KR Offshore Inc.
2
KR Offshore Inc.
1. Introduction
2. Company History
3. Company Organization
4. Business cooperation
5. Business Core
6. Project Reference
7. Company License
8. Company Location
KR Offshore Inc.
3
Introduction
Since the establishment of our business in 1998. KR ENC CO., LTD. has been renowned and top ranked for our
expertise in the fields of Salvage / Wreck Removal, Overseas Towing.
Marine Transportation. Heavy Weight Cargo Handling.
Contaminated Sediment Dredging. Dredging, Offshore & etc.
As the world situation changing rapidly . It is inevitable to develop
And improve our technical know-how & vessel / equipment to cope with such innovations. And along with our
business developments. Our staffs are kept highly trained and skilled in these fields of marine business with
vast experience.
Furthermore. To ensure the maximum environmental preservation
And meet customer’s needs. We will make best endeavor for a prompt react against possible marine accident
and to improve marine environment.
With promising the best of us,
KR Offshore Inc.
KR Offshore Inc.
4
Company History
1988
February 12. Established “ THE KOREA SALVAGE CO., Ltd”
(Amount of capital fund : USD 220,000)
1999
April 28. Obtained a “business license of marine brokerage”
2009
September 9. Obtained a “business license
of contaminated sediment dredging
2009
September 26. Increased capital fund (USD 400,000)
2010
March 3. Officially commended a honest taxpayer by NTS
2011
JUNE 3. Established “ KR ENC CO., Ltd ” as joint venture company with
Korea salvage and Kojimagumi
2012
May 1. Established “ KR DREDGING CO, LTD “
KR Offshore Inc.
5
Company Organization
CEO
Management
-Accounting
-Financing
-HR
-General Affairs
-Detail & Production
Design
-Comm. Procedure
-Operation Manuel
-Upgrade/Conversion
-Marine & Utility Sys
-Drilling System
-Purchase
-Vessel Management
-Safety Control
-Technical Department
-Local Total
Customer Service
for Owner & Vendor
-Material Supply
Service
Engineering Commissioning
Management
Department
Total Customer
Service
HSE
Branch
-Japan(Tokyo)
-Japan(Osaka)
QA/QC
KR Offshore Inc.
6
Business Core
• Resourcing of manpower
• Procurement
• Offshore support service
• Dredging
• Insurance Brokerage
• Engineering service
• Drilling rig tool
KR Offshore Inc.
7
Resourcing of manpower
KR Offshore goal is to support business success for our customer through quality activities.
in relation with the equipment fabrication in the power plant, petrochemical plant and
offshore plant. Our value is measured by customer’s success.
For this goal KR Offshore maintains quality engineers and technical specialists having a lot of experience.
