SlideShare a Scribd company logo
1 of 37
Presented by:
Vladimir Vujović, PMP
PMI Certification Preparation: PMP / CAPM
- Project Communications Management -
Project Management Institute, Inc. All rights reserved.
November 2017
• Presenter
• Participants: profile, background, expectations
• Session: structure, approach and benefits
Introduction to the session
1. Integration management
2. Scope management
3. Time management
4. Cost management
5. Quality management
6. Human resources management
7. Communications management
8. Risk management
9. Procurement management
10. Stakeholder management
Project Management Knowledge Areas
PMI PMBOK 5th edition
Types of communications
• Internal / External
• Formal / Informal
• Vertical / Horizontal
• Official / Unofficial
• Verbal (Oral) / Non-verbal / Written
Significance in interactions
55%
38%
7%
Body language Vocal signals Words
1. Plan Communications Management
2. Manage Communications
3. Control Communications
Project Communications Management Processes:
Plan Communications Management
Inputs
• Project management plan
• Stakeholder register
• Enterprise environmental
factors
• Organizational process assets
Tools and Techniques
• Communication
requirements analysis
• Communication technology
• Communication models
• Communication methods
• Meetings
Outputs
• Communications
management plan
• Project document updates
Plan Communications Management: Data Flow
Plan
Communications
Management
Manage
Communications
Manage
Stakeholder
Engagement
Enterprise /
Organization
Project Communications Management
• Communications
management plan
• Stakeholder register
• OPA
• EEF
Develop Project
Management
Plan
Identify
Stakeholders
• Project
management
plan
Project documents
• Communications
management plan
• Project
documents
updates
X = number of potential communication channels
n = number of stakeholders
Number of communication channels
X =
n * ( n – 1 )
2 1
2
3
45
6
7 8
9
10
• Steps in a basic communication model:
▫ Encode
▫ Transmit message
▫ Decode
▫ Acknowledge
▫ Feedback/Response
Communication models
• Interactive communication
• Push communication
• Pull communication
Communication methods
Manage Communications
Inputs
• Communications
management plan
• Work performance reports
• Enterprise environmental
factors
• Organizational process assets
Tools and Techniques
• Communication technology
• Communication models
• Communication methods
• Information management
systems
• Performance reporting
Outputs
• Project communications
• Project management plan
updates
• Project documents updates
• Organizational process assets
updates
Manage Communications: Data Flow
Manage
Communications
Plan
Communications
Management
Develop Project
Management
Plan
Enterprise /
Organization
Project Communications Management
• Communications
management plan
• OPA
• EEF
Control
Communications
Monitor and
Control Project
Work
Project documents
• Project
communications • Project
management
plan updates
• Project
documents
updates
• Work
performance
reports
• OPA updates
importance of good communication
Exercise
Control Communications
Inputs
• Project management plan
• Project communications
• Issue log
• Work performance data
• Organizational process assets
Tools and Techniques
• Information management
systems
• Expert judgment
• Meetings
Outputs
• Work performance
information
• Change requests
• Project management plan
updates
• Project documents updates
• Organizational process assets
updates
Control Communications: Data Flow
Control
Communications
Manage
Communications
Monitor and
Control Project
Work
Enterprise /
Organization
Project Communications Management
• Project communications
• OPA
Manage
Stakeholder
Engagement
Direct and
Manage Project
Work
Develop Project
Management
Plan
Project documents
• Work
performance data
• Project
Management
Plan
• Work
performance
information
• Project
documents
updates
• Issue log
Perform
Integrated
Change Control• Change
requests
• OPA updates
• Project Management Plan updates
• A project manager is having trouble getting a project member to
complete her tasks as assigned. What type of communication would
the project manager want to use to address this problem initially?
A. Informal verbal
B. Formal verbal
C. Informal written
D. Formal written
Sample question #1
• A project manager is having trouble getting a project member to
complete her tasks as assigned. What type of communication would
the project manager want to use to address this problem initially?
A. Informal verbal
B. Formal verbal
C. Informal written
D. Formal written
Sample question #1
• A project has five stakeholders, when an additional project member
gets added, how many communication channels exist?
