3. Grunt Productions 2007
OBJECTIVES
State the reasons for planning an
anchorage
Explain the factors to be considered
Make basic calculations required
Prepare a simple anchorage plan
4. Grunt Productions 2007
WHY SHOULD WE PLAN?
Anchor close to final
destination
Anchor where legal/allowed
Avoid dangers
Anchor in a known space
Room to swing
14. Grunt Productions 2007
FACTORS TO CONSIDER
Draught of Ship
Depth of water
Tide rise/fall
As close to land as safety
allows
15. Grunt Productions 2007
FACTORS TO CONSIDER
Draught of Ship
Depth of water
Tide rise/fall
As close to land as safety
allows
Safety Swinging Circle
16. Grunt Productions 2007
SAFETY SWINGING CIRCLE
SSC = Length of Ship + Total
length of
cable + Safety
margin
Safety usually 1 Cable (200 yards)
18. Grunt Productions 2007
FACTORS TO CONSIDER
Draught of Ship
Depth of water
Tide rise/fall
As close to land as safety
allows
Swinging Circle
Holding Ground
19. Grunt Productions 2007
FACTORS TO CONSIDER
Draught of Ship
Depth of water
Tide rise/fall
As close to land as safety
allows
Swinging Circle
Holding Ground
Navigation Marks
22. Grunt Productions 2007
FACTORS TO CONSIDER
Draught of Ship
Depth of water
Tide rise/fall
As close to land as safety
allows
Swinging Circle
Holding Ground
Navigation Marks