Free PMP Sample Q & A
Free PMP Sample Q & AFree PMP Sample Q & A
Free PMP Sample Q & A
 
Free PMP Sample Q & A
Free PMP Sample Q & AFree PMP Sample Q & A
Free PMP Sample Q & A
 
10 communication
10 communication10 communication
10 communication
 
Project Management as an Art Form
Project Management as an Art FormProject Management as an Art Form
Project Management as an Art Form
 
PMP_Project Communication Management
PMP_Project Communication ManagementPMP_Project Communication Management
PMP_Project Communication Management
 
Free PMP Sample Q & A
Free PMP Sample Q & AFree PMP Sample Q & A
Free PMP Sample Q & A
 
Project communications management PMBOK Sixth Edition
Project communications management  PMBOK Sixth EditionProject communications management  PMBOK Sixth Edition
Project communications management PMBOK Sixth Edition
 
PMP Exam Q & A
PMP Exam Q & APMP Exam Q & A
PMP Exam Q & A
 
Free PMP Exam Sample Question of the week
Free PMP Exam Sample Question of the weekFree PMP Exam Sample Question of the week
Free PMP Exam Sample Question of the week
 
10.0 Project Communications Management Overview
10.0 Project Communications Management Overview10.0 Project Communications Management Overview
10.0 Project Communications Management Overview
 

Recently uploaded

Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 

Recently uploaded (20)

Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 

PROJECT COMMUNICATION MANAGEMENT Ch9.ppt

  • 1.
  • 2. Advertising in Arab countries The Coca Cola Poster
  • 5. Communication technology  How quickly must the information reach the audience?  Will there be feedback from the communication?  What technology will the audience need to receive the communication?  Are there technical difficulties or learning curve issues to address?
  • 6. Communication technology  Are there access or security issues with the communications technology?  Is the particular mode of technology likely to become outdated?  What is the relative cost of each technology?
  • 10. Developing Great Communication Skills  Understand & follow the communication model (Sender,  Receiver, Message, Noise)  Take informal approach when communicating with  stakeholders outside status meetings  Develop effective listening skills  appear interested  make eye contacts  put your speaker at ease  recap what the speaker said in your words  do not interrupt
  • 11. Communication Management Plan Main Contents  Stakeholder communication requirements  Information to be communicated  Reason for distributing the information  Time frame and frequency  Responsible person/party to prepare and/or communicate  Responsible person/party for authorizing release of confidential information
  • 12. Communication Management Plan Main Contents  Persons who will receive the information (distribute to)  Communication method, type and technology  Allocated resources to perform communication, time and budget  Escalation process  Updating & refining the communications management plan  Glossary of common terminology  Project information flowcharts  Communication constraints
  • 13. Tips to Create a Communications Management Plan  Determine the communication needs of project stakeholders.  Evaluate any constraints and assumptions.  Determine the appropriate communications technologies.  Distribute the communications management plan to project stakeholders.  Include activities for preparing project reports and documentations  Set enough time for meetings
  • 14. Tips to Distribute Project Information  Distribute information in accordance with the communications plan.  Use effective communication skills to exchange information.  Monitor the communications system for feedback to ensure messages are  getting through as planned.  Analyze effects on project execution and control when unexpected
  • 15. Tips to Distribute Project Information  information requests surface.  Be prepared for the meetings, insist on the team to be prepared  Don’t count on verbal communication for approvals, get it in writing  SMART follow up is a key success for your project:  Stakeholders receive your message  Stakeholders understand what you mean  Stakeholders take necessary actions
  • 16. Tips to Report Project Performance  Distribute information in accordance with the communications plan.  Use effective communication skills to exchange information.  Monitor the communications system for feedback to ensure messages are  getting through as planned.  Analyze effects on project execution and control when unexpected
  • 17. Tips to Report Project Performance  information requests surface.  Be prepared for the meetings, insist on the team to be prepared  Don’t count on verbal communication for approvals, get it in writing  SMART follow up is a key success for your project:  Stakeholders receive your message  Stakeholders understand what you mean  Stakeholders take necessary actions
  • 18. Tips to Report Project Performance  Analyze work results against planned performance.  Hold performance reviews.  Determine the type of report needed for the information being reported.  Prepare professional performance reports.  Balance the cost, time, and logistics of preparing performance reports  against the benefits gained.  Measure and monitor performance consistently throughout the project.
  • 19. Tips to Manage Stakeholders  Be flexible in communications with senior management.  Assign, track, and resolve open issues.  Process change requests in order to update the communications plan.  Take corrective action to bring project performance in line with stakeholder  expectations.  Document lessons learned.
  • 20. Communication Activity Group1 Develop a communication management plan (who will receive what information, when and how?) Group2 In the middle of your project, one critical resource of the project team big member resigned and wants to quit immediately. What is your plan?, and how you will communicate this information with the stakeholders? Group3 The senior management asked you to hold on some activities which definitely will delay the project. How are you going to deal with this request? Group4 In the middle of your project, the CEO informed that a VIP guest is visiting the company and he wants you to prepare a 15 minutes presentation about the project. What topics will you include in the presentation?
  • 22. 1. Extensive use of - communication is most likely to aid in solving complex problems. A. verbal B. written C. formal D. nonverbal
  • 24. 2. The work breakdown structure can be an effective aid for communication in which situation(s)? A. Internal within the project team B. Internal within the organization C. External with the customer D. Internal and external to the project
  • 26. 3. The MOST likely result of communication blockers is that: A. the project is delayed. B. trust level is enhanced. C. conflict occurs. D. senior management is displeased
  • 28. 4. Communications are often enhanced when the sender the receiver. A. speaks up to B. uses more physical movements when talking to C. talks slowly to D. shows concern for the perspective of
  • 30. 5. Formal written correspondence with the customer is required when: A. defects are detected. B. the customer requests additional work not covered under contract. C. the project has a schedule slippage that includes changes to the critical path. D. the project has cost overruns.
  • 32. 6. A project manager has a problem with a team member's performance. What is BEST form of communication for addressing this problem? A. Formal written communication B. Formal verbal communication C. Informal written communication D. Informal verbal communication
  • 34. 7. Communications under a contract should tend toward: A. formal written communication. B. formal verbal communication. C. informal written communication. D. informal verbal communication.
  • 36. 8. The project status report is an example of which form of communication? A. Formal written communication B. Formal verbal communication C. Informal written communication D. Informal verbal communication
  • 38.  9. When a project manager is engaged in negotiations, nonverbal communication skills are of: A. little importance. B. major importance. C. importance only when cost and schedule objectives are involved. D. importance only to ensure you win the negotiation.
  • 40.  10. A large, one-year telecommunications project is about halfway done when you take the place of the previous project manager. The project involves three different sellers and a project team of 30 people. You would like to see the project's communications requirements and what technology is being used to aid in project communications. Where will you find this information?  A. The project management plan  B. The information distribution plan  C. The bar chart  D. The communications management plan