A. 15
B. 14
C. 6
D. 20
Sample question #2
• A project has five stakeholders, when an additional project member
gets added, how many communication channels exist?
A. 15
B. 14
C. 6
D. 20
Sample question #2
• Communications are often enhanced when the sender _____ the
receiver.
A. Speaks up to
B. Uses gestures when speaking to
C. Speaks slowly to
D. Shows concern for the perspective of
Sample question #3
• Communications are often enhanced when the sender _____ the
receiver.
A. Speaks up to
B. Uses gestures when speaking to
C. Speaks slowly to
D. Shows concern for the perspective of
Sample question #3
• When a project manager is engaged in negotiations, nonverbal
communication skills are of:
A. Litte importance.
B. Major importance.
C. Importance only when cost and schedule objectives are involved.
D. Importance to ensure he wins the negotiation.
Sample question #4
• When a project manager is engaged in negotiations, nonverbal
communication skills are of:
A. Litte importance.
B. Major importance.
C. Importance only when cost and schedule objectives are involved.
D. Importance to ensure he wins the negotiation.
Sample question #4
• A project manager has a project team consisting of people in four
countries. The project is very important to the company, and the
project manager is concerned about its success. The length of the
project schedule is acceptable. What type of communication should
he use?
A. Informal verbal communication
B. Formal written communication
C. Formal verbal communication
D. Informal written communication
Sample question #5
• A project manager has a project team consisting of people in four
countries. The project is very important to the company, and the
project manager is concerned about its success. The length of the
project schedule is acceptable. What type of communication should
he use?
A. Informal verbal communication
B. Formal written communication
C. Formal verbal communication
D. Informal written communication
Sample question #5
• If a project manager wants to report on the actual project results
versus planned results, she should use a:
A. Trend report.
B. Forecasting report.
C. Status report.
D. Variance report.
Sample question #6
• If a project manager wants to report on the actual project results
versus planned results, she should use a:
A. Trend report.
B. Forecasting report.
C. Status report.
D. Variance report.
Sample question #6
• What term describes information that is sent to recipients at their
request via Web sites, bulletin boards, e-learning, knowledge
repositories like blogs and other means?
A. Push communications
B. Pull communications
C. Interactive communications
D. Customer communications
Sample question #7
• What term describes information that is sent to recipients at their
request via Web sites, bulletin boards, e-learning, knowledge
repositories like blogs and other means?
A. Push communications
B. Pull communications
C. Interactive communications
D. Customer communications
Sample question #7
• Which of the following is not a guidance to help improve time spent at
meetings?
A. Invite extra people who support your project to make the meeting run
more smoothly.
B. Determine if a meeting can be avoided.
C. Define the purpose and intended outcome of the meeting.
D. Build relationships.
Sample question #8
• Which of the following is not a guidance to help improve time spent at
meetings?
A. Invite extra people who support your project to make the meeting run
more smoothly.
B. Determine if a meeting can be avoided.
C. Define the purpose and intended outcome of the meeting.
D. Build relationships.
Sample question #8
• Who is responsible for ensuring that the communication actually
delivered the information intended?
A. Both the sender and the receiver
B. The sender
C. The receiver
D. The project communications coordinator
Sample question #9
• Who is responsible for ensuring that the communication actually
delivered the information intended?
A. Both the sender and the receiver
B. The sender
C. The receiver
D. The project communications coordinator
Sample question #9
• What do many experts agree is the greatest threat to the success of
any project?
A. Lack of proper funding.
B. A failure to communicate.
C. Poor listening skills.
D. Inadequate staffing.
Sample question #10
• What do many experts agree is the greatest threat to the success of
any project?
A. Lack of proper funding.
B. A failure to communicate.
C. Poor listening skills.
D. Inadequate staffing.
Sample question #10
Vladimir VUJOVIĆ, PMP E-mail: vladimir.vujovic@gmail.com
PMO and BCM Manager
Delhaize Serbia
Sources used:
PMBOK Guide, 5th Edition
Rita Mulcahy’s PMP Exam Prep, 8th Edition
Good Luck!