and specialized capability and also continuously trains their ability.
Finally we will provide customer satisfaction.
KR Offshore will help customer to
SAVE - Cost, time and confidence
CONTROL - Failure Prevent, quality
and schedule
IMPROVE - Process, system and
Sub contractor
HSE Policy
SQM pays strict attention to HSE. We promote good safety practice and
encourage all employees to participate in safety program. And all
employees comply with HSE laws and regulations regarding our works
and activities.
KR Offshore Inc.
8
Offshore Support Service
• FAST CREW SUPPLIER
• PLATFORM SUPPLY VESSEL
• ANCHOR HANDLING TUG SUPPLIER
• SAFETY STANDBY VESSEL
• MULTI PURPOSE VESSEL
• WELL STIMULATION VESSEL
• OFFSHORE CARRIER
KR Offshore Inc.
9
Dredging
• GRAB DREDGER
• DIPPER DREGGER
• ANCHOR SHIP AND TUG BOAT
• PUMP REDGER
• SURVEY SHIP
• BARGE
KR Offshore Inc.
10
Dredging Vessel List
SHIP NAME STANDARD CAPACITY REMARK
GRAB DREDGER
GIANT 18㎥ 2,200 HP JAPAN
HAPPY-G7 6㎥ 535 HP JAPAN
HAPPY-G17 13㎥ 1,530 HP JAPAN
HAPYY-G18 16㎥ 1,600 HP JAPAN
KR18 18㎥ 2,000 HP JAPAN
KR20 20㎥ 1,100HP JAPAN
KR36 36㎥ 1,650HP JAPAN
KR56 56㎥ 2,550HP JAPAN
KR200 200㎥ 3,250HP JAPAN
DIPPER DREDGER
HAPPY-5 5㎥ 630 HP HITACH EX 1100
HAPPY-6 6㎥ 400 HP X 2EA HITACH UH50
UNDERWATER BACKHOE KR-B1 0.5㎥ 180 HP HITACHI
ANCHOR SHIP
AND
TUGBOAT
A-1 ANCHOR 750 HP X 1기 JAPAN
A-2 ANCHOR 700 HP X 2기 JAPAN
A-3 TUGBOAT 425 HP X 2기 KOREA
A-5 TUGBOAT 1,500 HP KOREA
PUMP
REDGER
KR-4001 4,000 HP KOREA
KR-4002 425 HP AMERICA
KR-4002 425 HP AMERICA
SURVEY SHIP OFFSHORE EXPO 630 HP
Multi-Beam(SeaBat8125)
Echo-Sounder(Knudsen)
HOLD BARGE
AND
SPLIT BARGE
HAPPY-1 850㎥ BARGE
HAPPY-2 850㎥ BARGE
HPPAY-SB1 650㎥ Split
HAPPY
SB1200
1,200㎥ Split
HAPPY
SB1201
1,000㎥ Split
KR Offshore Inc.
11
 Elevator
 Tong
 Rotary slip
 Series of Die and insert
 NJY-B Torque Sensor
 Safety Clamps
 Pneumatic Slips
 Roller Kelly Bushings
 Master Bushings
 Master Bushing Accessories
 Casing Bushing
 Type QQP pneumatic Spiders
 Hinged Casing Spiders
 Bit Breaker
ELEVATOR
 DDZ TD
 DD(TA) CENTER LATCH
 SLIP
 CASING
 Y-SLIP
 SUCKER ROD ELEVA
 SP AUXILIARY
 CDZ SERIES DRILL PIPE
 CD SERIES SIDE DOOR
TONG
 B MANUAL
 SB MANUAL
 AAX MANUAL
 C MANUAL
 WWB MANUAL
 WWC MANUAL
 CASING
 DB MANUAL
 SDD MANUAL
 LF MANUAL
 WELL SERVICING
ROTARY SLIPS
 FLAKE
 SD
 DCS DRILL COLLAR
 CMS CASING SLIPS
 CASING SLIPS
Drilling Rig tool
KR Offshore Inc.
12
[FIT-UP] [PAINTING][WELDING]
[Pressure Vessel] [Power Plant Package]
Auto Welding Products
KR Offshore Inc.
13
Advantage of Automatic Welding
- Saving of 20 ~ 30% production time
 Edge preparation by machining – Faster and accurate
 Fit-up by dedicated special purpose machine – Less tolerance
