2. KR Offshore Inc.
2
KR Offshore Inc.
1. Introduction
2. Company History
3. Company Organization
4. Business cooperation
5. Business Core
6. Project Reference
7. Company License
8. Company Location
3. KR Offshore Inc.
3
Introduction
Since the establishment of our business in 1998. KR ENC CO., LTD. has been renowned and top ranked for our
expertise in the fields of Salvage / Wreck Removal, Overseas Towing.
Marine Transportation. Heavy Weight Cargo Handling.
Contaminated Sediment Dredging. Dredging, Offshore & etc.
As the world situation changing rapidly . It is inevitable to develop
And improve our technical know-how & vessel / equipment to cope with such innovations. And along with our
business developments. Our staffs are kept highly trained and skilled in these fields of marine business with
vast experience.
Furthermore. To ensure the maximum environmental preservation
And meet customer’s needs. We will make best endeavor for a prompt react against possible marine accident
and to improve marine environment.
With promising the best of us,
KR Offshore Inc.
4. KR Offshore Inc.
4
Company History
1988
February 12. Established “ THE KOREA SALVAGE CO., Ltd”
(Amount of capital fund : USD 220,000)
1999
April 28. Obtained a “business license of marine brokerage”
2009
September 9. Obtained a “business license
of contaminated sediment dredging
2009
September 26. Increased capital fund (USD 400,000)
2010
March 3. Officially commended a honest taxpayer by NTS
2011
JUNE 3. Established “ KR ENC CO., Ltd ” as joint venture company with
Korea salvage and Kojimagumi
2012
May 1. Established “ KR DREDGING CO, LTD “
5. KR Offshore Inc.
5
Company Organization
CEO
Management
-Accounting
-Financing
-HR
-General Affairs
-Detail & Production
Design
-Comm. Procedure
-Operation Manuel
-Upgrade/Conversion
-Marine & Utility Sys
-Drilling System
-Purchase
-Vessel Management
-Safety Control
-Technical Department
-Local Total
Customer Service
for Owner & Vendor
-Material Supply
Service
Engineering Commissioning
Management
Department
Total Customer
Service
HSE
Branch
-Japan(Tokyo)
-Japan(Osaka)
QA/QC
6. KR Offshore Inc.
6
Business Core
• Resourcing of manpower
• Procurement
• Offshore support service
• Dredging
• Insurance Brokerage
• Engineering service
• Drilling rig tool
7. KR Offshore Inc.
7
Resourcing of manpower
KR Offshore goal is to support business success for our customer through quality activities.
in relation with the equipment fabrication in the power plant, petrochemical plant and
offshore plant. Our value is measured by customer’s success.
For this goal KR Offshore maintains quality engineers and technical specialists having a lot of experience.
and specialized capability and also continuously trains their ability.
Finally we will provide customer satisfaction.
KR Offshore will help customer to
SAVE - Cost, time and confidence
CONTROL - Failure Prevent, quality
and schedule
IMPROVE - Process, system and
Sub contractor
HSE Policy
SQM pays strict attention to HSE. We promote good safety practice and
encourage all employees to participate in safety program. And all
employees comply with HSE laws and regulations regarding our works
and activities.
8. KR Offshore Inc.
8
Offshore Support Service
• FAST CREW SUPPLIER
• PLATFORM SUPPLY VESSEL
• ANCHOR HANDLING TUG SUPPLIER
• SAFETY STANDBY VESSEL
• MULTI PURPOSE VESSEL
• WELL STIMULATION VESSEL
• OFFSHORE CARRIER
10. KR Offshore Inc.
10
Dredging Vessel List
SHIP NAME STANDARD CAPACITY REMARK
GRAB DREDGER
GIANT 18㎥ 2,200 HP JAPAN
HAPPY-G7 6㎥ 535 HP JAPAN
HAPPY-G17 13㎥ 1,530 HP JAPAN
HAPYY-G18 16㎥ 1,600 HP JAPAN
KR18 18㎥ 2,000 HP JAPAN
KR20 20㎥ 1,100HP JAPAN
KR36 36㎥ 1,650HP JAPAN
KR56 56㎥ 2,550HP JAPAN
KR200 200㎥ 3,250HP JAPAN
DIPPER DREDGER
HAPPY-5 5㎥ 630 HP HITACH EX 1100
HAPPY-6 6㎥ 400 HP X 2EA HITACH UH50
UNDERWATER BACKHOE KR-B1 0.5㎥ 180 HP HITACHI
ANCHOR SHIP
AND
TUGBOAT
A-1 ANCHOR 750 HP X 1기 JAPAN
A-2 ANCHOR 700 HP X 2기 JAPAN
A-3 TUGBOAT 425 HP X 2기 KOREA
A-5 TUGBOAT 1,500 HP KOREA
PUMP
REDGER
KR-4001 4,000 HP KOREA
KR-4002 425 HP AMERICA
KR-4002 425 HP AMERICA
SURVEY SHIP OFFSHORE EXPO 630 HP
Multi-Beam(SeaBat8125)
Echo-Sounder(Knudsen)