More Related Content

What's hot

PMC post implementation review
PMC post implementation reviewPMC post implementation review
PMC post implementation reviewJean Pаoli
 
Taking the Creep Out of Scope Creep
Taking the Creep Out of Scope CreepTaking the Creep Out of Scope Creep
Taking the Creep Out of Scope CreepComputer Aid, Inc
 
5 - Project Scope Management.pptx
5 - Project Scope Management.pptx5 - Project Scope Management.pptx
5 - Project Scope Management.pptxMuhammadNazim63
 
Sample Project Requirements Document – Library Blog
Sample Project Requirements Document – Library BlogSample Project Requirements Document – Library Blog
Sample Project Requirements Document – Library BlogALATechSource
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Saad Merie
 
Business Analysis: Key Concepts and Deliverables
Business Analysis: Key Concepts and DeliverablesBusiness Analysis: Key Concepts and Deliverables
Business Analysis: Key Concepts and DeliverablesProduct School
 
Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Agus Suhanto
 
Chap03 the project management process groups
Chap03 the project management process groupsChap03 the project management process groups
Chap03 the project management process groupsDhani Ahmad
 
Project Management PowerPoint Presentation Slides
Project Management PowerPoint Presentation SlidesProject Management PowerPoint Presentation Slides
Project Management PowerPoint Presentation SlidesSlideTeam
 
Pmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsPmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsAnand Bobade
 
Pmi - Project Management Professional (Pmp) Certification Study Guide
Pmi - Project Management Professional (Pmp)   Certification Study GuidePmi - Project Management Professional (Pmp)   Certification Study Guide
Pmi - Project Management Professional (Pmp) Certification Study Guiderobsonnasc
 
Project Management for the Non-Project Manager
Project Management for the Non-Project ManagerProject Management for the Non-Project Manager
Project Management for the Non-Project ManagerGary Gelb
 
Chap01 introduction to project management
Chap01 introduction to project managementChap01 introduction to project management
Chap01 introduction to project managementDhani Ahmad
 
8 Essential Interpersonal Skills Project Manager Must Have!
8 Essential Interpersonal Skills Project Manager Must Have! 8 Essential Interpersonal Skills Project Manager Must Have!
8 Essential Interpersonal Skills Project Manager Must Have! PMExamSmartNotes
 

What's hot (20)

PMC post implementation review
PMC post implementation reviewPMC post implementation review
PMC post implementation review
 
Taking the Creep Out of Scope Creep
Taking the Creep Out of Scope CreepTaking the Creep Out of Scope Creep
Taking the Creep Out of Scope Creep
 
PMO 101
PMO 101PMO 101
PMO 101
 
5 - Project Scope Management.pptx
5 - Project Scope Management.pptx5 - Project Scope Management.pptx
5 - Project Scope Management.pptx
 
Sample Project Requirements Document – Library Blog
Sample Project Requirements Document – Library BlogSample Project Requirements Document – Library Blog
Sample Project Requirements Document – Library Blog
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7
 
Business Analysis: Key Concepts and Deliverables
Business Analysis: Key Concepts and DeliverablesBusiness Analysis: Key Concepts and Deliverables
Business Analysis: Key Concepts and Deliverables
 
Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Project Scope Management - PMBOK6
Project Scope Management - PMBOK6
 
PMP Exam Preparation - 200 Questions
PMP Exam Preparation - 200 QuestionsPMP Exam Preparation - 200 Questions
PMP Exam Preparation - 200 Questions
 
Chap03 the project management process groups
Chap03 the project management process groupsChap03 the project management process groups
Chap03 the project management process groups
 
Project scope management 2
Project scope management 2Project scope management 2
Project scope management 2
 
Project Management PowerPoint Presentation Slides
Project Management PowerPoint Presentation SlidesProject Management PowerPoint Presentation Slides
Project Management PowerPoint Presentation Slides
 
Iiba cbap
Iiba cbapIiba cbap
Iiba cbap
 
Pmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsPmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management details
 
Pmi - Project Management Professional (Pmp) Certification Study Guide
Pmi - Project Management Professional (Pmp)   Certification Study GuidePmi - Project Management Professional (Pmp)   Certification Study Guide
Pmi - Project Management Professional (Pmp) Certification Study Guide
 