 FC/SA Welding on Fill pass & Cap pass welding – Higher production
HigherPerformance
in production
- Approx. 20~30% labor reduction
Less direct / indirect cost for the labor
Less number of
Labors
- Approx. 10~20% cost reduction
 Less cost per Dia_Inch than manual welding production
 Minimized labor with productivity increased
Less cost for
production
- Less welding defect rate
 Improved production quality by standardization of weld preparation
by mechanization
 Guaranteed consistency in welding quality
Improved welding
quality
KR Offshore Inc.
14
SMAW
Process
Deposition Rate
(g/min)
Arc Rate
(%)
Efficiency
SMAW 30 20 1
S.A. FCAW 60 25 2.5
S.A. FCAW 1GR 60 35 3.5
Auto FCAW 70 50 5.8
SAW 120 50 10
S.A. FCAW Auto FCAW SAW
Comparison of Fill&Cap Pass Welding
KR Offshore Inc.
15
Process Edge Preparation Fit-up Root Welding Main Welding
Conventional
Process
Grinding Manual Jig GTAW Welding SMAW Welding
Auto Welding
Process Beveling
Internal or External
Clamp
GTAW or GMAW
Welding FCAW Welding
Photo
Advantages
 Easy Fit-up
 Improvement
Welding Quality
 Reduction of
Fit-up Time
 Improvement
Welding Quality
 Higher Welding
Productivity &
Quality
 Higher Welding
Productivity &
Quality
NonSkilledWelder
Comparison of Welding Process
KR Offshore Inc.
16
Ditching
(Rock)
Padding
Ditch
Bottom
Stringing Bending Beveling
Line-up
(Fit-up)
GT/GMAW
(Hot Pass)
FCAW
(Fill & Cap)
NDT &
Repair of
Welding
Coating
Inspection
& Repair of
Coating
Laying Padding
Hydrostatic
Testing
Clean-Up &
Landscaping
Welding Cabin
Working Procedure – Pipe line
KR Offshore Inc.
17
Working Procedure – Pipe line
KR Offshore Inc.
18
Project Reference
P R O J E C T YEAR OF BUILT Customer
EXXON MOBIL OIL PIPE SPOOL (EASTAREA)
TOTAL PIPE SPOOL
2009 Samsung Heavy
Industries
Philippine NAGA Power plant 2010 SHILOH International
POSCO Power INI ISM Power Plant External Piping 2011 POSCO
EMAL Phase II CCPP External Piping #32, #41, #51, #52 2012 SAMSUNG C&T
SAUDI ARMCO 2013 ARAMCO
[Power Generation] [Pipe Rack] [Seawater Treatment] [Oil Separation]
KR Offshore Inc.
19
Photos of Construction Site
KR Offshore Inc.
20
Company Patent
KR Offshore Inc.
21
Certificate of Authority
to use the Official API
Monogram
License Numbers
7k-0146
API License
KR Offshore Inc.
22
Houston Office / Ware House
#4611 N. Sam Houston Pkwy East
Houston, TX 77032 U.S.A
T. +1-713-574-7642
F. +1-713-993-7752
International Location
Seoul Office
#232, Daeryung Post tower 6-cha,
Gasan Dong, Geumcheon Gu, Seoul, South Korea
Tel: +82-2-2083-5777
Fax: +82-2-2083-5779
Busan Office
#301, Marine Officers’ Bldg., 1212-7,
Choryang Dong,Dong gu, Busan, South Korea
Tel: +82-51-441-0801~3
Fax: +82-51-441-9786