HOLD BARGE
AND
SPLIT BARGE
HAPPY-1 850㎥ BARGE
HAPPY-2 850㎥ BARGE
HPPAY-SB1 650㎥ Split
HAPPY
SB1200
1,200㎥ Split
HAPPY
SB1201
1,000㎥ Split
11. KR Offshore Inc.
11
Elevator
Tong
Rotary slip
Series of Die and insert
NJY-B Torque Sensor
Safety Clamps
Pneumatic Slips
Roller Kelly Bushings
Master Bushings
Master Bushing Accessories
Casing Bushing
Type QQP pneumatic Spiders
Hinged Casing Spiders
Bit Breaker
ELEVATOR
DDZ TD
DD(TA) CENTER LATCH
SLIP
CASING
Y-SLIP
SUCKER ROD ELEVA
SP AUXILIARY
CDZ SERIES DRILL PIPE
CD SERIES SIDE DOOR
TONG
B MANUAL
SB MANUAL
AAX MANUAL
C MANUAL
WWB MANUAL
WWC MANUAL
CASING
DB MANUAL
SDD MANUAL
LF MANUAL
WELL SERVICING
ROTARY SLIPS
FLAKE
SD
DCS DRILL COLLAR
CMS CASING SLIPS
CASING SLIPS
Drilling Rig tool
13. KR Offshore Inc.
13
Advantage of Automatic Welding
- Saving of 20 ~ 30% production time
Edge preparation by machining – Faster and accurate
Fit-up by dedicated special purpose machine – Less tolerance
FC/SA Welding on Fill pass & Cap pass welding – Higher production
HigherPerformance
in production
- Approx. 20~30% labor reduction
Less direct / indirect cost for the labor
Less number of
Labors
- Approx. 10~20% cost reduction
Less cost per Dia_Inch than manual welding production
Minimized labor with productivity increased
Less cost for
production
- Less welding defect rate
Improved production quality by standardization of weld preparation
by mechanization
Guaranteed consistency in welding quality
Improved welding
quality
14. KR Offshore Inc.
14
SMAW
Process
Deposition Rate
(g/min)
Arc Rate
(%)
Efficiency
SMAW 30 20 1
S.A. FCAW 60 25 2.5
S.A. FCAW 1GR 60 35 3.5
Auto FCAW 70 50 5.8
SAW 120 50 10
S.A. FCAW Auto FCAW SAW
Comparison of Fill&Cap Pass Welding
15. KR Offshore Inc.
15
Process Edge Preparation Fit-up Root Welding Main Welding
Conventional
Process
Grinding Manual Jig GTAW Welding SMAW Welding
Auto Welding
Process Beveling
Internal or External
Clamp
GTAW or GMAW
Welding FCAW Welding
Photo
Advantages
Easy Fit-up
Improvement
Welding Quality
Reduction of
Fit-up Time
Improvement
Welding Quality
Higher Welding
Productivity &
Quality
Higher Welding
Productivity &
Quality
NonSkilledWelder
Comparison of Welding Process
16. KR Offshore Inc.
16
Ditching
(Rock)
Padding
Ditch
Bottom
Stringing Bending Beveling
Line-up
(Fit-up)
GT/GMAW
(Hot Pass)
FCAW
(Fill & Cap)
NDT &
Repair of
Welding
Coating
Inspection
& Repair of
Coating
Laying Padding
Hydrostatic
Testing
Clean-Up &
Landscaping
Welding Cabin
Working Procedure – Pipe line
18. KR Offshore Inc.
18
Project Reference
P R O J E C T YEAR OF BUILT Customer
EXXON MOBIL OIL PIPE SPOOL (EASTAREA)
TOTAL PIPE SPOOL
2009 Samsung Heavy
Industries
Philippine NAGA Power plant 2010 SHILOH International
POSCO Power INI ISM Power Plant External Piping 2011 POSCO
EMAL Phase II CCPP External Piping #32, #41, #51, #52 2012 SAMSUNG C&T
SAUDI ARMCO 2013 ARAMCO
[Power Generation] [Pipe Rack] [Seawater Treatment] [Oil Separation]
22. KR Offshore Inc.
22
Houston Office / Ware House
#4611 N. Sam Houston Pkwy East
Houston, TX 77032 U.S.A
T. +1-713-574-7642
F. +1-713-993-7752
International Location
Seoul Office
#232, Daeryung Post tower 6-cha,
Gasan Dong, Geumcheon Gu, Seoul, South Korea
Tel: +82-2-2083-5777
Fax: +82-2-2083-5779
Busan Office
#301, Marine Officers’ Bldg., 1212-7,
Choryang Dong,Dong gu, Busan, South Korea
Tel: +82-51-441-0801~3
Fax: +82-51-441-9786