Project Management for the Non-Project Manager
Project Management for the Non-Project ManagerProject Management for the Non-Project Manager
Project Management for the Non-Project Manager
 
Setting priorities
Setting prioritiesSetting priorities
Setting priorities
 
Chap01 introduction to project management
Chap01 introduction to project managementChap01 introduction to project management
Chap01 introduction to project management
 
Michelle Simpson Assignment #2
Michelle Simpson Assignment #2Michelle Simpson Assignment #2
Michelle Simpson Assignment #2
 
8 Essential Interpersonal Skills Project Manager Must Have!
8 Essential Interpersonal Skills Project Manager Must Have! 8 Essential Interpersonal Skills Project Manager Must Have!
8 Essential Interpersonal Skills Project Manager Must Have!
 

Similar to Project Communications Management - PMP preparation course

10 projectcommunicationmanagement
10 projectcommunicationmanagement10 projectcommunicationmanagement
10 projectcommunicationmanagementDhamo daran
 
PROJECT COMMUNICATION MANAGEMENT Ch9.ppt
PROJECT COMMUNICATION MANAGEMENT Ch9.pptPROJECT COMMUNICATION MANAGEMENT Ch9.ppt
PROJECT COMMUNICATION MANAGEMENT Ch9.pptLoryNeri
 
Project management.docx communictionLecture notes Training for Trainers in Ge...
Project management.docx communictionLecture notes Training for Trainers in Ge...Project management.docx communictionLecture notes Training for Trainers in Ge...
Project management.docx communictionLecture notes Training for Trainers in Ge...berhanu taye
 
Project management.docx communiction
Project management.docx communictionProject management.docx communiction
Project management.docx communictionberhanu taye
 
Project communication management
Project communication managementProject communication management
Project communication managementPreshan Pradeepa
 
10.0 Project Communications Management Overview
10.0 Project Communications Management Overview10.0 Project Communications Management Overview
10.0 Project Communications Management OverviewDavidMcLachlan1
 
pmicertificationpreparationintegrationmanagementvvujovic20170307-170308083758...
pmicertificationpreparationintegrationmanagementvvujovic20170307-170308083758...pmicertificationpreparationintegrationmanagementvvujovic20170307-170308083758...
pmicertificationpreparationintegrationmanagementvvujovic20170307-170308083758...RaheelMuhammad5
 
PMP Training - 10 project communication management
PMP Training - 10 project communication managementPMP Training - 10 project communication management
PMP Training - 10 project communication managementejlp12
 
Project communications management
Project communications managementProject communications management
Project communications managementPrabudh Dhingra
 
PMP Chap 10 - Project Communication Management Details
PMP  Chap 10 - Project Communication Management DetailsPMP  Chap 10 - Project Communication Management Details
PMP Chap 10 - Project Communication Management DetailsAnand Bobade
 
Learning from our grant writing mistakes
Learning from our grant writing mistakesLearning from our grant writing mistakes
Learning from our grant writing mistakesDiane Leonard, GPC
 
Online PMP Training Material for PMP Exam - Communications Management Knowled...
Online PMP Training Material for PMP Exam - Communications Management Knowled...Online PMP Training Material for PMP Exam - Communications Management Knowled...
Online PMP Training Material for PMP Exam - Communications Management Knowled...GlobalSkillup
 
10.1 Plan Communication Management
10.1 Plan Communication Management10.1 Plan Communication Management
10.1 Plan Communication ManagementDavidMcLachlan1
 
10.1 Plan Communication Management
10.1 Plan Communication Management10.1 Plan Communication Management
10.1 Plan Communication ManagementDavidMcLachlan1
 
Project communications management
Project communications managementProject communications management
Project communications managementSanket Gandhi
 
Project Communications Management - PMBOK6
Project Communications Management - PMBOK6Project Communications Management - PMBOK6
Project Communications Management - PMBOK6Agus Suhanto
 

Similar to Project Communications Management - PMP preparation course (20)

Session 8 gdas pmp study group presentation
Session 8   gdas pmp study group presentationSession 8   gdas pmp study group presentation
Session 8 gdas pmp study group presentation
 