More Related Content

What's hot

Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )
Asme section viii division 1 and 2   pressure vessel series ( CONFIRM RUN )Asme section viii division 1 and 2   pressure vessel series ( CONFIRM RUN )
Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )Putri Kolopaking
 
PetroSync - Advanced Fishing
PetroSync - Advanced FishingPetroSync - Advanced Fishing
PetroSync - Advanced FishingPetroSync
 
Recommended guidelines for well intergity
Recommended guidelines for well intergity Recommended guidelines for well intergity
Recommended guidelines for well intergity HPHT Wells Summit
 
Lifecycle Well Integrity 3-day Course
Lifecycle Well Integrity 3-day CourseLifecycle Well Integrity 3-day Course
Lifecycle Well Integrity 3-day CourseChase van Noordwijk
 
C.V Syed Azeem Abbas
C.V Syed Azeem AbbasC.V Syed Azeem Abbas
C.V Syed Azeem Abbasazeem zaidi
 
OCS Training API 510 pressure vessel preparation course 2019
OCS Training API 510 pressure vessel preparation course 2019OCS Training API 510 pressure vessel preparation course 2019
OCS Training API 510 pressure vessel preparation course 2019Muanisa Waras
 
WELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENTWELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENTpetroEDGE
 
Mahmoud Alnajjar Up To Date CV FROM 2000 TILL 2016
Mahmoud Alnajjar Up To Date CV FROM  2000 TILL 2016Mahmoud Alnajjar Up To Date CV FROM  2000 TILL 2016
Mahmoud Alnajjar Up To Date CV FROM 2000 TILL 2016Mahmoud Alnajjar
 
Dirk de Hamer Resume 2015
Dirk de Hamer Resume 2015Dirk de Hamer Resume 2015
Dirk de Hamer Resume 2015Dirk de Hamer
 
CURRICULUM VITAE 2015 GG
CURRICULUM VITAE 2015 GGCURRICULUM VITAE 2015 GG
CURRICULUM VITAE 2015 GGGraeme Gardner.
 
Derick's Last Updated Resume 9-2-2015
Derick's Last Updated Resume 9-2-2015Derick's Last Updated Resume 9-2-2015
Derick's Last Updated Resume 9-2-2015Derick Lee
 

What's hot (19)

N.Sadhasivam_CV
N.Sadhasivam_CVN.Sadhasivam_CV
N.Sadhasivam_CV
 
Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )
Asme section viii division 1 and 2   pressure vessel series ( CONFIRM RUN )Asme section viii division 1 and 2   pressure vessel series ( CONFIRM RUN )
Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )
 
PetroSync - Advanced Fishing
PetroSync - Advanced FishingPetroSync - Advanced Fishing
PetroSync - Advanced Fishing
 
Rg div presentation.
Rg div presentation.Rg div presentation.
Rg div presentation.
 
Recommended guidelines for well intergity
Recommended guidelines for well intergity Recommended guidelines for well intergity
Recommended guidelines for well intergity
 
RICHARD KIRKNESS (5)
RICHARD KIRKNESS (5)RICHARD KIRKNESS (5)
RICHARD KIRKNESS (5)
 
Lifecycle Well Integrity 3-day Course
Lifecycle Well Integrity 3-day CourseLifecycle Well Integrity 3-day Course
Lifecycle Well Integrity 3-day Course
 
C.V Syed Azeem Abbas
C.V Syed Azeem AbbasC.V Syed Azeem Abbas
C.V Syed Azeem Abbas
 
OCS Training API 510 pressure vessel preparation course 2019
OCS Training API 510 pressure vessel preparation course 2019OCS Training API 510 pressure vessel preparation course 2019
OCS Training API 510 pressure vessel preparation course 2019
 
MY RESUME-1-2
MY RESUME-1-2MY RESUME-1-2
MY RESUME-1-2
 
Abd El Shafy El Shenawy
Abd El Shafy El ShenawyAbd El Shafy El Shenawy
Abd El Shafy El Shenawy
 
WELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENTWELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENT
 
Training Certificates
Training CertificatesTraining Certificates
Training Certificates
 
Mahmoud Alnajjar Up To Date CV FROM 2000 TILL 2016
Mahmoud Alnajjar Up To Date CV FROM  2000 TILL 2016Mahmoud Alnajjar Up To Date CV FROM  2000 TILL 2016
Mahmoud Alnajjar Up To Date CV FROM 2000 TILL 2016
 
Peter-Engelhardt (1) (1)
Peter-Engelhardt (1) (1)Peter-Engelhardt (1) (1)
Peter-Engelhardt (1) (1)
 
Dirk de Hamer Resume 2015
Dirk de Hamer Resume 2015Dirk de Hamer Resume 2015
Dirk de Hamer Resume 2015
 
Assistant Driller
Assistant DrillerAssistant Driller
Assistant Driller
 
CURRICULUM VITAE 2015 GG
CURRICULUM VITAE 2015 GGCURRICULUM VITAE 2015 GG
CURRICULUM VITAE 2015 GG
 
Derick's Last Updated Resume 9-2-2015
Derick's Last Updated Resume 9-2-2015Derick's Last Updated Resume 9-2-2015
Derick's Last Updated Resume 9-2-2015
 

