  1. 1. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE
  2. 2. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE DOYLE DRIVE Public Private Partnership Industry Workshop July 6, 2009
  3. 3. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Doyle Drive Overview Project Purpose Environmental Approval Project Setting Early Schedule
  4. 4. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Project Setting Location Map
  5. 5. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE DOYLE DRIVE Project Purpose and Environmental Approval
  6. 6. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Project Purpose “Improve the seismic, structural, and traffic safety of the roadway within the setting and context of the Presidio of San Francisco and its purpose as a National Park.” - Doyle Drive EIS/R
  7. 7. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Project Consensus FHWA Doyle Drive Subcommittee
  8. 8. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Environmental Process 2000 Initiate Environmental Process 2003 Introduce Parkway Concept 2005 Circulate Draft EIS/R October 2008 Release Final EIS/R January 2009 Record of Decision
  9. 9. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE The Presidio
  10. 10. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Why Replace Doyle Drive?
  11. 11. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Presidio Parkway Replace deficient facility Two new tunnels Wide landscaped median New direct access to Presidio Continuous shoulders
  12. 12. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Presidio Parkway
  13. 13. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Original Project Timeline Preferred Alt Fall 2010 Feb. Sept. 2000 Dec. Winter Spring 2006 Summer 2005 Dec 2014 2011 2000 2008 Detailed Design Environmental Completed Project Draft ESI/EIR Complete Studies begin Public Comment Final Construction ID Begins EIS/EIR Start Alternatives Begin Prelim Engineering Draft Final Start EIS/EIR EIS/EIR Construction For Comment ROD = Milestones Completed
  14. 14. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE DOYLE DRIVE Project Status
  15. 15. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE DOYLE DRIVE Project Description and Status
  16. 16. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Presentation Overview Project Acceleration Project Description Conditions, Constraints, Limitations Maintenance Requirements Operations Requirements
  17. 17. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Project Acceleration To achieve seismic safety earlier (Feb. 2011) To reduce risk of cost growth To meet Economic Stimulus timetable To take advantage of the favorable market conditions Help create jobs and support the local and regional economy
  18. 18. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Contracts Pre-Construction Contracts: Contract 1: Environmental mitigation (Built-Environmental Treatment Plan) – Active through roadway contracts Contract 2: Utility Plan and Relocation Roadway Construction Contracts: Contract 3: Southbound Presidio Interchange/High Viaduct Contract 4: Southbound Battery Tunnel and At-Grade Detour P3 Contracts: Contract 5: Girard Interchange, Low Viaduct Contract 6: Northbound Battery Tunnel, Main Post Tunnels Contract 7: Northbound Presidio Interchange/High Viaduct Contract 8: Landscaping
  19. 19. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE DRAFT Schedule Seismic Safety Achieved – Feb 2011 Contract 1 R/W Activities Contract 2 Roadway Complete – Contract 3 Late 2012 Contract 4 Contract 5 Contract 6 Contract 7 P3 Contract 8 Original Project Schedule Completion – Spring 2014
  20. 20. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Existing Site Golden Gate Bridge Toll Plaza We are here. National Historic Park Historic Buildings Former Army Base Presidio Trust South Access to Golden Gate Bridge
  21. 21. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Contract No. 3 – SB Presidio Interchange Construction Capital $ 130 Million Begin/End Construction: Oct 2009 - Summer 2011 Design – 100% complete
  22. 22. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Contract No. 4 – Southbound Battery Tunnel/Temporary at-grade detour Construction Capital $ 110 Million Begin/End Construction: Dec. 2009 – Summer 2011 Traffic Shift for Seismic Safety – February 2011 Design – 95% complete
  23. 23. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE DOYLE DRIVE Construction Contracts for P3 Procurement
  24. 24. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Contract No. 5 – Tunnels Construction Capital $ 233 Million Begin/End Construction: Summer 2011- Early 2013 Design – 50% complete
  25. 25. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Contract No. 6 – Girard Interchange Construction Capital $144 Million Begin/End Construction: Summer 2011 – Early 2013 Design – 50% complete
  26. 26. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Contract No. 7 – NB Presidio Interchange Construction Capital $103 Million Begin/End Construction: Summer 2011 - Early 2013 Design – 55% complete
  27. 27. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Contract No. 8 – Landscaping Construction Capital $ 9 Million Begin/End: Early 2013 – 2016
  28. 28. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE DOYLE DRIVE Constraints, Conditions, Limitations
  29. 29. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Fixed Design Elements Horizontal and vertical alignments Cross-sections (lane and shoulder widths, horizontal clearances) Design Exceptions Tunnel limits and portal shape High Viaduct: Aesthetic, span lengths/column location and structure type. Fire Life Safety requirements for Tunnel Contract 3 and 4 completed facility tie-ins.
  30. 30. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Fixed Design Elements ST-10 Barrier
  31. 31. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Environmental/Regulatory Requirements Final Environmental Impact Report/Statement (FEIR/S) Record of Decision Programmatic Agreement / Section 106 Water Quality Certification (RWQCB) Nationwide Permit (USACOE) Wetland Mitigation Monitoring Program General Biological Monitoring Program Migratory Bird Act Bay Conservation and Development Commission (BCDC) requirements National Pollution Discharge Elimination System (NPDES)
  32. 32. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE DOYLE DRIVE Maintenance
  33. 33. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Maintenance - Roadway Highway Signs and Traffic Control Devices Pavement Striping and Delineation Sweeping Removal of all Debris and Objects Drainage Pavement
  34. 34. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Maintenance - Roadside Landscape Guard Rail, Safety Devices, Bridge Rail Maintenance Tunnels Pumping Plants Electric and Mechanical Substations Lighting
  35. 35. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Maintenance - Facility Structures Substructures and superstructures Graffiti Removal
  36. 36. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE DOYLE DRIVE Operations
  37. 37. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Operations Day-To-Day Coordination: Caltrans/CHP Transportation Management Center (24/7/365 ) Bay Area 511 Traveler Information City/County of San Francisco: Signals & roadway maintenance Golden Gate Bridge & Highway District: Incident management & roadway maintenance CHP: Homeland Security
  38. 38. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Operations Traffic Control: Roadway/Lane Closure Charts Seven days advance request Approval process Late pick-up penalties Incident Management: Tow Service: Project Limits + Approaches on Park Presidio (Hwy 1), Lombard Street, Marina Boulevard TBD in coordination with: • Golden Gate Bridge • Bay Area Freeway Service Freeway Service Program
  39. 39. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Operations Other Coordination Required for: Encroachment Permits: Utilities, Filming, Special Events Transportation Permits: Extra-Legal Loads & Commercial Vehicles Safety & Operational Investigations
  40. 40. SOUTH ACCESS TO THE GOLDEN GATE BRIDGE – DOYLE DRIVE Questions?

×