Q+&+as+
Q+&+as+Q+&+as+
Q+&+as+
 
10 projectcommunicationmanagement
10 projectcommunicationmanagement10 projectcommunicationmanagement
10 projectcommunicationmanagement
 
PROJECT COMMUNICATION MANAGEMENT Ch9.ppt
PROJECT COMMUNICATION MANAGEMENT Ch9.pptPROJECT COMMUNICATION MANAGEMENT Ch9.ppt
PROJECT COMMUNICATION MANAGEMENT Ch9.ppt
 
Project management.docx communictionLecture notes Training for Trainers in Ge...
Project management.docx communictionLecture notes Training for Trainers in Ge...Project management.docx communictionLecture notes Training for Trainers in Ge...
Project management.docx communictionLecture notes Training for Trainers in Ge...
 
Project management.docx communiction
Project management.docx communictionProject management.docx communiction
Project management.docx communiction
 
Project communication management
Project communication managementProject communication management
Project communication management
 
10.0 Project Communications Management Overview
10.0 Project Communications Management Overview10.0 Project Communications Management Overview
10.0 Project Communications Management Overview
 
pmicertificationpreparationintegrationmanagementvvujovic20170307-170308083758...
pmicertificationpreparationintegrationmanagementvvujovic20170307-170308083758...pmicertificationpreparationintegrationmanagementvvujovic20170307-170308083758...
pmicertificationpreparationintegrationmanagementvvujovic20170307-170308083758...
 
PMP Training - 10 project communication management
PMP Training - 10 project communication managementPMP Training - 10 project communication management
PMP Training - 10 project communication management
 
Project communications management
Project communications managementProject communications management
Project communications management
 
PMP Chap 10 - Project Communication Management Details
PMP  Chap 10 - Project Communication Management DetailsPMP  Chap 10 - Project Communication Management Details
PMP Chap 10 - Project Communication Management Details
 
Learning from our grant writing mistakes
Learning from our grant writing mistakesLearning from our grant writing mistakes
Learning from our grant writing mistakes
 
Online PMP Training Material for PMP Exam - Communications Management Knowled...
Online PMP Training Material for PMP Exam - Communications Management Knowled...Online PMP Training Material for PMP Exam - Communications Management Knowled...
Online PMP Training Material for PMP Exam - Communications Management Knowled...
 
Pmp session 1
Pmp session 1Pmp session 1
Pmp session 1
 
10.1 Plan Communication Management
10.1 Plan Communication Management10.1 Plan Communication Management
10.1 Plan Communication Management
 
10.1 Plan Communication Management
10.1 Plan Communication Management10.1 Plan Communication Management
10.1 Plan Communication Management
 
Project communications management
Project communications managementProject communications management
Project communications management
 
Project Communications Management - PMBOK6
Project Communications Management - PMBOK6Project Communications Management - PMBOK6
Project Communications Management - PMBOK6
 
Communications Ternopil
Communications TernopilCommunications Ternopil
Communications Ternopil
 

Recently uploaded

The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringSebastiano Panichella
 
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)Basil Achie
 
Event 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxEvent 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxaryanv1753
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxFamilyWorshipCenterD
 
The Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationThe Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationNathan Young
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptssuser319dad
 
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...henrik385807
 
Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸mathanramanathan2005
 
Genshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxGenshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxJohnree4
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Krijn Poppe
 
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
LANDMARKS  AND MONUMENTS IN NIGERIA.pptxLANDMARKS  AND MONUMENTS IN NIGERIA.pptx
LANDMARKS AND MONUMENTS IN NIGERIA.pptxBasil Achie
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...NETWAYS
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Pooja Nehwal
 
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSebastiano Panichella
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxmavinoikein
 
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...NETWAYS
 
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Salam Al-Karadaghi
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfhenrik385807
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...NETWAYS
 

Recently uploaded (20)

The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software Engineering
 
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
 
Event 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxEvent 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptx
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
 
The Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationThe Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism Presentation
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.ppt
 
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
 
Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸
 
Genshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxGenshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptx
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
 