Similar to Kr Offshore PQ Ver.2

Wgcme 0.6 email (2)
Wgcme 0.6 email (2)Wgcme 0.6 email (2)
Wgcme 0.6 email (2)walid najd
 
Ball Valves, Ball Valves Manufacturers USA - WOM Group
Ball Valves, Ball Valves Manufacturers USA - WOM GroupBall Valves, Ball Valves Manufacturers USA - WOM Group
Ball Valves, Ball Valves Manufacturers USA - WOM Groupwomgroup
 
All-Weld Sales Presentation Show
All-Weld Sales Presentation ShowAll-Weld Sales Presentation Show
All-Weld Sales Presentation ShowS_Dunsmoor
 
INDCON PRESENTATION LNT.ppt
INDCON PRESENTATION LNT.pptINDCON PRESENTATION LNT.ppt
INDCON PRESENTATION LNT.pptDeepakDayal11
 
BROCHURE_SKLP
BROCHURE_SKLPBROCHURE_SKLP
BROCHURE_SKLPRony AS
 
Sumber Karya Lestari Pratama (SKLP)
Sumber Karya Lestari Pratama (SKLP)Sumber Karya Lestari Pratama (SKLP)
Sumber Karya Lestari Pratama (SKLP)SKLP1905
 
Chemical Process Equipment and Services By Seven Star Engineers & Fabricators
Chemical Process Equipment and Services By Seven Star Engineers & FabricatorsChemical Process Equipment and Services By Seven Star Engineers & Fabricators
Chemical Process Equipment and Services By Seven Star Engineers & FabricatorsIndiaMART InterMESH Limited
 
NJ Jackson 6700 Tamper Workhead Catalogue REV F
NJ Jackson 6700 Tamper Workhead Catalogue REV FNJ Jackson 6700 Tamper Workhead Catalogue REV F
NJ Jackson 6700 Tamper Workhead Catalogue REV FJack Ford
 
Abaapcam Presentation
Abaapcam PresentationAbaapcam Presentation
Abaapcam Presentationadebruno20
 
Briggs Group Presentation
Briggs Group PresentationBriggs Group Presentation
Briggs Group Presentationaliciadacre
 
Briggs Group Presentation
Briggs Group PresentationBriggs Group Presentation
Briggs Group Presentationfiona1234
 
Briggs Group Presentation
Briggs Group PresentationBriggs Group Presentation
Briggs Group Presentationwarren1234
 

Similar to Kr Offshore PQ Ver.2 (20)

PEAK 2016 CATALOG_opt
PEAK 2016 CATALOG_optPEAK 2016 CATALOG_opt
PEAK 2016 CATALOG_opt
 
Wgcme 0.6 email (2)
Wgcme 0.6 email (2)Wgcme 0.6 email (2)
Wgcme 0.6 email (2)
 
Ball Valves, Ball Valves Manufacturers USA - WOM Group
Ball Valves, Ball Valves Manufacturers USA - WOM GroupBall Valves, Ball Valves Manufacturers USA - WOM Group
Ball Valves, Ball Valves Manufacturers USA - WOM Group
 
All-Weld Sales Presentation Show
All-Weld Sales Presentation ShowAll-Weld Sales Presentation Show
All-Weld Sales Presentation Show
 
Wgcme 0.5 (5)
Wgcme 0.5 (5)Wgcme 0.5 (5)
Wgcme 0.5 (5)
 
Company Brochures
Company BrochuresCompany Brochures
Company Brochures
 
INDCON PRESENTATION LNT.ppt
INDCON PRESENTATION LNT.pptINDCON PRESENTATION LNT.ppt
INDCON PRESENTATION LNT.ppt
 
PQ_SEC _2014
PQ_SEC _2014PQ_SEC _2014
PQ_SEC _2014
 
BROCHURE_SKLP
BROCHURE_SKLPBROCHURE_SKLP
BROCHURE_SKLP
 
Sumber Karya Lestari Pratama (SKLP)
Sumber Karya Lestari Pratama (SKLP)Sumber Karya Lestari Pratama (SKLP)
Sumber Karya Lestari Pratama (SKLP)
 
Chemical Process Equipment and Services By Seven Star Engineers & Fabricators
Chemical Process Equipment and Services By Seven Star Engineers & FabricatorsChemical Process Equipment and Services By Seven Star Engineers & Fabricators
Chemical Process Equipment and Services By Seven Star Engineers & Fabricators
 
NauticalCFD Services Sep_2022.pdf
NauticalCFD Services Sep_2022.pdfNauticalCFD Services Sep_2022.pdf
NauticalCFD Services Sep_2022.pdf
 
my presentation
my presentationmy presentation
my presentation
 
NJ Jackson 6700 Tamper Workhead Catalogue REV F
NJ Jackson 6700 Tamper Workhead Catalogue REV FNJ Jackson 6700 Tamper Workhead Catalogue REV F
NJ Jackson 6700 Tamper Workhead Catalogue REV F
 
RESUME
RESUMERESUME
RESUME
 
Abaapcam Presentation
Abaapcam PresentationAbaapcam Presentation
Abaapcam Presentation
 
rakesh2016
rakesh2016rakesh2016
rakesh2016
 
Briggs Group Presentation
Briggs Group PresentationBriggs Group Presentation
Briggs Group Presentation
 
Briggs Group Presentation
Briggs Group PresentationBriggs Group Presentation
Briggs Group Presentation
 
Briggs Group Presentation
Briggs Group PresentationBriggs Group Presentation
Briggs Group Presentation
 