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
LANDMARKS  AND MONUMENTS IN NIGERIA.pptxLANDMARKS  AND MONUMENTS IN NIGERIA.pptx
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
 
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptx
 
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
 
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
 

Project Communications Management - PMP preparation course

  • 1. Presented by: Vladimir Vujović, PMP PMI Certification Preparation: PMP / CAPM - Project Communications Management - Project Management Institute, Inc. All rights reserved. November 2017
  • 2. • Presenter • Participants: profile, background, expectations • Session: structure, approach and benefits Introduction to the session
  • 3. 1. Integration management 2. Scope management 3. Time management 4. Cost management 5. Quality management 6. Human resources management 7. Communications management 8. Risk management 9. Procurement management 10. Stakeholder management Project Management Knowledge Areas PMI PMBOK 5th edition
  • 4. Types of communications • Internal / External • Formal / Informal • Vertical / Horizontal • Official / Unofficial • Verbal (Oral) / Non-verbal / Written
  • 5. Significance in interactions 55% 38% 7% Body language Vocal signals Words
  • 6. 1. Plan Communications Management 2. Manage Communications 3. Control Communications Project Communications Management Processes:
  • 7. Plan Communications Management Inputs • Project management plan • Stakeholder register • Enterprise environmental factors • Organizational process assets Tools and Techniques • Communication requirements analysis • Communication technology • Communication models • Communication methods • Meetings Outputs • Communications management plan • Project document updates
  • 8. Plan Communications Management: Data Flow Plan Communications Management Manage Communications Manage Stakeholder Engagement Enterprise / Organization Project Communications Management • Communications management plan • Stakeholder register • OPA • EEF Develop Project Management Plan Identify Stakeholders • Project management plan Project documents • Communications management plan • Project documents updates
  • 9. X = number of potential communication channels n = number of stakeholders Number of communication channels X = n * ( n – 1 ) 2 1 2 3 45 6 7 8 9 10
  • 10. • Steps in a basic communication model: ▫ Encode ▫ Transmit message ▫ Decode ▫ Acknowledge ▫ Feedback/Response Communication models
  • 11. • Interactive communication • Push communication • Pull communication Communication methods
  • 12. Manage Communications Inputs • Communications management plan • Work performance reports • Enterprise environmental factors • Organizational process assets Tools and Techniques • Communication technology • Communication models • Communication methods • Information management systems • Performance reporting Outputs • Project communications • Project management plan updates • Project documents updates • Organizational process assets updates
  • 13. Manage Communications: Data Flow Manage Communications Plan Communications Management Develop Project Management Plan Enterprise / Organization Project Communications Management • Communications management plan • OPA • EEF Control Communications Monitor and Control Project Work Project documents • Project communications • Project management plan updates • Project documents updates • Work performance reports • OPA updates
  • 14. importance of good communication Exercise
  • 15. Control Communications Inputs • Project management plan • Project communications • Issue log • Work performance data • Organizational process assets Tools and Techniques • Information management systems • Expert judgment • Meetings Outputs • Work performance information • Change requests • Project management plan updates • Project documents updates • Organizational process assets updates
  • 16. Control Communications: Data Flow Control Communications Manage Communications Monitor and Control Project Work Enterprise / Organization Project Communications Management • Project communications • OPA Manage Stakeholder Engagement Direct and Manage Project Work Develop Project Management Plan Project documents • Work performance data • Project Management Plan • Work performance information • Project documents updates • Issue log Perform Integrated Change Control• Change requests • OPA updates • Project Management Plan updates
  • 17. • A project manager is having trouble getting a project member to complete her tasks as assigned. What type of communication would the project manager want to use to address this problem initially? A. Informal verbal B. Formal verbal C. Informal written D. Formal written Sample question #1
  • 18. • A project manager is having trouble getting a project member to complete her tasks as assigned. What type of communication would the project manager want to use to address this problem initially? A. Informal verbal B. Formal verbal C. Informal written D. Formal written Sample question #1