Kr Offshore PQ Ver.2

  • 1.
  • 2. KR Offshore Inc. 2 KR Offshore Inc. 1. Introduction 2. Company History 3. Company Organization 4. Business cooperation 5. Business Core 6. Project Reference 7. Company License 8. Company Location
  • 3. KR Offshore Inc. 3 Introduction Since the establishment of our business in 1998. KR ENC CO., LTD. has been renowned and top ranked for our expertise in the fields of Salvage / Wreck Removal, Overseas Towing. Marine Transportation. Heavy Weight Cargo Handling. Contaminated Sediment Dredging. Dredging, Offshore & etc. As the world situation changing rapidly . It is inevitable to develop And improve our technical know-how & vessel / equipment to cope with such innovations. And along with our business developments. Our staffs are kept highly trained and skilled in these fields of marine business with vast experience. Furthermore. To ensure the maximum environmental preservation And meet customer’s needs. We will make best endeavor for a prompt react against possible marine accident and to improve marine environment. With promising the best of us, KR Offshore Inc.
  • 4. KR Offshore Inc. 4 Company History 1988 February 12. Established “ THE KOREA SALVAGE CO., Ltd” (Amount of capital fund : USD 220,000) 1999 April 28. Obtained a “business license of marine brokerage” 2009 September 9. Obtained a “business license of contaminated sediment dredging 2009 September 26. Increased capital fund (USD 400,000) 2010 March 3. Officially commended a honest taxpayer by NTS 2011 JUNE 3. Established “ KR ENC CO., Ltd ” as joint venture company with Korea salvage and Kojimagumi 2012 May 1. Established “ KR DREDGING CO, LTD “
  • 5. KR Offshore Inc. 5 Company Organization CEO Management -Accounting -Financing -HR -General Affairs -Detail & Production Design -Comm. Procedure -Operation Manuel -Upgrade/Conversion -Marine & Utility Sys -Drilling System -Purchase -Vessel Management -Safety Control -Technical Department -Local Total Customer Service for Owner & Vendor -Material Supply Service Engineering Commissioning Management Department Total Customer Service HSE Branch -Japan(Tokyo) -Japan(Osaka) QA/QC
  • 6. KR Offshore Inc. 6 Business Core • Resourcing of manpower • Procurement • Offshore support service • Dredging • Insurance Brokerage • Engineering service • Drilling rig tool
  • 7. KR Offshore Inc. 7 Resourcing of manpower KR Offshore goal is to support business success for our customer through quality activities. in relation with the equipment fabrication in the power plant, petrochemical plant and offshore plant. Our value is measured by customer’s success. For this goal KR Offshore maintains quality engineers and technical specialists having a lot of experience. and specialized capability and also continuously trains their ability. Finally we will provide customer satisfaction. KR Offshore will help customer to SAVE - Cost, time and confidence CONTROL - Failure Prevent, quality and schedule IMPROVE - Process, system and Sub contractor HSE Policy SQM pays strict attention to HSE. We promote good safety practice and encourage all employees to participate in safety program. And all employees comply with HSE laws and regulations regarding our works and activities.
  • 8. KR Offshore Inc. 8 Offshore Support Service • FAST CREW SUPPLIER • PLATFORM SUPPLY VESSEL • ANCHOR HANDLING TUG SUPPLIER • SAFETY STANDBY VESSEL • MULTI PURPOSE VESSEL • WELL STIMULATION VESSEL • OFFSHORE CARRIER
  • 9. KR Offshore Inc. 9 Dredging • GRAB DREDGER • DIPPER DREGGER • ANCHOR SHIP AND TUG BOAT • PUMP REDGER • SURVEY SHIP • BARGE
  • 10. KR Offshore Inc. 10 Dredging Vessel List SHIP NAME STANDARD CAPACITY REMARK GRAB DREDGER GIANT 18㎥ 2,200 HP JAPAN HAPPY-G7 6㎥ 535 HP JAPAN HAPPY-G17 13㎥ 1,530 HP JAPAN HAPYY-G18 16㎥ 1,600 HP JAPAN KR18 18㎥ 2,000 HP JAPAN KR20 20㎥ 1,100HP JAPAN KR36 36㎥ 1,650HP JAPAN KR56 56㎥ 2,550HP JAPAN KR200 200㎥ 3,250HP JAPAN DIPPER DREDGER HAPPY-5 5㎥ 630 HP HITACH EX 1100 HAPPY-6 6㎥ 400 HP X 2EA HITACH UH50 UNDERWATER BACKHOE KR-B1 0.5㎥ 180 HP HITACHI ANCHOR SHIP AND TUGBOAT A-1 ANCHOR 750 HP X 1기 JAPAN A-2 ANCHOR 700 HP X 2기 JAPAN A-3 TUGBOAT 425 HP X 2기 KOREA A-5 TUGBOAT 1,500 HP KOREA PUMP REDGER KR-4001 4,000 HP KOREA KR-4002 425 HP AMERICA KR-4002 425 HP AMERICA SURVEY SHIP OFFSHORE EXPO 630 HP Multi-Beam(SeaBat8125) Echo-Sounder(Knudsen) HOLD BARGE AND SPLIT BARGE HAPPY-1 850㎥ BARGE HAPPY-2 850㎥ BARGE HPPAY-SB1 650㎥ Split HAPPY SB1200 1,200㎥ Split HAPPY SB1201 1,000㎥ Split
  • 11. KR Offshore Inc. 11  Elevator  Tong  Rotary slip  Series of Die and insert  NJY-B Torque Sensor  Safety Clamps  Pneumatic Slips  Roller Kelly Bushings  Master Bushings  Master Bushing Accessories  Casing Bushing  Type QQP pneumatic Spiders  Hinged Casing Spiders  Bit Breaker ELEVATOR  DDZ TD  DD(TA) CENTER LATCH  SLIP  CASING  Y-SLIP  SUCKER ROD ELEVA  SP AUXILIARY  CDZ SERIES DRILL PIPE  CD SERIES SIDE DOOR TONG  B MANUAL  SB MANUAL  AAX MANUAL  C MANUAL  WWB MANUAL  WWC MANUAL  CASING  DB MANUAL  SDD MANUAL  LF MANUAL  WELL SERVICING ROTARY SLIPS  FLAKE  SD  DCS DRILL COLLAR  CMS CASING SLIPS  CASING SLIPS Drilling Rig tool
  • 12. KR Offshore Inc. 12 [FIT-UP] [PAINTING][WELDING] [Pressure Vessel] [Power Plant Package] Auto Welding Products
  • 13. KR Offshore Inc. 13 Advantage of Automatic Welding - Saving of 20 ~ 30% production time  Edge preparation by machining – Faster and accurate  Fit-up by dedicated special purpose machine – Less tolerance  FC/SA Welding on Fill pass & Cap pass welding – Higher production HigherPerformance in production - Approx. 20~30% labor reduction Less direct / indirect cost for the labor Less number of Labors - Approx. 10~20% cost reduction  Less cost per Dia_Inch than manual welding production  Minimized labor with productivity increased Less cost for production - Less welding defect rate  Improved production quality by standardization of weld preparation by mechanization  Guaranteed consistency in welding quality Improved welding quality
  • 14. KR Offshore Inc. 14 SMAW Process Deposition Rate (g/min) Arc Rate (%) Efficiency SMAW 30 20 1 S.A. FCAW 60 25 2.5 S.A. FCAW 1GR 60 35 3.5 Auto FCAW 70 50 5.8 SAW 120 50 10 S.A. FCAW Auto FCAW SAW Comparison of Fill&Cap Pass Welding
  • 15. KR Offshore Inc. 15 Process Edge Preparation Fit-up Root Welding Main Welding Conventional Process Grinding Manual Jig GTAW Welding SMAW Welding Auto Welding Process Beveling Internal or External Clamp GTAW or GMAW Welding FCAW Welding Photo Advantages  Easy Fit-up  Improvement Welding Quality  Reduction of Fit-up Time  Improvement Welding Quality  Higher Welding Productivity & Quality  Higher Welding Productivity & Quality NonSkilledWelder Comparison of Welding Process
  • 16. KR Offshore Inc. 16 Ditching (Rock) Padding Ditch Bottom Stringing Bending Beveling Line-up (Fit-up) GT/GMAW (Hot Pass) FCAW (Fill & Cap) NDT & Repair of Welding Coating Inspection & Repair of Coating Laying Padding Hydrostatic Testing Clean-Up & Landscaping Welding Cabin Working Procedure – Pipe line
  • 17. KR Offshore Inc. 17 Working Procedure – Pipe line
  • 18. KR Offshore Inc. 18 Project Reference P R O J E C T YEAR OF BUILT Customer EXXON MOBIL OIL PIPE SPOOL (EASTAREA) TOTAL PIPE SPOOL 2009 Samsung Heavy Industries Philippine NAGA Power plant 2010 SHILOH International POSCO Power INI ISM Power Plant External Piping 2011 POSCO EMAL Phase II CCPP External Piping #32, #41, #51, #52 2012 SAMSUNG C&T SAUDI ARMCO 2013 ARAMCO [Power Generation] [Pipe Rack] [Seawater Treatment] [Oil Separation]
  • 19. KR Offshore Inc. 19 Photos of Construction Site
  • 21. KR Offshore Inc. 21 Certificate of Authority to use the Official API Monogram License Numbers 7k-0146 API License
  • 22. KR Offshore Inc. 22 Houston Office / Ware House #4611 N. Sam Houston Pkwy East Houston, TX 77032 U.S.A T. +1-713-574-7642 F. +1-713-993-7752 International Location Seoul Office #232, Daeryung Post tower 6-cha, Gasan Dong, Geumcheon Gu, Seoul, South Korea Tel: +82-2-2083-5777 Fax: +82-2-2083-5779 Busan Office #301, Marine Officers’ Bldg., 1212-7, Choryang Dong,Dong gu, Busan, South Korea Tel: +82-51-441-0801~3 Fax: +82-51-441-9786