  • 19. • A project has five stakeholders, when an additional project member gets added, how many communication channels exist? A. 15 B. 14 C. 6 D. 20 Sample question #2
  • 20. • A project has five stakeholders, when an additional project member gets added, how many communication channels exist? A. 15 B. 14 C. 6 D. 20 Sample question #2
  • 21. • Communications are often enhanced when the sender _____ the receiver. A. Speaks up to B. Uses gestures when speaking to C. Speaks slowly to D. Shows concern for the perspective of Sample question #3
  • 22. • Communications are often enhanced when the sender _____ the receiver. A. Speaks up to B. Uses gestures when speaking to C. Speaks slowly to D. Shows concern for the perspective of Sample question #3
  • 23. • When a project manager is engaged in negotiations, nonverbal communication skills are of: A. Litte importance. B. Major importance. C. Importance only when cost and schedule objectives are involved. D. Importance to ensure he wins the negotiation. Sample question #4
  • 24. • When a project manager is engaged in negotiations, nonverbal communication skills are of: A. Litte importance. B. Major importance. C. Importance only when cost and schedule objectives are involved. D. Importance to ensure he wins the negotiation. Sample question #4
  • 25. • A project manager has a project team consisting of people in four countries. The project is very important to the company, and the project manager is concerned about its success. The length of the project schedule is acceptable. What type of communication should he use? A. Informal verbal communication B. Formal written communication C. Formal verbal communication D. Informal written communication Sample question #5
  • 26. • A project manager has a project team consisting of people in four countries. The project is very important to the company, and the project manager is concerned about its success. The length of the project schedule is acceptable. What type of communication should he use? A. Informal verbal communication B. Formal written communication C. Formal verbal communication D. Informal written communication Sample question #5
  • 27. • If a project manager wants to report on the actual project results versus planned results, she should use a: A. Trend report. B. Forecasting report. C. Status report. D. Variance report. Sample question #6
  • 28. • If a project manager wants to report on the actual project results versus planned results, she should use a: A. Trend report. B. Forecasting report. C. Status report. D. Variance report. Sample question #6
  • 29. • What term describes information that is sent to recipients at their request via Web sites, bulletin boards, e-learning, knowledge repositories like blogs and other means? A. Push communications B. Pull communications C. Interactive communications D. Customer communications Sample question #7
  • 30. • What term describes information that is sent to recipients at their request via Web sites, bulletin boards, e-learning, knowledge repositories like blogs and other means? A. Push communications B. Pull communications C. Interactive communications D. Customer communications Sample question #7
  • 31. • Which of the following is not a guidance to help improve time spent at meetings? A. Invite extra people who support your project to make the meeting run more smoothly. B. Determine if a meeting can be avoided. C. Define the purpose and intended outcome of the meeting. D. Build relationships. Sample question #8
  • 32. • Which of the following is not a guidance to help improve time spent at meetings? A. Invite extra people who support your project to make the meeting run more smoothly. B. Determine if a meeting can be avoided. C. Define the purpose and intended outcome of the meeting. D. Build relationships. Sample question #8
  • 33. • Who is responsible for ensuring that the communication actually delivered the information intended? A. Both the sender and the receiver B. The sender C. The receiver D. The project communications coordinator Sample question #9
  • 34. • Who is responsible for ensuring that the communication actually delivered the information intended? A. Both the sender and the receiver B. The sender C. The receiver D. The project communications coordinator Sample question #9
  • 35. • What do many experts agree is the greatest threat to the success of any project? A. Lack of proper funding. B. A failure to communicate. C. Poor listening skills. D. Inadequate staffing. Sample question #10
  • 36. • What do many experts agree is the greatest threat to the success of any project? A. Lack of proper funding. B. A failure to communicate. C. Poor listening skills. D. Inadequate staffing. Sample question #10
  • 37. Vladimir VUJOVIĆ, PMP E-mail: vladimir.vujovic@gmail.com PMO and BCM Manager Delhaize Serbia Sources used: PMBOK Guide, 5th Edition Rita Mulcahy’s PMP Exam Prep, 8th Edition Good Luck!

Editor's Notes

  1. How presentation will benefit audience: Adult learners are more interested in a subject if they know how or why it is important to them. Presenter’s level of expertise in the subject: Briefly state your credentials in this area, or explain why participants should listen to you.